This is a solicitation for procurement of boathouse small craft operations and preventative maintenance services. The United States Marine Corps is seeking these services for a one base year plus two option years beginning in late September 2021. The contractor will provide maintenance and operational support for a variety of open ocean safety craft, deployable small inflatable craft, and associated equipment to support III MEF and EOTG amphibious operations throughout the III MEF area of responsibility. Key requirements include providing qualified boat captains, factory-trained technicians, safety craft and equipment maintenance in accordance with manufacturer guidelines, corrosion control programs, operator and maintenance training, and on-water boat operator support for III MEF training events. The solicitation includes a performance work statement outlining technical requirements, place of performance at Marine Corps installations in Okinawa, applicable documents, government furnished property, and other special instructions. Pricing is fixed-price for maintenance and training services, with estimated costs provided for travel and reimbursable parts.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| M6740021Q0054-0002.pdf | ||
| M6740021Q0054-0001.pdf | ||
| Boat Maintenance SOP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
M6740021Q0054
b. TELEPHONE NUMBER
011-81-98-970-8145
8. OFFER DUE DATE/LOCAL TIME
10:00 AM 09 Aug 2021
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
08-Jul-2021
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
M674009. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
MINAKO YARA
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
MCIPAC REGIONAL CONTRACTING OFFICE
MCB CAMP S.D. BUTLER
OKINAWA 904-0100
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE M20380 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
III MEF EOTG
JUSTIN RICH
UNIT 35640
CAMP HANSEN, BLDG 2865
KIN 96385-5607
TEL: 623-4418 FAX:
FAX:
TEL: 315-645-3607 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
NAICS:
811310
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
M6740021Q0054
Section SF 1449 - CONTINUATION SHEET
CLAUSES INCORPORATED BY FULL TEXT
52.212-1 ADDENDUM TO INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS (MAR 2020)
The provision at 52.212-1, incorporated by reference, applies with the following changes/additions:
(a) North American Industry Classification System (NAICS) code and small business size standard.
Non-U.S. business concerns of any size are not qualifying entities.
(b) SUBMISSION OF OFFERS. [Changed to read as follows]:
Submit signed and dated offers electronically (emailed) using the specified contact information in section (m) below, at or before the exact local date / time, Japan Standard Time (JST) specified in block 8 of this RFQ.
Due to government computer firewall security and file size limitations, please be advised that it is the prospective contractor’s responsibility to ensure that the Contracting Office receives ALL required documents on time, including acknowledgment of receipt from the Government.
OFFERS MUST BE SUBMITTED AS INDICATED:
(1) Completed SF1449/SF30. All Pricing and other required information, including:
SF1449
(a) Block 5, The Request for Quote number;
(b) Block 8, The time specified in the Request for Quotes for receipt of offers;
(c) Blocks 17a including the name, address, and telephone number of the Offeror
(d) Block 17b if appropriate, "Remit to" address, if different than mailing address;
(e) Blocks 30a, 30b, and 30c.
SF30 (if applicable)
(f) SF30 block 15a,b,c; and Acknowledgment of Request for Quotes Amendments, if applicable
(2) Offeror’s Price:
(a) Offerors shall fill in prices for all Contract Line Items. Price Breakdown: Offerors shall submit a detailed pricing break down that details the calculation used for determining proposed pricing. All prices contained in the pricing schedule shall reflect total compensation for the services detailed therein and are fully inclusive of all costs including labor (Example; workers, management, aids, assistants, and operators), overhead, general and administrative (G&A) expenses, and profit.
Note: Offerors may leave the estimated cost blank for travel CLINs 0004 ($23,996.00), 1004 ($23,996), 2004 ($23,996) and Reimbursable Consumable Parts CLINs 0005 ($36,000), 1005 ($36,000), 2005 ($36,000) or may include in their pricing schedule
(3) Submissions of Proposal information must include followings:
Technical Approach (Task Understanding)
- The Offeror shall provide the methodology and detail as to how the Offeror intends to perform the tasks as specified in the Performance Work Statement (PWS). In particular, the Offeror shall provide specific details of how the Offeror will fulfill all the required tasks of the PWS.
Staffing Approach
- The Offeror shall provide its proposed Staffing Approach that details its plans to staff, recruit and screen and retain qualified personnel in order to satisfy the Government’s performance requirement.
The information provided shall be definitive enough to provide the Government a clear understanding of how the Offeror intends to staff this contract in order to meet all the PWS requirements and retain personnel to avoid turnover of support that may be disruptive to operations. Specifically, the contractor should address mitigation of potential COVID 19 impacts. Offeror shall include a detailed discussion of the roles of each employee position proposed to support this requirement, and use of staff resources to accomplish the intended tasks required by the PWS).
