Makino CNC Machine Extended Warranty - PWS.pdf

PDF 302 KB Posted

Attached to
Makino CNC Machines Preventative Maintenance
Solicitation number
FA812526Q0074
Issued by

About this file

This is a Performance Work Statement (PWS) for Makino CNC Machine Preventative Maintenance services at the Oklahoma City–Air Logistics Complex (OC-ALC) at Tinker Air Force Base, prepared by OC-ALC/OBCA on June 24, 2026.

The contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation, and inspection manuals necessary to perform preventive maintenance on eight Makino CNC machines: four Makino A71nx units, three Makino A81nx units, and one Makino U86. Required recurring services for each machine include annual preventive maintenance (PM), six-month health checks, annual machine recertification every 12 months, and annual extended machine and control warranty coverage. The annual extended warranty includes all parts and labor for on-site corrective repairs using strictly new parts (refurbished or remanufactured parts are expressly prohibited), replacement of failed components, travel time and transportation, remote diagnostics during business hours (0700-1500, Monday-Friday), and applicable software and firmware updates. The contractor must notify the Contracting Officer Representative (COR) seven business days prior to each scheduled PM visit and must arrive on site within two business days of malfunction notification. Service reports must be provided within five business days of completion and include detailed documentation of work performed, parts used, labor costs, and verification that only new parts were used.

The contractor must comply with extensive requirements including environmental protection and hazardous material management, safety and health standards, tool control procedures, training requirements (FOD/DOP awareness, fire safety, environmental training, security/OPSEC briefings, and lockout/tagout), and personnel qualifications. Personnel must have minimum five years of documented experience performing maintenance and repair on mechanical spindle CNC machines including Makino equipment. A contract manager fluent in English must be designated within ten business days of award. Performance assessment is based on 100% compliance with seven service summary objectives measured through periodic surveillance and 100% surveillance for the safety and health plan. The contractor must provide initial employee listings within five business days of award and updated personnel listings within ten business days when changes occur. Work shall be performed Monday through Friday, 0700-1500, excluding federal holidays and base closures, and the contractor must comply with all Tinker AFB regulations and procedures.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

Makino CNC Machine Preventative Maintenance

PREPARED BY:

OC-ALC/OBCA

TINKER AFB 73145

24 June 2026

Commanders Safety Intent: The safety of everyone on Tinker AFB is our top priority. All Individuals must accept personal responsibility for safety and seek opportunities for improving the safety of our work environment. Everyone working on Tinker AFB is challenged to find, fix (if able) and report all hazards and near-misses. It is our shared duty to take every reasonable step and precautions to prevent accidents and preserve the health/safety of each contractor and government employee.

Section One

1.0 Scope: The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation and inspection manuals necessary to perform the Preventive Maintenance (PM), on eight Makino CNC Machines at the Oklahoma City–Air Logistics Complex (OC-ALC). The equipment: Four (4) Makino A71nx, three (3) Makino A81nx, and one (1) Makino U86 as listed in Appendix A.

1.0.1 The Contractor shall be responsible for ensuring all services, parts and Original Equipment Manufacturer (OEM) components provided under this contract are in accordance with (IAW) the terms and conditions outlined herein, conform to the manufacturer’s equipment specifications and this PWS.

1.2 Requested Services: The requested services are preventive maintenance (PM), for the following equipment: Four (4) Makino A71nx, three (3) Makino A81nx, and one (1) Makino U86 at the Oklahoma City–Air Logistics Complex (OC-ALC).

1.2.1 Makino equipment: perform the following recurring services for each Makino machine listed in Appendix A:

• Annual Preventive Maintenance (PM)

• Six-month Health Check (every 6 months)

• Annual Machine Recertification (every 12 months)

• Annual Extended Machine and Control Warranty (every 12 months)

1.2.1.1 Annual Extended Machine and Control Warranty Inclusions: The "Annual Extended Machine and Control Warranty" service shall include, but is not limited to, the following for covered failures. This work is not considered "Over and Above" (O&A) work.

• All parts and labor for on-site corrective repairs.

• Replacement of failed components with strictly NEW parts necessary to restore the machine to OEM specifications. In accordance with Section 1.12, the use of refurbished, remanufactured, or used parts is expressly prohibited.

• All Labor, travel time, transportation, and per diem expenses for on-site service visits to Tinker AFB.

• Remote diagnostics and technical support during normal business hours (0700-1500, Monday-Friday).

