Mad Creek Bridge Replacement Plans_11-30-22.pdf
PDF 6 MB Posted
- Solicitation number
- 1094020
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a summary of construction plans and specifications for the GAOA Mad Creek Bridge Replacement project on the Medicine Bow National Forest in Routt County, Colorado. The project involves replacing an existing timber bridge with a new prefabricated steel truss bridge spanning 84.5 feet over Mad Creek. Key requirements include mobilization; surveying; soil erosion and pollution control; removal of the existing bridge abutments and superstructure; structural excavation and backfill; placement of 145 cubic yards of class 4 riprap; geocell abutment stabilization; 21 cubic yards of crushed aggregate surfacing; 3.1 miles of roadway reconditioning; two precast concrete abutments; a prefabricated steel bridge superstructure; seeding; wood posts; and object markers. The estimated cost is $350,000. Bids for the project are due by January 15, 2023, with construction to be completed by July 31, 2023. The Forest Service will administer the contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Mad Creek Bridge Prebid Notes_lr draft.docx | DOCX document | |
| Amendment No. 1.pdf | ||
| Wage Determination.pdf | ||
| Mad Creek Bridge FSSS Final_11-30-22.pdf | ||
| 1240LT23R0026.pdf | ||
| SOW HPBE RD MAD CREEK TRAIL BRIDGE REPLACEMENT 20230314.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE, ROCKY MOUNTAIN REGION
MEDICINE BOW-ROUTT NATIONAL FORESTS
HAHNS PEAK BEARS EARS RANGER DISTRICT
ROUTT COUNTY, COLORADO
CONSTRUCTION PLANS FOR:
MAD CREEK TRAIL
BRIDGE REPLACEMENT
NFSR 128.1 MP 3.1
VICINITY MAP
MATERIAL SOURCES
CONTRACTOR FURNISHED
THERE ARE NO GOVERNMENT
PROVIDE MATERIAL SOURCES
FOR THIS PROJECT
INDEX TO SHEETS
NO. DESCRIPTION
1 TITLE SHEET
ESTIMATED QUANTITIES &
GENERAL NOTES
TRAIL TYPICAL SECTION &
POINT TABLES
4 TRAIL PLAN AND PROFILE
5 BRIDGE GENERAL LAYOUT
6 FOUNDATION PLAN
7 EXCAVATION & BACKFILL
8 - 9 ABUTMENT DETAILS
XS1 - XS3 TRAIL CROSS SECTIONS
PROJECT
LOCATION
R
W R
W
T6N T7N
PROJECT LOCATION:
40.586905°N -106.865881°W
ENGINEERS
PLANNERS
SURVEYORS
FOREST ENGINEER
MEDICINE BOW-ROUTT NATIONAL FORESTS
I HAVE REVIEWED THE TECHNICAL ASPECTS OF
THESE DRAWINGS:
DATE
REGIONAL BRIDGE ENGINEER
ROCKY MOUNTAIN REGION
RECOMMENDED BY:
DATE
FOREST SUPERVISOR
MEDICINE BOW-ROUTT NATIONAL FORESTS
APPROVED BY:
DATE
REGIONAL ENGINEER
ROCKY MOUNTAIN REGION
DATE
ENGINEERING/REGIONAL SPECIALIST
ROCKY MOUNTAIN REGION
DATE
PROJECT MANAGER
DATE
DISTRICT RANGER
HAHNS PEAK/BEARS EARS RANGER DISTRICT
DATE
PROJECT
LOCATION
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
/30
/22
:4 3 C
LA
IR
E.
TH
OM
SO
N F:
\70
.03 F
IS
H
CR
EE
K
TR
AI
L-
MA
D
CR
EE
K
BR
ID
GE
\D W
G\
.03
M
AD
C
RE
EK
D
ES
IG
N
' S
PA
N.
DW
G;
REGION 2
ROCKY MOUNTAIN REGION
ESTIMATED
QUANTITIES &
GENERAL NOTES
Nov-22
C. THOMSON
P. JACKSON
A. GROESBECK
7034.03
MEDICINE BOW-ROUTT
NATIONAL FORESTS
MAD CREEK TRAIL
BRIDGE
REPLACEMENT
NFSR 128.1 MP 3.1
HAHNS PEAK/BEARS EARS
RANGER DISTRICT
SPECIFICATIONS: Construct the project in compliance with Federal Highway Administration Standard Specifications for Construction of Road and Bridges on Federal Highway Projects (FP-14) and applicable Forest Service Supplemental Specifications (FSSS).
DEWATERING & EROSION CONTROL PLAN: Submit a Dewatering and Soil Erosion and Sediment Control Plan to the Contracting Officer for approval at least seven
(7) days prior to beginning work. See Section 157 of the Supplemental Specifications for details. Construct temporary means to divert the flow of the live stream as necessary to perform work. Do not pump water from excavations directly into the live stream.
