Marshall resurfacing Scope of Work~3.docx
DOCX document 53 KB Posted
- Attached to
- DNR Levee Resurfacing at Marshall SFWA - W76D
- Solicitation number
- 23-422DNR-RESCO-B-37457
- Issued by
- Mason County, Chicago City, Illinois
About this file
This document is a Scope of Work for a small purchase procurement by the Illinois Department of Natural Resources to construct an aggregate driving surface on the Atchison Levee at the Marshall State Fish & Wildlife Area. The project involves clearing and grubbing the top width of the levee, placing a 6-inch base layer of CA2 aggregate, and a 4-inch driving surface layer of CA6 aggregate over a 2,000-foot length. The minimum quantities required are 640 tons of CA2 and 480 tons of CA6. All work must be completed by September 1, 2023. Bids may be submitted through the BidBuy system, with a bid submittal deadline specified in the solicitation. The contract will be awarded to the lowest responsive and responsible bidder. The project is funded in whole or in part by federal grants and is subject to various federal regulations and requirements.
The contract requires the selected contractor to have 3 years of relevant experience and to perform a minimum of 51% of the work themselves. Prevailing wage rates apply, and certified payroll records must be submitted. There are no small business set-aside requirements, but the state charges a $15 fee for the Minority Contractor Opportunity Initiative. The contractor is responsible for securing all necessary permits and licenses, and must provide appropriate insurance coverage.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Marshall resurfacing _Project Location Maps.pdf | ||
| standard terms and conditions 2~6.pdf | ||
| Standard Certifications V23.1~80.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ILLINOIS DEPARTMENT OF NATURAL RESOURCES
SMALL PURCHASE PROCUREMENT
SCOPE OF WORK & PROJECT REQUIREMENTS
Date: April 19, 2023 File# 1-23-047
LOCATION: Marshall State Fish & Wildlife Area – Atchison Waterfowl Refuge
PROJECT TITLE: Construct Aggregate Driving Surface on Atchison Levee
PROJECT NARRATIVE:
The Atchison Waterfowl Refuge is part of the Marshall State Fish & Wildlife Area and located along the east side of the Illinois River north of Chillicothe. It was formed by constructing a levee to impound natural seep water for use as a waterfowl rest area. The levee used borrowed sediments adjacent to the levee for the construction effort. Rehabilitation efforts, which included riprap armoring, was completed in 2020. This effort shall provide for an aggregate driving surface that allows for better access to the water control structure.
SCOPE OF WORK:
The contractor shall construct a 2,000-foot-long by 10-foot-wide aggregate driving surface on the Atchison Refuge levee. The earthen levee currently has a top width that varies between ten feet (10’) and twelve feet (12’) wide. The aggregate surface shall commence at the spillway terminus and continue to approximately thirty-feet beyond the water control structure, including the small turn-around area.
The Contractor shall undertake the following:
1. Clear and Grub top width vegetation and sod to a depth of 3-4” along length of improvements, including turnaround area. Remove and dispose of material offsite.
2. Provide, deliver & place a six-inch (6”) thick layer (final thickness) of CA2 aggregate as a base. Tailgate spreading is an acceptable method of placement. Minimum quantity to be provided is 640 tons. Any additional tonnage required to provide the specified length, width, and depth of material is incidental to the Contract.
3. Provide, deliver & place a four-inch (4”) thick (final) layer of CA6 aggregate as a driving surface per Paragraph 402.07 of the IDOT Standard Specifications for Road and Bridge Construction, 2022 edition. Minimum quantity to be provided is 480 tons. Any additional tonnage required to provide the specified length, width, and depth of material is incidental to the Contract.
4. Initial aggregate compaction may be attained via repeated tandem truck travel evenly dispersed along full width and length of improvement. Complete final shaping and trimming of surface with a center crown to promote positive drainage, and final compact with a small smooth-drum roller to the satisfaction of DNR.
5. Work shall be completed at a time of low river levels and dry conditions to minimize potential for levee saturation and pumping of groundwater due to repeated loaded truck traffic.
ATTACHMENTS:
The following documents are included:
1) Aerial Photos identifying project location
MATERIAL SPECIFICATIONS & REQUIREMENTS:
A. Coarse Aggregate:
All specified materials shall be purchased at an IDOT approved material supplier and in accordance with the IDOT Specifications. Coarse aggregate shall be angular and classified as Crushed Stone or Crushed Gravel in accordance with Section 1004.01 of the IDOT Standard Specifications for Road and Bridge Construction, adopted January 1, 2022.