• Applicable software and firmware updates. Installation of firmware and software updates required to maintain warranty coverage and OEM specifications.

• Generation and submission of all required inspection documentation, estimate repair reports, and final service reports in accordance with Sections 1.10, and 1.12.

1.3 Reserved

1.4 Preventive Maintenance (PM): The objective of PM is to protect equipment capability and investment by removing causes of failure, performing routine maintenance, and providing adjustments to compensate for normal wear before failure occurs. The Contractor shall perform all PMs in accordance with OEM specifications.

• The Contractor shall perform one PM per year on each of the following equipment: Four

(4) Makino A71nx, three (3) Makino A81nx, and one (1) Makino U86.

• The annual preventive maintenance tasks are specified in Appendix D (Makino Program) for all applicable Makino equipment.

• The Contractor shall notify the COR seven (7) business days prior to each scheduled PM visit.

1.5 Six-Month Health Check (Once per Calendar Year): The Contractor shall perform a Six- Month Health Check, to occur once per calendar year, consisting of a detailed visual inspection of all designated critical components. Inspections shall be performed by qualified personnel and documented in the maintenance report provided by the contractor with findings, identified deficiencies, and recommended corrective actions.

• Horizontal Machining Centers (HMC): Detailed visual inspection of critical components including way covers and wipers, ball screws, tool magazine, pallet changer, B-axis table cones, automatic lubrication system, spindle, and motor couplings.

• Electrical Discharge Machine (EDM): Detailed visual inspection of critical components including way covers and wipers, ball screws, automatic lubrication system, EDM tank seals, and motor couplings.

1.6 Annual Machine Recertification (Every 12 Months): The Contractor shall perform an Annual Machine Recertification every 12 months. Recertification shall be performed by qualified technicians and include the following, adjusted and corrected as necessary to meet OEM specifications. All results, adjustments, and corrective actions shall be documented in a complete report.

• Complete geometry checks with measurements and corrections as required to restore machine geometry to OEM specifications.

• Renishaw Ballbar testing for all linear axes, including analysis and any corrective actions required to meet OEM tolerances.

• Renishaw laser positioning accuracy checks for all axes, including pitch-error compensation calibration to OEM specifications.

• Complete documented report containing test results, before-and-after measurements, descriptions of adjustments performed, parts replaced (if any), and recommended follow-up actions.

• As part of the annual recertification, the contractor shall verify and install all applicable OEM firmware and control software updates necessary to maintain machine accuracy, functionality, and warranty validity.

1.7 Reserved

1.8 Over and Above (O&A): O&A is defined as work discovered during the course of performing the repair efforts that is within the scope of the contract and necessary in order to satisfactorily complete the contract. The Contractor shall complete O&A requirements In Accordance With (IAW) Defense Federal Acquisition Regulation Supplement (DFARS) 252.217-7028. PGI 217.77.

1.9 Malfunction and Notification Process: Upon occurrence of an equipment or system malfunction, the COR will contact the Contractor by telephone, email, or fax and provide information below. If the COR notifies the Contractor via telephone, the COR will provide a written copy of the request by email or fax.

• the equipment identification number (ID)

• A brief description of the malfunction

• location of equipment

• name and telephone number of the Point of Contact (POC)

1.9.1 Upon notification of the malfunction system, the technician shall arrive on site at the equipment location within two (2) business days or if overseas five (5) business days.

1.10 Equipment Evaluations: The Contractor shall provide a written Estimate Repair Report to the COR by fax or email no later than (NLT) one (1) business day after the completion of the inspection. As a minimum, the information cited in the Estimate Repair Report shall include:

• the equipment ID#

• date of evaluation

• Description of findings and recommendations

• required parts and part numbers (P/N)

• cost of parts

• number of parts needed

• estimated labor hours required to complete the repair

1.10.1 Any recommendations cited shall consider:

• the priority of the requested service

• available source for obtaining new parts

• the availability of the new parts

• shipping and delivery schedules of parts

• other factors which may be peculiar to the specific repair requirement

1.11 Authorizations for Repair Actions: Only the Contracting Officer (CO) can authorize repair actions. The COR will coordinate any repair actions with the Government Subject Matter Expert (SME) and the CO in order to obtain the approval to proceed. The Contractor shall ensure all repair actions have the documented CO approval, in writing, before initiating any repair or ordering parts. The Contractor shall demonstrate to the Government SME that the repairs have been completed.

