M67854-14-R-5011.doc

DOC document 923 KB Posted

Attached to
Amendment 2
Solicitation number
M67854-14-R-5011
Issued by

About this file

EBFL RFP M67854-14-R-5011 with Draft watermark removed.

View the file

Other files

File Type Posted
EBFL_MODERIZATION__Question_and_Answers_6-20-14.xlsx XLSX spreadsheet
14-R-5011-0002.doc DOC document
Attachment_F_-_EBFL_Price_Submission_Worksheet_Admt_0002.xlsx XLSX spreadsheet
Attachment_J_-_JLG_Manual_Supplement_31200693.pdf PDF
Attachment_A_-_EBFL_Performance_Specification_Admt_0001.docx DOCX document
EBFL_MODERIZATION__Question_and_Answers.xlsx XLSX spreadsheet
Exhibits_A _B _and_D_-_EBFL_CDRLs_Admt_0001.docx DOCX document
Attachment_H_-_16610794200_TI_10794B_OR_2.pdf PDF
14-R-5011-0001.doc DOC document
Attachment_F_-_EBFL_Price_Submission_Worksheet_Admt_0001.xlsx XLSX spreadsheet
Exhibits_A _B _and_D_-_EBFL_CDRLs.docx DOCX document
Attachment_E_-_Tire_Inspection_and_Replacement_Criteria.docx DOCX document
Attachment_C_-_SOW_PS_Section_D_Matrix.xlsx XLSX spreadsheet
Attachment_D_-_EBFL_Serial_Number_unit_breakout_13-May-2014.xlsx XLSX spreadsheet
TDP_Option_Selection_-_CDRL_Attachment_1.pdf PDF
Attachment_B_-_DD_254.pdf PDF
Attachment_F_-_EBFL_Price_Submission_Worksheet.xlsx XLSX spreadsheet
Attachment_A_-_EBFL_Performance_Specification.docx DOCX document
Product_Drawing_-_CDRL_Attachment_2.docx DOCX document
Attachment_G_-_Anticipated_EBFL_Delivery_Locations_and_Quantities.xlsx XLSX spreadsheet
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
6
Each

EBFL - Modernized

FFP

IAW with SOW and PS. This is the price of a modernized EBFL with an exchange credit. Base Period.

FOB: Destination

MAX

NET AMT

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

EBFL - New

IAW with SOW and PS. This is the price of a new EBFL without an exchange credit. Base Period.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
700
Each

Exchange Credit

IAW with SOW 3. This SLIN is for evaluation purposes only to delineate the value of the exchange credit the offeror is providing. This SLIN will be removed at award as the credit is built into the price of the modernized EBFL. Base Period

MAX

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
6
Each

Armored Cab

IAW with SOW and PS. Base Period.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
10
Each

Spare Parts Block

IAW SOW 3.1.4. Base Period.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
6
Each

Retrofit and Refurb

IAW SOW 3.10.4 and 3.10.5.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
10
Each

NET CONUS - Operator

IAW SOW 6.1.2.4.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
2
Each

NET OCONUS - Operator

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
10
Each

NET CONUS - Maintainer

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
2
Each

NET OCONUS - Maintainer

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each

NET for PQT

IAW SOW 6.1.2.1

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each

NET for FUE

IAW SOW 6.1.2.2

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each

NET for I&KPT

IAW SOW 6.1.2.3

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each

Training Task Data

IAW SOW 6.1.1.2

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each

NET Outline of Instruction

IAW SOW 6.1.1.3

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each

Lesson Plan Data

IAW SOW 6.1.1.4

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each

Trainee Guide Data

IAW SOW 6.1.1.5

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each

Courseware Data Files

IAW SOW 6.1.1.6

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each

Training Test Package Dev.

IAW SOW 6.1.1.7

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each

Product Drawings

IAW SOW 3.8

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Provisioning Technical Documentation

IAW SOW Section 4.5.4

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each

Critical Design Review (CDR)

IAW SOW 3.4.2.1.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each

Test Readiness Review (TRR)

IAW SOW 3.4.2.2

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each

System Verification Review (SVR)

IAW SOW 3.4.2.3

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each

Production Readiness Review (PRR)

IAW SOW 3.4.2.4

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each

Physical Configuration Audit (PCA)

IAW SOW 3.4.2.5

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each

TM Outline

IAW SOW 5.3 and 5.15

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each

Preliminary Draft TM

IAW SOW 5.4 and 5.15

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each

Draft TM

IAW SOW 5.5 and 5.15

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each

Final Draft TM

IAW SOW 5.6 and 5.15

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each

Sign-off Copy of TM

IAW SOW 5.7 and 5.15

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
500
Each

Final Reproducible Copy of TM

IAW SOW 5.8 and 5.15.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

CTR Support for Gov't Testing

IAW SOW 3.10.2

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

CTR certification of EBFL

IAW SOW 3.10.1

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

CDRLs

These are the data deliverable not designed by a seperate CLIN or SLIN. Exhibits A, B and D.

