Maryland 26-NT-3107 Approved Lake Elkhorn Construction Plans.pdf

PDF 8 MB Posted

Attached to
Lake Elkhorn East Inlet Boardwalk Replacement
Solicitation number
146623
Issued by
Howard County, Maryland

About this file

This is a construction plan approval document for the Lake Elkhorn East Inlet Boardwalk Replacement project involving the Columbia Association in Maryland. The project encompasses the replacement of the boardwalk at Lake Elkhorn's east inlet, with construction anticipated to occur from January 4, 2027 through April 2, 2027, subject to adjustment based on contract execution and issuance of the Notice to Proceed. A critical constraint on the project is that all in-stream work must be completed by February 28, 2027, as the Little Patuxent River stream tributary feeding Lake Elkhorn is classified by the State of Maryland as Nontidal Stream Use Class IV Recreational Trout Waters, and the Maryland Department of the Environment imposes Time-of-Year-Restrictions on construction projects affecting aquatic habitats in the tributary from March 1 through May 31.

The approved construction plans document serves as the detailed technical specifications and design requirements for contractors bidding on or executing the boardwalk replacement project. No specific pricing, set-asides, or funding source information is detailed in this plan approval document; however, the document confirms that the project has received the necessary approvals and establishes the environmental compliance framework under which all construction activities must be performed.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LAKE ELKHORN BOARDWALK

WIDENING & BOAT RAMP EXTENSION

HOWARD COUNTY, MARYLAND

MAY 2026

CALL

BEFORE YOU DIG

M I SS UT

I

L I

T Y

BEFORE YOU DIG CALL

1-800-257-7777 OR DIAL 811

BOAT RAMP

BOARDWALK

COLUMBIA ASSOCIATION

LAKE ELKHORN BOARDWALK WIDENING & BOAT RAMP EXTENSION

COVER SHEET

Debra Correia Approved

Debra Correia Approved

COLUMBIA ASSOCIATION

LAKE ELKHORN BOARDWALK WIDENING & BOAT RAMP EXTENSION

EXISTING CONDITIONS AND DEMOLITION

2025 SURVEY EXTENT

SHEET 5

SHEET 4

COLUMBIA ASSOCIATION

KEY SHEET AND CONSTRUCTION ACCESS

BOARDWALK SITE PLAN

S U

R V

E Y

E X

TE

N

T

COLUMBIA ASSOCIATION

BOAT RAMP SITE PLAN

CROSS-SECTIONS