Madison VA Telecommunications Site Plan.pdf

PDF 1 MB Posted

Attached to
Fiber Optic Cable and installation - Paging System Upgrade and Expansion
Solicitation number
36C25226Q0526
Issued by

About this file

This document is a Telecommunications Site Plan drawing for the EHRM Infrastructure Upgrades project at the University of Wisconsin Hospital in Madison, Wisconsin (2500 Overlook Terrace, Madison, WI 53705).

The project requires the contractor to install four new 4-inch PVC conduits with trench work and landscape restoration, including directional boring at sidewalks, curbs, and asphalt areas. The contractor must provide new 24-fiber redundant OSP OS2 fiber to each outbuilding, with all new underground conduit maintained at a minimum 20-foot separation from existing or new conduits. Key work includes replacing the main incoming WAN fiber from the service provider to Building 01 in coordination with the service provider and the Contracting Officer's Representative (COR), constructing new handholes, installing fiber cable trays within overhead walkways, and relocating existing Cable TV head-end equipment from Building 5 and ground level to the upper penthouse roof of Building 1. Additional requirements include installing new copper conduit with CAT6A fiber between Building 5 and Building 4, coordinating with the COR regarding the University of Wisconsin helicopter pad during D-Wing tower construction, and establishing new cable TV satellite locations on the upper penthouse roof. The contractor must obtain independent utility location services including ground-penetrating radar (GPR) and potholing prior to excavation, hand-dig within 5 feet of known utilities, and provide both hard and electronic copies of the survey to the VA. All damages to utilities caused by contractor negligence must be repaired or replaced at the contractor's expense.

View the file

Other files

File Type Posted
36C25226Q0526.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SERVICE

ENCLOSURE

ROOFTOP UNIT

FLAG

U N

IV

E

R S

IT

Y

B A

Y D

R

IV

E

H

IG

H L A

N D

A V

E

O

VERLO

O

K TER

O V

E R

L O

O K

T E

R

BLDG 1

BLDG

BLDG

BLDG

BLDG

BLDG 5

BLDG

BLDG

UNIVERSITY OF

WISCONSIN HOSPITAL

BLDG

TYP.

TYP.

HH

HH

HH

HH

H H

HH

HH

HH

H H

TYP.

FUTURE PARKING GARAGE LOCATION

M

IN

. 2 0' S

EPERATIO

N, T

YP.TYP.

HH

TYP.

TYP.

TYP.

GROUND FLOOR

SERVER ROOM

C125

M

IN

' S

E P

E R

A T

IO

N

T

Y P

WOODED EMBANKMENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

321 4 5 6 7 8 9 10

KEYNOTES

TRIPLE C - The A/E Group

4625 Lindell Blvd., 2nd Floor, 2064

St. Louis, MO 63108

MAT PERKINS

314-372-0067

STAMP

B

IM

/6

-2

-7

E H

R M

I n fr a s tr u c tu re U p g ra d e s M a d is o n

W I/

-2

-7

.M a d

.E H

R M

.M E

P .S

IT

E

.r v t

/2

/2

:1

:2

A

M

TN100

TELECOMMUNICATIONS SITE PLAN 607-21-700

SITE

07/22/2022 M. PERKINS G. Weaver

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

2500 Overlook Terrace, Madison, WI 53705

LEGEND

SCALE: 1 : 6000

F1

TELECOMMUNICATIONS SITE PLAN

NEW CONDUIT & NEW REDUNDANT CONDUIT

PATH "A"

HH

NEW WAN FIBER FROM SERVICE PROVIDER

NEW HANDHOLE

1. SITE TELECOMMUNICATION FIBER ROUTE. CONTRACTOR TO INSTALL FOUR (4)

NEW 4" PVC CONDUIT, TRENCH AND REPLACE EXISTING LANDSCAPE TO MATCH

EXISTING CONDITIONS. DIRECTIONAL BORE AT SIDEWALK, CURB, AND ASPHALT,

SEE DETAILS ON SHEET T-501 FOR ADDITIONAL INFORMATION. PROVIDE NEW 24F

REDUNDANT OSP OS2 FIBER TO EACH OUTBUILDING, SEE SHEET T-601 FOR

ADDITIONAL INFORMATION.

2. MAIN INCOMING WAN FIBER FROM SERVICE PROVIDER TO B01 TO BE REPLACED,

COORDINATE REPLACEMENT WITH SERVICE PROVIDER AND COR PRIOR TO

COMMENCING WORK.

3. EXISTING DIRECT BURY FACILITY TELEVISION FIBER BACKBONE AND CABLING TO

REMAIN, PROTECT IN PLACE.

4. CONSTRUCT NEW HANDHOLE - SEE DETAIL C1, SHEET T-501

5. CONSTRUCT FIBER CABLE TRAYS WITHIN OVERHEAD WALKWAY

6. ELECTRICAL/TELECOMMUNICATION MANHOLES TO REMAIN, PROTECT IN PLACE.

7. ALL NEW UNDERGROUND CONDUIT INSTALLED MUST BE A MINIMUM OF 20' AWAY

FROM ANY OTHER NEW OR EXISTING CONDUITS.