NET AMT

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
291
Each

EBFL - Modernized

IAW with SOW and PS. This is the price of a modernized EBFL with an exchange credit. Ordering Period 1

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

EBFL - New

IAW with SOW and PS. This is the price of a new EBFL without an exchange credit. Ordering Period 1

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
25
Each

Exchange Credit

IAW with SOW 3 and Section L of the RFP. This SLIN is for evaluation purposes only to delineate the value of the exchange credit the offeror is providing. This SLIN will be removed at award as the credit is built into the price of the modernized EBFL. Ordering Period 1

MAX

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
10
Each

Armored Cab

IAW with SOW and PS. Ordering Period 1

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
10
Each

Spare Parts Block

IAW SOW 3.1.4. Ordering Period 2.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
10
Each

NET CONUS - Operator

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
2
Each

NET OCONUS - Operator

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
10
Each

NET CONUS - Maintainer

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
2
Each

NET OCONUS - Maintainer

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

CDRLs

NET AMT

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
69
Each

EBFL - Modernized

IAW with SOW and PS. This is the price of a modernized EBFL with an exchange credit. Ordering Period 2

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

EBFL - New

IAW with SOW and PS. This is the price of a new EBFL without an exchange credit. Ordering Period 2

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
25
Each

Exchange Credit

IAW with SOW 3 and Section L of the RFP. This SLIN is for evaluation purposes only to delineate the value of the exchange credit the offeror is providing. This SLIN will be removed at award as the credit is built into the price of the modernized EBFL. Ordering Period 2.

MAX

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
20
Each

Armored Cab

IAW with SOW and PS. Ordering Period 2

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
10
Each

Spare Parts Block

IAW SOW 3.1.4. Ordering Period 2.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
10
Each

NET CONUS - Operator

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
3
Each

NET OCONUS - Operator

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
10
Each

NET CONUS - Maintainer

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
3
Each

NET OCONUS - Maintainer

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

CDRLs

NET AMT

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
87
Each

EBFL - Modernized

IAW with SOW and PS. This is the price of a modernized EBFL with an exchange credit. Ordering Period 3

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

EBFL - New

IAW with SOW and PS. This is the price of a new EBFL without an exchange credit. Ordering Period 3

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
25
Each

Exchange Credit

IAW with SOW 3 and Section L of the RFP. This SLIN is for evaluation purposes only to delineate the value of the exchange credit the offeror is providing. This SLIN will be removed at award as the credit is built into the price of the modernized EBFL. Ordering Period 3.

MAX

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
20
Each

Armored Cab

IAW with SOW and PS. Ordering Period 3.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
10
Each

Spare Parts Block

IAW SOW 3.1.4. Ordering Period 3.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
10
Each

NET CONUS - Operator

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
2
Each

NET OCONUS - Operator

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
10
Each

NET CONUS - Maintainer

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
2
Each

NET OCONUS - Maintainer

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

CDRLs

NET AMT

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
42
Each

EBFL - Modernized

IAW with SOW and PS. This is the price of a modernized EBFL with an exchange credit. Ordering Period 4.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Each

EBFL - New

IAW with SOW and PS. This is the price of a new EBFL without an exchange credit. Ordering Period 4.

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
25
Each

Exchange Credit

IAW with SOW 3 and Section L of the RFP. This SLIN is for evaluation purposes only to delineate the value of the exchange credit the offeror is providing. This SLIN will be removed at award as the credit is built into the price of the modernized EBFL. Ordering Period 4.

MAX

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
50
Each

Armored Cab - Ordering Period 4

IAW with SOW and PS

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
10
Each

Spare Parts Block

IAW SOW 3.1.4. Ordering Period 4.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
10
Each

NET CONUS - Operator

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
2
Each

NET OCONUS - Operator

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
10
Each

NET CONUS - Maintainer

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
2
Each

NET OCONUS - Maintainer

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Lot

CDRLs

NET AMT

CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE

The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

$100,000.00

$78,000,000.00

CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE

The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.

CLIN
MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

Section C - Descriptions and Specifications

STATEMENT OF WORK

STATEMENT OF WORK

FOR

EXTENDABLE BOOM FORKLIFT (EBFL) MODERNIZATION PROGRAM

1. SCOPE.

This statement of work (SOW) describes the outcome the contractor is required to achieve in order to provide the United States Marine Corps with modernized Extendable Boom Forklifts (EBFL). The contractor shall provide a modernized EBFL which has been enhanced with the modifications and serviced as specified in this SOW and meets the performance requirements established in the Performance Specification.

The contractor is responsible for providing all material, services and necessary support documentation needed to complete the tasks identified in this SOW.

2. APPLICABLE DOCUMENTS.

The following documents form a part of this SOW to the extent specified herein. The most recent revision of the referenced document at the time of contract shall be used unless otherwise specified. In the event of conflict between the applicable documents and this SOW, the SOW shall take precedence. All below references cited in mandatory compliance documents shall be considered as guidance only. Nothing in this document supersedes applicable laws or regulations unless a specific exemption has been obtained.

