Macon OHD MainSpec.docx
DOCX document 114 KB Posted
- Solicitation number
- 300000252585383
- Issued by
- Missouri
About this file
This is a specification document for the FY27 NE Macon Maintenance Building Overhead Door Replacement Project issued by the Missouri Department of Transportation (MoDOT). The project requires the removal and replacement of overhead doors, operators, and associated accessories at MoDOT's Macon Maintenance Building. The specifications call for electric sectional overhead doors meeting ANSI A216.1 standards with insulated panels, glazed openings, and torsion spring counterbalance systems. Door operators must be jackshaft-side mount units with 115/230V single-phase motors, monitored light curtains (Liftmaster LC36M), and adjustable rotary limit switches. Additional requirements include heavy-duty galvanized steel tracks, stainless steel cables with 8:1 safety factors, EPDM rubber seals, and one-year manufacturer warranties on all equipment. Site visit attendance is mandatory for bid acceptance, and bidders must notify the buyer of record, Logan Wilbers (logan.wilbers@modot.mo.gov), at least five business days before the bid closing if submitting hard copy bids. Bids are submitted electronically through MissouriBUYS or by mail, UPS, or FedEx.
The contractor awarded this project is responsible for all aspects of installation, including coordination with electrical contractors for power connections, final equipment adjustments, and complete disposal of all removed items. The specifications require contractors to provide comprehensive project documentation including construction progress schedules, operation and maintenance manuals in three-ring binders, project record documents, and spare parts as specified. Quality assurance provisions mandate that installers be manufacturer-approved specialists with minimum three years of experience. Contractors must execute formal start-up procedures under manufacturer supervision, provide two-week pre-completion demonstrations to owner personnel, and correct any defective work within one year of project completion. All submittals must follow the electronic format requirements outlined in Section 01300, with 15-day review periods for most submissions and specific deadlines for final documentation and punch list completion prior to project closeout.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MODOT 0000000343SL_SUPPLIER.pdf | ||
| Macon OHD Operator Pictures.docx | DOCX document | |
| Macon OHD Plans.pdf | ||
| AWO 33.pdf | ||
| section 01300 and 01700.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TABLE OF CONTENTS
DIVISION PAGE
DIVISION 1 – GENERAL REQUIREMENTS (BROAD SCOPE)
| 01019 | CONTRACT REQUIREMENTS | 2 |
| 01039 | COORDINATION AND MEETING REQUIREMENT | 4 |
| 01300 | SUBMITTAL REQUIREMENTS | 7 |
| 01400 | QUALITY CONTROL REQUIREMENTS | 10 |
| 01500 | CONSTRUCTION FACILITIES AND TEMPORARY CONTROL REQUIREMENTS | 12 |
| 01600 | MATERIAL AND EQUIPMENT REQUIREMENT | 14 |
| 01650 | STARTING OF SYSTEMS REQUIREMENT | 16 |
| 01700 | CONTRACT CLOSEOUT REQUIREMENT | 17 |
DIVISION 8 - DOORS AND WINDOWS
| 08360 | SECTIONAL OVERHEAD DOORS | 19 |
| 08720 | ELECTRIC DOOR OPERATORS | 23 |
01019
CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 SCHEDULE OF VALUES
A. Submit a printed schedule on Contractor's standard form. Electronic media printout will be considered.
B. Submit Schedule of Values in duplicate within 20 days after date of Owner-Contractor Agreement.
C. Revise schedule to list approved Change Orders, with each Application For Payment.
1.2 APPLICATIONS FOR PAYMENT
| A. | Submit four copies of each application on Contractor's electronic media driven form. |
| B. | Content and Format: Utilize Schedule of Values for listing items in Application for Payment. |
| C. | Payment Period: 30 days. |
| D. | Include an updated construction progress schedule. |
| E. | Certified payroll records. |
1.3 CHANGE PROCEDURES
A. The Architect/Engineer/Designer may issue a Notice of Change that includes a detailed description of a proposed change with supplementary or revised Drawings and specifications, a change in Contract Time for executing the change with a stipulation of any overtime work required.
B. The Contractor may propose changes by submitting a request for change to the Architect/Engineer/Designer describing the proposed change and its full effect on the Work. Include a statement describing the reason for the change, the effect on the Contract Sum/Price and Contract Time, and a statement describing the effect on Work by the MoDOT District or other Contractors.
C. Stipulated Sum/Price Change Order: Based on Notice of Change and Contractor's fixed price quotation or Contractor's request for a Change Order as approved by Architect/Engineer/Designer.
D. Construction Change Directive: Architect/Engineer/Designer may issue a directive instructing the Contractor to proceed with a change in the Work, for subsequent inclusion in a Change Order. Document will describe changes in the Work, and designate method of determining any change in Contract Sum/Price or Contract Time. Promptly execute the change.
E. Time and Material Change Order: Submit itemized account and supporting data after completion of change, within time limits indicated in the Conditions of the Contract. Architect/Engineer/Designer will determine the change allowable in Contract Sum/Price and Contract Time as provided in the Contract Documents.
F. Maintain detailed records of work done on Time and Material basis. Provide full information required for evaluation of proposed changes, and to substantiate costs for changes in the Work.
G. Execution of Change Orders: Architect/Engineer/Designer will issue Change Orders for signatures of parties as provided in the Conditions of the Contract.
1.4 DEFECT ASSESSMENT
A. Replace the Work, or portions of the Work, not conforming to specify requirements.
B. If, in the opinion of the Architect/Engineer/Designer, it is not practical to remove and replace the Work, the Architect/Engineer/Designer will direct an appropriate remedy or adjust payment.
1.5 ALTERNATIVES
A. Accepted Alternatives will be identified in Owner-Contractor Agreement.
END OF SECTION
01039
COORDINATION AND MEETING REQUIREMENT
PART 1 GENERAL
1.1 COORDINATION AND PROJECT CONDITIONS
A. Coordinate scheduling, submittals, and Work of the various sections of the Project Manual to ensure efficient and orderly sequence of installation of interdependent construction elements.