1.11.1 Once the authorization for repair action has been received from the CO, the Contractor shall order any required parts within two (2) business days and notify the COR, in writing, of the estimated arrival date of the parts. Upon the receipt of the parts, the Contractor shall perform the repair within five (5) business days. The COR will verify the receipt of the parts with the Contractor to ensure the repair is performed in a timely manner.

1.12 Service Report: Upon completion of any maintenance the Contractor shall provide a draft, written Service Report to the COR and SME. The Contractor shall provide, by email, the final service report within 5 business days to the COR. At a minimum, the final service report shall contain the following information:

• Company Name

• Requested service date

• Contract #

• Equipment ID #

• Description of Services provided

• Additional Services recommended (if any)

• Printed Name and Signature of Technician who performed the Services (electronic signatures are acceptable)

• Printed Name and Signature of on-site SME or COR (electronic signatures are acceptable)

• Start and Completion dates

• Complete Breakdown of the Labor Cost (hours and rate)

• Materials and Parts used

• Details of any other charges

• Printed Name and Signature stating only new parts and materials were used (electronic signatures are acceptable)

• Written verification statement that a performance check to verify operational condition was performed and that the equipment is in working order. (electronic signatures are acceptable)

1.13 Reserved

1.14 Maintenance Documentation: The Contractor shall notify the Government Subject Matter Expert (SME) upon completion of each PM or similar requirement, IAW OC-ALC Operating Instruction (OI) 21-203, Chapter 1, 2, and 3, as applicable.

1.15 Red Tagged Items: Red Tagged items create unsafe conditions for the workplace and are noted by the annotation of a Red X in the Facilities and Equipment Management Web-Based (FEMWEB) system. A Red X indicates the equipment is considered unsafe or unserviceable and will not be used until the unsatisfactory condition is corrected and the Red X is cleared. The Contractor shall not authorize, use or direct equipment to be used until the Red “X” has been properly cleared IAW OC-ALC OI 21-203, Chapter 2.

1.16 Red X Clearance: The Contractor shall ensure the Red X’s are cleared IAW OC-ALC OI 21-203, Chapter 2. The Contractor shall immediately notify the shop supervisor or work leader in any instance where the Contractor clears a Red X in his or her assigned work area.

1.17 Red X Clearance on Equipment: Red X on Equipment will be cleared in FEMWEB by the shop supervisor, work leader, or supervisor’s designee.

1.18 Continuation of Essential Department of Defense (DoD) Contractor Services During Crisis: This requirement has been determined not to be essential and does not require continued support during a crisis as defined in DFARS 252.237-7023.

1.19 Hours of Operation: The Contractor shall perform the work required under this contract during the following days and hours: Monday through Friday, 0700-1500. If work hours are required outside the hours stated, the Contractor shall contact the COR for approval from the CO.

Upon approval from the CO, the Government Subject Matter Expert (SME) or COR must be present with the Contractor.

1.19.1 These dates and hours exclude Federal Holidays, base closures due to inclement weather, and furlough days, as applicable.

1.20 Special Qualifications: The Contractor shall provide personnel with the following special qualifications:

• Minimum 5 years of documented experience performing maintenance, troubleshooting, calibration, and repair on mechanical spindle CNC machines, including Makino vertical and horizontal machining centers. This experience shall be documented via employee resumes, which must be submitted to the COR for review and approval prior to the employee performing work under this contract.

1.21 Contractor Personnel: The Contractor shall provide the name of the Contract Manager (CM) and any alternates who shall act for the Contractor when the CM is absent. They shall be designated to the CO and COR, in writing, within ten (10) business days after the contract award date. The Contractor shall provide telephone numbers and email addresses where the CM and alternates may be contacted at any time. The CM or alternate shall have full authority to act for the Contractor on all matters relating to operation of this contract at the OC-ALC on Tinker Air Force Base (AFB). The CM or alternate shall be available to meet on the installation with Government personnel designated by the CO to discuss problem areas. The Contractor shall provide a CM who can read, write, speak, and understand English fluently.

1.21.1 The Contractor and Contractor personnel shall be required to identify themselves as contractor personnel by introducing themselves or being introduced as Contractor personnel. The Contractor personnel shall also display distinguishing badges or other visible identification for meetings with Government personnel or while performing work for the OC-ALC on Tinker AFB.

The Contractor and Contractor personnel shall identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.

