Madison VA Telecommunications Site Plan.pdf
PDF 1 MB Posted
- Solicitation number
- 36C25226Q0526
About this file
This document is a Telecommunications Site Plan drawing for the EHRM Infrastructure Upgrades project at the University of Wisconsin Hospital in Madison, Wisconsin (2500 Overlook Terrace, Madison, WI 53705).
The project requires the contractor to install four new 4-inch PVC conduits with trench work and landscape restoration, including directional boring at sidewalks, curbs, and asphalt areas. The contractor must provide new 24-fiber redundant OSP OS2 fiber to each outbuilding, with all new underground conduit maintained at a minimum 20-foot separation from existing or new conduits. Key work includes replacing the main incoming WAN fiber from the service provider to Building 01 in coordination with the service provider and the Contracting Officer's Representative (COR), constructing new handholes, installing fiber cable trays within overhead walkways, and relocating existing Cable TV head-end equipment from Building 5 and ground level to the upper penthouse roof of Building 1. Additional requirements include installing new copper conduit with CAT6A fiber between Building 5 and Building 4, coordinating with the COR regarding the University of Wisconsin helicopter pad during D-Wing tower construction, and establishing new cable TV satellite locations on the upper penthouse roof. The contractor must obtain independent utility location services including ground-penetrating radar (GPR) and potholing prior to excavation, hand-dig within 5 feet of known utilities, and provide both hard and electronic copies of the survey to the VA. All damages to utilities caused by contractor negligence must be repaired or replaced at the contractor's expense.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25226Q0526.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SERVICE
ENCLOSURE
ROOFTOP UNIT
FLAG
U N
IV
E
R S
IT
Y
B A
Y D
R
IV
E
H
IG
H L A
N D
A V
E
O
VERLO
O
K TER
O V
E R
L O
O K
T E
R
BLDG 1
BLDG
BLDG
BLDG
BLDG
BLDG 5
BLDG
BLDG
UNIVERSITY OF
WISCONSIN HOSPITAL
BLDG
TYP.
TYP.
HH
HH
HH
HH
H H
HH
HH
HH
H H
TYP.
FUTURE PARKING GARAGE LOCATION
M
IN
. 2 0' S
EPERATIO
N, T
YP.TYP.
HH
TYP.
TYP.
TYP.
GROUND FLOOR
SERVER ROOM
C125
M
IN
' S
E P
E R
A T
IO
N
T
Y P
WOODED EMBANKMENT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
CONSULTANT
321 4 5 6 7 8 9 10
KEYNOTES
TRIPLE C - The A/E Group
4625 Lindell Blvd., 2nd Floor, 2064
St. Louis, MO 63108
MAT PERKINS
314-372-0067
STAMP
B
IM
/6
-2
-7
E H
R M
I n fr a s tr u c tu re U p g ra d e s M a d is o n
W I/
-2
-7
.M a d
.E H
R M
.M E
P .S
IT
E
.r v t
/2
/2
:1
:2
A
M
TN100
TELECOMMUNICATIONS SITE PLAN 607-21-700
SITE
07/22/2022 M. PERKINS G. Weaver
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
2500 Overlook Terrace, Madison, WI 53705
LEGEND
SCALE: 1 : 6000
F1
TELECOMMUNICATIONS SITE PLAN
NEW CONDUIT & NEW REDUNDANT CONDUIT
PATH "A"
HH
NEW WAN FIBER FROM SERVICE PROVIDER
NEW HANDHOLE
1. SITE TELECOMMUNICATION FIBER ROUTE. CONTRACTOR TO INSTALL FOUR (4)
NEW 4" PVC CONDUIT, TRENCH AND REPLACE EXISTING LANDSCAPE TO MATCH
EXISTING CONDITIONS. DIRECTIONAL BORE AT SIDEWALK, CURB, AND ASPHALT,
SEE DETAILS ON SHEET T-501 FOR ADDITIONAL INFORMATION. PROVIDE NEW 24F
REDUNDANT OSP OS2 FIBER TO EACH OUTBUILDING, SEE SHEET T-601 FOR
ADDITIONAL INFORMATION.
2. MAIN INCOMING WAN FIBER FROM SERVICE PROVIDER TO B01 TO BE REPLACED,
COORDINATE REPLACEMENT WITH SERVICE PROVIDER AND COR PRIOR TO
COMMENCING WORK.
3. EXISTING DIRECT BURY FACILITY TELEVISION FIBER BACKBONE AND CABLING TO
REMAIN, PROTECT IN PLACE.
4. CONSTRUCT NEW HANDHOLE - SEE DETAIL C1, SHEET T-501
5. CONSTRUCT FIBER CABLE TRAYS WITHIN OVERHEAD WALKWAY
6. ELECTRICAL/TELECOMMUNICATION MANHOLES TO REMAIN, PROTECT IN PLACE.
7. ALL NEW UNDERGROUND CONDUIT INSTALLED MUST BE A MINIMUM OF 20' AWAY
FROM ANY OTHER NEW OR EXISTING CONDUITS.