STREAM CROSSINGS: The Contractor is allowed to cross the live stream during construction with CO approval.
CONCRETE: Use Class A(AE) Concrete for Precast members. The required 28-day compressive strength (F'c) is 5,000 psi with an entrained air content of 5% ±
1%. Finish all precast elements with an ordinary surface finish. Make all concrete in accordance with an approved mix design. Chamfer all exposed edges of concrete 3/4" and fillet all acute angles 3" unless otherwise noted.
REINFORCING STEEL: Use reinforcing steel of the deformed type conforming to AASHTO M31 (ASTM A615) Grade 60. Concrete cover is as shown; where not shown it must conform to AASHTO. Cut and bend reinforcing steel in conformance with ACI 315. Lap splice bars 2' min.
GENERAL NOTES
CQ= Contract Quantity (See SECTION 109.02(b) of the STANDARD SPECIFICATIONS)
SUMMARY OF ESTIMATED QUANTITIES
ITEM
NO.
ITEM DESCRIPTION UNIT
QUANTITY
COMMENTS
15101 MOBILIZATION
Lump Sum
ALL
15201
CONSTRUCTION SURVEY AND STAKING, METHOD 1,
TOLERANCE A
Lump Sum
ALL LICENSED SURVEYOR REQUIRED.
15713 SOIL EROSION & POLLUTION CONTROL
Lump Sum
ALL INCLUDES DEWATERING. SEE GENERAL NOTES.
20301 REMOVAL OF EXISTING BRIDGE, DISPOSAL METHOD A Lump Sum
ALL
EXISTING BRIDGE ABUTMENTS TO BE REMOVED.
EXISTING BRIDGE SUPERSTRUCTURE (NOT INCLUDING
TIMBER DECKING) IS STOCKPILED OFF ROADWAY AND
IS INCLUDED IN THIS ITEM.
20803 STRUCTURAL BACKFILL Cubic Yard 65 CQ
20804 STRUCTURE EXCAVATION
Lump Sum
25101
PLACED RIPRAP, CLASS 4
Cubic Yard 145 CQ
CONTRACTOR FURNISHED MATERIAL FROM A
COMMERCIAL SOURCE. EXISTING ROCK MAY BE
SALVAGED AND INCORPORATED INTO WORK.
27201 GEOCELL ABUTMENT STABILIZATION, 6" DEPTH Square Yard
22 CQ
INCLUDES CONTRACTOR FURNISHED COARSE
GRANULAR BACKFILL AND GEOTEXTILE.
30208
CRUSHED AGGREGATE SURFACING, COMPACTION METHOD 1
Cubic Yards 21 CQ
CONTRACTOR FURNISHED MATERIAL FROM A
COMMERCIAL SOURCE. IN-PLACE QUANTITY, NOT
ADJUSTED FOR SHRINK/SWELL.
30315 ROADWAY RECONDITIONING Mile 3.1 CQ
FOR BRIDGE TRANSPORT TO SITE. INCLUDES REMOVAL
AND REPLACEMENT OF WATERBARS AND POTENTIAL
FOR WIDENING OF ROAD IN SOME LOCATIONS.
55220
PRECAST CONCRETE MEMBER, ABUTMENT
Each 2 AQ
INCLUDES REINFORCING STEEL AND ALL REQUIRED
TESTING.
57101
STEEL PREFABRICATED BRIDGE SUPERSTRUCTURE,
DESIGN, FABRICATE, TRANSPORT AND INSTALL
Lump Sum
ALL
INCLUDES TIMBER DECKING
62504 SEEDING, DRY METHOD WITH MULCH Lump Sum
ALL
63306
POSTS, WOOD
Linear Foot 40 CQ
63307
OBJECT MARKER, TYPE 3
Each 4 AQ
DESIGN: This structure is designed for pedestrian, snow, and HL-5 loading in accordance with AASHTO "LRFD Guide Specifications for Design of
Pedestrian Bridges", 2009, and AASHTO "LRFD Bridge Design Specifications", 9th edition with current interims.
All other loads, combinations of loads, deflection criteria, etc. conforms to the
Guide Specifications for Design of Pedestrian Bridges and the USFS Handbook
7709.56b - Transportation Structures Handbook, Chapter 80 - Trail Bridge
Design.
SUBSTRUCTURE DESIGN NOTES
SUPERSTRUCTURE: The information provided in these plans and notes is intended to show the general configuration, materials, and loading requirements for the bridge superstructure. The superstructure must incorporate the elements shown in the TYPICAL SECTION on Sheet 5 and conform to the dimensions shown. Fabricate all top and bottom chords, verticals, and diagonals, from square or rectangular weathering steel tubing.