1.22 Listing of Contractor Employees: The Contractor shall provide an initial listing of names and position titles of employees who will come to Tinker Air Force Base to the COR within five

(5) business days after the contract award date. Within ten (10) business days, the Contractor shall also provide an updated listing of personnel to the COR when employees affecting the work of this contract change status or position.

1.22.1 The Contractor shall not employ persons on this contract if such employee is identified to the Contractor as a potential threat to the health, safety, security, and/or general well-being, or operational mission of the installation and its population. The Contractor shall not employ any person who is an employee of the United States (US) Government if the employment of the person would create a conflict of interest. The Contractor shall not employ any person who is an employee of the Department of the Air Force (AF), either military or civilian, unless such person seeks and receives approval according to the DoD 5500.7-R Joint Ethics Regulations (JER). In addition, the Contractor shall not employ any person who is an employee of the Department of the AF if such employment would be contrary to the policies contained in Air Force Instruction (AFI) 64-106, Air Force Industrial Labor Relations Activities. The Contractor shall be prohibited from employing off-duty CORs who are providing surveillance on any contracts/sub-contracts awarded to the Contractor. All contract personnel, depending on particular condition, occasion, or place or job assignment shall be required to wear professional and suitable attire. All Contractor personnel shall conduct themselves in a professional and courteous manner. The selection, assignment, reassignment, transfer, supervision, management, and control of contractor personnel in performance of this PWS shall be the responsibility and prerogative of the Contractor; however, the Contractor shall comply with the requirements set forth in this PWS and Tinker AFB regulations concerning the conduct of employees as referenced herein. The Contractor shall employ and maintain a technically trained and experienced work force.

1.23 Environmental Protection & Safety: The Contractor shall be knowledgeable of and comply with all applicable federal, state and local laws, regulations, instructions and requirements regarding environmental protection and occupational safety and health. The Contractor shall comply with any laws, instructions or regulation changes during the term of this contract.

1.23.1 Contractors shall be compliant Tinker Air Force Base (TAFB) Supplement to Air Force Manual (DAFMAN) 32-7002, “Environmental Compliance and Pollution Prevention”, Tinker AFB procedures per Tinker Air Force Base Hazardous Waste Management Plan (TAFB HWMP), and Complex procedures per Oklahoma City Air Logistics Complex (OC-ALC) Supplement to DAFMAN 32-7002, “Environmental Compliance and Pollution Prevention” and OC-ALCI 32-101 “Air Quality Record Keeping Procedure”. Publications are available digitally on e-Publishing website at www.e-publishing.af.mil <http://www.e-publishing.af.mil> for downloading or ordering.”

1.24 Hazardous Material (HAZMAT): If no HAZMAT will be brought on base or used in performance on this contract, the contractor shall certify “No HAZMAT will be brought on base” or “No HAZMAT Usage” by official correspondence. This certification shall be provided to the COR within ten (10) days after award. Upon COR receipt of the certification, the requirements of this section no longer apply. Appropriate penalties for the contractor shall be assessed if found in violation of above certification.

1.24.1 The Contractor shall not store chemicals or hazardous material (HAZMAT) on Tinker AFB. Contractors shall be compliant with HAZMAT management procedures per Oklahoma City Air Logistics Complex (OC-ALC) Supplement to DAFMAN 32-7002, “Environmental Compliance and Pollution Prevention”. The Contractor shall maintain a log of all HAZMAT that is used on base. This usage log shall be provided to the COR monthly, the last business day of each month, or when the required work is completed. The COR will forward the records to the Unit Environmental Coordinator (UEC) no later than the fourth (4th) day of the following month or the first (1st) subsequent business day.

1.25 Safety Data Sheet (SDS) and Labeling: Upon COR receipt of the “No HAZMAT Usage” certification, the requirements of this section no longer apply.

1.25.1 The Contractor shall not transport, ship or use any chemical, material or substance used in the performance of this PWS on Tinker AFB before written approval is provided by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). The Contractor shall submit to the COR, ten (10) calendar days after contract award date all Safety Data Sheets (SDSs). The Contractor shall receive approval from the COR prior to shipping any chemical, material or substance to Tinker AFB. A copy of the manufacturer SDS shall accompany the shipment. Contractor shall comply with the effective dates for SDS requirements IAW the Occupational Safety and Health Administrations (OSHA) Hazardous Communication Standard, Title 29, Code of Federal Regulation (CFR) Part 1910.1200. The Contractor shall ensure containers of hazardous chemicals are labeled with the following information, prior to shipping to Tinker AFB IAW OSHA Hazardous Communication Standard, Title 29, CFR Part 1910.1200 (2012): product identifier; signal word; hazard statement(s); precautionary statement(s);

pictogram(s); and name, address and telephone number of the chemical manufacturer, importer, or other responsible party. The COR will forward all SDS submittals to 72 ABW/CEIE for approval. A current manufacturer SDS shall be submitted to the COR if the Contractor changes manufacturer or vendor for any chemicals that were prior approved. The Contractor shall maintain copies of manufacturer SDSs for all chemicals and SDSs shall be readily accessible at all times by Contractor personnel as well as government employees.

