DRAFT PWS Fire Tower Repair Services.pdf

PDF 340 KB Posted

Attached to
Repair of Live Fire Training Facility Tower (Camp Fuji)
Solicitation number
M6740026Q3009
Issued by

About this file

This is a Performance Work Statement (PWS) for the repair of the Live Fire Training Facility Tower located at Building 200, Combined Arms Training Center (CATC), Camp Fuji, Japan. The primary objective is to complete a full replacement of the damaged Marinite fire liner in Burn Cell 1 of the Fire Chief Model 14 x 21 training tower to restore structural integrity and operational readiness for mission training.

The scope of work includes: full tear-out and replacement of approximately 924 square feet of damaged Marinite fire liner with new Fire Command Composite Class A High Temp Fire Liner; installation of new continuous stainless-steel hinges for three shutters and two burn doors; material preparation, crating, and palletization of an estimated 6 crates and 3 pallets for Department of Defense-managed transport; and complete cleanup of contractor-generated debris. The period of performance is up to 10 days, with all work required to commence no later than September 30, 2026. Work stoppage is required during Tropical Cyclone Condition of Readiness 1C declarations. The Government will provide disposal of old materials, electrical access, recreational lodging for up to three contractor personnel (chargeable to contractor), and material shipping management from TRACI, California. The contractor is responsible for all personnel, equipment, supplies, facilities, transportation, tools, materials, and supervision except those specified as government-furnished. Materials should be delivered to the Supply Officer at MCATC Camp Fuji, attention Mr. Clay Thompson. Contractor personnel must comply with identification requirements, vehicle registration and insurance per Japanese law and military regulations, base pass/DBIDS credentialing, designated third country national restrictions, privacy act requirements, and occupational safety and health standards including participation in local Voluntary Protection Programs.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Source Selection Information—See FAR 2.101 and 3.104

[This footer applies during internal development of the SOW. Remove the footer when officially releasing the SOW to vendors as a draft for comment or in the formal solicitation]

DISTRIBUTION: DoW COMMUNITY ONLY

Performance Work Statement (PWS) for the

Live Fire Training Facility Repair

1.0 General

Description of Services/Introduction. Repair of the Live Fire Training Facility Tower located at the Combined Arms Training Center, Camp Fuji, Japan Building 200. The work involves the full replacement of a damaged fire liner system to ensure the facility is safe and ready for training missions. The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the work required as defined in this Performance Work Statement (PWS), except for those items specified as government-furnished property and services. The contractor shall perform to the standards of this contract.

1.1. Description of Services/Introduction. The scope of this project is the complete repair and replacement of the damaged Marinite fire liner in Burn Cell 1 of the Fire Chief Model 14 x 21 training tower. The objective is to restore the structural integrity and safety of the fire training facility, making it fully operational for mission readiness training.

1.2. Scope of Work and Objective. The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform a full replacement of the damaged fire liner, except for those items specified as government-furnished property and services.

1.3. Period of Performance. Performance of this work should take up to 10 days to be completed all work needs to be started by no later than September 30, 2026.

1.3.1. Federal Holidays. The contractor shall not be required to provide services on federal holidays unless the holiday is particularly specified otherwise in this PWS.

* When a federal holiday falls on Sunday, the following Monday will be observed as a holiday by the U.S.

government. When a federal holiday falls on a Saturday, the preceding Friday will be observed as a holiday.

In addition to these federal holidays, if the President of the United States issues an executive order closing the federal government, that date shall also be considered a recognized federal holiday (Reference Executive Order 11582 of February 11, 1971, and 5 U.S.C. 5546 and 6103(b) and other similar statues insofar as they relate to the pay and leave of employees of the United States).

Federal Holiday Occurrence New Year’s Day 1 January*

Martin Luther King Jr.’s Birthday 3rd Monday of January President’s Day 3rd Monday of February Memorial Day last Monday of May

Juneteenth 19 June* Independence Day 4 July*

Labor Day 1st Monday of September Columbus Day 2nd Monday of October Veterans Day 11 November*

Thanksgiving Day 4th Thursday of November Christmas Day 25 December*

1.3.2. Typhoon Conditions. Japan-based military installations close when Tropical Cyclone Condition of Readiness 1C (TCCOR 1C or TC-1C) is declared by Military Weather Station authorities. The Contractor will be required to depart military bases, remain indoors, and monitor radio/television to determine when the TCCOR changes to TCCOR SW (Storm Watch) or TCCOR AC (All Clear). When TCCOR SW is declared by Military Weather Station authorities, the Contractor shall restart the service within 2 hours. If that occurs after normal business hours, services shall begin the next normal workday at 7:30am.

