This is a Notice to Bidders issued by the North Carolina Department of Adult Correction, Division of Engineering, Construction, and Maintenance, for the Marion Correctional Institution Roof Replacement Project (SCO ID#: 25-29271-01A). The project encompasses selective demolition and replacement of the existing low-sloped ballasted EPDM roof system with a new two-ply modified bitumen membrane system across all roof areas, including the Gatehouse, Main Administrative Areas, and Dormitories at Marion Correctional Institution located in Marion, North Carolina. Sealed proposals will be received until 10:00 AM on June 25, 2026, at the North Carolina Department of Adult Correction DECM office in Raleigh. A mandatory pre-bid meeting will be held on June 9, 2026, at 10:00 AM at Marion Correctional Institution (355 Old Glenwood Road, Marion, NC 28752), with failure to attend disqualifying bidders from participation. Complete plans and specifications are available for inspection at multiple locations, including online plan rooms through ConstructConnect/iSqFt, Dodge Construction Network, and various minority plan rooms, as well as electronically at no cost via email request to the designer (tim@atlasnc.com). Hardcopy documents require a one-hundred-dollar deposit, refundable upon return of documents within ten days after the bid date; this deposit is waived for pre-bid meeting attendees.
Bids are to be submitted as lump sum proposals for a single prime contract and must be accompanied by either a cash deposit or certified check equal to five percent of the proposal amount, or alternatively, a five percent bid bond from a North Carolina-licensed surety company. Performance and payment bonds equal to one hundred percent of the contract price will be required. Payment will be made based on ninety-five percent of monthly estimates with final payment upon completion and acceptance of work. Bidders must hold an Unlimited general contractor license classification as required by North Carolina General Statutes Chapter 87, Article 1; however, contractors properly licensed under G.S. 87-Arts 2 and 4 (Plumbing, Mechanical, and Electrical) may bid as the single prime contractor if the general construction value does not exceed twenty-five percent of total construction value. Bidders are required to include with their proposals the Identification of Minority Business Participation form with either Affidavit A or Affidavit B as applicable, and failure to complete these forms is grounds for bid rejection. No bid may be withdrawn for sixty days after the scheduled closing time. The North Carolina Department of Adult Correction reserves the right to reject any or all bids and to waive informalities. The project designer is Atlas Engineering, Inc. (Tim Ford, PE; 919-420-7676).
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCO-Notice To Bidders 2010 – (Updated Dec. 2010)
NOTICE TO BIDDERS
North Carolina Department of Adult Correction – Division of Engineering, Construction, and Maintenance Marion Correctional Institution – Roof Replacement Project
SCO ID#: 25-29271-01A
Sealed proposals will be received by the North Carolina Department of Adult Correction in Raleigh NC, in the office of NCDAC DECM, Door #4, Attn: Taylor Oldham , 2020 Yonkers Road, Raleigh, NC (hand delivered, FedEx, UPS, USPS Priority); 4216 Mail Service Center, Raleigh, NC 27699-4216 (mailing address, but allow at least 48 hours, not recommended), Attn:
Taylor Oldham up to 10:00 AM on 6/25/2026 and immediately thereafter publicly opened and read for the furnishing of labor, material and equipment entering into the construction of:
Marion Correctional Institution – Roof Replacement Project
This project includes selective demolition, replacement of the existing low-sloped ballasted EPDM roof system with a new two-ply modified bitumen membrane system and associated work at all roof areas including the Gatehouse, Main Administrative Areas, and Dormitories at Marion Correctional Institution.
Bids will be received for a single prime contract. All proposals shall be lump sum.
Pre-Bid Meeting
A mandatory pre-bid meeting will be held for all interested bidders on 6/9/2026 at 10:00 AM at Marion Correctional Institution, 355 Old Glenwood Rd, Marion, NC 28752. All attendees should meet at the front gatehouse to check in with a valid photo ID. The meeting will address project specific questions, security, issues, bidding procedures and bid forms. Failure to attend the Pre-Bid Conference will disqualify your company from bidding.
Complete plans, specifications and contract documents will be open for inspection in the offices of North Carolina Department of Adult Correction – DECM and Atlas Engineering, Inc. and in the online plan room of the ConstructConnect/iSqFt (constructconnect.com), the online plan room of Dodge Construction Network (dodge.construction.com), the online plan room of Minority Plan Rooms at The Institute, (theinstitutenc.org), 114 West Parrish Street, Durham, NC 27701;
919-956-8889 and MMCA, (mmcaofcharlotte.org) 801 East Morehead Street, Suite 126, Charlotte, NC 28202; 704- 372-3341.