2.1 Military Standards and Specifications - Mandatory Compliance.

GEIA-STD-0007

Logistics Product Data

NAVMC 1553.1

Systems Approach to Training Users Guide

MIL-PRF-49506

Logistics Management Information

MIL-STD-130

Identification Marking of U.S. Military Property

MIL-STD-882

System Safety

MIL‑STD‑3018 w/Ch1

Parts Management

MIL-STD-31000

Technical Data Packages

MIL-STD-40051_

Technical Manual Standards

2.2 Military Handbooks - Guidance Only.

GEIA-HB-0007

Logistics Product Data Handbook

MIL‑HDBK‑61A

Configuration Management

MIL-HDBK-502

Acquisition Logistics

2.3 Other Government Documents. Unless otherwise stated, the following documents may be obtained from the Document Automation and Production Service, Building 4/D, 700 Robbins Avenue, Philadelphia, PA 19111-5094 or visit http://dodssp.daps.mil.

DI-SESS-81000

Product Drawings/Models and Associated Lists

TI 10794B-OR/2

Extendable Boom Fork-Lift Inspection of Mid Boom Wear Pad Bolts

TM 10794B-OI/A

Extendable Boom Fork-Lift Organizational and Intermediate Maintenance Manual with Repair Parts List

TM 10794B-OR/A

Extendable Boom Fork-Lift Operators Manual

2.4 Non-Government Documents.

ASME Y14.100

Engineering Drawing Practices with Append. B, C, D, & E

ASME Y14.24

Types and Applications of Engineering

ASME Y14.34

Associated Lists

GEIA-HB-649

Implementation Guide for Configuration Management

JLG Supplement 31200693 Sky Trak Model MMV Supplement #1

(Copies of ASTM documents are available from www.astm.org or American Society for Testing and Materials International, 100 Barr Harbor Drive, West Conshohocken, PA 19428-2959.)

3. REQUIREMENTS.

The Government will exchange its entire fleet of EBFL systems with the contractor which will in turn provide the Government with modernized EBFL systems as set forth below. The contractor may as deemed necessary utilize the exchanged EBFL systems as a spare parts pool to produce and deliver the required quantity of modernized EBFL systems to the Government. The contractor shall receive title to all exchanged EBFL systems in excess of the quantity to be delivered to the Government and shall be responsible for transportation and disposal of such systems to include all parts, components, and subsystems. The contractor shall perform all tasks and provide all materials, equipment, hard tooling, personnel, and facilities required to deliver the types and quantities of deliverables specified in the contract. This includes associated documentation; logistics, technical support; a training package; and technical manuals. Upon successful completion of Production Qualification Testing (PQT) and the Field User Evaluation (FUE), the Government may place additional orders for production.

3.1 Modernization Program Elements

The EBFL Modernization Program consists of a series of modifications and services as set forth below.

3.1.1 Modifications.

The contractor shall implement the following five (5) modifications. The modernized EBFL shall meet all requirements in the Performance Specification.

a. Overall Height Reduction.

b. Boom Hydraulic Assembly Relocation.

c. Carriage Quick Attach Coupler Relocation.

d. Carriage Backrest Enhancement.

e. Armored Cab Integration.

3.1.2 Inspection and Services.

An Initial Technical Inspection (ITI) shall be conducted upon receipt of each EBFL to determine the status of the system. During this inspection the contractor shall record all major component model numbers, serial numbers and other pertinent data. The contractor shall also inventory the required system components and basic issue items (BII). The ITI shall determine the status of, at a minimum, all subsystems which will undergo inspection, repair and replacement based maintenance as defined below. The condition of each machine along with serial/model numbers and inventory shall be documented and provided to Product Manager Engineer Systems (PdM ES), Material Handling Equipment/Construction Equipment (MHE/CE) in an ITI report. The ITI report shall be delivered to Government 14 calendar days after completion. The contractor shall conduct the following three (3) services.

CDRL B001, DI-NDTI-80809B, Initial Technical Inspection Report

3.1.2.1 Corrective Maintenance. The contractor shall conduct the corrective maintenance prescribed as follows on all EBFLs provided by the Government regardless of assigned condition code.

3.1.2.1.1 Inspection-Based Maintenance. The contractor shall conduct a thorough inspection of the following subsystems on all EBFL systems and shall repair only minor physical and functional degradation. The contractor shall notify the Government within 10 calendar days of receipt if any subsystems have major physical and functional degradation which require complete overhaul. Systems with major degradation requiring overhaul are defined as units which would not meet the current EBFL performance specification after modernization or have an economic useful life of less than 10 years. The contractor shall provide the Government an itemized estimate of the cost to repair any such systems which require complete overhaul. The contractor shall not conduct a complete overhaul of any of the following subsystems until approved by the Government.

a. Engine

b. Boom

c. Axles

d. Transmission

e. Vehicle Frame

3.1.2.1.2 Repair-Based Maintenance. The contractor shall conduct a thorough inspection of the following subsystems or features on all EBFL systems and shall repair all physical and functional degradation. Repairs shall consist of the most economical approach between cleaning, repairing, replacement of parts, or any combination thereof.