Detailed shop drawings and design calculations for the final bridge design must be submitted for review a minimum of 6 weeks prior to fabrication.
Refer to The Forest Service Supplemental Specifications, Section 571, for additional requirements.
DESIGN: The design of all prefabricated bridge superstructure elements shall comply with the AASHTO "LRFD Guide Specifications for Design of Pedestrian
Bridges", 2009, and AASHTO "LRFD Bridge Design Specifications", 9th edition, with current interims. The final design shall be prepared by a licensed professional engineer whose signed seal shall be on the design documents.
Design notes as follows:
90 psf Pedestrian Live Load
10,000 lbs. Vehicular Live Load (H5)
102 psf Ground Snow Load (Routt County Snow Load Mapper)
All other loads, combination of loads, deflection criteria, etc. shall be as specified in the Guide Specifications for Design of Pedestrian Bridges and the
USFS Handbook 7709.56b - Transportation Structures Handbook, Chapter 80 -
Trail Bridge Design.
STEEL FABRICATION: The steel bridge truss shall be fabricated by a plant with AISC-Intermediate Bridge Certification.
MATERIALS:
Steel: Use steel shapes, plates and bars of weathering steel conforming to
ASTM A588 or ASTM A242. Use hollow steel shapes of weathering steel conforming to ASTM A847 or ASTM A606 (Fy= 50,000 psi). Minimum steel thicknesses shall be as specified in the Guide Specifications for Design of
Pedestrian Bridges. Use high strength bolts conforming to AASHTO M164, Type 3, unless noted otherwise. Hardware through oil-based treated wood shall be hot-dipped galvanized per ASTM A123. Hardware through waterborne treatement shall be stainless or hot dip galvanized per ASTM F593 or ASTM
A123. All welding shall conform to the Bridge Welding Code, AWS D1.5.
Timber Decking: Furnish decking of pressure-treated Douglas-Fir Larch, No. 1 or better. Treatment to be AWPA UC4A, either oil-based or waterborne treatment as listed below:
Copper Naphthenate in hydrocarbon solvent A
Alkaline Copper Quat (formulation A, B, C, or D), Copper Azole
(formulation B or C), or Micronized copper azole (formulation C).
Alternate oil-based or waterborne products when approved equal. Field treat all cuts, bores, holes, and other alternations with 3-brush coats of Copper
Naphthenate, or AWPA M4.
PREFABRICATED SUPERSTRUCTURE NOTES:
OPTIONAL ITEMS
55220
PRECAST CONCRETE MEMBER, COLORED CONCRETE
ABUTMENT
Each 2 AQ COLOR TO BE COORDINATED WITH CO.
CP-1
CP-2
CP-3
CP-4
CENTERLINE POINTS
POINT #
NORTHING
1459288.8989
1459299.3600
1459309.8211
1459317.3699
1459340.3603
1459340.4317
1459425.5872
1459427.0427
1459441.0929
1459456.1713
1459466.7704
1459474.7211
1459481.6547
1459484.6189
1459485.1951
1459485.5799
1459484.4823
EASTING
2620225.4501
2620242.4961
2620259.5420
2620271.8424
2620287.8605
2620287.8747
2620304.8433
2620305.1333
2620305.4159
2620303.0372
2620295.8129
2620282.2658
2620270.4518
2620261.1269
2620254.3489
2620242.7324
2620229.0107
ELEVATION
7153.13
7151.43
7150.31
7149.91
7150.00
7150.00
7150.00
7149.99
7149.85
7150.39
7151.90
7154.30
7156.09
7156.98
7157.41
7158.02
7158.77
DESCRIPTION
STA 0+50.00
STA 0+70.00
STA 0+90.00
STA 1+04.43 PC
STA 1+33.26 PT
STA 1+33.33
STA 2+20.16
STA 2+21.65 PC
STA 2+35.77 PT
STA 2+51.04 PC
STA 2+64.29 PT
STA 2+80.00
STA 2+93.70 PC
STA 3+03.56 PT
STA 3+10.37 PC
STA 3+22.00
STA 3+35.77 PT
LAYOUT POINTS
POINT #
NORTHING
1459341.5758
1459424.4431
EASTING
2620288.1027
2620304.6153
ELEVATION
7145.39
7145.39
DESCRIPTION
ABUTMENT 1 LAYOUT
ABUTMENT 2 LAYOUT
CONTROL POINT TABLE
POINT #
CP-1
CP-2
CP-3
CP-4
NORTHING
1459150.34
1459221.47
1459574.11
1459549.64
EASTING
2620024.12
2620342.67
2620350.04
2620108.68
ELEVATION
7170.67
7172.76
7180.13
7170.38
DESCRIPTION
SET - AC
SET - AC
SET - AC
SET - AC
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
/30
/22
:5 7 C
LA
IR
E.