1) Coarse Aggregate (Base): Minimum Amount Required: 640 tons. All material shall be Gradation CA2, Quality A.
2) Coarse Aggregate (Surface): Minimum Amount Required: 480 tons. All material shall be Gradation CA6, Quality A.
| A. | Project Specifications: |
| 1) | The awarded contractor must have 3 years of experience in the commercial earth moving, heavy equipment or aggregate placement industry and be able to provide documentation of completion of at least 5 projects similar in size and scope to this one. |
| B. | Project Instructions and Notes: |
| 1) | Work Completed by Prime Contractor: A minimum of fifty-one percent of the work shall be completed by the Prime Contractor on this project. Pursuant to (30 ILCS 500/1-15.17) the Contractor is the person having a contract with the Illinois Department of Natural Resources. |
2) Coordination of Work Activities:
All work activities and entry to the site must be coordinated with the site superintendent.
3) Contractor’s Licensing and/or Certifications:
Contractor shall be responsible for compliance with all applicable contractor and trades person licensing with the appropriate State agency.
4) Federal Assistance Provisions and Assurances:
This project is wholly or partially funded by the federal government and is subject to all federal laws and regulations pertaining to federally assisted construction projects. As such, these special provisions hereinafter amended are expressly incorporated by reference into the Contract and all rights, duties and liabilities set forth therein shall be deemed to specifically apply to the Contractor and his employees. In the event of a conflict caused by these provisions, the more restrictive requirements will govern.
A. INSPECTION AND AUDIT. The authorized representatives of the Federal Government and the State of Illinois shall be permitted to inspect all work, material, payrolls, personnel records, invoices for materials and other data and records relevant to the Contract.
| B. | Whereas Federal grants-in-aid funds have been granted for execution of this contract, the Contractor hereby assures and certifies that he will comply with applicable regulations, policies, guidelines, and requirements of Office of Management and Budget Circular A-102: Uniform Administrative Requirements for Grants-in-Aid to State and Local Government. Also, the Contractor gives assurance and certifies with respect to the Federal grant that: | ||
| 1. | He and all Subcontractors will comply with all applicable standards, orders, or requirements issued under section 306 of the Clean Air Act 42 U.S.C. 1857 (h), section 508 of the Clean Air Act (33 U.S.C. 1368), Executive Order 11738, and Environmental Protection Agency regulations (40 CFR Part 15), and Executive Order 11738 implementing provisions of the Clean Air Act (P.O. 91-604) and the Federal Water Pollution Control Act (P.L. 92-500). |
| 2. | He and all Subcontractors will comply with the Copeland Anti-Kick Back Act |
| (18 U.S.C. 874) as supplemented in Department of Labor regulations (29 CFR Part 3). |
3. He and all Subcontractors awarded subcontracts for construction having a value of more than $10,000 will comply with Executive Order 11246, entitled Equal Employment Opportunity as amended by Executive Order 11375, and as supplemented in Department of Labor regulations (41 CFR Part 60).
4. He and all Subcontractors awarded subcontracts which involve employment of mechanics or laborers in excess of $2,500 or subcontracts for construction in excess of $2,000, will comply with Sections 103 and 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C. 327-330) as supplemented by Department of Labor regulations (29 CRF Part 5).
5. He and all subcontractors, materialmen, and suppliers agree that only domestic construction material will be used, in the performance of this contract, except for foreign construction materials, if any, listed in this contract, as provided by the Buy American Act (41 U.S.C 10). The Buy American Act provides that the Government give preference to domestic construction material defined as components, construction material and domestic construction material.
a. Components, as used in this clause, means those articles, materials, and supplies incorporated directly into construction materials.
b. Construction material, as used in this clause, means an article, material, and supply brought to the construction site for incorporation into the building or work. Construction material also includes an item brought to the site pre-assembled from articles, materials and supplies.
However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, which are discrete systems incorporated into a public building or work and which are produced as a complete system, shall be evaluated as a single and distinct construction material regardless of when or how the individual parts or components of such systems are delivered to the construction site.
| c. | Domestic construction material, as used in this clause, means: |
| (i) an unmanufactured construction material mined or produced in the | |
| United States, or (ii) a construction material manufactured in the United |
States, if the cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind as the construction materials determined to be unavailable pursuant to 12.810(a)(3) of 43 CFR part 12, subpart E shall be treated as domestic.