B. Verify utility requirements and characteristics of operating equipment are compatible with building utilities. Coordinate work of various sections having interdependent responsibilities for installing, connecting to and placing in service, such equipment.
C. Coordinate space requirements, supports, and installation of mechanical and electrical Work, which are indicated diagrammatically on Drawings. Follow routing shown for pipes, ducts, and conduit, as closely as practicable; place runs parallel with lines of building. Utilize spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs.
D. In finished areas, except as otherwise indicated, conceal pipes, ducts and wiring within the construction. Coordinate locations of fixtures and outlets with finish elements.
E. Coordinate completion and clean up of Work of separate sections in preparation for Completion.
F. After Owner occupancy of premises, coordinate access to site for correction of defective Work and Work not in accordance with Contract Documents, to minimize disruption of Owner's activities.
1.2 FIELD ENGINEERING
| A. | Employ a Land Surveyor registered in the State of Missouri and acceptable to Architect/Engineer/Designer. |
| B. | Owner will locate and protect survey control and reference points. |
| C. | Control datum for survey is that established by Owner provided survey. |
| D. | Verify setbacks and easements; confirm drawing dimensions and elevations. |
| E. | Provide field engineering services. Establish elevations, lines and levels, utilizing recognized engineering survey practices. |
1.3 PRECONSTRUCTION MEETING
| A. | Architect/Engineer/Designer will schedule a meeting after Notice of Award. |
| B. | Attendance Required: District engineer or representative, Architect/Engineer/Designer and Contractor. |
| C. | Record minutes and distribute copies within 5 days after meeting to participants, with two copies to District Engineer, Architect/Engineer/Designer, participants and those affected by decisions made. |
1.4 SITE MOBILIZATION MEETING
A. Architect/Engineer/Designer will schedule a meeting at the Project site prior to Contractor occupancy.
B. Architect/Engineer/Designer will record minutes and distributes copies within 5 days after meeting to participants, with two copies to Architect/Engineer/Designer, participants and those affected by decisions made.
1.5 PROGRESS MEETINGS
A. Schedule and administer meetings throughout progress of the Work at when arranged by Architect/Engineer/Designer.
B. Architect/Engineer/Designer will make arrangements for meetings, prepare agenda with copies for participants, and preside at meetings.
C. Attendance Required: Job superintendent, major Subcontractors and suppliers, District engineer representative, Architect/Engineer/Designer, as appropriate to agenda topics for each meeting.
| D. | Agenda: |
| 1. | Review of Work progress. |
| 2. | Field observations, problems, and decisions. |
| 3. | Identification of problems, which impede planned progress. |
| 4. | Maintenance of progress schedule. |
| 5. | Corrective measures to regain projected schedules. |
| 6. | Coordination of projected progress. |
| 7. | Effect of proposed changes on progress schedule and coordination. |
E. Record minutes and distributes copies within 5 days after meeting to participants and those affected by decisions made.
1.6 PREINSTALLATION MEETING
| A. | When required in individual specification sections, convene a pre-installation meeting at the site prior to commencing work of the section. |
| B. | Notify Architect/Engineer/Designer seven days in advance of meeting date. |
| C. | Prepare agenda and preside at meeting: |
| 1. | Review conditions of installation, preparation and installation procedures. |
| 2. | Review coordination with related work. |
| D. | Record minutes and distributes copies within 5 days after meeting to participants and those affected by decisions made. |
PART 2 PRODUCTS
Not used
PART 3 EXECUTION
3.1 CUTTING AND PATCHING
A. Employ skilled and experienced installer to perform cutting and patching.
| B. | Submit written request in advance of cutting or altering elements, which affect: |
| 1. | Structural integrity of element. |
| 2. | Integrity of weather-exposed or moisture-resistant elements. |
| 3. | Work of Owner or separate contractor. |
| C. | Execute cutting, fitting, and patching to complete Work, and to: |
| 1. | Uncover Work to install or correct ill-timed Work. |
| 2. | Remove and replace defective and non-conforming Work. |
| 3. | Provide openings in elements of Work for penetrations of mechanical and electrical Work. |
D. Cut masonry and concrete materials using masonry saw or core drill.
E. Fit Work tight to pipes, sleeves, ducts, conduit and other penetrations through surfaces.
F. Maintain integrity of wall, ceiling, or floor construction; completely seal voids.
G. Refinish surfaces to match adjacent finishes. For continuous surfaces, refinish to nearest intersection; for an assembly, refinish entire unit.
H. Identify hazardous substances or conditions exposed during the Work to the Architect/Engineer/Designer for decision or remedy.
3.2 ALTERATION PROJECT PROCEDURES
A. Materials: As specified in Product sections; match existing Products and work for patching and extending work.
B. Close openings in exterior surfaces to protect existing work from weather and extremes of temperature and humidity.
C. When finished surfaces are cut so that a smooth transition with new Work is not possible, terminate existing surface along a straight line at a natural line of division and submit recommendation to Architect/Engineer/Designer for review.
D. Patch or replace portions of existing surfaces that are damaged, lifted, discolored or showing other imperfections.
E. Finish surfaces as specified in individual Product sections.
01300
SUBMITTAL REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
A. AGC Associated General Contractors of America publication "The Use of CPM in Construction - A Manual for General Contractors and the Construction Industry".