2.0 Place of Performance. The work to be performed under this contract will be conducted at the Combined Arms Training Center (CATC), Camp Fuji, Japan Building 200.

3.0 Technical Requirements (Description of Work / Tasks)

3.1 Fire Liner Replacement: The contractor shall conduct a full tear-out and replacement of the damaged Marinite fire liner in Burn Cell 1.

3.2 Fire Liner Installation: The contractor shall install approximately 924 square feet of new Fire Command Composite Class A High Temp Fire Liner. Installation must include the proper securing of stainless-steel hat channels, mounting spacers, and screws to ensure structural integrity and heat resistance.

3.3 Hardware Installation: The contractor shall install new continuous stainless-steel hinges for three (3) shutters and two (2) burn doors on the training tower.

3.4 Material Preparation: The contractor shall prepare, crate, and palletize all materials (estimated at 6 crates and 3 pallets) for DoD-managed transport to Camp Fuji.

3.5 Clean Up: The contractor shall remove all materials and other debris accumulated as a result of the work. A general cleanup will be conducted at the end of the installation and final removal phases.

4.0 Delivery or Deliverables. For any delivery made to Camp Fuji please use the below address with the Attention to Mr. Clay Thompson.

SUPPLY OFFICER

2092 NAKABATA SHIZUOKA PREF

MF M30229 MCATC CAMP FUJI

GOTEMBA CITY JP

JAPAN

4.1. (Contract Data Requirements List – CDRL). N/A

4.2. Meetings and Status Reports. N/A

5.0 Applicable Documents / Governing References. In addition requirements of regulations and policies applicable to this contract/order by virtue of clauses contained herein, the contractor shall, in the performance of this contract/order, also comply with all references applicable to the specific tasks of this Performance Work Statement, as listed below, including any amendments or subsequent issuance.

Reference Location N/A N/A

6.0 Government Furnished Facilities, Equipment, Services and/or Information. Government property identified herein, or by attachment, is subject to the requirements of FAR and DFARS part 45, pursuant to the enumerated property clauses incorporated in this contract/order.

The Government (DoD) shall provide the following in support of this contract:

1. Disposal of old materials and debris.

2. Access to electricity for contractor use during installation.

3. Access to recreational lodging on base for up to three (3) contractor personnel for the duration of the installation, chargeable to the contractor.

4. Management of shipping of materials from TRACI, CA, to the worksite at Camp Fuji.

7.0 Special Instructions and Administrative Information

7.1. Non-Personal Services. This is a non-personal services, performance-based contract. The contractor bears responsibility to manage its employees and guard against any actions that could be characterized as personal services as defined in FAR 37.104, or which convey the perception that personal services are being delivered. No provisions are implied nor provided in this contract for any benefits such as medical care, retirement, or worker’s compensation, other than those incorporated through enumerated clauses.

7.2. Identification of Contractor Personnel and Equipment. In accordance with DFARS 211.106, contractor personnel performing non-personal services on DoD installations or other government facilities shall ensure that they are readily identifiable as contractor employees (including subcontractors and consultants). All contractor employees shall comply with the following at all times:

7.2.1. Telephone Identification. Identify themselves as contractor personnel at the onset of every telephone call made from a Government telephone or any other phone if the call is made in support of Government-related requirements and activities.

7.2.2. Recorded Messages. Identify themselves as contractor personnel in all recorded messages including those, which are heard by callers attempting to contact contractor employees via answering machines or voicemail.

7.2.3. Meetings, Conferences and Events. Identify themselves as contractor personnel at the onset of every meeting, conference or any other gathering attended in support of any Government related requirements or activities.

7.2.4. Correspondence. Identify themselves as contractor personnel on any correspondence, documents, or reports accomplished or sent in support of any service provision to the Government, including, but not limited to, correspondence sent via the U.S. Mail, facsimile, or electronic mail (email) inclusive of out-of-office replies.

7.2.5. Personal and Corporate Identification. Wear or display contractor provided nametags, badges or attire which display, at a minimum, the name of the contractor and their respective company.

7.3. Designated Third Country Nationals (DTCN). Persons from certain countries are considered DTCN and are generally restricted from entering Marine Corps Bases Japan (MCBJ) Camps, Air Stations, or facilities. A listing of DTCN countries and other related information regarding this policy can be found in USFJ Instruction 31-204 (Designated Third Country Nationals), which can be made available upon request.