| C. | Section 10 of the River and Harbor Act of 1899 |
| D. | Copeland Anti-Kick Back Act; 18 USC 874 as supplemented in the Department of Labor Regulations, (29 CFR Part 3) |
| E. | The Civil Rights Act of 1964, Title VI (nondiscrimination of federally assisted programs), P.L. 88-352, as amended; as well as 43 CFR 17, and Part 506 of the Department of the Interior Manual |
| F. | The Anadromous Fish Conservation Act of 1965, P.L. 89-304 as amended |
| G. | Land and Water Conservation Fund Act of 1965, P.L. 88-578, as amended |
| H. | National Historic Preservation Act of 1966 (P.L. 89-665) |
| I. | Department of Transportation Act of 1966, Section 4 (f) (P.L. 89-670) as amended |
| J. | Architectural Barriers (denying use by the physically handicapped) Act of 1968, P.L. 90-480, as amended |
| K. | National Environmental Policy Act of 1969 (P.L. 91-190) as amended |
| L. | Occupational Safety and Health Act of 1970 (P.L. 91-596) |
| M. | Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 (P.L. 91-646) |
| N. | Section 401 of the Federal Water Pollution Control Act (P.L. 92-500) |
| O. | Section 402 (Other Pollutants) and 405 (Sewage Sludge) of the Federal Water Pollution Control Act (P.L. 92-500) |
| P. | Section 404 of the Federal Water Pollution Control Act (P.L. 92-500) |
| Q. | Federal Environmental Pesticide Control Act of 1972 (P.L. 92-516) |
| R. | Endangered Species Act of 1973 (P.L. 93-205) |
| S. | Flood Disaster Protection Act of 1973 (P.L. 93-234) |
| T. | Archaeological and Historic Preservation Act of 1974 (P.L. 93-291) |
| U. | Hatch Act Amendments of 1974, 5 CFR 151, 5 USC 1501 et. seq. |
| V. | Contract Compliance for Equal Employment Opportunity Executive Orders 11246, 11375 and Department of Labor Regulations 41 CFR 60 |
| W. | Executive Order 11296 of August 10, 1966; Evaluation of Flood Hazard in Locating Federally Owned or Financed Buildings, Roads and Other Facilities; also see 24 CFR 1909-15 |
| X. | Executive Order 11644 of February 8, 1972; Use of Off-Road Vehicles on Public Lands |
| Y. | Executive Order 11738 of September 10, 1974; Administration of the Clean Air Act and the Federal Water Pollution Control Act with Respect to Federal Contracts, Grants, or Loans |
| Z. | OMB Circular A-21; Principles for Determining Costs Applicable to Research and Development under Grants and Contracts with Educational Institutions |
| AA. | OMB Circular A-84; Reporting of Federal Outlays by Geographic Location |
| BB. | OMB Circular A-87; Cost Principles Applicable to Grants and Contracts with State and Local Governments |
| CC. | OMB Circular A-102; Uniform Administrative Requirements for Grants-In-Aid to State and Local Governments |
| DD. | Buy American Act (41 U.S.C 10) |
| C. | Project Requirements: |
| 1) | Project Meeting |
| PROJECT MEETING TO BE HELD: YES |_| NO |X| | |
| MANDATORY ATTENDANCE: YES |_| NO |X| |
| 2) | Duration |
| Bids shall be good for ninety (90) calendar days after the submittal date. |
| 3) | Prevailing Wage Rates |
| This contract [or agreement] calls for the construction of a “public work,” within the meaning of | |
| the Illinois Prevailing Wage Act, 820 ILCS 130/.01 et seq. (“the Act”). The Act requires | |
| contractors and subcontractors to pay laborers, workers and mechanics performing services on | |
| public works projects no less than the current “prevailing rate of wages” (hourly cash wages | |
| plus, amount for fringe benefits) in the county where the work is performed. The Illinois | |
| Department of Labor (IDOL) publishes the prevailing wage rates on its website at | |
| http://labor.illinois.gov/. IDOL revises the prevailing wage rates and the | |
| contractor/subcontractor has an obligation to check the IDOL’s web site for revisions to | |
| prevailing wage rates. For information regarding current prevailing wage rates, please refer to | |
| IDOL’s website. All contractors and subcontractors rendering services under this contract must | |
| comply with all requirements of the Act, including but not limited to, all wage requirements and | |
| notice and record keeping duties. |
| 4) | Certified Payroll |
| State law 820 ILCS 130/5 requires all contractors and sub-contractors working on state | |
| construction projects to submit certified payroll records to the Department of Natural | |
| Resources. The payroll records must include all workers employed by contractors on the | |
| project. |
In accordance with 820 ILCS 130/5, the contractor and sub-contractor(s) shall make and keep, for a period of 5 years from the date of the last payment made on or after January 1, 2014 (the effective date of Public Act 98-328) on a contract or subcontract for public works, records of all laborers, mechanics, and other workers employed by them on the project.
