25I8029_RFI_Attachment 1 - Questions and Answers_20March.pdf
PDF 111 KB Posted
- Attached to
- M67854-25-I-8029 Indoor Simulated Marksmanship Trainer Contractor Operation and Maintenance Services
- Solicitation number
- M67854-25-I-8029
- Issued by
-
United States Marine Corps
About this file
This document is an Attachment 1 - Questions and Answers for Request for Information (RFI) M67854-25-I-8029 related to the Marine Corps Indoor Simulated Marksmanship Trainer (ISMT) Contractor Operation and Maintenance Services. The Q&A provides insights into the USMC's requirements, confirming they are seeking contractor support for maintenance, training, and operation of existing ISMT systems and ancillary equipment, not system replacement. Key details include: the contractor may be required to operate the ISMT system for training and non-training events, no facility clearance is required, the current contract (M6754-21-F-8020) is still active, and the USMC does not intend to release a draft Performance Work Statement (PWS) or hold an industry day prior to the RFP release. The document emphasizes that this Sources Sought Notice is for planning purposes only and does not constitute a commitment to contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 25I8029_RFI_Attachment 1 - Questions and Answers_17March.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI M67854-25-I-8029
Attachment 1 – Questions and Answers
1. Is the USMC looking to replace the ISMT system?
No, this RFI is for the ISMT system with ancillary components life cycle support.
2. Is the USMC looking to repair/maintain the ISMT system?
Yes, the USMC is requesting information on contractor support for the maintenance, training, and operation of its current ISMT systems and ancillary equipment.
3. Does the USMC already have the space/room if replacing the current ISMT?
The USMC is not currently seeking to replace its ISMT systems.
4. Does the USMC require Civilian Operator or would it provide its own Instructor/NCO to run the system?
Yes, the contractor may be required to operate the ISMT system for system training, non-training events, testing, and training at locations with technicians , if availability permits.
5. Is there a facility clearance required of the vendor to support this?
The vendor is not required or expected to have a facility clearance.
6. Also we have a copy of the MSSC & HQMC I&L Industry Day slides and it says on the ISMT slide that the current contract is M6754-21-F-8020. I can’t seem to find any information on FPDS for this contract. Is this contract still active?
Yes this contract is still active.
7. Will the Government release a draft PWS prior to issuing the final RFP?
The Government does not intend to release a draft PWS prior to RFP release. This Sources Sought Notice is for planning purposes only, and does not constitute an RFP or indication that the Government will contract for the services contained in this notice.
8. If the Government releases a draft PWS prior to issuing the final RFP, will the Government please consider including Section L response requirements and anticipated Level of Effort?
The Government does not intend to release a draft PWS or Section L prior to RFP release. This Sources Sought Notice is for planning purposes only, and does not constitute an RFP or indication that the Government will contract for the services contained in this notice.
9. Will there be an industry day associated with this procurement?
USMC does not intend to hold an industry day for this procurement.
10. When does the Government anticipate releasing the final RFP?
This Sources Sought Notice is for planning purposes only, and does not constitute an RFP or indication that the Government will contract for the services contained in this notice.