1.26 Hazardous Waste: If no HAZWASTE will be generated during performance of this contract, the contractor shall certify “NO Hazardous Waste Generation” by official correspondence. This certification shall be provided to the COR within ten (10) days after award. Upon COR receipt of the “No Hazardous Waste Generation” certification, the requirements of this section no longer apply. Appropriate penalties for the contractor shall be assessed if found in violation of above certification.

1.26.1 The Contractor shall dispose of contaminated solid waste, spent or processed chemical solutions, used rags and hazardous waste in government furnished waste containers located in the shop or area the work is being performed. The Contractor shall notify the COR if the required waste containers are not available on site.

1.27 Discharges: Any discharges into Tinker’s industrial waste treatment plant (IWTP) or sanitary sewer shall be approved and done IAW Tinker Industrial Wastewater Discharge Permit as instructed by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). Notice of intent documentation shall be provided to the COR within ten (10) days after award. The COR will submit the required notice of intent documentation to the UEC for 72 ABW/CEIE approval. The Contractor shall not discharge into IWTP and sanitary sewer prior to approval issued by 72 ABW/CEIE. The Contractor shall maintain records of written approval issued by 72 ABW/CEIE for discharges into IWTP and sanitary sewer.

1.28 Off-Site Discharges: For discharges outside of Tinker AFB, the Contractor shall ensure wastewater discharges, that may contain pollutants resulting from any contracted service, go to a state or federal permitted treatment facility such as a municipal Publicly Owned Treatment Works (POTW). The Contractor shall provide official correspondence ten (10) calendar days after contract award date to the COR from the POTW that states the POTW is permitted for all pollutants that the Contractor may discharge during the contracted service.

1.29 Spills: Upon the occurrence of any spill that could enter the storm system or cause any harmful environment effects, the Contractor shall immediately call 911 to report the incident.

When possible, the Contractor shall use a base telephone to receive help from Tinker AFB 911.

If using a cell phone, the Contractor shall request Tinker AFB 911. The Contractor shall immediately report all environmental spills to the COR and UEC. The Contractor shall provide five (5) copies of a typed or written report about the incident within four (4) clock hours as follows.

1.29.1 One (1) copy to CO, two (2) copies to the COR, a copy for UEC and one (1) copy for record. The format of the report shall be left up to the Contractor, but the report shall contain the following information:

1.) Name and contact number of people reporting the spill 2.) Date and time of incident 3.) Location and source of spill 4.) Substance or pollutant spilled 5.) Amount spilled and rate of discharge 6.) Any damages or injuries involved 7.) Extent of area impacted 8.) Potential hazards 9.) Actions taken 10.) Organizations contacted 11.) Remarks Section - that addresses the cause of the spill (e.g. human error, equipment, etc.) and whether 911 was called and which agencies responded.

1.30 Environmental Training: Upon COR receipt of the “No Hazardous Waste Generation” certification, the requirements of this section no longer apply.

1.30.1 Contractor personnel performing duties in the service of this PWS shall have training that acquaints the person with the details of Resource Conservation Recovery Act (RCRA) regulations in 40 CFR 260 through 279; applicable State Laws and regulations; DoD, Air Force and local requirements. This training can be obtained through creditable training institutions or companies. All training shall be approved by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). RCRA training is available at http://www.natlenvtrainers.com/RCRA-hazardous-waste.htm;

http://www.skillsoft.com/catalog/detail.asp?CourseCode=esh_sah_a34_sh_enus000000 <http://www.skillsoft.com/catalog/detail.asp?CourseCode=esh_sah_a34_sh_enus000000> and http://www.lion.com/Storing-Hazardous-Waste-for-LQGs at the Contractor’s expense. Prior to obtaining training, the Contractor shall provide the name of the training institution or company and course description to the COR for approval within ten (10) calendar days after contract award date. Once written approval is received from the COR, the Contractor shall provide the environmental training certificates for employees performing duties in the service of this PWS to the COR, within thirty (30) calendar days after contract award date. In addition to the required environmental training, Contractors shall be compliant with Tinker AFB procedures per TAFB HWMP, “Hazardous Waste Management”.