No later than the 15th day of each calendar month, the contractor shall file a certified payroll for the immediately preceding month with the Department of Natural Resources.
5) Employment of Public Workers on Public Works:
In a period of excessive unemployment rates, State contractors (1) constructing or building any public works or (2) cleaning-up and disposing on-site of hazardous waste, and that clean-up or on-site disposal is funded or financed in whole or in part with State funds or funds administered by the State, are required to employ at least 90% Illinois laborers on such project. For projects involving clean-up and on-site disposal of hazardous waste, emergency response or immediate removal activities are excluded. This requirement applies to all labor whether skilled, semi-skilled or unskilled, whether manual or non- manual.
A period of excessive unemployment rates is defined as any month immediately following two consecutive calendar months during which the level of unemployment in the State of Illinois has exceeded 5% as measured by the United States Bureau of Labor Statistics in its monthly publication of employment and unemployment figures.
Any public works project financed in whole or in part by federal funds administered by the State of Illinois is covered under the provisions of this requirement, to the extent permitted by any applicable federal law or regulation. 30 ILCS 570.
Contractors may receive an exception from this requirement by submitting a request and supporting documents certifying that Illinois laborers are either not available or are incapable of performing the particular type of work involved. The certification must: (a) be submitted to the agency within the first quarter of the Contract Term; (b) provide sufficient support that demonstrates the exception is met; (c) be signed by an authorized signatory of the contractor; and (d) be approved by the agency.
6) Small Business Set-Aside N/A
7) Apprenticeship-in-Training When applicable, the contractor and all subcontractors must be participants in apprenticeship and training programs that are both approved by and registered with the U.S. Department of Labor’s Bureau of Apprenticeship and Training. The program(s) must be in the same trade(s) in which the contractor or subcontractor performs work. For information on how to participate in or set up a program, contractors may call the U.S. Department of Labor at 312/596-5508 or visit their website http://www.doleta.gov/oa/ .
8) Illinois Office The bidder must certify that the bidder will maintain an Illinois office as the primary place of employment for persons employed in the construction authorized by the contract.
| 9) | Subcontractors |
| The Contractor shall identify the names of all subcontractors to be utilized by them in the | |
| performance of this contract, together with the anticipated amount of money that each | |
| subcontractor is expected to receive pursuant to this contract. Pursuant to Illinois Procurement | |
| Code (30 ILCS 500/1-15-108), a person or entity is not a “subcontractor” if that person only | |
| Provides goods or supplies that are incidental to the performance of a contract by a person | |
| who has a contract subject to the Code. |
| 10) | Insurance |
| Contractor shall, at all times during the term of this contract and any renewals or extensions, maintain and provide a Certificate of Insurance naming the State as an additionally insured for all required bonds and insurance. Certificates may not be modified or canceled until at least thirty (30) days’ notice has been provided to the State. Contractor shall provide: (a) General Commercial Liability insurance in the amount of $1,000,000 per occurrence (Combined Single Limit Bodily Injury and Property Damage) and $2,000,000 Annual Aggregate; (b) Auto Liability, including Hired Auto and Non-owned Auto (Combined Single Limit Bodily Injury and Property Damage), in amount of $1,000,000 per occurrence; and (c) Worker’s Compensation Insurance in the amount required by law. Insurance shall not limit Contractor’s obligation to indemnify, defend, or settle any claims. |
11) Performance Bond/Labor and Material Payment Bond Pursuant to the Public Construction Bond Act (30 ILCS 550/), a performance bond and a labor and material payment bond covering the faithful performance of the contract and the payment of all obligations arising thereunder, shall be required if the project cost exceeds $50,000. Each bond shall be in the full amount of the contract. The bond must be from a surety licensed to do business within the State of Illinois and acceptable to IDNR.
12) Minority Contractor Opportunity Initiative The State requires a fee of $15 to cover Expenses related to the administration of the Minority Contractor Opportunity Initiative. Any Vendor awarded a contract under Section 20-10, 20-15, 20-25 or 20-30 of the Illinois Procurement Code (30 ILCS 500) of $1000 or more is required to pay a fee of $15. The Comptroller shall deduct the fee from the first check issued to the Vendor under the contract and deposit the fee in the Comptroller’s Administrative Fund.
13) Permits and Licenses Permits and licenses necessary for the execution of the work shall be secured and paid for by the Contractor.