a. Fuel Tanks

b. Operator Seat and Seatbelt

c. Controls and Displays

d. Load Moment Indicator

e. Anti-Overload Device

f. Heating, Ventilation, Air Conditioning (HVAC)

g. Defroster

h. Window Wipers and Washer

i. Windows

j. Mirrors

k. Cab Light

l. Cab Fan

m. Horn and Backup Alarm

n. Lights

o. Tires*

p. Hydraulic Hoses and Fittings

q. Electrical Wires and Fittings

r. Boom Wear Pads (see TI 10794B-OR/2)

s. Battery Disconnect Switch (see JLG Supplement 31200693)

t. Steering Linkage Boots

j. Transfer Case

*Tires shall be inspected and replaced per Attachment E

3.1.2.1.3 Replacement-Based Maintenance. The contractor shall replace the following on all EBFL systems. Replacement parts and materials shall maintain the same form, fit, and function as the corresponding discarded item.

a. Batteries*

b. Petroleum, Oil, and Lubricants (POL)

c. Air and Fluid Filters

d. Transfer Cases**

e. Battery Disconnect Switch***

* Batteries shall be replaced with Hawker battery NSN 6140-01-485-1472

**The current fleet of EBFLs possess two variations of transfer cases, one manufactured by ZF and one by Carraro. The contractor shall replace all ZF transfer cases with Carraros transfer cases and ancillary interface equipment. The estimate of EBFLs which will need a transfer case replacement is 300. EBFLs with Carraro transfer cases only require repair based maintenance per 3.1.2.1.2.

*** In instances where the EBFL is not equipped with a battery disconnect switch the contractor shall install one per JLG Supplement 31200693. The estimate of EBFLs which will need a battery disconnect switch is 400.

3.1.2.2 Preventive Maintenance. The contractor shall conduct the Preventive Maintenance Checks and Services (PMCS) inclusive of the 250‑hr, 500‑hr, 1,000‑hr, and 2,000‑hr operator, field, and intermediate service intervals, without duplication of service, on all modernized EBFLs regardless of engine hour meter reading.

3.1.3 Paint and Treatment. The contractor shall paint and treat all modernized EBFLs. Specific requirements for this service are provided in the Performance Specification.

3.1.4 Spare Parts Kit. The contractor shall provide the government with a Spare Parts Kits (SPK). The SPK equipment shall undergo all modernization and maintenance in this SOW and, when installed onto the modernized EBFL, meet the requirements in the performance specification. Each SPK shall include the following items: Ten (10) Engines, Ten (10) Transmissions, One (1) set of Axles (one set includes one front axle and one rear axle), One (1) Boom assembly, Ten (10) Carraro Transfer Cases, Ten (10) 7k fork carriage assemblies and Ten (10) 11k fork carriage assemblies.

3.2 Program Management.

3.2.1 Program Management. The contractor shall establish and maintain program management practices throughout the period of performance. Program management practices shall provide visibility into the contractors’ organization and techniques used in managing the program, including subcontractor and data management. Documentation shall be readily available to Government representative(s) during planned visits. The contractor shall be responsible for tracking all EBFLs in a Master Control Document. The Master Control Document shall be provided to government per CDRL B002.

CDRL B002, DI-MGMT-80442, Master Control Document

3.2.2 Subcontractor Management. The contractor is responsible for performance of requirements delineated in this SOW and shall institute appropriate management actions relative to subcontractor performance. The contractor shall be accountable for subcontractor compliance and is responsible for ensuring all deliverable products comply with the contract requirements.

3.2.3 Schedule Planning. Monthly production shall equal a minimum of twenty (20) Modernized EBFLs per month after successful PQT and a Full Rate Production (FRP) decision. The contractor shall notify the Government in writing within 10 days of any anticipated or projected work stoppages or delays that will impact schedules.

3.2.4 Planned Deliveries. The contractor is responsible for the pick-up and drop-off shipping cost. The Government will coordinate pick-up for Modernized EBFL which must be worldwide supportable and shipped Free On Board (FOB) to CONUS and OCONUS locations. Quantity and location will be specified on each individual delivery order. The pick-up and delivery locations are provided in attachment D.

3.3 Meetings, Formal Reviews, Conferences, and Audits.

3.3.1 Contractor Responsibilities. The contractor shall plan, attend, coordinate, support and conduct necessary meetings, formal reviews, conferences, and audits (hereinafter called "reviews"). The reviews shall be conducted at either Government or contractor facilities and shall allow individuals to participate via Video Teleconferencing (VTC)/Teleconference channels when necessary. Reviews requiring demonstration or examination of equipment shall be conducted at the contractor's facility. All such reviews shall be included in the program schedule and may be held concurrently with the Government’s approval. The contractor shall prepare agendas and conference presentation materials, and provide minutes and reports following each review. The Government reserves the right to cancel any review or to require any review to be scheduled at critical points during the period of performance. Action item documentation, assignment of responsibility for completion and due dates shall be determined prior to adjournment of all reviews. A summary of all action items, responsible parties, and estimated completion dates shall be included with the minutes per CDRL B003.

CDRL B003, DI-ADMN-81250A, Meeting Minutes

3.3.2 Post Award Meeting/Preliminary Design Review. A combined Post Award Meeting (PAM) and Preliminary Design Review (PDR) will be held within 30 days after Contract Award. The purpose of the PAM/PDR is for the contractor to review and demonstrate to the Government the Program and Data Management procedures, provide progress assessments, review of technical and other specialty area status, and to establish schedule dates for near term critical meetings, actions, and reviews. The contractor shall present management, key personnel, and program implementation processes.

