Market Research Survey.doc

DOC document 51 KB Posted

Attached to
41- Vaneaxial Fans
Solicitation number
NSN4140002898783
Issued by

About this file

This is a market research survey issued by the Defense Logistics Agency Troop Support (DLATS) for NSN 4140-00-289-8743, a vaneaxial fan product. The survey, issued by Contracting Officer Nicholas Hadik, requests industry input to develop an acquisition strategy for an anticipated Indefinite Quantity Contract with a base period of one or two years and optional extension periods, not to exceed five years total. Responses are requested by close of business Wednesday, May 27, 2026, and should be submitted to Nicholas.Hadik@dla.mil. The current estimated annual demand is 3 units. The Government is exploring a one-time guaranteed minimum for the base year only, with no guaranteed minimums for option years, and is seeking vendor preferences on guaranteed minimum structures (quantity versus dollar value).

The survey requests detailed information on product specifications, including whether the fan qualifies as commercial or modified commercial under FAR 2.101, manufacturing and stocking capabilities, production rates, delivery capabilities, and transportation methods. Vendors must provide estimated per-unit pricing on an FOB Origin basis for the base period, any quantity-sensitive price breaks, and pricing stability assessments. The Government is considering an Economic Price Adjustment (EPA) mechanism for option years and requests vendor preferences between multi-year pricing or EPA-based adjustments, with reference to specific Producer Price Index categories. Additional inquiries address surge requirements, Electronic Data Interchange (EDI) capabilities, long-term contracting history, small business status, and anticipated manufacturing or supply challenges. The survey emphasizes that responses remain confidential and are non-binding, with no commitment implied by the Government's inquiry.

View the file

Other files

File Type Posted
Sources Sought Notice NSN 4140-00-289-8783 Vaneaxial Fan.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEFENSE LOGISTICS AGENCY

TROOP SUPPORT

700 ROBBINS AVENUE

PHILADELPHIA, PENNSYLVANIA 19111

-5092

IN REPLY

REFER TO

DLATS- Nicholas Hadik 700 Robbins Ave Philadelphia, Pa. 19111

SUBJECT:

Market Research for: NSN 4140-00-289-8743 // FAN,VANEAXIAL DLA Troop Support (DLATS) is conducting market research on the above item to determine an acquisition strategy that will enhance our support of military customers worldwide as well as to determine what your industry will be capable of providing with respect to the required item. For this reason, DLATS would appreciate your firm sharing your expertise and insight into how this item can be most efficiently procured.

DLATS anticipates issuing a solicitation for the referenced item under an Indefinite Quantity Contract. The contract may be for a term of one year or two years. Further, it may contain an option to extend the term of the contract. If an option to extend the term of the contract provision is included in the solicitation, each option term would be one year. However, the total contract term will not exceed five years. The answer to the questions concerning pricing will be one of the factors that will help the Government to determine the terms of the contract.

It should be noted that this inquiry, in no way, should be interpreted as a solicitation for offers. No information provided in response to this inquiry will be considered binding between the vendor and the Government. With these facts in mind, it is requested that you review the items listed above and answer the questions on the attached pages. The answers you provide will remain confidential. Please return this survey to Jessica Sheaffer, by C.O.B. Wednesday, May 27, 2026, by email at Nicholas.Hadik@dla.mil.

Thank you for your time and consideration.

Sincerely

Nicholas Hadik

Contracting Officer

1. (a) Is this Fan a commercial or modified commercial item in accordance with Federal Acquisition Regulation (FAR) 2.101? For example: is the item of a type used by the general public; sold or offered for sale to the general public? Is the modification of a type available in the commercial marketplace?

(i) If the item is modified commercial, please briefly describe the modification(s).

(b) If the answer to (a) is yes, is the item a commercially available off-the-shelf (COTS) item in accordance with FAR 2.101? For example, is the item sold in substantial quantities to the general public? Is the item sold to the Government in the same form in which it is sold in the commercial marketplace?

(i) If the item is modified, please briefly describe the modification(s).

2. (a) Is the Fan made of any type of material that is a major cost driver?

(b) Does any part of the Fan consist of foreign material?

(c) Does your firm normally stock the Fan?

(1) If yes, how many are on hand at any given time?

(2) If no, would your firm be willing to stock the Fan?

(3) If your firm is willing to stock the Fan, would you need a stocking-up period? If so, how many days would be required to stock-up?

(d) What is the production rate of the Fan? How many can be produced at a time? Is the manufacturing process a batch process or a continuous process?

