210105 21R1801 Industry QA1.pdf
PDF 410 KB Posted
- Attached to
- INDUSTRY MANUFACTURING CAPABILITY FOR ENHANCED COMBAT RUBBER RECONNAISSANCE CRAFT (E-CRRC)
- Solicitation number
- M67854-21-R-1801
- Issued by
-
United States Marine Corps
About this file
This document contains questions and answers related to a forthcoming solicitation for enhanced combat rubber reconnaissance craft. The United States Marine Corps seeks a Berry Amendment compliant vessel through solicitation M67854-21-R-1801. Questions from industry cover topics such as demonstration and testing plans, payload requirements, dimensions for storage, and potential engineering changes. The Marine Corps provides responses clarifying broaching payload weight, stored dimensions including installed floors but not accessories, and process for addressing non-compliances after award and delivery.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Industry Question
Will USMC debrief the manufacturers on their Demo boats via conference call or in person?
Will USMC accept additional material samples in advance of the final specification to determine if current components and accessories are acceptable?
Can USMC define the broaching test payload (section 3.6.1)? For example, 2800 lb Objective, minus 4x 200lbs Marines = 2000lbs remaining payload for broaching.
Would USMC consider loaning a 55 MFE engine for a mutually agreed time to facilitate factory testing prior to RFP publication? Vendor's does not own a 55 MFE pump jet engine to use for factory testing. It is currently impossible to accurately verify performance specifications.
New 55 MFE are not available since BRP/Evinrude ceased production.
5. Are the stored dimension requirements (section 3.12.2) intended to include the installed air floor? Are accessories (pumps, paddles, lift sling) to be included in the stored dimensions?
Will USMC consider changing KPP’s based on manufacturer’s demo boat performances during the December event?
Following award and delivery of the six bid sample craft, will USMC work with the awarded manufacturer to resolve noncompliances to performance specifications?
a. Yes, please coordinate through the Project Officer (GySgt McConnell; morgan.mcconnell@usmc.mil)
a. Yes, installed floor is to be included in dimensions.
b. No, accessories are not to be included in dimensions.
a. No.
a. If non-compliance is discovered during First Article Testing, the Government will determine the severity of non-compliance and reserves the right to either work with manufacturers though Engineering Change
Proposals to meet compliance or cancel the contract out of convenience to the Government.
E-CRRC INDUSTRY DAY RFP Q&As
a. Marine Corps Systems Command will respond with comments via email.
a. No.
Gov't Response
a. The broaching payload is 1600 lbs (payload minus weight of 4 Marines). Weight of 4 Marines (conducting the broach) at 200 lbs each plus weight of 8 combat loaded rucks at 100 lbs each for total of 1600 lbs.