1.31 OC-ALC Security and OPSEC training: All Contractor personnel working on base in the OC-ALC shall be required to read the OC-ALC Security and OPSEC briefings. The COR will ensure the Security and OPSEC briefings are available for review by the Contractor. The Contractor shall provide the COR with a report within five (5) business days after receiving the briefings. The report shall contain the employee’s name and the date of review. These requirements are IAW AFI 16-1404, “Information Security Program”, Chapter 6, Paragraph 6.2-6.2.3, 6.4- 6.4.4.; DoDI 5220.22 “Industrial Security”, Section 9, Paragraph 9.2(6).; AFI 10-701, “Operations Security”, Chapter 4, Paragraph 4.4. and OC-ALC 16-1404, “OC-ALC Security”, Paragraph 7.

1.32 Housekeeping: The Contractor shall keep the work areas clean and neat IAW industry standards, OSHA, fire and safety standards, and this PWS.

1.33 Tool Control and Accountability: While performing contract services in or around Maintenance Production Shops, which includes ramp areas, the Contractor shall comply with AFI 21-101_AFMC Supplement 1, 21-101, Chapter 10 (all paragraphs) and OC-ALCI 21-112, paragraph 14.1. and 14.5.3. The Contractor shall provide the completed Tool Sheet Accountability prior to performing work in the OC-ALC industrial areas. The Tool Sheet Accountability is available from the COR. The Contractor or Contractor’s personnel shall inventory the container or bag of tools at the beginning of each workday and at the end of each workday. The Contractor personnel shall immediately notify the COR of any tools that are missing or lost from the work area or container (e.g. tool or job box or tool bag). The COR will report any missing Contractor’s tools which have not been located within one (1) hour after notification to the appropriate Government personnel. The CM shall ensure each employee on the job site receives a briefing from the COR about Housekeeping, FOD/DOP, and Tool Control prior to starting work in OC- ALC Industrial Areas.

1.34 Privately Owned Motor Vehicles (POV): Contractor Contractor’s personnel shall comply with the directives pertaining to the operation of POVs on Tinker AFB, per DAFMAN 31-116, in its entirety, “Motor Vehicle Traffic Supervision”. The Contractor shall comply with Tinker AFBI 24- 302, in its entirety for the operation of POVs within Tinker AFB.

1.35 Visitors Pass: The Contractor shall contact the COR seven (7) business days before arriving on Tinker AFB in order to make arrangements for Visitors Passes. The COR will assign a sponsor for the Contractor from within the organization. The Contractor and the sponsor shall arrange to meet at Pass and Registration, building 6611 at the Tinker Gate which is South of I-40 off of Air Depot. The Contractor shall provide two (2) forms of identification, one of which shall be a picture ID, to the 72 SFS. The 72 SFS will provide an AF Form 75, Visitors Pass, which will be valid for up to thirty (30) calendar days.

1.36 Foreign Nationals: The Contractor shall notify the COR before sending a Foreign National representative to perform services. Special rules apply for foreign nationals visiting a US Government facility.

1.37 Safety and Health on Government Installations: While performing work under this contract on a Government installation, the Contractor shall comply with federal, state and local regulations, and DDAFMAN 91-203, “AIR FORCE OCCUPATIONAL FIRE AND HEALTH STANDARDS”, as established by this contract and Appendix C. The Contractor shall notify the CO, COR, and Government Contract Administrator (CA) within one (1) business day of any injuries that occur to contractor personnel while they are on the installation. The Contractor shall notify the CO, COR, and Government CA within one (1) business day of damage to Government property or equipment during the execution of the contract.

1.38 Communicating Hazards of Workplace (CHOW): Contractor’s onsite representative communicates all hazards being introduced to the worksite by the Contractor. This is accomplished prior to commencement of work and refreshed daily during performance, IAW Contractor’s Site Safety Plan.

1.39 Safety and Health Plan: The Contractor shall be responsible for compliance with the OSHA Public Law 91-596. The Contractor shall submit a Safety and Health Plan (SHP) and corresponding site safety checklist to the CO and the COR (see Appendix C).