TH
OM
SO
N F:
\70
.03 F
IS
H
CR
EE
K
TR
AI
L-
MA
D
CR
EE
K
BR
ID
GE
\D W
G\
.03
M
AD
C
RE
EK
D
ES
IG
N
' S
PA
N.
DW
G;
REGION 2
ROCKY MOUNTAIN REGION
TRAIL TYPICAL
SECTION & POINT
TABLES
Nov-22
C. THOMSON
P. JACKSON
A. GROESBECK
7034.03
MEDICINE BOW-ROUTT
NATIONAL FORESTS
MAD CREEK TRAIL
BRIDGE
REPLACEMENT
NFSR 128.1 MP 3.1
HAHNS PEAK/BEARS EARS
RANGER DISTRICT
TRAIL TYPICAL SECTION
Not to Scale
LEGEND
EXISTING FEATURES
Existing Edge of Water
Major Contour (5')
Minor Contour (1')
Existing Edge of Trail
Existing Bridge
PROJECT CONTROL
1" = 100'
Existing Fence
OBJECT MARKERS: Use 12"x 36" Type 3 object markers colored yellow and black. Use material meeting MUTCD OM-3L or OM-3R specifications. Fasten to post w/ (2) 1/4" Ø machine bolts w/ washers. Field drill bolt holes. Install posts such that the inside edge of the reflectorizied panel is on line with the inside edge of the curb.
OBJECT MARKER TYPE 3
Not to Scale
5'-0" 5'-0"
10'-0"
1'-0"
Crushed Aggregate Surfacing
4" compacted thickness
Centerline
Trail
Profile Grade
1'-0"
1'-0"
5'-0" min. 5'-0" min.
Clearing Limits
Clear to: Toe of fill, Cut daylight, or 5' min. shown.
1.5
-3%
-3
1.5
Transition to 0% Cross
Slope at Bridge. See Plan for Transition Points.
Bridge Washout
M
A
D
C
R
E
E
K
N
F
S
R
12"
2'
Max.
Warning Signs and
Markers
4x4 Rough Sawn
Wood Post
Ditch
* AC = Aluminum Cap
* Abutment layout points are bottom of grade beam elevations.
* Centerline Points are at Profile Grade at stations shown.
2+00
CURVE DATA:
R=35.00
L=28.83'
Δ=47°11'35"
CURVE DATA:
R=40.00
L=14.13'
Δ=20°14'04"
CURVE DATA:
R=15.00
L=13.25'
Δ=50°37'35"
P
C
P C
P
C
PC: 3+10.37
PC: 2+93.70
P T
P
T
P
T
PT: 3+35.77
PT: 3+03.56
CURVE DATA:
R=22.13
L=9.87'
Δ=25°32'57"
CURVE DATA:
R=112.46
L=25.40'
Δ=12°56'31"
0+00 1+00 2+00 3+00 3+50
1.0 0%
-1.00%
S T A
E L
S T
E
S T
E
STA = 3+22.00
EL = 7158.02
60.00' VC
B V C S
B V C E
E V C S
E V C E
PVI STA:0+90.00
PVI ELEV:7149.57
K: 6.05
30.00' VC
B V C S
B V C E
E V C S
E V C E
PVI STA:2+50.00
PVI ELEV:7149.70
K: 1.84
30.00' VC
B V C S
B V C E
E V C S
E V C E
PVI STA:2+95.00
PVI ELEV:7156.60
K: 2.98
PROFILE
Scale: 1" = 30'
PLAN
Existing Ground at
Centerline Road
Centerline Road
Finished Grade
STA 3+22 END TRAIL
WORK MATCH EXISTING
(END SURFACING)
STA 0+50
BEGIN TRAIL WORK
MATCH EXISTING
(BEGIN SURFACING)
Remove and Dispose of
Existing Bridge Debris
Centerline
Trail
Remove and
Dispose of Existing
Bridge Abutments, Typ.
New Edge of
Trail, Typ.
SCALE IN FEET
0 15 30
Toe of
Fill, Typ.
Top of
Cut, Typ.
New Steel
Bridge
Existing Edge of Water, Typ.
M
A
D
C
R
E
E
K
Existing
Fence, Typ.
Existing
Trail, Typ.
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
/30
/22
:4 3 C
LA
IR
E.
TH
OM
SO
N F:
\70
.03 F
IS
H
CR
EE
K
TR
AI
L-
MA
D
CR
EE
K
BR
ID
GE
\D W
G\
.03
M
AD
C
RE
EK
D
ES
IG
N
' S
PA
N.