1.2 SUBMITTAL PROCEDURES
| A. | Submittals shall be submitted electronically with Architect/Engineer/Designer accepted form. |
| B. | Identify Project, Contractor, Subcontractor or supplier; pertinent drawing and detail number and specification section number, as appropriate. |
| C. | Apply Contractor's stamp, signed or initialed certifying that review, approval, verification of Products required, field dimensions, adjacent construction Work and coordination of information is in accordance with the requirements of the Work and Contract Documents. |
| D. | Schedule submittals to expedite the Project, and deliver to Architect/Engineer/Designer at business address. Coordinate submission of related items. |
| E. | For each submittal for review, allow 15 days excluding delivery time to and from the contractor. |
| F. | Identify variations from Contract Documents and Product or system limitations, which may be detrimental to successful performance of the completed Work. |
| G. | Submittals not requested will not be recognized or processed. |
1.3 CONSTRUCTION PROGRESS SCHEDULES
| A. | Submit initial schedule in duplicate within 15 days after date established in Notice to Proceed. |
| B. | Revise and resubmit as required. |
| C. | Submit revised schedules with each Application for Payment, identifying changes since previous version. |
| D. | Submit a horizontal bar chart with separate line for each major portion of Work or operation, identifying first workday of each week. |
1.4 PROPOSED PRODUCTS LIST
| A. | Within 15 days after date of Notice to Proceed, submit list of major products proposed for use, with name of manufacturer, trade name and model number of each product. |
| B. | For products specified only by reference standards, give manufacturer, trade name, model or catalog designation and reference standards. |
1.5 PRODUCT DATA
| A. | Product Data for Review: |
| 1. | Submitted to Architect/Engineer/Designer for review for the limited purpose of checking for conformance with information given and the design concept expressed in the contract documents. |
| 2. | After review, provide copies and distribute in accordance with SUBMITTAL PROCEDURES article above and for record documents purposes described in Section 01700 - CONTRACT CLOSEOUT. |
B. Product Data for Information:
1. Submitted for the Architect/Engineer/Designer’s knowledge as contract administrator or for the Owner.
C. Product Data for Project Closeout:
1. Submitted for the Owner's benefit during and after project completion.
D. Submit the number of copies, which the Contractor requires, plus two copies that will be retained by the Architect/Engineer/Designer.
E. Mark each copy to identify applicable products, models, options and other data. Supplement manufacturers' standard data to provide information specific to this Project.
F. After review distribute in accordance with the Submittal Procedures article above and provide copies for record documents described in Section 01700 - CONTRACT CLOSEOUT.
1.6 SHOP DRAWINGS
| A. | Shop Drawings for Review: |
| 1. | Submittals shall be submitted electronically with Architect/Engineer/Designer for review for the limited purpose of checking for conformance with information given and the design concept expressed in the contract documents. |
| 2. | After review, produce copies and distribute in accordance with SUBMITTAL PROCEDURES article above and for record documents purposes described in Section 01700 - CONTRACT CLOSEOUT. |
| B. | Shop Drawings for Information: |
| 1. | Submitted for the Architect/Engineer/Designer’s knowledge as contract administrator or for the Owner. |
| C. | Shop Drawings for Project Closeout: |
| 1. | Submitted for the Owner's benefit during and after project completion. |
D. Indicate special utility and electrical characteristics, utility connection requirements and location of utility outlets for service for functional equipment and appliances.
E. Submit in the form of one reproducible transparency and one opaque reproduction.
1.7 SAMPLES
| A. | Samples for Review: |
| 1. | Submitted to Architect/Engineer/Designer for review for the limited purpose of checking for conformance with information given and the design concept expressed in the contract documents. |
| 2. | After review, produce duplicates and distribute in accordance with SUBMITTAL PROCEDURES article above and for record documents purposes described in Section 01700 - CONTRACT CLOSEOUT. |
| B. | Samples for Information: |
| 1. | Submitted for the Architect/Engineer/Designer’s knowledge as contract administrator or for the Owner. |
| C. | Samples for Selection: |
| 1. | Submitted to Architect/Engineer/Designer for aesthetic, color, or finish selection. |
| 2. | Submit samples of finishes for Architect/Engineer/Designer selection. |
| 3. | After review, produce duplicates and distribute in accordance with SUBMITTAL PROCEDURES article above and for record documents purposes described in Section 01700 - CONTRACT CLOSEOUT. |
1.8 DESIGN DATA
| A. | Submit for the Architect/Engineer/Designer’s knowledge as contract administrator or for the Owner. |
| B. | Submit for information for the limited purpose of assessing conformance with information given and the design concept expressed in the contract documents. |
1.9 TEST REPORTS
| A. | Submit for the Architect/Engineer/Designer’s knowledge as contract administrator or for the Owner. |
| B. | Submit test reports for information for the limited purpose of assessing conformance with information given and the design concept expressed in the contract documents. |
1.10 CERTIFICATES
| A. | When specified in individual specification sections, submit certification by the manufacturer, installation/application subcontractor, or the Contractor to Architect/Engineer/Designer, in quantities specified for Product Data. |
| B. | Indicate material or Product conforms to or exceeds specified requirements. Submit supporting reference data, affidavits and certifications as appropriate. |
| C. | Certificates may be recent or previous test results on material or Product but must be acceptable to Architect/Engineer/Designer. |
1.11 MANUFACTURER'S INSTRUCTIONS
| A. | When specified in individual specification sections, submit printed instructions for delivery, storage, assembly, installation, and start-up, adjusting and finishing, to Architect/Engineer/Designer for delivery to owner in quantities specified for Product Data. |
| B. | Indicate special procedures, perimeter conditions requiring special attention and special environmental criteria required for application or installation. |
| C. | Refer to Section 01400 - Quality Control, Manufacturers' Field Services article. |
1.12 MANUFACTURER'S FIELD REPORTS
| A. | Submit reports for the Architect/Engineer/Designer's benefit as contract administrator or for the Owner. |
| B. | Submit for information for the limited purpose of assessing conformance with information given and the design concept expressed in the contract documents. |
1.13 ERECTION DRAWINGS
| A. | Submit drawings for the Architect/Engineer/Designer’s benefit as contract administrator or for the Owner. |
| B. | Submit for information for the limited purpose of assessing conformance with information given and the design concept expressed in the contract documents. |
| C. | Data indicating inappropriate or unacceptable Work may be subject to action by the Architect/Engineer/Designer or Owner. |
01400
QUALITY CONTROL REQUIREMENTS
PART 1 GENERAL
1.1 QUALITY ASSURANCE - CONTROL OF INSTALLATION
A. Monitor quality control over suppliers, manufacturers, Products, services, site conditions and workmanship, to produce Work of specified quality.