3. Can you deliver items on an FOB Origin basis? This item qualifies for First Destination Transportation and Packaging (See DLAD 52.247-9058 and 52.247-9059.) Would FOB Origin be acceptable to your firm under the projected contract?

4. (a) How are the Fans usually transported?

(b) What is the average delivery per truckload?

(c) Is there a specific ordering quantity based on truckloads?

(d) How are the Fans palletized?

5. What is the standard delivery time your company experiences for the Fan? Would one standard delivery be suitable for the Fan (i.e. 90 days for any quantity) or would a phased delivery schedule be a better option (i.e. a 30 day ramp up period with 1,000 EA delivered every 30 days thereafter)? Please give your preference and the actual delivery time frame (how ramp up days and what quantity you could delivery every 30 days thereafter until the order is complete).

6. The current ESTIMATED annual demand quantity for this Fan is 3 EA.

(a) We are considering doing a one-time guaranteed minimum for the base year ONLY. There would be NO guaranteed minimum for the option years. Would this be acceptable to your company?

(b) We typically do either a specific quantity for the guaranteed minimum or a percentage of the annual demand value of the contract, usually 10% or so. Do you a preference for one over the other, quantity vs. $ figure? In addition, what do you feel would be a fair guaranteed minimum?

7. Please use the above estimated annual demand quantity to answer the below questions:

(a) Will you be manufacturing the material supplied under this contract? If not please provide the name and cage code of the actual manufacturer.

i. If you are a manufacturer do you plan on submitting a proposal or do you plan to quote through a distributor?

(b) What would the per unit price be on an F.O.B. origin basis? (Please note you will not be held to any pricing information given during the market research phase. We are only asking for estimated prices and know that pricing may change between now and the time the solicitation is issued and your proposal submitted.)

(c) Is this quantity sensitive, as in would you offer price breaks? If so, at what quantity points and what would the associated estimated unit prices be for each price break?

8. Is the pricing of this Fan stable or volatile?

9. If the Government wishes to use an option to extend the term of the contract, a pricing mechanism for the option year(s) needs to be included in any resultant contract.

(a) Would you be able to provide pricing for the base contract year, and any option year(s)? That is, could you price items out 2 years, 3 years, 4 years or 5 years?

(b) Do you prefer a base period of one or two years?

(c) Would you be willing to accept an Economic Price Adjustment (EPA), which would allow the Government to adjust the base contract price to achieve a revised contract unit price for an option year(s)? The EPA is based on a formula that is generally tied to the Producer Price Index and is limited to a 10% annual increase.

(d) Which pricing method do you prefer, pricing out the option years or using an EPA?

(e) If an EPA was used to adjust pricing, would you require that an EPA adjustment occur more than once during the year? If so how often and why?

(f) If an EPA adjustment were to be used to adjust the per unit price what PPI index do you feel best represents this product? WPU103 // Metal Containers or WPU10320106 // Steel shipping barrels or Fan (more than 12-gallon capacity) or some other index?

10. Do you have a minimum ordering quantity and/or dollar value that you require for an individual order for this Fan; if so what would that quantity and/or dollar value be?

11. Do you have a maximum ordering quantity and/or dollar value that you require for an individual order for this Fan; if so what would that quantity and/or dollar value be?

12. Is there a maximum quantity per month that you would be able to supply?

13. Are you a large or small business? If you are a small business, what type of small business are you (woman owned, disadvantaged, veteran owned, etc.)? If you a distributor, is your manufacturer a large or small business?

14. Do you have any long-term contracts (up to 5 years) with your customers and/or suppliers? If yes, please describe. If no, please explain why, e.g. pricing too volatile, not interest.

15. Can your company accommodate a Surge Requirement in which your company would be required to satisfy requirements for emergency situations (i.e., ramp up to meet early requirements (surge) and/or requirements that may exceed estimated annual quantities)?

16. Delivery orders issued under any resultant contract will be communicated to your company by Electronic Data Interchange (EDI). Does your firm have EDI capabilities? If no, do you plan on establishing EDI capabilities in the near future?

17. Have you encountered any problems with manufacturing this item if you are a manufacturer, or problems with supplying this item if you are a distributor, which may affect the upcoming contract? (i.e. long lead times on component parts, problems with raw materials, quality discrepancies, etc.)

18. If the item is commercial, any anticipated Request for Proposal (RFP) may only allow 2 weeks between issue date and closing/due date. Can you respond to an RFP in this timeframe?

19. Is there any other pertinent information that you feel that the Government should know or consider in regards to this item when determining the best way to procure it for the forthcoming contract?

20. Do you have any other comments, suggestions, or concerns that were addressed by the above questions?

_925211128.unknown

File details come from the government source that posted it. Updated .