1.40 Combating Trafficking in Persons: IAW DFARS PGI 222.17, the COR shall pursue, as appropriate, the following methods of monitoring the Contractor’s performance regarding trafficking in persons such that non-compliances with FAR clause 52.222-50 are brought to the immediate attention of the Contracting Officer:

a. Keep the lines of communication open with the Contractor. At the Post-Award conference, remind the Contractor of his contractual responsibilities to notify the government if the Contractor receives notification of any alleged violations to this policy or if actions have been taken against the Contractor employees, subcontractor’s or subcontractor employees pursuant to the clause.

b. When appropriate, encourage Contractor to complete Human Trafficking Awareness Training.

c. Encourage the Contractor to take steps to investigate and eliminate slavery and human trafficking in their supply chains and to publish information for consumer awareness.

d. Periodically access the Department of State’s Trafficking in Person (TIP) website for updates and to view the latest reports. http://www.state.gov/g/tip

1.41 Speak Up for Safety: Safety surety is an integral part of our overall goal of establishing a world class safety and health program. Our “Speak Out for Safety” initiative ensures a partnership with contractors and government employees to further enhance safety to ensure we are looking out for all our partners and empowers all employees to actively participate in each other’s safety.

1.41.1 A safe workplace is everyone's business. As part of the contract team, military, civilian and contractor personnel are empowered to Speak Out for Safety (S.O.S.) when they observe an unsafe act.

1.41.2 Government personnel are empowered to intercede in events that pose imminent danger to personnel or catastrophic damage to property.

1.42 Reporting Period: Contractors are required to input data by 31 October of each year.

1.43 Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor’s name and contract number associated with the data.

1.44 User Guide: Data for Air Force service requirements must be input at www.sam.gov. A quick start user guide is available at on the SAM.gov website at https://sam.gov/SAM/transcript/SCR_QSG.pdf. In addition, a full user guides for contractors and government personnel are available at https://www.sam.gov/SAM/pages/public/help/samUserGuides.jsf.

1.45 Training – General (including but not limited to): The Government COR will provide training via slides, video, or classroom prior to the Contractor performing work at the OC-ALC.

The Government will be responsible for all approved costs associated with the training identified below. The COR will document training on and maintain copies of the completed AF IMT 2426, Training Attendance and Rating, as part of the contract surveillance file. The Government will add or remove training as required per Air Force Regulation.

1.45.1 The Contractor shall contact the COR prior to work being performed in order to accomplish the required training or to verify the required training as listed below has been completed.

Contractor Required Courses Course Number FOD and DOP Awareness Training Course Initial CHPMAS0000400SU AFMC FOD and DOP Awareness Training Refresher CHPMAS0001301CB Initial Fire Safety and Prevention Training CTESAF0000100SU http://www.state.gov/g/tip https://sam.gov/SAM/transcript/SCR_QSG.pdf https://www.sam.gov/SAM/pages/public/help/samUserGuides.jsf

Refresher Fire Safety and Prevention Training, Computer Based Training (CBT)

CTEMAS0002900CB

OC-ALC Environmental Accountability/Solid Waste Training, CBT MTEMAS9713800BR OC-ALC Human Factors Training, CBT MTEPDV9775100BR Environmental Management Systems (EMS) - General Awareness Training MTEENV9733070BR

ISO 50001 Compliance Training Records Management - User Training MLMW0188 Controlled Unclassified Information (CUI) Training_2022BG ZZZ2021CUI OC-ALC/OB Initial Workplace Specific FOD/DOP Briefing MTEMAS0002011BR Lockout/Tagout Initial and Refresher Course for Affected Personnel, CBT

CTEMAS0003001CB

Lockout/Tagout Initial Course TE00141 Lockout/Tagout Refresher Course for Authorized Personnel, CBT CTEMAS0003000CB

Section Two

Performance Assessment

The Contractor shall be aware that in the absence of any contract requirement from the Service Summary (SS) does not detract from its enforceability nor limit the rights or remedies of the Government under any other provision of the contract. The Contractor shall ensure the following SS requirements are accomplished:

Service Summary (SS) Table 2-1

PERFORMANCE

OBJECTIVE

PWS

PARA

PERFORMANCE

THRESHOLD

METHOD OF

SURVEILLANCE

SS-1. Requested Services: 1.2 100% Compliance Periodic Surveillance SS-2. Preventive Maintenance (PM): 1.4 100% Compliance Periodic Surveillance.