B. Comply with manufacturers' instructions, including each step in sequence.
C. Should manufacturers' instructions conflict with Contract Documents, request clarification from Architect/Engineer/Designer before proceeding.
D. Comply with specified standards as minimum quality for the Work except where more stringent tolerances, codes or specified requirements indicate higher standards or more precise workmanship.
E. Perform Work by persons qualified to produce required and specified quality.
F. Verify that field measurements are as indicated on shop drawings or as instructed by the manufacturer.
G. Secure Products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, or disfigurement.
1.2 TOLERANCES
| A. | Monitor fabrication and installation tolerance control of Products to produce acceptable Work. Do not permit tolerances to accumulate. |
| B. | Comply with manufacturers' tolerances. Should manufacturers' tolerances conflict with Contract Documents, request clarification from Architect/Engineer/Designer before proceeding. |
| C. | Adjust Products to appropriate dimensions; position before securing Products in place. |
1.3 REFERENCES AND STANDARDS
A. For Products or workmanship specified by association, trade or other consensus standards, comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes.
| B. | Conform to reference standard by date of issue current on date for receiving bids or date specified in the individual specification sections, except where a specific date is established by code. |
| C. | Neither the contractual relationships, duties or responsibilities of the parties in Contract nor those of the Architect/Engineer/Designer shall be altered from the Contract Documents by mention or inference otherwise in any reference document. |
1.4 TESTING SERVICES
| A. | Contractor to provide all testing services as called out in these specifications. |
| B. | Testing and source quality control may occur on or off the project site. Perform off-site testing as required by the Architect/Engineer/Designer or the Owner. |
| C. | Testing does not relieve Contractor to perform Work to contract requirements. |
| D. | Re-testing required because of non-conformance to specified requirements shall be performed by the same MoDOT personnel on instructions by the Architect/Engineer/Designer. |
1.5 INSPECTION SERVICES
| A. | Owner will employ MoDOT Personnel to perform inspection. |
| B. | Inspecting may occur on or off the project site. Perform off-site inspecting as required by the Architect/Engineer/Designer or the Owner. |
| C. | Inspecting does not relieve Contractor to perform Work to contract requirements. |
1.6 MANUFACTURERS' FIELD SERVICES
| A. | When specified in individual specification sections, require material or Product suppliers or manufacturers to provide qualified staff personnel to observe site conditions, conditions of surfaces and installation, quality of workmanship, start-up of equipment, test, adjust and the balancing of equipment as applicable and to initiate instructions when necessary. |
| B. | Report observations and site decisions or instructions given to applicators or installers that are supplemental or contrary to manufacturers' written instructions. |
| C. | Refer to Section 01300 - SUBMITTALS, MANUFACTURERS' FIELD REPORTS article. |
PART 2 EXECUTION
2.1 EXAMINATION
| A. | Verify that existing site conditions and substrate surfaces are acceptable for subsequent Work. Beginning new Work means acceptance of existing conditions. |
| B. | Verify that existing substrate is capable of structural support or attachment of new Work being applied or attached. |
2.2 PREPARATION
| A. | Clean substrate surfaces prior to applying next material or substance. |
| B. | Seal cracks or openings of substrate prior to applying next material or substance. |
| C. | Apply manufacturer required or recommended substrate primer, sealer or conditioner prior to applying any new material or substance in contact or bond. |
01500
CONSTRUCTION FACILITIES AND TEMPORARY CONTROL REQUIREMENTS
PART 1 GENERAL
1.1 TEMPORARY ELECTRICITY
A. Cost: By Contractor; pay for temporary power service furnished by MoDOT.
1.2 TELEPHONE SERVICE
A. Provide, maintain, and pay for telephone service to field office and Architect/Engineer/Designer’s field office at time of project mobilization.
1.3 FACSIMILE SERVICE
A. Provide, maintain and pay for facsimile service and a dedicated telephone line to field office and Architect/Engineer/Designer’s field office at time of project mobilization.
1.4 TEMPORARY WATER SERVICE
| A. | Connect to existing water source as directed for construction operations at time of project mobilization. |
| B. | Contractor will reimburse Owner for water used in construction as agreed upon at time of project mobilization. |
