Q As-GCCS-TCO-JTCW_T E_v1.pdf
PDF 93 KB Posted
- Attached to
- GCCS-TCO/JTCW T&E Contractor Service Support Federal contract opportunity
- Solicitation number
- M6890916Q7600
- Issued by
- United States Marine Corps
About this file
Q A's
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| GCCS_TCO_JTCW_PWS_30_Nov_2015_-_Final_v1.pdf | ||
| 16-Q-7600_Amendment_0002.pdf | ||
| RFQ_16-Q-7600-0001.pdf | ||
| GCCS-TCO-JTCW_T E_Past_Performance_Questionnaire.doc | DOC document | |
| Format_for_Q A_-_GCCS-TCO-JTCW_T E.xls | XLS spreadsheet | |
| GCCS_TCO_JTCW_PWS_7_Oct_2015_-_Final.pdf | ||
| RFQ_Main_16-Q-7600.pdf | ||
| DOL_WD_05-2057_(Rev.-17)_dtd_11172015.pdf | ||
| GCCS-TCO-JTCW_T E_Past_Performance_Questionnaire.doc | DOC document | |
| OPERATIONS_SECURITY_REQUIREMENTS_JUNE_2009.pdf | ||
| Draft_DD254_GCCS-TCO-JTCW_T E.pdf | ||
| FOUO_Information.pdf | ||
| GCCS-TCO__JTCW_QASP_7_Oct_2015_-_Final.pdf | ||
| Specific_OnSite_Security_Requirements_MASTER_doc_Apr_2010.pdf | ||
| RFQ_Cover_16-Q-7600.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GCCS-TCO / JTCW T/E CSS
M68909-16-Q-7600 Q/A
RFQ
Section/Subsection RFQ Language Offeror's Question
Technical or
Contractual
GOVERNMENT'S ANSWER
RFQ Section B Travel will be reimbursed per the Joint Travel Regulations.
Material ODCs shall have prior written approval of the
Contracting Officer.
How does the Government want contractors to price Travel?
Will you give us a "plug" number, or do we leave this blank?
Same question applies for ODCs?
Contractual Please use $5,000.00 per year as an estimate for potential ODCs.
Funding for actual ODCs will be evaluated, determined, and provided for during contract award.
PWS Section 3.1 The contractor shall setup, configure and validate the
GCCS-TCO/JTCW FoS test environment, troubleshoot, and correct any technical problems that may affect the conduct of test.
Will the Government provide the C2/C4 network portion of the test environment required to accurately assess the
GCCS-TCO/JTCW FoS, or will testing be in a simulated
C2/C4 network environment? (The Introduction/Background paragraph, 1.1, states: "MCTSSA focuses on testing GCCS-
TCO/JTCW FoS within an operationally representative
MAGTF Command and Control (C2) architecture executing operational mission threads under representative network loads." Our question is: "Who provides this portion of the
Task 3.1 quoted?")
Technical The Government labs have the C2/C4 network infrastructure. The contractor will be required to setup the Tactical COP Server (TCS), JTCW, COC and AFTADS. Some track SIM/STIM is utilized.
PWS Section 1.2 (Scope),
3.1 (Test Support)(Table), and 3.2 (Joint Certification
Testing)
Section 1.2 states "Typically, there will be two test events per fiscal year with ongoing engineering evaluations of beta software." The Table at 3.1 shows four separate Test
Events. And the Table at 3.2 shows a fifth Test Event.
What is the more accurate number of test events per year to which we should propose our support?
Technical Table 3.1 Plan for two complete formal test events from planning phase to reporting phase with three informal (product familiarization, test procedures, trouble reports) engineering events, and the planning phase (test plan, test procedures development) of a third formal test event. The fourth test event will take place in 1st Qtr
FY17. Table 3.2 Joint Certification event will involve providing technical input to the test plan and test report documentation, and executing the test.
RFQ Section B and PWS
Section 7 (Period of
Performance)
RFQ Section B shows Base
Year plus 4 Option Years; PWS
Section 7 states one year plus
3 Opt yrs
Does the Government want us to price to RFQ Section B? Contractual Amended PWS, Section 7, to 4 option years vice 3.
Cover Offer Due Date 11/30/2015 Will the Government consider extending the proposal due date to allow adequate time for competition?
Contractual Responded 11/23/2015 with RFQ due date extension amendment to
12/8/2015.
Section M, Factor 1, Technical Understanding and Approach
Page Limit Does the 10 page limit for Factor 1 include the 3-page
Transition Plan, or is the 3-page Transition plan in addition to the 10 pages?
Contractual 3 pages for the Transition Plan are in addition to the 10 pages allowed under Technical Understanding & Approach.
Section M, Factor 3, Past
Peformance
Page Limit Is there a page limit for Factor 3, Past Performance? Contractual No page limit on Past Performance, however, 10 pages can be excessive.
DoL Wage Determination
Attachment
Attachment Is the current work being performed in SCA labor categories, and if so, will the Government identify the current labor rates since the awardee will be required to offer the first right of refusal to current SCA workers and maintain their fringe benefit levels.
Contractual DoL Wage Determination Labor Categories used on prior contracts were: Computer System Analysts, Computer Operators, and
Technical Writers
M68909-16-Q-7600 ATTACHMENT J.6 QUESTION / ANSWER
File details come from the government source that posted it. Updated .