DW
G;
REGION 2
ROCKY MOUNTAIN REGION
TRAIL PLAN &
PROFILE
Nov-22
C. THOMSON
P. JACKSON
A. GROESBECK
7034.03
MEDICINE BOW-ROUTT
NATIONAL FORESTS
MAD CREEK TRAIL
BRIDGE
REPLACEMENT
NFSR 128.1 MP 3.1
HAHNS PEAK/BEARS EARS
RANGER DISTRICT
Existing Cattle
Guard
Outslope Ditch Away
From Abutment As
Directed By CO, Typ.
Roadway Reconditioning to CR 129
Remove
Existing Tree, Incidental to
Item 20804
Remove Existing
Tree, Incidental to Item 20804
27 CY Cut, 13 CY Fill
Structure Excavation
See Sheet 7
51 CY Cut, 0 CY Fill
New Steel
Bridge
Class 4
Riprap, Typ.
TRAIL CONSTRUCTION NOTES:
1. Quantities shown are in-place, calculated to subgrade and not adjusted for shrink/swell.
2. Construct trail embankment in accordance with FP-14
Section 204.
3. Haul & dispose excess/unsuitable material to the waste site designated by the CO.
TYPICAL SECTION
Scale: 3/8" = 1'-0"
PLAN
ELEVATION
TYPICAL RIPRAP SECTION
Scale 1" = 5'
Existing Ground at
Centerline Trail
Precast Grade
Beam, Typ.
Centerline
Trail
84.50'
CL Bearing to CL Bearing
Centerline Brg.
Abutment 1
FG EL = 7150.00
Centerline Brg.
Abutment 2
FG EL = 7150.00
Prefabricated Steel
Truss Bridge
Centerline Trail
Finished Grade
(FG)
Precast Grade Beam, Typ.
0.00%
Object Marker, Typ.
(1 ea. Corner)
Class 4 Riprap, Typ.
M
A
D
C
R
E
E
K
HYDRAULIC DATA:
Q2 = 960 cfs
Avg. depth = 5.55'
Bankfull width = 60'
Q100 = 1640 cfs
Avg. depth = 6.65'
*Q100 Elevation = 7145.66'
2.3' Freeboard
New Edge of
Trail, Typ.
H
V
12.7'6.16'
Precast Grade
Beam, Typ.
Existing
Ground
Class 4 Riprap
Steel Top
Chord, Typ.
Steel Bottom
Chord, Typ.
Steel Diagonal
Truss Member, Typ.
Toe Plate, Typ.
3x12 PT Lumber
Decking, Typ.
Steel Stringer, Typ.
Steel
Floorbeam
Note: Chords of Truss are parallel.
Safety Rail, Typ.
T y p
SCALE IN FEET
0 10 20
84.5' - Total Truss Length
Object Marker, Typ.
(1 ea. Corner)
Precast
Wingwall, Typ.
Geocell, Typ.
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
/30
/22
:4 3 C
LA
IR
E.
TH
OM
SO
N F:
\70
.03 F
IS
H
CR
EE
K
TR
AI
L-
MA
D
CR
EE
K
BR
ID
GE
\D W
G\
.03
M
AD
C
RE
EK
D
ES
IG
N
' S
PA
N.
DW
G;
REGION 2
ROCKY MOUNTAIN REGION
BRIDGE GENERAL
LAYOUT
Nov-22
C. THOMSON
P. JACKSON
A. GROESBECK
7034.03
MEDICINE BOW-ROUTT
NATIONAL FORESTS
MAD CREEK TRAIL
BRIDGE
REPLACEMENT
NFSR 128.1 MP 3.1
HAHNS PEAK/BEARS EARS
RANGER DISTRICT
10'-6"
2+00
3'
Geocell, Typ.
10'-0"
S T A
C e n t e r l i n e
B r g
A b u t
S T A
C e n t e r l i n e
B r g
A b u t
Precast Wingwall, Typ.
NOTE: See Prefabricated Superstructure Design Notes on
Sheet 2 for additional superstructure design requirements.
Class 4
Riprap, Typ.
21'-6"
Typ.
7'-0"
Typ.
NOTE: Use existing natural boulders in addition to Class 4 riprap for bank protection. Maintain existing natural boulders throughout stream and streambank, and ultilize any additional natural boulders found during excavation for bank protection.
Class 2 Seperation
Geotextile Filter
(714.01), Cost to be Included in Bid
Item 25101
2+00
P C
P T
Layout Pt.
Layout Pt.
EL 7145.39
Grade Beam
EL 7144.89
Geocell
EL 7145.39
Grade Beam
EL 7144.89
Geocell
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
/30
/22
:4 3 C
LA
IR
E.