3.3.3 In-Process Review. In-Process Reviews (IPR) shall be held quarterly or as needed. The Government reserves the right to cancel any review or to require any review to be scheduled during the period of performance. The contractor’s progress, management, technical support services, administrative processes, assurance of compliance with contract requirements, program status, funding, problem identification and resolutions shall be agenda items. Actual versus expected performance of each area shall be addressed. The contractor shall prepare presentation materials providing an overview of all agenda items.

3.4 Systems Engineering.

3.4.1 Systems Engineering Program. The contractor shall establish and maintain a systems engineering program throughout the period of performance. The systems engineering program shall be documented in a Systems Engineering Management Plan (SEMP) and shall describe the contractor’s planned systems engineering approach to meeting the program’s contract, objectives, and overall technical and management approach.

3.4.2 Technical Reviews. Technical reviews will be conducted in accordance with MCSCO 5400.5, Naval Systems Engineering Policy and the MARCORSYSCOM Technical Review Handbook.

3.4.2.1 Critical Design Review. The contractor shall participate in the Critical Design Review (CDR) scheduled by the Government to be conducted after Contract Award and prior to delivery of PQT and FUE assets. At the CDR, the contractor shall present and discuss the SEMP, the Requirements Traceability Matrix (RTM), all certifications required in the Performance Specification, the System Impact Assessment (SIA), the Corrosion Prevention and Control Plan (CPCP), the Quality Management (QM) program, Roll Over Protection Systems (ROPS) & Falling Objects Protection Systems ( FOPS) design analysis and the Technical Data Package (TDP). In preparation for the CDR, the contractor shall provide all presentation materials, technical data, and reports, to the Government at least 7 calendar days prior to the scheduled CDR.

3.4.2.2 Test Readiness Review. The contractor shall participate in the Test Readiness Review (TRR) scheduled by the Government to be conducted prior to PQT and the FUE. At the TRR, the contractor shall present and discuss any changes or updates to the materials presented during the CDR, the plan for providing support during PQT and the FUE, the Failure Reporting, Analysis, and Corrective Action System (FRACAS) with approach to reviewing and responding to Test Incident Reports (TIRs), and the Configuration Management (CM) program. In preparation for the TRR, the contractor shall provide all presentation materials, documents updated since the CDR, and an accurate TDP for establishing a product baseline to the Government at least 7 calendar days prior to the scheduled TRR.

3.4.2.3 System Verification Review. The contractor shall participate in the System Verification Review (SVR) scheduled by the Government to be conducted after completion of PQT and the FUE and prior to any production Delivery Orders. The contractor shall present and discuss any changes or updates to the materials presented during the TRR and all failures identified during PQT and the FUE with the corresponding analyses, and corrective actions planned and/or implemented. In preparation for the SVR the contractor shall provide all presentation materials, documents updated since the TRR, and all failure analyses and corrective actions with responses to all TIRs to the Government at least 7 calendar days prior to the SVR.

3.4.2.4 Production Readiness Review. The contractor shall participate in the Production Readiness Review (PRR) scheduled by the Government to be conducted after the PQT and FUE have been completed and prior to any production Delivery Orders. The contractor shall present and discuss any changes or updates to the materials presented during the SVR, the Producibility Plan, the QM program, the CM program, any anticipated, approved, or implemented engineering changes or deviances from the product baseline. In preparation for the PRR, the contractor shall provide all presentation materials and documents updated since the SVR to the Government at least 7 calendar days prior to the PRR.

3.4.2.5 Physical Configuration Audit. The contractor shall participate in the Physical Configuration Audit (PCA) scheduled by the Government to be conducted after the first production Delivery Order and prior to fielding. The contractor shall present and discuss any changes or updates to the materials presented during the PRR. In preparation for the PCA, the contractor shall provide all presentation materials and documents updated since the PRR to the Government at least 7 days prior to the PCA. Additional details for the PCA are established in the Configuration Management section of this SOW.

3.4.3 Requirements Traceability Matrix. The contractor shall document technical compliance in a Requirements Traceability Matrix (RTM) identifying how modernized EBFL compliance with each requirement in the Performance Specification has been attained and preserved throughout the entire period of performance. The RTM shall include all supporting design, certification, analysis, demonstration, examination, or test data obtained or generated by the contractor during the design and/or fabrication processes.

3.4.4 Corrosion Prevention and Control. The contractor shall develop a Corrosion Prevention and Control Plan (CPCP) that describes the specific measures to be implemented throughout the EBFL Modernization Program. The purpose of the CPCP is to document corrosion-related design decisions and identify materials and corrosion control methods used in the EBFL. The plan shall address the techniques and processes to be applied in assuring that the products to be delivered will meet the requirements contained in the Performance Specification. Changes in materials, coatings, or corrosion prevention methods during the course of production shall be reflected in updated versions of the CPCP. At a minimum, the CPCP shall provide the following information:

a. Discussion of corrosion prevention techniques employed in design, including measures taken to minimize water collection/entrapment and collection of debris, to mitigate corrosion in areas inaccessible to cleaning and maintenance, and to minimize dissimilar metal contact.

b. Process instructions detailing application of coatings and other corrosion prevention compounds (if any). Process instructions should address personnel training and qualification, material inspection, surface preparation, and coating or compound application procedures.

c. Any test data developed for coatings and materials.

d. Identification of coating/substrate combinations for which no testing was required or performed.

e. Recommended corrosion control-specific maintenance.

f. Quality assurance program provisions to address materiel control to ensure that the materials used in the EBFL are shown on engineering drawings; and in-process measurements (number, type, frequency, locations) to ensure compliance with process instructions developed under b, above.