1.5 TEMPORARY SANITARY FACILITIES
A. Provide and maintain required facilities and enclosures. Provide at time of project mobilization.
1.6 FENCING
| A. | Construction: Use plastic mesh safety fencing or better. |
| B. | Provide 48” high fence around construction site; equip with vehicular and pedestrian gates with locks. |
1.7 WATER CONTROL
| A. | Grade site to drain. Maintain excavations free of water. Provide, operate and maintain pumping equipment. |
| B. | Protect site from puddling or running water. Provide water barriers as required to protect site from soil erosion. |
1.8 EXTERIOR ENCLOSURES
| A. | Provide temporary weather tight closure of exterior openings to accommodate acceptable | working conditions and protection for Products, to allow for temporary heating and maintenance of required ambient temperatures identified in individual specification sections, and to prevent entry of unauthorized persons. Provide access doors with self-closing hardware and locks. |
| 1.9 | PROTECTION OF INSTALLED WORK |
| A. | Protect installed Work and provide special protection where specified in individual specification sections. | |
| B. | Provide temporary and removable protection for installed Products. Control activity in immediate work area to prevent damage. | |
| C. | Provide protective coverings at walls, projections, jambs, sills and soffits of openings. | |
| D. | Protect finished floors, stairs, and other surfaces from traffic, dirt, wear, damage or movement of heavy objects, by protecting with durable sheet materials. | |
| E. | Prohibit traffic or storage upon waterproofed or roofed surfaces. If traffic or activity is necessary, obtain recommendations for protection from waterproofing or roofing material manufacturer. | |
| F. | Prohibit traffic from landscaped areas. |
1.10 SECURITY
| A. | Provide security and facilities to protect Work and existing facilities and Owner's operations from unauthorized entry, vandalism or theft. |
| B. | Coordinate with Owner's security program. |
1.11 ACCESS ROADS
| A. | Provide and maintain access to fire hydrants, free of obstructions. |
| B. | Provide means of removing mud from vehicle wheels before entering streets. |
| C. | Designated existing on-site roads may be used for construction traffic. |
1.12 PROGRESS CLEANING AND WASTE REMOVAL
| A. | Maintain areas free of waste materials, debris and rubbish. Maintain site in a clean and orderly condition. |
| B. | Remove debris and rubbish from pipe chases, plenums, attics, crawl spaces and other closed or remote spaces, prior to enclosing the space. |
| C. | Broom and vacuum clean interior areas prior to start of surface finishing and continue cleaning to eliminate dust. |
| D. | Collect and remove waste materials, debris and rubbish from site periodically and dispose off-site. |
| E. | Open free-fall chutes are not permitted. Terminate closed chutes into appropriate containers with lids. |
1.13 FIELD OFFICES AND SHEDS
| A. | Office: Weather tight, with lighting, electrical outlets, heating and ventilating equipment and equipped with drawing rack and drawing display table. |
| B. | Provide space for Project meetings, with table and chairs to accommodate 6 persons. |
1.14 REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS
| A. | Remove temporary utilities, equipment, facilities and materials prior to Final Application for Payment inspection. |
| B. | Clean and repair damage caused by installation or use of temporary work. |
| C. | Restore existing facilities used during construction to original condition. Restore permanent facilities used during construction to specified condition. |
PART 2 PRODUCTS Not Used.
PART 3 EXECUTION Not Used.
END OF SECTION
01600
MATERIAL AND EQUIPMENT REQUIREMENT
PART 1 GENERAL
1.1 PRODUCTS
| A. | Do not use materials and equipment removed from existing premises, except as specifically permitted by the Contract Documents. |
| B. | Provide interchangeable components of the same manufacture for components being replaced. |
1.2 TRANSPORTATION AND HANDLING
| A. | Transport and handle Products in accordance with manufacturer's instructions. |
| B. | Promptly inspect shipments to ensure that Products comply with requirements, quantities are correct and products are undamaged. |
| C. | Provide equipment and personnel to handle Products by methods to prevent soiling, disfigurement or damage. |
1.3 STORAGE AND PROTECTION
A. Store and protect Products in accordance with manufacturers' instructions.
B. Store with seals and labels intact and legible.
C. Store sensitive Products in weather tight, climate controlled, enclosures in an environment favorable to Product.
D. For exterior storage of fabricated Products, place on sloped supports above ground.
E. Provide bonded off-site storage and protection when site does not permit on-site storage or protection.
F. Cover Products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of Products.
G. Store loose granular materials on solid flat surfaces in a well-drained area. Prevent mixing with foreign matter.
H. Provide equipment and personnel to store Products by methods to prevent soiling, disfigurement or damage.
I. Arrange storage of Products to permit access for inspection. Periodically inspect to verify Products are undamaged and are maintained in acceptable condition.
1.4 PRODUCT OPTIONS
| A. | Products Specified by Reference Standards or by Description Only: Any Product meeting those standards or description is acceptable. |
| B. | Products Specified by Naming One or More Manufacturers: Products of manufacturers named and meeting specifications, no options or substitutions allowed. |
| C. | Products Specified by Naming One or More Manufacturers with a Provision for Substitutions: Submit a request for substitution for any manufacturer not named in accordance with the following article. |
1.5 SUBSTITUTIONS
A. Architect/Engineer/Designer will consider requests for Substitutions only within 15 days after date established in Notice to Proceed.
B. Substitutions may be considered when a Product becomes unavailable through no fault of the Contractor.
C. Document each request with complete data substantiating compliance of proposed Substitution with Contract Documents.
| D. | A request constitutes a representation that the Contractor: |
| 1. | Has investigated proposed Product and determined that it meets or exceeds the quality level of the specified Product. |
| 2. | Will provide the same warranty for the Substitution as for the specified Product. |
| 3. | Will coordinate installation and make changes to other Work that may be required for the Work to be complete with no additional cost to Owner. |
| 4. | Waives claims for additional costs or time extension that may subsequently become apparent. |
| 5. | Will reimburse Owner for review or redesign services associated with re-approval by authorities. |
E. Substitutions will not be considered when they are indicated or implied on shop drawing or product data submittals, without separate written request or when acceptance will require revision to the Contract Documents.
| F. | Substitution Submittal Procedure: |
| 1. | Submit three copies of request for Substitution for consideration. Limit each request to one proposed Substitution. |
| 2. | Submit shop drawings, product data and certified test results attesting to the proposed Product equivalence. Burden of proof is on proposer. |
| 3. | The Architect/Engineer/Designer will notify Contractor in writing of decision to accept or reject request. |
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Not Used.
01650
STARTING OF SYSTEMS REQUIREMENT
PART 1 GENERAL
1.1 STARTING SYSTEMS
| A. | Coordinate schedule for start-up of various equipment and systems. |
| B. | Notify Architect/Engineer/Designer seven days prior to start-up of each item. |
| C. | Verify that each piece of equipment or system has been checked for proper lubrication, drive rotation, belt tension, and control sequence and for conditions that may cause damage. |
| D. | Verify tests, meter readings, and specified electrical characteristics agree with those required by the equipment or system manufacturer. |
| E. | Verify that wiring and support components for equipment are complete and tested. |
| F. | Execute start-up under supervision of applicable manufacturer's representative or Contractors' personnel in accordance with manufacturers' instructions. |
| G. | When specified in individual specification Sections, require manufacturer to provide authorized representative to be present at site to inspect, check and approve equipment or system installation prior to start-up and to supervise placing equipment or system in operation. |
| H. | Submit a written report in accordance with Section 01300 that equipment or system has been properly installed and is functioning correctly. |
1.2 DEMONSTRATION AND INSTRUCTIONS
A. Demonstrate operation and maintenance of Products to Owner's personnel two weeks prior to date of Final Completion.
B. For equipment or systems requiring seasonal operation, perform demonstration for other season within six months.
C. Utilize operation and maintenance manuals as basis for instruction. Review contents of manual with Owners' personnel in detail to explain all aspects of operation and maintenance.