TH
OM
SO
N F:
\70
.03 F
IS
H
CR
EE
K
TR
AI
L-
MA
D
CR
EE
K
BR
ID
GE
\D W
G\
.03
M
AD
C
RE
EK
D
ES
IG
N
' S
PA
N.
DW
G;
REGION 2
ROCKY MOUNTAIN REGION
FOUNDATION PLAN
Nov-22
C. THOMSON
P. JACKSON
A. GROESBECK
7034.03
MEDICINE BOW-ROUTT
NATIONAL FORESTS
MAD CREEK TRAIL
BRIDGE
REPLACEMENT
NFSR 128.1 MP 3.1
HAHNS PEAK/BEARS EARS
RANGER DISTRICT
PLAN
SCALE IN FEET
0 5 10
84.50'
CL Bearing to CL Bearing
Edge of
Water, Typ.
Centerline
Road, Typ.
M
A
D
C
R
E
E
K
2'-6"
G e o c e l l
A
DETAIL
Not to Scale
SECTION
Not to scale
17'-0" Abutment
19'-0" Geocell
1'-0"
Precast Concrete
Abutment
G e o c e l l
Subexcavation
& Backfill
Centerline Trail
Centerline Structure
SECTION
Not to scale
17'-0" Abutment
19'-0" Geocell
1'-0" 1'-0"
Precast Concrete
Abutment
G e o c e l l
Subexcavation
& Backfill
Centerline Trail
Centerline Structure
A
Finished
Grade
Precast Concrete Abutment.
See Abutment Details
Bridge
Superstructure
Structural
Backfill per
704.04
Geotextile
See Note 4
2'-6"
Outline of
Geocell, Typ.
1'-6"
A b u t m e n t
1'-6"
S T A
C e n t e r l i n e
B r g
A b u t
S T A
C e n t e r l i n e
B r g
A b u t
S u b e x c a v a t i o n
L a y e r o f
G e o c e l l
1'-0"
Typ.
7'-0" Subexcavation
& Backfill
5'-0" Geocell
See Geocell Note 1
TYPICAL GEOCELL
1. Place Geocell on compacted structural backfill wrapped in Class 1, Type A
Geotextile.
2. Install Geocell in accordance with Forest Service Supplemental Specifications
(FSSS) 272.06, holding lines and grades in place with suitable side forms
(i.e. "stretcher frames" or steel stakes) to ensure cells are expanded to the minimum dimension required by the manufacturer.
3. Backfill Geocell with coarse granular backfill per subsection 703.03(a) of the
Standard Specifications.
4. Place Class 1, Type A Separation Geotextile under Geocell and wrap over top after backfilling (incidentai to Item 27201).
5. Extend Geocell 1' minimum beyond limits of grade beam on all sides.
GEOCELL NOTES:
1'-0"
Upstream Side
Upstream Side
Existing Ground
Existing Ground
3'-0"
5'-0"
Downstream Side Downstream Side
2'-0" Subexcavation
ABUTMENT 1 ABUTMENT 2
2'-0" Subexcavation
Min. Lap
Length 2'
Subexcavate to 2' below bottom of geocell and 1' beyond the edges of geocell. Backfill with Structural
Backfill, Item 20803.
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
/30
/22
:4 3 C
LA
IR
E.
TH
OM
SO
N F:
\70
.03 F
IS
H
CR
EE
K
TR
AI
L-
MA
D
CR
EE
K
BR
ID
GE
\D W
G\
.03
M
AD
C
RE
EK
D
ES
IG
N
' S
PA
N.
DW
G;
REGION 2
ROCKY MOUNTAIN REGION
EXCAVATION &
BACKFILL
Nov-22
C. THOMSON
P. JACKSON
A. GROESBECK
7034.03
MEDICINE BOW-ROUTT
NATIONAL FORESTS
MAD CREEK TRAIL
BRIDGE
REPLACEMENT
NFSR 128.1 MP 3.1
HAHNS PEAK/BEARS EARS
RANGER DISTRICT
Limits of Structure
Excavation, typ.
Finish Ground
Profile
1.5
Approximate
Existing Ground
2'
Typ.
Backfill the area behind the Bridge with Structural
Backfill (704.04)
1.5
Structure Excavation Area
Waste Removal and Haul is
Incidental to Structural
Excavation [Item 20804].
Approximately 350 CY*.
Note: All material outside the
Structural Backfill limits must meet the requirements for
Unclassified Borrow (704.06)
STRUCTURE EXCAVATION
No Scale
LOOKING UPSTREAM
Remove Existing
Bridge Abutment
1. Complete Structure Excavation in accordance with FP-14 Section
208.
2. The Contractor is solely responsible for excavation support and compliance with all applicable OSHA regulations.
3. Excavation limits shown comply with OSHA sloping and benching requirements based on Soil Types found during soils exploration.
