OPR: AFCEC/COSC Ver 2.0 12 Oct 2021
ATTACHMENT C
BASIS OF ESTIMATE WORKSHEET
Purpose: To document assumptions and methods used to develop cost estimates for project programmed amount or Independent Cost Estimate (ICE) prior to contract solicitation; assist the independent review of construction cost estimates by government cost reviewers and evaluators; and minimize the financial risk for a given project.
Directions: IAW AFI 32-1020, provide AACEI RP 34R-05 “Basis of Estimate” or otherwise document knowledge of the project, quantities, scope and/or schedule and assumptions.
Provide concise details and a clear explanation of the project. Details or descriptions may be copied from supporting documents as appropriate. Cite sources.
1. GENERAL
Project Title:
Project Number (ABCD NN-NNNN):
Project Location (Installation/State or Country):
Project Program Year (FY):
Name/rank/role of persons in team writing the estimate:
Organization of person(s) writing the estimate:
Date of estimate (MMM-YY):
2. PROJECT SUMMARY
Time & Duration of Construction: Project Midpoint, Key Milestones:
Estimated Construction Start Date (MMM-YY):
Estimated Number of Months of Construction (MM):
Estimated Midpoint of Construction (MMM-YY):
Temporary or Swing Space Required – Gross Square Feet (GSF)/Gross Square Meters (GSM):
Purpose & Class of Estimate/Level of Design planning (Planning, Programming, Pre-Award):
Scope (separated between new and renovation work):
Facility/building type/uses:
Category Codes:
Floor area – GSM/GSF (Horizontal facilities M/FT):
Height – Number of stories, M/FT:
Describe facility/building systems (edit as required) A – Substructure A10 – Foundations
A40 – Slabs on Grade
B – Shell B10 – Superstructure
B20 – Exterior Walls
B30 – Roofing
C – Interiors C10 – Interior Construction
C20 – Stairs (as required)
C30 – Interior Finishes
D – Services D10 – Conveyances (as required)
D20 – Plumbing
D30 – HVAC
D40 – Fire Protection
D50 – Electrical
F – Special Construction & Demolition F20 – Selective Building Demolition (as required)
G – Building Sitework G10 – Site Preparation
G20 – Site Improvements
G30 – Site Civil/Mechanical Utilities
G40 – Site Electrical Utilities
AT/FP considerations and elements:
Cybersecurity:
Environmental mitigation & permits:
Extraordinary elements:
Deviations from AF standard design and/or Unified Facility Criteria corporate standards (list, narrative):
3. KEY ASSUMPTIONS
Effect on costs (summary):
Unusual schedule requirements:
Exclusions (identify what is not in the project but needed for complete work):
Exceptions (e.g., elements or features different from policy):
Demolition required:
Facility special systems, elements or items included/excluded:
Government-furnished, Contractor-installed equipment; Government-furnished, Government-installed equipment:
Extraordinary items:
4. DESCRIPTION OF ESTIMATE
Methods Used & Limitations Sources of Cost Data Used:
Area Cost Factor(s):
Changes/Markups to Default Data and Justifications:
Duration and Escalation (Justification):
Coordination:
Sustainability and Energy Measures:
Special/Unique Features:
Contracting Method:
Planned Responses to Potential Cost Growth:
ATTACHMENT A – Supporting Documents DD Form 1391 Statement of Work Other reference documents: (e.g., Planning Charrette Report, Smart Start Checklist, PDRI, as-built/existing conditions drawings, project drawings, pictures, etc.):