Electronic copies of the documents are available at no cost by request from the designer via email (Attn: tim@atlasnc.com). Hardcopies of the documents may be obtained upon deposit of one hundred dollars ($100.00) in cash or certified check. The full plan deposit will be returned to those bidders provided all documents are returned in good, usable condition within ten (10) days after the bid date. Deposit for one set will be waived for Bidders attending the Pre-Bid Meeting. or may be obtained by those qualified as prime bidders, upon deposit of one hundred dollars ($100) in cash or certified check. The full plan deposit will be returned to those bidders provided all documents are returned in good, usable condition within ten (10) days after the bid date.
NOTE: The bidder shall include with the bid proposal the form Identification of Minority Business Participation identifying the minority business participation it will use on the project and shall include either Affidavit A or Affidavit B as applicable. Forms and instructions are included within the Proposal Form in the bid documents. Failure to complete these forms is grounds for rejection of the bid. (GS143-128.2c Effective 1/1/2002.)
https://www.constructconnect.com/ https://www.dodge.construction.com/ https://theinstitutenc.org/ http://mmcaofcharlotte.org/contact/
SCO-Notice To Bidders 2010 (Updated Dec. 2010)
General contractors are notified that Chapter 87, Article 1, General Statutes of North Carolina, will be observed in receiving and awarding general contracts. General contractors submitting bids on this project must have license classification for Unlimited (set forth the license classification required by the NC General Contractors Licensing Board under G.S. 87-1)
NOTE--SINGLE PRIME CONTRACTS: Under GS 87-1, a contractor that superintends or manages construction of any building, highway, public utility, grading, structure or improvement shall be deemed a “general contractor” and shall be so licensed. Therefore, a single prime project that involves other trades will require the single prime contractor to hold a proper General Contractors license. EXCEPT: On public buildings being bid single prime, where the total value of the general construction does not exceed 25% of the total construction value, contractors under GS87- Arts 2 and 4 (Plumbing, Mechanical & Electrical) may bid and contract directly with the Owner as the SINGLE PRIME CONTRACTOR and may subcontract to other properly licensed trades. GS87-1.1- Rules .0210
Each proposal shall be accompanied by a cash deposit or a certified check drawn on some bank or trust company, insured by the Federal Deposit Insurance Corporation, of an amount equal to not less than five percent (5%) of the proposal, or in lieu thereof a bidder may offer a bid bond of five percent (5%) of the bid executed by a surety company licensed under the laws of North Carolina to execute the contract in accordance with the bid bond. Said deposit shall be retained by the owner as liquidated damages in event of failure of the successful bidder to execute the contract within ten days after the award or to give satisfactory surety as required by law.
A performance bond and a payment bond will be required for one hundred percent (100%) of the contract price.
Payment will be made based on ninety-five percent (95%) of monthly estimates and final payment made upon completion and acceptance of work.
No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of 60 days.
The owner reserves the right to reject any or all bids and to waive informalities.
Designer: Owner: NC Department of Adult Correction- Atlas Engineering, Inc: Tim Ford, PE DECM (Name)
551-A Pylon Drive, Raleigh, NC 27606 2020 Yonkers Road (4216 MSC) (Address) Raleigh, NC 27699-4216
(919) 420-7676 (919-324-1263 (Phone) http://www.ncleg.net/EnactedLegislation/Statutes/HTML/BySection/Chapter_87/GS_87-1.html http://www.nclbgc.org/pages/LawNReg.pdf
| This project includes selective demolition, replacement of the existing low-sloped ballasted EPDM roof system with a new two-ply modified bitumen membrane system and associated work at all roof areas including the Gatehouse, Main Administrative Areas,... |
| Complete plans, specifications and contract documents will be open for inspection in the offices of North Carolina Department of Adult Correction – DECM and Atlas Engineering, Inc. and in the online plan room of the ConstructConnect/iSqFt (constructco... |
| Electronic copies of the documents are available at no cost by request from the designer via email (Attn: tim@atlasnc.com). Hardcopies of the documents may be obtained upon deposit of one hundred dollars ($100.00) in cash or certified check. The full ... |
File details come from the government source that posted it. Updated .