Notify the CO immediately if actual conditions vary from the soil types shown.
4. Submit an Excavation Plan for approval that includes, as a minimum, the following: drawings and a written outline illustrating and describing the proposed excavation limits, methods, equipment to be used, location of stockpiles, and estimated quantities. The
Excavation Plan must comply with all applicable OSHA requirements. Changes to the excavation limits shown here for the
Contractor's dewatering methods or Contractor convenience must be shown on the Plan and are the responsibility of the Contractor.
The Excavation Plan is incidental to the work.
1. Place Structural Backfill meeting FP-14 Subsection 704.04 at the ends of the bridge in accordance with Subsection 208.10 and compact in accordance with
Subsection 208.10.
2. The Structural Backfill limits shown here are the minimum requirements.
3. It is assumed that material from Structure Excavation at this site will not be suitable for re-use. Remove and haul all unsuitable material to the designated waste site. Any material deemed suitable may be used upon approval by the CO.
4. Any material outside the limits shown for Structural Backfill must meet the requirements of Subsection 704.06, Unclassified Borrow.
STRUCTURE EXCAVATION NOTES:
BACKFILL NOTES:
1. Protect against soil erosion and sedimentation during construction in accordance with FP-14 Section 157 and the project permits. Prepare and submit a Soil Erosion and Sediment Control Plan to the CO for approval prior to beginning work. Include drawings and written outline illustrating and describing the proposed layout, methods, and equipment.
SOIL EROSION CONTROL:
1. Complete Structure Removal in accordance with FP-14 Section 203.
2. Submit a Demolition Plan for approval that includes, as a minimum, the following:
drawings and a written outline illustrating and describing the methods, equipment to be used, and estimated quantities. The Demolition Plan must comply with all applicable OSHA requirements. The Excavation Plan is incidental to the work.
STRUCTURE DEMOLITION NOTES:
ABUT. 1
ABUT. 2
*Estimated quantity is in-place with no adjustment for shrink/swell.
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
/29
/22
:4 1 C
LA
IR
E.
TH
OM
SO
N F:
\70
.03 F
IS
H
CR
EE
K
TR
AI
L-
MA
D
CR
EE
K
BR
ID
GE
\D W
G\
.03
M
AD
C
RE
EK
D
ET
AI
LS
.D
W G;
REGION 2
ROCKY MOUNTAIN REGION
ABUTMENT DETAILS
Nov-22
C. THOMSON
P. JACKSON
A. GROESBECK
7034.03
MEDICINE BOW-ROUTT
NATIONAL FORESTS
MAD CREEK TRAIL
BRIDGE
REPLACEMENT
NFSR 128.1 MP 3.1
HAHNS PEAK/BEARS EARS
RANGER DISTRICT
ABUTMENT PLAN
Scale: 3/8" = 1'-0"
ABUTMENT 1 SHOWN
ABUTMENT 2 SIMILAR
ABUTMENT ELEVATION
Scale: 3/8" = 1'-0"
ABUTMENT 1 SHOWN
ABUTMENT 2 SIMILAR
SECTION
Scale: 3/4" = 1'-0"
ABUTMENT 1 SHOWN
ABUTMENT 2 SIMILAR
ABUTMENT REINFORCEMENT
Symmetrical about
Centerline Structure
Centerline
Bearing
17'-0"
2'-8
" 5'-9
5'-3" 3'-3"
Steel Cap
Plate
Steel Cover
Plate
3'-6" 5'-0"
Bridge Anchor Bolts
& Bearing per
Fabricator
4'-0"
A
Concrete Grade
Beam
Toe Plate
Bridge Anchor Bolts
& Bearing per
Fabricator
Precast Concrete
Abutment
A
DETAIL
Scale: 3/4" = 1'-0"
10" 4"
(3) Equal Spaces
(4) #8 Bars Top & Bottom
#4 Bar, Each Face
2"
Clr. Typ.
3'-0"
32"
#4 Hoop
20"
E q u a l
S p a c e s
H o r i z o n t a l
B a r s
#4 Vert. at 12"
O.C. Max
#4 Horizontal
Bar, Typ.
10"
Steel Cap
Plate
See DETAIL
A
A
2"
(10) Spaces at 10" oc. = 8'-4" Finish Grade
Stream Face of Abutment
Fill To Spill
Around End of Abutment
Fill Slope
Behind
17'-0" Out-to-Out Abutment
(11) #4 Hoops
(Symmetrical About CL Structure)
Symmetrical about
Centerline Structure
Precast Concrete
Abutment
PT Lumber
Decking
Steel Truss
PT Lumber
Decking
Steel Bottom
Chord
Steel
Floorbeam
Steel Stringer
Note: All dimensions to be coordinated with bridge fabricator's final design.