Changes in materials, coatings, or corrosion prevention methods during the course of production shall be reflected in updated versions of the CPCP per CDRL A001.

CDRL A001, DI-MFFP-81403, Corrosion Prevention and Control Plan

3.4.5 Reliability and Maintainability

3.4.5.1 Reliability and Maintainability Program. The Reliability and Maintainability (R&M) program shall encompass all aspects of reliability with respect to design selection of components, predictions, and testing. The contractor shall maintain and make available to the Government all R&M data on any vendor or subcontractor supplied item and shall inform the Government of any part or component, which will degrade system R&M requirements.

3.4.5.2 Procedures and Controls. The contractor shall maintain procedures and controls, which ensure products obtained from suppliers, vendors and subcontractors meet reliability requirements. The contractor shall establish, implement, and maintain documented procedures, which detect and/or preclude the use of substandard or counterfeit parts in the production process, and impose similar requirements on subcontractors.

3.4.5.3 Failure Reporting, Analysis, and Corrective Action System. The contractor shall develop a closed loop failure reporting system, procedures for analysis of failures to determine the root cause, and documentation for recording corrective actions taken. The FRACAS shall include uniform failure reporting, failure analysis reports and corrective actions. All hardware/software failures from system level down to the subassembly level shall be subject to these requirements throughout the testing period including production and integration testing, and during the post-production support.

3.5 Quality Management System.

3.5.1 Quality Assurance Program Plan (QAPP). The contractor shall establish, implement, document and maintain a quality system that ensures conformance to contractual requirements. The contractor shall implement the requirements of ANSI/ASQC Q9001, ISO 9001 or an equivalent quality system model; no third party certification is required. The contractor shall make their QAPP or Quality Manual (whichever document they've developed as required by their ANSI, ISO, or equivalent quality system – development of a Government unique document is not required) available for Government review at their facility as required. The contractor shall notify the Government when they update their QAPP throughout the contract period of performance through Letter of Transmittal to the PCO.

3.5.2 Quality Assurance Management Meeting (QAMM). The contractor shall schedule and participate in QAMMs. The meetings shall include representatives from Quality, Production, and Engineering at a minimum, and shall be held quarterly (at a minimum) in conjunction with the IPR or on an as needed basis. Additional meetings shall be scheduled through the Administrative Contracting Officer (ACO) /PCO if quality issues dictate additional surveillance.

3.6 Producibility. The contractor shall apply producibility principles during all design processes to ensure that the production units will be easy to manufacture using the anticipated production facilities, equipment, materials, manpower, and processes. The producibility planning effort shall also maximize the ease of production control, quality control, tooling and inspection.

3.7 Environment, Safety, and Occupational Health

3.7.1 System Safety. The contractor shall identify and evaluate environmental, safety, and health hazards, define risk levels, and establish a program that manages the probability and severity of all hazards associated with development, use, and disposal of the system in accordance with MIL-STD-882. Risks will be evaluated by the Government in accordance with MIL-STD-882 and accepted as appropriate prior to exposing people, equipment, or the environment to known system related Environment, Safety, and Occupational Health (ESOH) risks.

3.7.2 Material Safety Data Sheets. The contractor shall make available Safety Data Sheets (SDS) or Material Safety Data Sheets (MSDS) for all hazardous materials used in the modernization of the EBFL prior to the CDR for the Government review.

3.8 Product Drawings/Models and Associated Lists. The contractor shall provide a complete Product Level Drawing Package in accordance with MIL-STD 31000, which completely documents the system design per CDRL A002. All drawings in this Product Drawing Package shall comply with ANSI Y14.100, ASME Y14.24 and ASME Y14.34M. This Product Drawing Package shall include assembly drawings and detail drawings down to the piece part for all items designed and developed at Government expense. The assembly and detail drawings shall provide necessary design, engineering, manufacturing and quality assurance requirements necessary to enable the procurement or manufacture of an interchangeable item, which duplicates the physical and performance characteristics of the original product, without additional design, engineering or recourse to the original design activity. This Product Drawing Package shall also include control drawings for all Commercial Off-The-Shelf (COTS) items that do not conform to recognized Government or industry specifications, non-developmental items (NDI), and items developed at private expense for which the Government has not acquired unlimited rights. These control drawings shall provide the applicable performance specification form, fit, function and interface information needed for competitive re-procurement of that item or an interchangeable item. The contractor shall also provide any digital modeling data files developed in support of this Product Drawing Package or the system design.