8. NEW LOCATION FOR CABLE TV SATELITES ON UPPER PENTHOUSE ROOF, SEE
TELECOMMUNICATION SHEETS IN BUILDING PACKAGE 1 FOR ADDITIONAL
INFORMATION.
9. NEW CONDUIT FOR FIBER FOR NEW HEAD-END CATV LOCATION. FIBER RUNS
FROM EXISTING HAND HOLE TO THE ROOF OF THE UPPER PENTHOUSE ON
BUILDING 1. SEE BUILDING 1 TELECOMMUNICATION PLANS FOR RISER LOCATIONS
AND ADDITIONAL INFORMATION.
10. NEW FIBER IN NEW CABLE TRAY/CONDUIT. SEE BUILDING PACKAGES
TELECOMMUNICATION PLANS AND SUBMIT COORDINATION DRAWINGS SHOWING
REDUNDANT, PHYSICALLY SEPARATED FIBER ROUTES.
11. CONTRACTOR TO COORDINATE WITH THE COR FOR THE UNIVERSITY OF
WISCONSIN HELICOPTER PAD DURING CONSTRUCTION OF THE "D-WING" TOWER
FOR BUILDING 1.
12. EXISTING CABLE TV HEAD-END EQUIPMENT ON THE ROOF AND ON THE GROUND
LEVEL IN BUILDING 5, TO BE RELOCATED TO THE UPPER PENTHOUSE ROOF OF
BUILDING 1. SEE BUILDING 1 PACKAGE FOR ADDITIONAL INFORMATION.
13. CONTRACTOR TO INSTALL NEW UNDERGROUND COPPER CONDUIT WITH CAT 6A
FIBER FROM BUILDING 5 TO BUILDING 4.
OEHRM OUTSIDE PLANT (OSP) FIBER SPECIFICATIONS
BUILDING OUTLINE
NOT TO SCALE
B3
B01 WEST SIDE UNDERGOURND FIBER ENTRANCE
NEW CONDUIT & NEW REDUNDANT CONDUIT
PATH "B" (CABLE TV FIBER TO FOLLOW SAME
ROUTE AS TELECOMMUNICATION FIBER ON SITE)
NEW COPPER CONDUIT WITH NEW CAT6A
FIBER
EXISTING MANHOLE
SURVEY INFORMATION OF SITE DETERMINED FROM
VA SUPPLIED AS-BUILT DRAWINGS AND ,
PHOTOGRAPHIC AND VISUAL SURVEY CONDUCTED
BY TRIPLE C. CONSTRUCTION MAY HAVE OCCURRED
ON THIS SITE SINCE THE SURVEY WAS COMPLETED.
CONDITION OF THE SITE MAY VARY FROM THE
SURVEYED CONDITION. UTILITY LOCATIONS ARE IN
APPROXIMATE LOCATION.
GENERAL CONTRACTOR TO RETAIN SERVICE FROM
INDEPENDENT CONTRACTOR TO VERIFY AND MARK
ON CONSTRUCTION DRAWINGS AND ON SITE THE
LOCATION OF ALL UNDERGROUND UTILITIES
ASSOCIATED WITH THIS PROJECT. SURVEY WILL
REQUIRE BOTH GPR LOCATION AND POTHOLING FOR
VERIFICATION. SEE SPECIFICATIONS 02 21 13 SITE
SURVEYS
CONTRACTOR TO PROVIDE UTILITY LOCATION
SERVICE PRIOR TO EXCAVATION FOR VERIFICATION
OF LOCATION AND DEPTH OF ALL UTILITIES TO
PROVIDE NON-INTERRUPTION OF SERVICE, TO
ENSURE PROPER CLEARANCE/SEPARATION, AND TO
AVOID DAMAGE THERETO. UTILITIES DAMAGED
THROUGH NEGLIGENCE OF THE CONTRACTOR TO
OBTAIN LOCATION OF SAME SHALL BE REPAIRED OR
REPLACED BY THE CONTRACTOR AT HIS EXPENSE.
CONTRACTOR SHALL PROVIDE ONE HARD AND ONE
ELECTRONIC COPY OF SURVEY TO THE VA.
CONTRACTOR TO HAND DIG WITHIN 5' OF KNOWN
UTILITIES.
SURVEY NOTES
FIBER IN NEW CABLE TRAY OR J HOOKS
Revisions: Date:
Revision 1 Date 1
NOT TO SCALE
C2
EXISTING CATV EQUIPMENT - B05
07/22/202207 /22
/20
HH
= Delete = Revised Boring Routing
HH
HH
HH
= Revised Excavation Routing
File details come from the government source that posted it. Updated .