D. Demonstrate start-up, operation, control, adjustment, trouble-shooting, servicing, maintenance and shutdown of each item of equipment at agreed time, at equipment location.
E. Prepare and insert additional data in operations and maintenance manuals when the need for additional data becomes apparent during instruction.
F. The amount of time required for instruction on each item of equipment and system that’s specified in individual sections.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
01700
CONTRACT CLOSEOUT REQUIREMENT
PART 1 GENERAL
1.1 CLOSEOUT PROCEDURES
| A. | Submit written certification that Contract Documents have been reviewed, Work has been inspected, and that Work is complete in accordance with Contract Documents and ready for Architect/Engineer/Designer’s review. |
| B. | Provide submittals to Owner that is required by governing or other authorities. |
| C. | Submit final Application for Payment identifying total adjusted Contract Sum, previous payments and sum remaining due. |
| D. | Owner will occupy portions of the building as specified in Section 01010. |
| E. | Projects shall not be accepted by MoDOT until the vendor has completed all punch list items. The vendor will then have 30 days to submit all required paperwork necessary to close the project. Failure to submit the required paperwork within 30 days could result in the debarment or suspension of the contractor from future projects. |
1.2 FINAL CLEANING
A. Execute final cleaning prior to final project assessment. Clean interior and exterior glass, surfaces exposed to view; remove temporary labels, stains and foreign substances, polish transparent and glossy surfaces, vacuum carpeted and soft surfaces.
B. Clean equipment and fixtures to a sanitary condition with cleaning materials appropriate to the surface and material being cleaned.
C. Clean or replace filters of operating equipment used during construction and/or adjustment.
D. Clean debris from roofs, gutters, downspouts and drainage systems.
E. Clean site; sweep paved areas, rake clean landscaped surfaces.
F. Remove waste and surplus materials, rubbish and construction facilities from the site.
1.3 ADJUSTING
A. Adjust operating Products and equipment to ensure smooth and unhindered operation.
1.4 PROJECT RECORD DOCUMENTS
A. Store record documents separate from documents used for construction.
B. Record information concurrent with construction progress.
| C. | Specifications: Legibly mark and record at each Product section description of actual Products installed, including the following: |
| 1. | Manufacturer's name and product model and number. |
| 2. | Product substitutions or alternates utilized. |
| 3. | Changes made by Addenda and modifications. |
| D. | Record Drawings and Shop Drawings: Legibly mark each item to record actual construction including: | ||
| 1. | Measured depths of foundations in relation to finish main floor datum. | ||
| 2. | Measured horizontal and vertical locations of underground utilities and appurtenances, referenced to permanent surface improvements. | ||
| 3. | Measured locations of internal utilities and appurtenances concealed in construction, referenced to visible and accessible features of the Work. | ||
| 4. | Field changes of dimension and detail. | ||
| 5. | Details not on original Contract drawings. |
E. Submit documents to Architect/Engineer/Designer’swith claim for final Application for Payment.
1.5 OPERATION AND MAINTENANCE DATA
| A. | Submit data bound in 8-1/2 x 11 inch (A4) text pages, three D side ring binders with durable plastic covers. |
| B. | Prepare binder cover with printed title "OPERATION AND MAINTENANCE INSTRUCTIONS", title of project and subject matter of binder when multiple binders are required. |
| C. | Internally subdivide the binder contents with permanent page dividers, logically organized; with tab titling clearly printed under reinforced laminated plastic tabs. |
| D. | Submit 1 draft copy of completed volumes 15 days prior to final inspection. This copy will be reviewed and returned with Architect/Engineer/Designer comments. Revise content of all document sets as required prior to final submission. |
| E. | Submit two sets of revised final volumes, within 10 days after final inspection. |
1.6 SPARE PARTS AND MAINTENANCE PRODUCTS
A. Provide spare parts, maintenance, and extra Products in quantities specified individual specification sections.
| B. | Deliver to Project site; obtain receipt prior to final payment. |
| C. | Examine system components at a frequency consistent with reliable operation. Clean, adjust and lubricate as required. |
| D. | Include systematic examination, adjustment, and lubrication of components. Repair or replace parts whenever required. Use parts produced by the manufacturer of the original component. |
| E. | Maintenance service shall not be assigned or transferred to any agent or Subcontractor without prior written consent of the Owner. |
1.7 WARRANTIES
| A. | Execute and assemble transferable warranty documents from Subcontractors, suppliers and manufacturers. |
| B. | Submit prior to final Application for Payment. |
| C. | For items of Work delayed beyond date of Final Completion, provide updated submittal within 10 days after acceptance, listing date of acceptance as start of the warranty period. |
| PART 2 | PRODUCTS |
Not Used.