SS-3. Six-Month Health Check (Once per Calendar Year)

1.5 100% Compliance Periodic Surveillance

SS-4. Annual Machine Recertification (Every 12 Months):

1.6. 100% Compliance.

Periodic Surveillance

SS-5. Service Report: 1.12. 100% Compliance.

Periodic Surveillance

SS-6. Red Tagged Items: 1.15. 100% Compliance Periodic Surveillance

SS-7. Safety and Health Plan 1.39. 100% Compliance 100% Surveillance

SECTION THREE

3. GOVERNMENT FURNISHED PROPERTY AND SERVICES.

3.1. Government Furnished Property (GFP). N/A

3.1.1. Government Property Repair/Maintenance (or Similar Requirement) On-Base.

Government Property Repair/Maintenance On-Base is not considered GFP in accordance with (IAW) Federal Acquisition Regulation (FAR) Parts 45 and 52.245 plus supplements. The responsible Government Organizations 76 CMXG for Government Property Repair/Maintenance On-Base will be responsible for the Government Property inventory, record keeping, reporting requirements (including Report of Survey), and disposal during the performance of this contract.

3.2. Government Furnished Services (GFS) are applicable during the performance of this contract. The Government will furnish the following services at Tinker AFB (TAFB), OK:

3.2.1. Security Forces. The Government will provide general on-base security forces’ service.

The security forces’ telephone numbers are 911 for emergencies, 405-734-2000 for crimes in progress and 405-734-3737 for non-emergency calls. The off-base 911 center receives 911 cell phone calls. Cell phone callers need to advise the 911 off-base center they are on TAFB in order to be connected with the on-base 911 center.

3.2.2. Fire Emergency and Routine Services. The Government will provide general on-base fire protection services. The Contractor shall comply with fire prevention rules and regulations enforced by the TAFB Fire Prevention Branch. Call 911 for emergencies. For routine fire prevention matters call 405-734-3981 or 405-734-3982 and 405-734-7964 for after hours and weekends. For routine calls to dispatch call 405-734-7964.

NOTE: If applicable, Government Contracting Officer Representative (COR) or Government Point of Contact (COR) needs to verify if the Government will provide, inspect, and maintain the fire extinguishers in Contractor occupied space.

3.2.3. Utilities. The Government will provide utility services. These utilities include natural gas, electricity, water, and sewer for the sole purpose of accomplishing this contract. If the contractor requires additional utility services, it shall be the contractor’s responsibility to provide. Contractor shall use due care and diligence in efforts to conserve utilities to reduce utility costs.

3.2.4. Workspace. The Government will provide access to the equipment and adequate workspace around the equipment.

3.3. Government Property Incidental to the Government Installation or Site.

Not Applicable

3.4. Intangible Government Property.

Intangible Government Property is not covered by FAR Part 45 plus supplements but is covered by FAR Part 27 and DFARS Part 227 plus supplements.

When applicable and in accordance with Government procedures, the Government will furnish, without cost, Intangible Government Property to the Contractor. All Intangible Government Property shall remain at all times sole property of the U.S. Government. All Intangible Government Property used, input, processed, acquired, modified, developed, and/or generated by the Contractor in support of this contract, in any media, shall remain at all times sole property of the U.S. Government.

The Contractor may not use or disclose any Intangible Government Property for any purpose or in any manner not specifically authorized or required by the contract and this PWS.

The Contractor shall ensure all Intangible Government Property is secured at the close of each workday. The Contractor shall use reasonable care to avoid losing and/or damaging Intangible Government Property. If the Contractor’s failure to use reasonable care causes loss and/or damage to Intangible Government Property, the Contractor shall be liable for the cost to replace the Intangible Government Property, which may be deducted from the contract price.

The Contractor shall use, input, process, maintain, and return all Intangible Government Property in the English language, readable and in a readily retrievable format, which requires no additional software or tools to read and retrieve beyond those already installed on the affected U.S. Government computers. The Contractor shall not return any Intangible Government Property by Universal Serial Bus (USB) thumb drives or equivalent devices.

During contract performance, contract completion, and/or termination, the Contractor shall return all Intangible Government Property to the Government COR or COR. The Contractor shall comply with the applicable contract clauses and this PWS.

3.1. Government Furnished Property (GFP). N/A
3.2. Government Furnished Services (GFS) are applicable during the performance of this contract. The Government will furnish the following services at Tinker AFB (TAFB), OK:

File details come from the government source that posted it. Updated .