7.4. Exemption from Japanese Taxes. Pursuant to the U.S. – Japan Status of Forces Agreement and the Joint Committee, the governments of the United States and Japan have agreed that the procurement in Japan of materials, supplies, equipment and services for official purposes may be except from certain Japanese taxes. When incorporated, paragraph c. of the clause FAR 52.229-6, “ TAXES – FOREIGN FIXED PRICE CONTRACTS” and/or DFARS 225.229-7001 ‘TAX RELIEF’ stipulate that contract/order pricing shall not include the Consumption Tax. Submission of, and/or incorporation into the contract of, your offer, certifies that pricing does not contain any cost related to the Consumption Tax. Questions concerning this matter should be directed to your local Japanese Tax Office.

7.5. Subcontract Management. The contractor shall be responsible for any subcontract management necessary to integrate work performed on this requirement and shall be responsible and accountable for subcontractor performance on this requirement. The prime contractor will manage work distribution to ensure there are no Organizational Conflict of Interest (OCI) considerations. Contractors may add subcontractors to their team after notification to the Procuring Contracting Officer (PCO) or Contracting Officer Representative (COR). Cross teaming may or may not be permitted.

7.6. Mission Essential Personnel / Tasks. N/A

7.7. Hazardous Materials and Safety. The Contractor and its subcontractors shall comply with all applicable laws, including Public Law 91-596 (Occupational Safety and Health Administration (OSHA)) and DOD Directive 4715.1E, Environmental, Safety, and Occupational Health (ESOH)). Contractor personnel performing services on a DOD installation shall participate in local Voluntary Protection Programs (VPP). Information on the VPP is available at http://www.osha.gov/dcsp/vpp/index.html

7.8. Installation Access and Personnel Credentialing

7.8.1. Motor Vehicles. Vehicle licensing, registration, and insurance requirements must all be conducted in accordance with host nation law, USFJ Instruction 31-205, and applicable local installation policies.

7.8.1.1. Registration/Permits. All company-owned and privately owned motor vehicles required to be in military installations during the performance of this contract must be registered with the Provost Marshal’s Office (PMO), Pass and Registration, CATC Camp Fuji. Vehicle permits may be issued to civilian Contractors for the duration of their contract, until expiration of base pass or vehicle inspection, whichever occurs first or until termination of their employment. Included in vehicle permit requests shall be the license number, year, make, model, color, and operator’s name for each vehicle. The Contractor shall hand-carry the request to the Vehicle Registration Station, the Provost Marshal’s Office, Building 81, CATC Camp Fuji (telephone #224-8577/8578). All necessary decals and/or permits shall be displayed on the vehicles in the manner directed by the Pass and Registration. Proof of insurance must also be presented to the Provost Marshal upon submission of the temporary vehicle permit or vehicle decal or upon request. The minimum requirement for insurance is the Japanese Compulsory Insurance (JCI) under Japanese Motor Vehicle Damage Compensation Guarantee Law. Upon contract expiration or vehicle inspection expiration, whichever comes first, any vehicle passes received for operation under this contract shall immediately become void.

7.8.1.2. Registration Termination. Vehicle permits will expire upon termination date of this contract/order, expiration of an individual base pass or DBIDS ID, expiration of vehicle inspection sticker, or termination of their employment (whichever occurs first). Permits issued to individuals who overstay any of these authorized dates become void and invalid.

7.8.1.3. Insurance. Vehicle permitting procedures require that all vehicles, personal or corporate, must be properly inspected and insured in accordance with Japanese Compulsory Insurance (JCI) requirements. Additionally, for SOFA status personnel and U.S. corporate vehicles, the Contractor or SOFA status individual is required to procure and maintain, during the entire period of performance under this contract, the following minimum insurance on each vehicle used by the Contactor at the work site:

Automobile Property Damage Insurance Amount: ¥30,000,000 (or U.S. Dollar equivalents) Bodily Injury Insurance Amount: ¥30,000,000 Yen (or U.S. Dollar equivalents)

Prior to the commencement of work, the Contractor shall furnish to the Contracting Officer a certificate or written statement of the above required insurance for any and all corporate vehicles to be used. The policies evidencing required insurance shall contain an endorsement to the effect that cancellation or any material change in the policies adversely affecting the laws of the state in which this contract is to be performed and in no event less than thirty (30) days after written notice thereof to the Contracting Officer.