CDRL A002, DI-SESS-81000D, Product Drawings/Models and Associated Lists

3.9 Configuration Management (CM)

3.9.1 Configuration Management Process. The contractor shall maintain a CM process for the control of all requirements, hardware, software and external system interface configuration documentation, media and parts representing or comprising work related to the EBFL Modernization Program. The principles contained in EIA-649, National Consensus Standard for Configuration Management, and MIL-HDBK-61A, Configuration Management Guidance, should be used for guidance as well as related MARCORSYSCOM acquisition and engineering policy. The contractor's CM process shall consist of CM planning, configuration identification, configuration control, configuration status accounting, and configuration verification and audits and data management including tools. Processes and tools for interfacing with other acquisition requirements such as design review, assurance, and other program related disciplines shall be addressed. The contractor shall designate a CM representative to serve as a primary point of contact to the Government for all CM matters. The contractor's representative shall be responsible for any subcontractor's CM efforts. The contractor shall notify the Government of any changes at the contractor's facility, which affect the execution of the contractor's CM Plan. The contractor shall present and discuss their CM plan at the Critical Design Review. The Government will review and approve the contractor’s CM plan. The CM Plan shall be reviewed at least annually, and updated to reflect changes in system engineering, logistics or acquisition strategy concepts.

3.9.2 Configuration Identification (CI). In coordination with the Government’s CM manager, the contractor shall develop methods to uniquely identify Configuration Items (CI) and associated documentation, such as drawings, manuals, plans, procedures, instructions, and other configuration-related documents.

3.9.3 Configuration Status Accounting. The contractor shall establish and maintain a Configuration Status Accounting (CSA) database, which represents the configuration of the armored cab. All baselines, changes and planned systems upgrades shall be documented in the contractor’s CSA database. The contractor’s CSA database shall permit acceptance of commercial product information; however, if requirements to report data outside of the contractor’s CSA database or format exist, the information may be delivered as a supplement to prevent disruption to their existing system. The contractor’s CSA database shall reconcile any differences between the supplier information and contractor practices to provide the Government with clear accountability of product information. Additionally, the CSA database shall provide a reliable source of configuration information to support all EBFL Modernization Program activities, including program management, systems engineering, logistics support, and modification/maintenance actions. The contractor’s CSA database shall be capable of providing CSA data in a digital format compatible with USMC’s CSA automated information system, Joint Configuration Management Information System (JCMIS).

3.9.3.1 Modification Tracking. The contractor shall utilize the CSA database to record completed field modifications or retrofit actions as a result of approved ECPs for each CI. The contractor shall maintain the information that allows visibility of completed actions to the USMC Serial numbers or IUID. The contractor’s CSA database shall include the following data elements:

a. USMC Serial Number, computer software name and version or IUID

b. ECP/MI Number

c. Date Installed

d. Location

e. Ownership.

3.9.3.2 Baseline Tracking. The contractor shall establish a database that records and maintains configuration baselines. The database shall record; documents, hardware, computer software and drawings that have been approved and placed under Government configuration control and new CIs which are planned for inclusion in future baseline updates. As a minimum, CI data shall identify the current approved baseline by:

a. Document number and Document type

b. CAGE

c. Revision Level

d. Nomenclature

e. Drawing size

f. Indentured breakdown of parts, which display a “parent to child” relationship, to include quantity. The breakdown shall only pertain to CI documents under Government configuration control.

g. Computer software version number.

3.9.4 Configuration Management Meetings/Audits. A Physical Configuration Audit (PCA) shall be performed to verify the EBFL Modernization Program CI are accurate, complete, and compatible. The Government and the contractor shall conduct the PCA jointly, at a time and place designated by the Government, with the Government chairing the audit. The PCA shall verify the drawings reflect the "as-built" configuration of all newly developed or modified portions of the system; accurate form, fit or function information is provided on control drawings for non-developmental/ commercial off-the-shelf items; and confirm the drawings accurately represent the "as-built" production configuration. Whenever possible, the PCA shall be conducted incrementally, concurrent with hardware fabrication and assembly of the first production system. The contractor shall develop a configuration audit plan and provide the system to be audited, facilities, personnel, documentation (including drawings) and other support as may be required. The contractor shall participate and assist the Government in the development of the PCA, using the guidelines contained in Section 8 of MIL-HDBK-61A, Configuration Management Guidance. The contractor shall document the results of the PCA after each audit and shall correct all audit discrepancies documented in the configuration audit summary reports. In the event the Government finds evidence the drawings and/or documents do not adequately represent the equipment, production shall cease until all discrepancies are corrected and the Government approves the configuration audit summary report.

3.9.5 Parts Management Program. The contractor shall establish and maintain a Parts Management Program in accordance with MIL-STD-3018, Parts Management, for all new designs or modified equipment. This program will ensure that the use of parts meet the contractual requirements, reduce proliferation of parts within and across DoD systems and equipment, through standardization, and enhance reliability and supportability to meet material readiness objectives, and reduce total-life-cycle costs. The contractor shall describe how the parts management process is validated, the contractor shall describe how process improvements are incorporated, and the contractor shall describe how process variation is controlled. The contractor shall document the program plan. The procedures, planning and all other documentation, media and data which define the Parts Management Program and the parts selected for use shall be made available to the Government for their review. The Government may perform any necessary inspections, verifications, and evaluations to ascertain conformance to requirements and adequacy of the implementing procedures. The Government may exercise its right to disapprove the Parts Management Program or portions thereof when it fails to meet its intended objectives