PART 3 EXECUTION
08360
SECTIONAL OVERHEAD DOORS
PART 1 GENERAL
1.1 SUMMARY
| A. | Provide electric overhead sectional door. |
| B. | Provide operating hardware, supports and controls. |
1.2 REFERENCES
| A. | ANSI A216.1 - Sectional Overhead Type Door (NAGDM 102). |
| B. | ASTM A526/A526M - Steel Sheet, Zinc-Coated (Galvanized) by the Hot-Dip Process, Commercial Quality. |
| C. | NEMA MG 1 - Motors and Generators. |
| D. | NFPA 70 - National Electrical Code. Conform to IBC code for motor and motor control requirements. Listed and classified by Underwriters Laboratories, Inc. |
1.3 SYSTEM DESCRIPTION
| A. | Panels: Insulated with glazed panels. |
| B. | Lift Type: Follow Roof Line track operating style with track and hardware. |
| C. | Operation: Electric. |
| D. | Loads: Design and size components to withstand dead and live loads caused by pressure and suction of wind acting normal to plane of wall as calculated in accordance with IBC code. |
1.4 SUBMITTALS FOR REVIEW
| A. | Section 01300 - Submittals: Procedures for submittals. |
| B. | Shop Drawings: Indicate opening dimensions and required tolerances, connection details, anchorage spacing, hardware locations and installation details. |
| C. | Product Data: Provide component construction, anchorage method and hardware. |
| D. | Samples: Submit two exterior and interior panel finish samples, 18 x 18 inches in size, illustrating color and finish. |
1.5 SUBMITTALS AT PROJECT CLOSEOUT
| A. | Section 01700 - Operation and Maintenance Data: Procedures for submittals. |
| B. | Operation Data: Include electrical control adjustments. |
| C. | Maintenance Data: Include data for motor and transmission, shaft and gearing, lubrication frequency, spare part sources. |
| D. | Warranty: Submit manufacturer warranty and ensure forms have been completed in Owner's name and registered with manufacturer. |
1.6 QUALITY ASSURANCE
| A. | Perform Work in accordance with ANSI A216.1, Application Type: Industrial. Maintain one copy on site. |
| B. | Manufacturer Qualifications: Company specializing in manufacturing the Products specified in this section with minimum three years experience. |
| C. | Installer: Company specializing in performing the work of this section and approved by manufacturer. |
1.7 DELIVERY, STORAGE AND HANDLING
A. Deliver materials and products in labeled protective packages. Store and handle in strict compliance with manufacturer’s instructions and recommendations. Protect from damage from weather, excessive temperatures and construction operations.
1.8 WARRANTY
| A. | Section 01700 - Warranties. |
| B. | Correct defective Work within a one-year period after Date of Completion. |
| C. | Warranty: Include coverage for electric motor and transmission. |
| D. | Provide a one-year manufacturer warranty for electric operating equipment. |
PART 2 PRODUCTS
2.1 SECTIONAL OVERHEAD DOORS
A. Provide standard sectional overhead doors of the dimensions and arrangements shown on the drawings, and with the following attributes: Equal to Model 3216, C.H.I. Overhead Doors, which is located at: 1485 Sunrise Dr.; Arthur, IL 61911; Toll Free Tel: 800-590-0559; Fax: 217-543-4454; Email: lschrock@chiohd.com; Web: www.chiohd.com
1. Design wind load: Comply with NAGDM specification 102-1976, except that minimum wind load shall be 80 mph.
| 2. | Door sections: | |
| a. | Exterior: Roll-form from .016” hot-dip galvanized steel, with integral reinforcing ribs consisting of six longitudinal ribs and two flat bottom V-grooves. | |
| b. | Provide meeting rails of double-rabbeted weatherproof interlocking joints functioning as integral struts and assuring alignment full width of each section. | |
| c. | Provide a minimum thickness of 2", R-Value 16.00. U-Value of .057. |
3. Glass openings: Provide insulated glass, sealed in automotive type rubber gaskets of the maximum size allowable, one per door in the 3rd section panel, (centered horizontally and vertically) size 24” x 7”.
| 4. | Track and Hardware: | |
| a. | Follow Roof line tracks shall be 2" wide galvanized steel, mounted by continuous galvanized steel angle. | |
| b. | Stainless Steel lift cables shall have a safety factor of 8 to 1. | |
| c. | Roller shall be full-floating ball bearings with hardened steel racers. | |
| d. | Counterbalance shall consist of a torsion spring mounted on a continuous thru solid steel shaft. | |
| e. | Provide interior side locking device, which with a slide bar extends through the left and right side tracks. | |
| f. | Astragal - Provide "U" type rubber astragal at the bottom edge of each door or an approved equal. | |
| g. | Torque Force (By Canimex) garage door safety stopping bottom bracket. |
· For Max door weight of 1,000 lbs
· Cable fixing on eye bolt for allowing up to 2” of travel for cable adjustment.
· Designed for limit Switch Installation.
5. Finish: Provide the manufacturer's standard pre-finish system in color selected by the owner from the manufacturer's standard colors.
6. Insulation: Rigid foamed-in-place polyurethane core free of CFC’s and will be fully encapsulated in non-permeable materials to prevent loss of thermal efficiency over time. Insulation shall have a back cover of .013” steel.
7. Safety: Provide a Monitored Light Curtain – 36 inch – Liftmaster LC36M.
| 8. | Weather strip | |
| a. | Between sections will be EPDM rubber tube seals fitted every joint. | |
| b. | Jamb seals. Provide pliable bulb seals. |
9. Springs: Springs will be 25,000 cycles. Provide pusher springs if required for operation.
2.2 ACCEPTABLE DOOR MANUFACTURER: Raynor ThermaSeal TM175.
2.3 OTHER MATERIALS
| A. | Provide other materials, not specifically described but required for a complete and proper installation, as selected by the Contractor subject to the approval of the Architect. |
| B. | Sheet Steel: ASTM A526/A526M galvanized to G60, pre-coated with silicone polyester finish, plain surface. |
| C. | Exterior Surfaces: Factory painted. (White) |
| D. | Interior Surfaces: Factory painted. (White) |
PART 3 EXECUTION
3.1 EXAMINATION
| A. | Verify that wall openings are ready to receive work and opening dimensions and | tolerances are within specified limits. |
| B | Verify that electric power is available and of the correct characteristics. |