7.8.1.4. Road Laws. All personnel operating motor vehicles under this contract/order are subject to U.S. military installation regulations and Japanese Road Laws. Failure of the contractor, its employees, or its sub-contractors, to comply, may result in revocation of driving privileges or other legal action.

http://www.osha.gov/dcsp/vpp/index.html

7.8.1.5. Vehicle Disposal. Personnel protected under the Status of Forces Agreement (SOFA) are required by regulation to properly dispose of vehicles prior to departure from Japan. For individuals performing under this contract, the contractor may be held financially liable for vehicles abandoned, or vehicles not disposed of properly, in accordance with vehicle regulations as agreed with the Government of Japan.

7.8.2. Personnel Access / Credentialing. Access to local installations is inherently required to accomplish specified tasks under this contract/order. The contractor shall therefore ensure all necessary actions are taken to obtain such access by its personnel in time to affect access in accordance with the requirements of the PWS and POP. Failure to complete such actions in a timely manner, some of which may occur prior to the POP or individual mobilization/relocation to the place of performance, shall not constitute excusable delay. Upon request, the Contracting Officer will provide a ‘check-in’ sheet that summarizes required actions.

7.8.2.1. Common Access Cards (CAC). N/A

7.8.2.2. Base Passes and/or Defense Biometrics IDentification System (DBIDS) cards. Personnel that do not qualify for CAC require an alternate credential for installation access, as governed by Marine Corps Installations Pacific Order 5512.2, which can be provided upon request. The process to request access requires approval from the Contracting Officer in an access request letter.

7.8.2.3. Return and/or Disposal of Access Credentials. The contractor’s employees shall return to the applicable issuing office all base passes, DBIDS cards, and/or CAC, immediately upon termination of employment or completion of this contract and certification of receipt shall be obtained and submitted to the Contracting Officer.

The Contractor shall submit a listing of employees terminated under this contract to the Contracting Officer within seven (7) days of the effective date of termination.

7.8.2.4. Status of Forces Agreement. Possession of a CAC or other credential does not, alone, determine the legal status of personnel performing under this contract. Additionally, unless specifically identified on the CAC, the credential does not necessarily authorize logistical support privileges such as commissary/exchange access. The individual status of personnel performing under this contract, and the privileges authorized, are governed in accordance with United States Force Japan Instructions (predominantly USFJI 64-100), applicable credentialing regulations, and the information prescribed via DFARS clauses regarding Contractor Personnel in Japan, as contained herein.

7.9. Privacy Act. Pursuant to FAR clause 52.224-3, as incorporated, DoD requires agency-specific Privacy Act training as prescribed in DODM 5400.11-R. DODM 5400.11-R also prescribes required actions regarding information and privacy, which are applicable to the contractor and its personnel performing under this contract/order. The regulation may subject the contractor and/or contractor's personnel to criminal liability under Title 18, Section 793 and 7908 of the United States Code.

7.10. Classified information. Any classified work products shall be handled in accordance with DoD Instruction 5220.22-M. The contractor’s procedures for protecting against unauthorized disclosure of information will not require DoD employees or members of the Armed Forces to relinquish control of their work product, whether classified or not, to the contractor. The contractor may also have access to, and be required to safeguard, For Official Use Only (FOUO), sensitive, confidential, and/or classified information and material.

7.11. Key Control. The Contractor shall establish and implement methods of ensuring that all keys issued to the Contractor by the government are not lost or misplaced, and are not used by unauthorized persons. The Contractor shall report lost keys to the COR. The Contractor shall not duplicate any keys. It is also the responsibility of the Contractor to prohibit the opening of locked areas by the Contractor’s employees to permit entrance of persons other than Contractor’s employees engaged in the performance of assigned work in those areas. In the event keys are lost or unauthorized duplication occurs through the fault of a Contractor employee, The Government may, at its option, require the Contractor to replace keys, reimburse the government for replacement of locks, or re-key as a result of Contractor losing keys. In the event a master key is lost or duplicated, the Contractor shall replace all locks and keys for that system and the total cost will be deducted from the monthly payment.

7.12. Travel. Travel costs are NOT reimbursable unless specifically provided for in this order/contract through an enumerated cost reimbursable Contract Line Item Number (CLIN) entitled Travel.

7.12.1. Travel Pre-Authorization. All travel shall be pre-approved, in writing, by the Contract Officer or COR. The request shall include total cost, and itemized airfare, rental vehicle, per diem, mileage, parking, fuel and toll charges.