4"
1'-9"
(8) Spaces at 11
" oc. = 7'-10"
(9) #4 Bars
(Symmetrical About CL Structure)
6"
Abutment to Bridge
Superstructure Connection
Note: Steel cap plate and reinforcement incidental to pay item 55220.
A
See DETAIL
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
/29
/22
:4 1 C
LA
IR
E.
TH
OM
SO
N F:
\70
.03 F
IS
H
CR
EE
K
TR
AI
L-
MA
D
CR
EE
K
BR
ID
GE
\D W
G\
.03
M
AD
C
RE
EK
D
ET
AI
LS
.D
W G;
REGION 2
ROCKY MOUNTAIN REGION
ABUTMENT DETAILS
Nov-22
C. THOMSON
P. JACKSON
A. GROESBECK
7034.03
MEDICINE BOW-ROUTT
NATIONAL FORESTS
MAD CREEK TRAIL
BRIDGE
REPLACEMENT
NFSR 128.1 MP 3.1
HAHNS PEAK/BEARS EARS
RANGER DISTRICT
ABUTMENT TO BRIDGE SUPERSTRUCTURE CONNECTION
A
DETAIL
Scale: 1 1/2" = 1'-0"
CAP PLATE
B
DETAIL
Scale: 3/4" = 1'-0"
COVER PLATE
C
DETAIL
Scale: 3/4" = 1'-0"
Precast Concrete
Abutment
1/2"Ø A325 Bolt
(Countersunk)
Steel Cap Plate
Loop Ferrule
Insert
1/8"
Beveled
Edge
1/8"
Beveled
Edge
9/16"Ø Countersunk
Hole, Typ.
A
A
1/2" Plate
See DETAIL
B
Steel Cover Plate
See DETAIL
C
SECTION A-A
5"
1"
1 2
(5) Spaces at 15" oc. = 6'-3"
8'-0"
9/16"Ø Countersunk
Hole, Typ.
SECTION A-A
(5) Spaces at 15" oc. = 6'-3"
Loop Ferrule Spacing
3" 3"
8'-0"
A
A
3" Typ.
C10x15.3
1/2" x 4" Headed
Concrete Anchor, Typ.
Loop Ferrule
Insert, Typ.
Headed Concrete
Anchor, Typ.
Note: Loop Ferrule Insert not shown for clarity.
(6) Spaces at 15" oc. Staggered = 7'-6"
Headed Concrete Anchor Spacing
PT Timber Decking
Field Cut 2" x 4" As
Required. Field Treat
Per Prefabricated
Superstructure Notes
Steel Stringer
3"
Steel
Floorbeam
5' 5'
1+34.50
2+19.00
-20 0 20
-20 0 20
0+50.00
0+70.00
0+90.00
1+04.43
1+33.26
1+33.33
-20 0 20
-20 0 20
-20 0 20
-20 0 20
-20 0 20
-20 0 20
Existing Ground, Typ.
Typ. Typ.
-2 .0% -2.0%
1.5
Match Existing Cross Slopes
Typical Cross Slopes
Typical Cut Slope
1.5
Typical Fill Slope
BRIDGE REPLACEMENT
TRAIL CROSS SECTIONS
MAD CREEK
ENGINEERS
PLANNERS
SURVEYORS
2+20.16
2+21.65
2+35.77
2+51.04
2+64.22
2+80.00
-20 0 20
-20 0 20
-20 0 20
-20 0 20
-20 0 20
-20 0 20
1.5
Typ. Typ.
Typical Fill Slope
Typical Cross Slopes
-2.0% -2.0%
5' 5'
Typ. Typ.
5' 5'
1.5
Typical Cut Slope
2+93.70
3+03.56
-20 0 20
-20 0 20
BRIDGE REPLACEMENT
TRAIL CROSS SECTIONS
MAD CREEK
ENGINEERS
Match Existing Cross Slopes
3+10.37
3+22.00
-20 0 20
-20 0 20
1.5
Typical Cut Slope
5' 5'
Typ. Typ.
BRIDGE REPLACEMENT
TRAIL CROSS SECTIONS
MAD CREEK
ENGINEERS
| Sheets and Views |
| 1 COVER |
| 2 ESTIMATED QUANTITIES & GENERAL NOTES |
| 3 TRAIL TYPICAL SECTION & POINT TABLES |
| 4 TRAIL PLAN & PROFILE |
| 5 BRIDGE GENERAL LAYOUT |
| 6 FOUNDATION PLAN |
| 7 EXCAVATION & BACKFILL |
| 8 ABUTMENT DETAILS |
| 9 ABUTMENT DETAILS |
| XS1 XS1 |
| XS2 XS2 |
| XS3 XS3 |
File details come from the government source that posted it. Updated .