- The Offeror shall provide its proposed minimum qualifications, certifications, experience, and specialized experience that the contractor’s employees will possess for each of the support areas identified in the PWS. When minimum qualifications are provided by the Government, the Offeror will state any instances for which they will provide a higher standard. If an Offeror proposes a standard higher than the minimum qualification, the Offeror shall certify that all the individuals to perform services throughout the life of the contract will meet the standard proposed.
Processes and Procedures/Quality Control
-The Offeror shall provide its approach on the processes, procedures, or systems they intend to use in the performance of this contract to ensure timely and effective performance of services that meet the Government’s requirement.
(4) Validation of Representations and Certifications
(a) Reps/certs completed electronically and registered as current via SAM per 52.212-3 need not be re-submitted. However, the following information MUST be provided with this quotation. Submitting the information affirms that the offeror is registered and current in the SAM database:
Commercial And Government Entity Code (CAGE) _________________(U.S. Vendor)
NATO Commercial And Government Entity Code (NCAGE) _________(Foreign Vendor)
Taxpayer Identification Number (TIN) ____________________
Data Universal Numbering System (DUNS) ____________________
(b) In accordance with 52.212-3 offerors must identify with its offer/quote, any information regarding its representations and certifications that has changed since updated in SAM.
(c) Alternatively, a completed copy of the representations and certifications at FAR 52.212-3 may be submitted.
(d) Other Representations and Certifications which may be required, but not resident in SAM.
(5) Licenses/Certifications.
(a) Copies of necessary licenses, certifications, permits, resumes, if applicable
(b) License/certification to do business in the country of Japan, if applicable
(6) Past performance information.
The Offeror shall submit past performance information (Attachment 1) no more than three summaries of contracts similar in size, scope, and complexity with performance that occurred within 36 months of the submission deadline. Past performance as a prime or as a subcontractor as well as past performance by a proposed subcontractor for this effort is acceptable for consideration.
The Offeror shall provide a copy of the past performance questionnaire (Attachment 2) for each reference listed in Attachment 1.
Attachments shall be submitted to the Government no later than the closing date of this solicitation. Should any of the identified past performance efforts be registered in the Contract Performance Assessment Reporting System (CPARS), the Offeror may notify the Government to evaluate the CPARS report in lieu of a questionnaire. While the Government may contact past performance reference POCs in order to obtain any necessary clarification on performance feedback information that the Government has received, it will not take additional action to obtain past performance feedback information in cases where the Offeror provides no information. The Offeror maintains the burden of providing thorough and complete past performance information and feedback.
(c) Period for acceptance of quotes.
The offeror agrees to hold the prices in its offer firm for 60 calendar days from the date specified for receipt of quotes.
(m) Correspondence.
All and any communications/questions pertaining to this solicitation must be submitted in the format provided in Attachment 3 to the Point of Contact below, no later than 19 July 2021 by 10:00AM Japan Standard Time (JST). If an offeror believes that the requirements in these instructions contain an error, omission, or are otherwise unsound, the offeror shall immediately notify the Contract Specialist in writing with supporting rationale.
Point of Contact:
Regional Contracting Office (RCO) Attn: Minako Yara Bldg #355, Marine Corps Installations Pacific - MCB Camp Butler, Okinawa, Japan E-mail: minako.yara.ja@usmc.mil
Table 1 – Required Format for Offer
Volume Title Maximum Number of pages
Format for Document
I Technical Proposal
30 (Title page and table of contents is not included in the page count)
MS Word or PDF
II Past Performance References Attachment I & 2 MS Word mailto:minako.yara.ja@usmc.mil
III Price Proposal As required MS Excel Spreadsheet
IV
Offeror’s Representations and Certifications
As required (see paragraph b(4) above) MS Word or PDF
The Offer volumes shall include a cover letter (letter of transmittal) prepared on the company’s letterhead stationery. There shall be no pricing information in any of the other volumes. All print will be no less than 10 point font for text throughout the document.
(End of provision)
Addendum to 52.212-2 Evaluation -- Commercial Items (Oct 2014)
(a) This is a commercial item requirement using Simplified Acquisition Procedures under FAR parts 12 and 13, respectively. Evaluation will be conducted using simplified procedures in accordance with FAR 13.106.
(b) The Government will award to the responsible offeror whose quote, conforming to the solicitation will be most advantageous to the Government, price and other factors considered. To receive consideration for award, the Offeror must, at a minimum, be rated ‘acceptable’ for ‘technical’ and ‘satisfactory’ ’ for ‘past performance’ factors in regard to meeting the Government's requirements in each area of the PWS.
The following factors shall be used to evaluate quotes:
1) Technical
2) Price
3) Past Performance
c) The Technical evaluation will be based upon the offerors submissions described in the “Technical Information” section of 52.212-1 ADDENDUM TO INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS (OCT 2015).