Travel requests will include the purpose of the trip and why VideoTeleConference (VTC) or phone conversations would not meet the business requirement. Costs for travel shall be billed in accordance with the regulatory implementation of Public Law 99-234 and FAR 31.205-46 Travel Costs

7.12.2. Authorized Travel. Authorized travel costs will only be reimbursed for:

• Contractor employees who otherwise perform direct day-to-day services at the designated place of performance under the requirements of this order/contract,

• Who have a need to travel to fulfill the performance of those duties, and

• Upon the direct request and written pre-approval of the Contracting Officer (KO) or appointed Contracting

Officer Representative (COR)

7.12.3. Unauthorized Travel. Travel costs are explicitly not-reimbursable for the following:

• Relocation or initial mobilization costs, or any other travel not pre-approved by the KO or COR,

• Contractor personnel who indirectly support this order/contract (such as visiting management or supervisory personnel not otherwise providing on-site day-to-day support),

7.12.4. Foreign Travel

7.12.4.1. Compliance with DoD Foreign Clearance Guide (FCG). Personnel performing under this contract who may be required to travel to other countries during performance, shall comply with all FCG prescriptions for each country to be visited. Access to the FCG can be found here: https://www.fcg.pentagon.mil/fcg.cfm . Contractors unable to access the site, or otherwise requiring assistance, shall contact the contracting officer, or appointed Contracting Officer Representative (COR) for assistance.

7.12.4.2. Compliance with U.S. Indo-Pacific Command (INDOPACOM) and other directives. Contractor personnel traveling within the INDOPACOM Area of Responsibility (AOR) are subject to, and shall comply with, INDOPACOM directives related to such travel. Additionally, contractor personnel traveling in support of exercises, or other specified events and activities, shall comply with applicable travel instructions published for the designated area or event, as issued by General Order, Planning Conference Memorandum, Exercise Directive, Initiating Directive, or other similar correspondence.

7.12.4.3. Personnel with security clearance are subject to additional requirements and shall consult with the supported command G-2 when contemplating and/or completing foreign travel.

7.12.5. Allowable Costs

7.12.5.1. All travel shall be conducted in accordance with Federal Travel Regulations (FTR) and/or U.S. Department of State Standardized Regulations (DSSR).

7.12.5.2. Reimbursement is strictly limited to only those direct costs authorized in FAR 31.205-46. Overhead and/or G&A expenses are not allowable.

7.12.5.3. As indicated in FAR 31.205-46(a)(3)(iv), 31.205-46(a)(7), and 31.250-46(b), all costs must be supported by appropriate documentation and receipts provided to the KO/COR.

7.13. Quality Control and Quality Assurance. In accordance with FAR part 46, and the respective enumerated clauses incorporated in this contract/order, the contactor is reminded that the government may conduct Quality https://www.fcg.pentagon.mil/fcg.cfm

Assurance actions, inspect the Contractor’s Quality Control Plan and records, and take remedial actions as necessary, at any time through the duration of this contract/order.

8. Acronym Key

9. Appendices

10. Performance Requirement Summary (PRS)

Performance Objective

PWS

Reference

Performance Standard Acceptable Quality Level

Surveillance Method

Incentive

Prepare all required material

3.4

The contractor shall prepare, crate, and palletize all materials needed to be sent to Camp Fuji.

Accuracy:

100% compliant installation.

100 % Inspection

Removal of existing Fire

Liner 3.0-3.1

Structures are fully installed per

Attachments 1 & 2 by the completion date no later than 1

Sep 2026 and accepted by the Government.

Accuracy:

100% compliant installation.

100 % Inspection

Maintenance of Structural Framework

3.2

Structure is maintained in good repair and safe condition.

Repairs for normal wear are initiated within 5 business days of notification.

Accuracy:

95% of repairs initiated on time.

Random Inspection, Service Call Logs

CPARS

report

(positive or negative)

Installation of New Liner

3.2-3.3

Structure, foundation, and all debris are removed, and the site is restored within 30 days of lease termination.

Accuracy:

100% site restoration.

100% Final Inspection

CPARS

report

(positive or negative)

Site Cleanliness 3.5

Worksite is kept free of contractor-generated trash and debris during and after performance

Accuracy:

No more than one valid complaint per month.

Random Inspection

CPARS

report

(positive or negative)

End Performance Work Statement

7.0 Special Instructions and Administrative Information

File details come from the government source that posted it. Updated .