3.9.6 Product Baseline Management. The contractor shall maintain a current and accurate Product Baseline to ensure form, fit, and function of the EBFL modifications and interface of the armored cab. The contractor shall establish definitive processes, which identify how the Product Baseline will be managed and maintained. These processes shall be defined in the contractor's CM plan and made available for Government review. The product baseline is the approved technical documentation that describes the configuration of a CI during the production, fielding/deployment and operational support phases of its life cycle. The product baseline shall prescribe; (1) all necessary physical or form, fit, and functional characteristics of a CI; (2) the selected functional characteristics designated for production acceptance testing and; (3) the production acceptance test requirements. The contractor shall establish the product baseline at the conclusion of the Critical Design Review. No changes shall be made to this baseline without following the Engineering Change Proposal (ECP) process.

3.9.7 Configuration Control. The contractor shall implement configuration control methods and procedures, which maintain the integrity and traceability of an established baseline. Changes to established baselines shall only be made after Government approval of ECP and Request for Deviations (RFDs) via the Configuration Control Board (CCB) process. Sufficient supporting data to evaluate the proposed change, such as drawings, supplemental drawings, sketches, specifications, or manufacturer’s data sheets, shall be submitted with ECP’s and RFD’s. Changes shall be identified to the affected assembly serial number, or if not part of an assembly, to the affected equipment serial number. The contractor’s configuration control process shall be available for Government review. The contractor shall submit all configuration control documentation in a digital format specified by the Government.

3.9.7.1 Engineering Release System. The contractor shall maintain an engineering release system and shall use the system to issue configuration documentation to functional activities (e.g. manufacturing, logistics, quality control, and engineering) and to authorize the use of configuration documentation associated with an approved configuration. The contractor shall maintain current and historical engineering release information for all configuration documentation for the EBFL Modernization Program. The contractor shall submit an Engineering Release Record (ERR) to release new or revised configuration documentation to the Government for approval. The contractor shall ensure all Government approved ERR information/documentation is reflected in the Configuration Status Accounting (CSA) database.

3.9.7.2 Engineering Change Proposals. ECP shall be submitted by the contractor; and shall be limited to those that are necessary or offer significant benefit to the Government. MIL-HDBK-61A provides guidance concerning the classification of ECP’s. Class I ECP’s shall be submitted when changes are required to: (a) Correct deficiencies; (b) Add or modify interface or interoperability requirements; (c) Make a significant and measurable effectiveness change in the operational capabilities or logistics supportability of the system; (d) Effect substantial life cycle costs/savings; and (e) Prevent slippage in an approved production schedule. Class II ECP’s shall be submitted by the contractor to the Procuring Contracting Officer (PCO) for approval for those engineering changes, which impacts none of the factors listed above. As a minimum, Class I ECP’s shall contain the following information: (a) Date prepared; (b) Originator; (c) ECP Classification; (d) ECP Number; (e) Reason/need for change; (f) System designation (nomenclature, model, P/N); (g) Name of part (or lowest assembly) affected to include part numbers; (h) Baselines affected (to include drawings, specifications, CAGE, revision level, etc.); (i) Title of change; (j) Description of change; (k) Effect on interfaces (Interchangeability and Interoperability); (l) Total costs/savings w/ breakout; (m) Retrofit information; (n) Ozone Depleting Substances; (o) Impact on any engineering disciplines (such as quality, environmental, safety, health, reliability, maintainability, etc.); (p) Justification for change; (q) Priority of change; (r) Impacts to any logistics support elements (such as software, manuals, spares, tools, etc.) being utilized by Government personnel in support of the product; and (s) Alternatives evaluated or considered.

3.9.7.3 Requests for Deviation. The contractor shall submit all Requests for Deviation (RFD) from current approved configuration documentation to the Government. Authorized deviations are a temporary departure from the requirements and do not constitute a change in an approved baseline. Submission of recurring deviations is discouraged and shall be minimized. Where it is determined that a change should be permanent, the contractor shall submit an Engineering Change Proposal. MIL-HDBK-61A provides guidance concerning the classification of RFDs. As a minimum, the RFD shall contain the following information: (a) Date prepared; (b) Originator; (c) RFD Classification (critical, major or minor); (d) Designation for deviation (model/type, CAGE code, system designation, and deviation number); (e) Class of deviation; (f) Part Number affected; (g) Cost/Price data; (h) Effectivity; (i) Description of deviation; (j) Need for deviation; (k) Effect on delivery schedule; (l) Recommended corrective action; and (m) Alternatives evaluated.

3.9.7.4 Notices of Revision. The contractor shall generate and submit Notices of Revision (NOR) concurrently with ECP when technical documentation controlled by another contractor or Government agency requires changes following approval of an ECP. As a minimum, the NOR shall contain the following information: (a) Date; (b) CAGE code; (c) NOR number; (d) Document number; (e) Title of document; (f) Revision letter (current and new), related ECP number; (g) Configuration item (or system) to which ECP applies; and (h) Description of revision.

3.10 Verification.

3.10.1 Contractor Certification. The contractor shall provide the necessary data to verify EBFL technical compliance with performance requirements as established in the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .