Text version
STATEMENT OF WORK
FOR
BLANKET PURCHASE AGREEMENT (BPA)
INSPECTION & REPAIR SERVICES OF
MATERIAL HANDLING EQUIPMENT (MHE)
1. DESCRIPTION OF SERVICES. The contractor shall provide all management, tools, specialized equipment, supplies, and labor necessary to perform preventative maintenance inspections, servicing and repairs of Material Handling Equipment (MHE) units provided to the contractor under an authorized call. All of the work shall be performed on Hurlburt Field. The services requested may include any of the following; inspection, troubleshooting, tear-down, providing quotes, preventative maintenance inspection (PMI), minor maintenance, major maintenance, software loading, and operational checks, to repair the vehicle to OEM specification.
2.0. PERFORMANCE
2.1. The contractor shall provide all parts, equipment, tools and associated labor necessary to return the MHE unit to a 100% fully functional state in accordance with the manufactures’ technical specifications.
2.1.1. The maximum amount of hours for the required troubleshooting, repair and/or PMI shall be agreed upon between the Government and contractor upon receipt of the authorized call and noted in the call register. If the numbers of hours for this procedure are to be exceeded, the contractor shall contact the authorized caller and increase the number through mutual agreement and the changes shall be recorded by the contractor in a revised quote, as well as the Government in the call register.
2.1.1.1. Quotes for any call shall be provided to the Government in writing within 3 days of the authorized call. The contractor may view the MHE identified in any call after being notified of a potential call by an authorized caller in writing (e-mail is acceptable). The Government shall coordinate with the contractor after a potential call is made to arrange for a mutually agreed time when the MHE may be inspected if an inspection is requested by the contractor. Authorized calls for PMI servicing or other simple services may not require a contractor inspection of the MHE and may be coordinated in writing and finalized as an authorized call without an inspection or site visit by the contractor.
2.1.2. The contractor shall provide the authorized caller a quote citing the following:
| - Call Number (provided by the authorized caller), Call Date. Authorized Caller name |
| - Total amount of hours to be invoiced for the troubleshooting, repair or PMI. |
| - Estimated number of hours to complete the inspection/repair at the labor rate in the Approved Price List. |
| - Listing of any individual part or components used for repairs. |
| - For parts over $3,500.00, three quotes to prove best price is provided to the Govt. |
| - Breakout of any other fees not covered under labor or materials |
| - Date when repairs are estimated to be completed. |
2.1.3. The contractor shall perform preventative maintenance inspection (PMI) at intervals cited in the manufacturers’ technical specifications. Schedules for PMIs shall be coordinated in advance yearly, within 14 days after the contractor receives the listing of MHE to be included in the PMI schedule, or upon addition of subsequent MHE equipment requested to be maintained via PMIs as requested by the authorized caller in writing.
2.1.3.1. After the schedule is submitted to the Government by the contractor for PMIs by MHE unit and month of PMI, the Authorized Caller shall make a call or calls based on available funding and availability of the MHE unit.
2.1.3.1. If MHE units are not listed under an authorized call within the month of their scheduled PMI, the Government retains the option to skip a PMI or move the PMI to another time. The contractor is not responsible for providing an updated schedule due to a Government delay in making an authorized call.
2.1.4. The contractor shall perform troubleshooting to isolate unit malfunctions and determine required repairs.
2.1.5. The contractor shall perform equipment/vehicle tear-down to minimum extent necessary to isolate unit malfunctions or perform required repairs
2.1.6. The contractor shall clear all alarms and MHE unit fault codes.
2.1.7. The contractor shall provide and install new approved parts and shall repair the units IAW the manufacturers’ technical specifications.
2.1.8. The contractor shall perform required minor/major maintenance to return the unit to full function.
2.1.9. The contractor shall perform touch-up painting services only as required to prevent or identified corrosion.
2.1.10. The contractor shall perform computer/electrical coding as required to return the unit to full function or as required by the OEM to fix a software deficiency.
2.1.11. The contractor shall, in strict accordance with manufacturers’ technical data and approved procedures, perform an operators check to determine if the MHE unit is functioning IAW manufactures’ specifications prior to closing out the call.
3.0. QUALITY ASSURANCE
3.1. The contractor shall ensure only authorized, trained technicians perform work on the MHE to be serviced.
3.2. The contractor shall perform operational checks IAW OEM specifications prior to invoicing. The contractor shall ensure MHE unit performs to manufacture specifications.
4.0. GENERAL INFORMATION.
4.1.2. Contractor Personnel. The contractor must validate that the employees assigned to this requirement are certified to work on and possess the required experience to work on the vehicles/equipment listed in the GFP attachment.
4.1.3. Contract Manager. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate or alternates, who shall act for the contractor when the manager is absent, shall be designated in writing to the contracting officer prior to the contract start date.
4.1.4. Service Location. All of the work shall be performed on Hurlburt Field either at 514 Hamby Place, Hurlburt Field, FL 32544, or other locations on Hurlburt Field as listed in the Equipment Inventory List.
4.1.5. Federal Holidays. The following is a list of federal holidays observed by this installation. Vehicle/Equipment pick-up or deliveries should not be coordinated on these dates unless coordinated with the authorized caller in advance.
| New Year's Day, January 1 or the Friday preceding or Monday following |
| Martin Luther King's Birthday, 3rd Monday in January |
| President's Day, 3rd Monday in February |
| Memorial Day, last Monday in May |
| Juneteenth, June 19 or the Friday preceding or Monday following |
| Independence Day, July 4 or the Friday preceding or Monday following |
| Labor Day, first Monday in September |
| Columbus Day, 2nd Monday in October |
| Veterans Day, November 11 or the Friday preceding or Monday following |
| Thanksgiving Day, 4th Thursday in November |
| Christmas Day, December 25 or the Friday preceding or Monday following |
4.1.6. Contractor/Employee Base Pass and Identification, Special Clearances, and Vehicle Passes.
4.1.7. The contractor shall obtain base identification and vehicle passes, if required for access to the base, for all contractor personnel who are anticipated to make visits to or perform work on Hurlburt Field. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished contractor identification badges while visiting or performing work on the installation.
4.1.8. The contractor shall be required to complete the following forms (to be provided at the pre-performance conference) in order for employees to gain access to the installation:
a. Contractor Employee Listing
b. Hurlburt Field Contractor Access Badge Affidavit (CAB)
c. Department of Homeland Security Form I-9 (DHS I-9)
4.1.9. The Contractor Employee List. This form shall list every employee requiring access. Every time employees change, it shall be updated to reflect additions and/or deletions. Identify those individuals who require escort authority by including the word “escort” next to their names. Limit the number of individuals designated as escorts to a reasonable number (i.e. one or two). The Contracting Officer will then prepare and attach a cover letter, and forward the Employee List to the Visitor Control Center.
4.1.10. Upon notification that the Employee List has been forwarded to the Visitor Control Center, the other two forms (DHS I-9 & CAB) shall be completed and hand carried to the Visitor Control Center by the employee. If everything is in order, they will receive a contractor badge. If an employee will be driving on Hurlburt Field they are required to provide a valid driver’s license, vehicle registration, and proof of insurance. NOTE: The section of the Visitor Control Center administrating this function is closed after 1400 (2:00 p.m.), therefore, employees must arrive prior to this time in order for their documentation to be processed.
4.1.11. Upon completion or termination of the contract or expiration of the identification passes, the contractor shall ensure that all base identification passes issued to employees are returned to the issuing office.
Attachment 1
Government Equipment Inventory List
| Type of Equipment |
| Make |
| Model |
| Serial # |
| Bldg # / Location |
| Electric Rider/Reach Truck (FL) |
| Raymond, Stand Up Fork Lift |
| ET-ACT-R30TT-U270 |
| ET-13-FF-2157 |
| 90639 / 2nd Flr |
| Electric Rider/Reach Truck (FL) |
| Raymond, Stand Up Fork Lift |
| ET-ACT-R30TT-U270 |
| ET-13-FF-2158 |
| 90639 / 1st Flr |
| Electric Rider/Reach Truck (FL) |
| Raymond, Stand Up Fork Lift |
| ET-ACT-R30TT-U270 |
| ET-13-FF-2159 |
| 90639 / 1st Flr |
| Electric Rider/Reach Truck (FL) |
| Raymond, Stand Up Fork Lift |
| EASIR30TT |
| ET-E-04-12936 |
| 90802 / west side |
| Electric Walk Behind Forklist (FL) |
| Raymond, Stand Up Fork Lift |
| RRS30 |
| RRS30-05001288 |
| 90802 / west side |
| 10K 463L Pallet Jack |
| BPR Rico |
| PWH-100 |
| R-14334 |
| 90710 / south end |
| 10K 463L Pallet Jack |
| BPR Rico |
| PWH-100 |
| R-14335 |
| 90710 / south end |
| Electric Ride-on 4K Forklift (sit down) |
| Raymond |
| DSD-C40TT |
| S40R20052 |
| 90710 / south end |
| Electric Ride-on 4K Forklift (sit down) |
| Raymond |
| DSD-C40TT |
| S40R40055 |
| 90802 / west side |
| Electric Ride-on 4K Forklift (sit down) |
| Raymond |
| DSD-C40TT |
| S40R20055 |
| 91258 |
| Electric Order Picker |
| Raymond, Picker |
| 520-OPC-30TT |
| 520-13-03423 |
| 90639 / 2nd Flr |
| Electric Order Picker |
| Raymond, Picker |
| 520-OPC-30TT |
| 520-13-03424 |
| 90639 / 3rd Flr |
| Electric Order Picker |
| Raymond, Picker |
| 520-OPC-30TT |
| 520-13-03425 |
| 90639 / 3rd Flr |
| Electric pallet Jack (Long Boy) |
| Raymond |
| 112TM-FRE80L |
| 112-03-45069 |
| 90710 / south end |
| Electric pallet Jack (Long Boy) |
| Raymond |
| 112TM-FRE80L |
| 112-05-56232 |
| 90710 / south end |
| WAVE Manlift |
| Crown |
| WAV50-118 |
| 9A194830 |
| 90639 / 2nd Flr |
| WAVE Manlift |
| Crown |
| WAV50-118 |
| 9A194831 |
| 91258 |
| WAVE Manlift |
| Crown |
| WAV50-118 |
| 9A194957 |
| 90639 / 2nd Flr |
| Walk Behind Forklift |
| Big Joe |
| PDC-30 158TR |
| 4486159 |
| 90639 / 3rd Flr |