14) Utilities Before starting excavation, establish location and extent of underground utilities occurring in the work area. Contractor shall contact Joint Utility Locating Information for Excavators (J.U.L.I.E.) 800-892-0123.
15) Highway Permits The Contractor is responsible for contacting the appropriate County Superintendent(s) of Highways and/or other appropriate local officials concerning the proposed work activities on the project as they may relate to use of the County and local road system. Coordination of any activities of concern to the County or Township shall be the responsibility of the Contractor. Special attention shall be given to load limits and seasonal restrictions.
16) New Products Unless otherwise specifically provided in the contract documents, all materials, equipment and products incorporated in the work under the contract shall be new and of a suitable grade for the purpose intended.
| 17) | Steel Products |
| Any steel product(s) used or supplied in the performance of this contract shall be manufactured or produced in the United States, in accordance with the Steel Products Procurement Act, unless a waiver is granted by IDNR (30 ILCS 565/). |
18) Specified Materials Bids shall be based on providing all products/materials exactly as required by the project specifications. Contractor may select from the list of acceptable manufacturers, offer an “equal” product and provide proof of its capabilities to meet the project specifications or, for products specified only by reference or performance standards, select any product which meets or exceeds the specified standards, by any manufacturer, subject to the approval of DNR.
19) Final Cleaning Contractor shall clean-up all work related debris and construction materials and properly dispose off-site. The Contractor shall repair and otherwise make good any damage caused by the work and leave the premises in the equivalent of the original condition.
20) Warranties The Contractor warrants that all work provided under the contract will be in conformance with the contract and free from defects in workmanship, materials, and equipment for a period of one year from the goods acceptance date.
21) Change Orders Change order shall be defined as a change in a contract term, other than as specifically provided for in the contract, which authorizes or necessitates any increase or decrease in the cost of the contract or the time for completion. A change order shall be executed by the State agency and vendor evidencing the change. All changes shall be approved by the CPO, or designee, and be accompanied by a written determination that the circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed and the change is germane to the original contract as signed. Change orders that increase or decrease the cost of a contract or an estimated contract by a total of $25,000 or more or the time of completion by more than 180 days shall be published on the Illinois Procurement Bulletin, pursuant to Section 15-25 of the Code and documented pursuant to Section 33E-9 of the Criminal Code of 2012, in advance of execution of the change order.
22) Inducement Resolution All or a portion of this project may be paid or reimbursed from the proceeds of tax-exempt bonds subsequently issued by the State.
23) Payment Payments, including late payment charges, will be paid in accord with the State Prompt Payment Act and rules when applicable, 30 ILCS 540/; 74 III. Adm. Code 900. This shall be the Contractor’s sole remedy for late payments by the State. Payment terms contained in Contractor’s invoice(s) shall have no force or effect.
| 24) | Contract Award |
| Contract award will be made to the lowest, responsible, responsive bidder. The Department of Natural Resources reserves the right to reject any or all bids. |
| 25) | Term of Contract |
| All work shall be completed by September 1, 2023. |
26) Bid Submittal Bids may be submitted on BidBuy.
| 27) | Bid Submittal Date and Time |
| Refer to the BIDBUY solicitation for the bid date and time. |
28) Questions
ALL QUESTIONS PERTAINING TO THE SCOPE OF WORK OR THE BIDBUY PROCEDURES, MUST
BE DIRECTED TO nicole.bergee@Illinois.gov ALL QUESTIONS MUST BE SUBMITTED IN WRITING NO LATER THAN THREE (3) BUSINESS DAYS BEFORE THE BID DATE.
29) Project Contacts: The following individuals are listed as project contacts during the construction phase. The Bidder may not communicate directly with any of these individuals during the bidding process. All communication during the bidding phase must be directed to the nicole.bergee@Illinois.gov email address.
| Project Architect/Engineer: | |||||
| Arthur Neal | |||||
| Illinois Department of Natural Resources | |||||
| Division of Architecture & Engineering | One Natural Resources Way | Springfield, IL 62702 | |||
| Phone: 217-782-4948 | |||||
| E-mail: arthur.neal@illinois.gov |
| Site Superintendent: | ||
| JD Russell | ||
| Illinois Department of Natural Resources |
Marshall & Woodford SFWA 236 Route 26 Lacon, IL 61540 Ph: 309-246-8351 E-mail: Jon.Russell@illinois.gov
| Billing: | |
| Sam Klimas |
District Wildlife Biologist, District 8 Illinois Department of Natural Resources 238 State Route 26 Lacon, Illinois 61540 Office: 309-246-2487 Cell: 309-214-7536 E-mail: Sam.Klimas@illinois.gov