3.2 PREPARATION
A. Prepare opening to permit correct installation of door unit to perimeter air and vapor barrier seal.
3.3 INSTALLATION
| A. | Install door unit assembly in accordance with manufacturer's instructions. | |
| B. | Anchor assembly to wall construction and building framing without distortion or stress. | |
| C. | Securely brace door tracks suspended from structure. Secure tracks to structural | members only. |
| D. | Fit and align door assembly including hardware. | |
| E. | Coordinate installation of electrical service, power and control wiring by electrical contractor from disconnect to unit components. | |
| F. | Coordinate installation of sealants and backing materials at frame perimeter as specified in Section 07900. | |
| G. | Install perimeter trim and closures. |
3.4 ERECTION TOLERANCES
| A. | Section 01400 - Quality Assurance: Tolerances. |
| B. | Maximum Variation from Plumb: 1/16 inch. |
| C. | Maximum Variation from Level: 1/16 inch. |
| D. | Longitudinal or Diagonal Warp: Plus or minus 1/8 inch from 10 ft straight edge. |
| E. | Maintain dimensional tolerances and alignment with adjacent work. |
3.5 MANUFACTURER'S FIELD SERVICES
| A. | Section 01650 - Starting of Systems: Prepare and start systems. |
| B. | Ensure the operation and adjustments to door assembly for specified operation. |
3.6 ADJUSTING
| A. | Section 01650 - Starting of Systems: Adjusting installed work. |
| B. | Adjust door assembly to smooth operation and in full contact with weather stripping. |
3.7 CLEANING
| A. | Section 01700 - Contract Closeout: Cleaning installed work. |
| B. | Clean doors, frames and glass. |
| C. | Remove temporary labels and visible markings. |
3.8 PROTECTION OF FINISHED WORK
| A. | Section 01700 - Contract Closeout: Protecting installed work. |
| B. | Do not permit construction traffic through overhead door openings after adjustment and cleaning. |
3.9 SCHEDULES
Refer to Door Schedule on Architectural Drawings.
08720
ELECTRIC DOOR OPERATORS
PART 1 GENERAL
1.1 SUMMARY
| A. | Provide electric sectional overhead door operator and electric rolling door operator, where shown on the Drawings, as specified herein and as needed for a complete and proper installation. |
| B. | Related work: |
| 1. | Documents affecting work of this Section include but are not necessarily limited to, General Conditions, Supplementary Conditions and Sections in Division 1 of these Specifications. |
1.2 SUBMITTALS
| A. | Product data: Within 30 calendar days after the Contractor has received the Owner's Notice to Proceed, submit: | |
| 1. | Materials list of items proposed to be provided under this Section. | |
| 2. | Manufacturers' specifications and other data needed to prove compliance with the specified requirements. | |
| 3. | Shop drawings showing general layout, installation, materials, | construction, and assembly wiring. |
| 4. | Manufacturers' recommended installation procedures which, when approved by the Architect, will become the basis for accepting or rejecting actual installation procedures used on the Work. | |
| B. | Upon completion of this portion of the work and as a condition of its acceptance, deliver to the owner three copies of the operation and maintenance manual. |
1.3 QUALITY ASSURANCE
| A. | Use adequate numbers of skilled workmen who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specified requirements and the methods needed for proper performance of the work of this Section. |
| B. | Comply with all governmental agencies having jurisdiction in this work. |
| C. | Each operator shall have a minimum one (1) year manufacturer's warranty. |
1.4 DELIVERY, STORAGE, AND HANDLING
A. Comply with pertinent provisions of Section 01600.
PART 2 PRODUCTS AND MATERIAL
2.1 REQUIRED ATTRIBUTES
| A. | Upward-Acting: Jackshaft – Side Mount |
| 1. | Motor - 115/230V single phase, instant reversing with automatic reset thermal overload. Use the 1/2 HP on 12’& 14’ wide doors and ¾ HP on 16’wide doors. Equal to LiftMaster Logic 5.0 Commercial Door Operator |
| 2. | Reversing Contactor - Heavy duty, electrically and mechanically interlocked. Provisions for the connection of Monitored Light Curtain |
| 3. | Limit Switches – Adjustable rotary type synchronized with door operation |
4 Control Circuit - 24 volt, three button, OPEN-CLOSE-STOP enclosure meeting NEMA 1.
5. Reduction – Heavy-Duty 5L V-Belt (First Stage): #48 Chain (Additional Reduction): #50 Output Sprocket Chain
6. Clutch – Adjustable friction clutch to protect the door and operator from damage and Obstructions
7. Brake – Solenoid actuated drum type
8. Monitored Light Curtain – 36 inch – Liftmaster LC36M
9. Track – Heavy duty hot dipped galvanized
10. Quick Disconnect - For manual or emergency operation. Provide chain hoist operator for emergency operation
11. Provide cable safety stop device
12. Cable Tension Springs as required for proper operation
13. Door pushers as required for proper operation
14. Where required provide car wash modification, electrical enclosure
| 2.2 | OTHER MATERIALS |
| A. | Provide other materials, not specifically described but required for a complete and proper installation, as selected by the Contractor subject to the approval of the Architect. |
| B. | Provide a one-button remote for each garage door opener. |
PART 3 EXECUTION
| 3.1 | SURFACE CONDITIONS |
| A. | Examine the areas and conditions under which work of this Section will be performed. Correct conditions detrimental to timely and proper completion of the Work. Do not proceed until unsatisfactory conditions are corrected. |
| 3.2 | INSTALLATION |
| A. | Install the work of this section in strict accordance with the manufacturer's recommendations and shop drawings and in accordance with pertinent requirements of governmental agencies having jurisdiction. |
| B. | Electrical contractor will run electricity to the electric door operator. Final connection to the door operator shall be the responsibility of the electric door operator installer. |
| 3.3 | ADJUSTMENTS AND INSTRUCTIONS |
| A. | Upon completion of the installation, carefully inspect each component and verify that all items have been installed in the proper location, adequately anchored and adjusted to achieve optimum operation. |
| B. | Demonstrate to the owner, operation and maintenance procedures. |