8. NEW LOCATION FOR CABLE TV SATELITES ON UPPER PENTHOUSE ROOF, SEE

TELECOMMUNICATION SHEETS IN BUILDING PACKAGE 1 FOR ADDITIONAL

INFORMATION.

9. NEW CONDUIT FOR FIBER FOR NEW HEAD-END CATV LOCATION. FIBER RUNS

FROM EXISTING HAND HOLE TO THE ROOF OF THE UPPER PENTHOUSE ON

BUILDING 1. SEE BUILDING 1 TELECOMMUNICATION PLANS FOR RISER LOCATIONS

AND ADDITIONAL INFORMATION.

10. NEW FIBER IN NEW CABLE TRAY/CONDUIT. SEE BUILDING PACKAGES

TELECOMMUNICATION PLANS AND SUBMIT COORDINATION DRAWINGS SHOWING

REDUNDANT, PHYSICALLY SEPARATED FIBER ROUTES.

11. CONTRACTOR TO COORDINATE WITH THE COR FOR THE UNIVERSITY OF

WISCONSIN HELICOPTER PAD DURING CONSTRUCTION OF THE "D-WING" TOWER

FOR BUILDING 1.

12. EXISTING CABLE TV HEAD-END EQUIPMENT ON THE ROOF AND ON THE GROUND

LEVEL IN BUILDING 5, TO BE RELOCATED TO THE UPPER PENTHOUSE ROOF OF

BUILDING 1. SEE BUILDING 1 PACKAGE FOR ADDITIONAL INFORMATION.

13. CONTRACTOR TO INSTALL NEW UNDERGROUND COPPER CONDUIT WITH CAT 6A

FIBER FROM BUILDING 5 TO BUILDING 4.

OEHRM OUTSIDE PLANT (OSP) FIBER SPECIFICATIONS

BUILDING OUTLINE

NOT TO SCALE

B3

B01 WEST SIDE UNDERGOURND FIBER ENTRANCE

NEW CONDUIT & NEW REDUNDANT CONDUIT

PATH "B" (CABLE TV FIBER TO FOLLOW SAME

ROUTE AS TELECOMMUNICATION FIBER ON SITE)

NEW COPPER CONDUIT WITH NEW CAT6A

FIBER

EXISTING MANHOLE

SURVEY INFORMATION OF SITE DETERMINED FROM

VA SUPPLIED AS-BUILT DRAWINGS AND ,

PHOTOGRAPHIC AND VISUAL SURVEY CONDUCTED

BY TRIPLE C. CONSTRUCTION MAY HAVE OCCURRED

ON THIS SITE SINCE THE SURVEY WAS COMPLETED.

CONDITION OF THE SITE MAY VARY FROM THE

SURVEYED CONDITION. UTILITY LOCATIONS ARE IN

APPROXIMATE LOCATION.

GENERAL CONTRACTOR TO RETAIN SERVICE FROM

INDEPENDENT CONTRACTOR TO VERIFY AND MARK

ON CONSTRUCTION DRAWINGS AND ON SITE THE

LOCATION OF ALL UNDERGROUND UTILITIES

ASSOCIATED WITH THIS PROJECT. SURVEY WILL

REQUIRE BOTH GPR LOCATION AND POTHOLING FOR

VERIFICATION. SEE SPECIFICATIONS 02 21 13 SITE

SURVEYS

CONTRACTOR TO PROVIDE UTILITY LOCATION

SERVICE PRIOR TO EXCAVATION FOR VERIFICATION

OF LOCATION AND DEPTH OF ALL UTILITIES TO

PROVIDE NON-INTERRUPTION OF SERVICE, TO

ENSURE PROPER CLEARANCE/SEPARATION, AND TO

AVOID DAMAGE THERETO. UTILITIES DAMAGED

THROUGH NEGLIGENCE OF THE CONTRACTOR TO

OBTAIN LOCATION OF SAME SHALL BE REPAIRED OR

REPLACED BY THE CONTRACTOR AT HIS EXPENSE.

CONTRACTOR SHALL PROVIDE ONE HARD AND ONE

ELECTRONIC COPY OF SURVEY TO THE VA.

CONTRACTOR TO HAND DIG WITHIN 5' OF KNOWN

UTILITIES.

SURVEY NOTES

FIBER IN NEW CABLE TRAY OR J HOOKS

Revisions: Date:

Revision 1 Date 1

NOT TO SCALE

C2

EXISTING CATV EQUIPMENT - B05

07/22/202207 /22

/20

HH

= Delete = Revised Boring Routing

HH

HH

HH

= Revised Excavation Routing

File details come from the government source that posted it. Updated .