Offerors will be evaluated on the suitability of their written plan, and ability to convey a clear, comprehensive approach to meeting the requirement as described in the PWS. The Government will evaluate Technical Approach Task Understanding for level assurance the contractor understands the requirement and the ability of the offeror to perform the PWS tasks. The Government will evaluate the offeror’s Staffing Approach to assess the effectiveness of the proposed Labor Mix Qualifications/Certifications/Experience plan to provide and retain a quality workforce that will mitigate effects of turnover of personnel and ensure continuity of operations. The Government will evaluate the offeror’s proposed Procedures/Quality Control plan to determine the degree to which it provides assurance of quality services that minimize operational risk to the Government.
d) For purposes of evaluation and determination of responsibility, and in accordance with FAR 13.106-2(b)(3), this assessment will primarily be conducted through Federal Awardee Performance and Integrity Information System (FAPIIS) / Contractor Performance Assessment Reporting System (CPARS), but may include other authorized methods described. Past performance, for purposes of this evaluation, will be assessed as ‘satisfactory’ or ‘unsatisfactory’ at the discretion of the contracting officer based on the totality of information available. A past performance determination of ‘unsatisfactory’ will exclude the offer from consideration for award.
e) Price. Competition is anticipated for this requirement and price evaluation will be conducted primarily using price competition as defined in FAR 13.5, FAR 15.403-1(c)(1)(i) and FAR 15.403-3 (two or more competitive quotations). Price analysis may be further substantiated using market research results. In case where price competition is not evident, and/or only one quote is received, conduct price analysis in accordance with FAR 13.106-3(2) and prescribed DFARS techniques at 215.371-1 through 215.371.3.
f) A written notice of award or acceptance of a quote, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the quote, shall result in a binding contract without further action by either party.
Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
PERFORMANCE WORK STATEMENT
III MEF BOATHOUSE SMALL CRAFT OPERATIONS
AND PREVENTATIVE MAINTENANCE SERVICES
1.0 General
1.1. Introduction and Background
The III Marine Expeditionary Force (MEF) Expeditionary Operations Training Group (EOTG) located on Camp Hansen, building 2865, Okinawa, Japan requires maintenance and operational support for a wide array of open ocean safety craft, deployable small inflatable craft, and associated support equipment to support III MEF and EOTG amphibious operations throughout III MEF’s Area of Responsibility (AOR).
EOTG manages and maintains the III MEF Boathouse and is responsible for the operation and maintenance of six twin engine safety craft and associated trailer systems, four personal water crafts and associated trailer systems, one
(1) 31’ United States Marine Corps (USMC) Open Water Safety Craft (OWSC), one (1) 31’ SAFE Patrol Boat, 48 Combat Rubber Reconnaissance Craft (CRRC) and associated trailer systems, 48 Non-Gasoline Burning Outboard (NBOE) engines, and associated Stock List Level 3 (SL-3) components, and Commercial of The Shelf (COTS) Theater Security Cooperation (TSC) and exercise support equipment.. This equipment is used in support of III MEF with TSC events and exercises, the 31st Marine Expeditionary Unit (MEU), and III MEF EOTG small boat courses and training. These equipment sets require continuous maintenance, repair, replacement, and training in order to provide mission ready, turn-key assets to support III MEF amphibious operations. Turn-key assets are considered full mission ready with all systems operational.
1.2. Scope of Work and Objective
The contractor and staff will provide technical expertise in the preparation, repair/maintenance, and operation of all twin-engine safety craft, personal water crafts, associated trailer systems, CRRCs, NBOEs, SL-3 components, and TSC/exercise support equipment in III MEF’s area of operation. Support of the objectives listed requires a mix of specific knowledge, skills, abilities, and experience with Marine Corps amphibious operations. The contractor and staff shall have practical experience and expertise in specific subject matters listed in the sections below and the applicable references. Per paragraph 3, the contractor will have to perform, at a minimum, the following:
- Contractor shall provide Small Craft operational support, and maintenance services to III MEF forces throughout III MEF’s Area of Operation (AOR). .
- The contractor shall have a sufficient number of English speaking boat captains that have a Japanese Class I license with personal water craft endorsement to ensure the required number of boats are available for operations.
- Provide factory-trained technicians capable of repairing Evinrude, Yamaha, Wing Inflatable Boats, and BRP Sea Doo personal water craft. The contractor will reference the “III MEF EOTG Boathouse Maintenance Standard Operating Procedure (SOP)” for current III MEF approved procedures. In order to develop the skills of the Marine personnel, the contractor shall provide support to the Small Craft Repair Platoon (SCRP) mechanics with establishing maintenance priorities, conducting critical maintenance, and instructing equipment theory.
- Coordinate and schedule quarterly safety craft training courses with adjacent services and required personnel. At a minimum one safety craft training course per quarter or as directed by the EOTG Officer in Charge
- Manage and maintain the III MEF Boathouse and its assigned equipment to a standard of 85% readiness at all times.
- Maintain maintenance records for all equipment assigned to the MEF Boathouse.
- Maintain Preventative Maintenance Checks and Services (PMCS) schedules in accordance with the original equipment manufacturer’s standards to prolong life of the assigned equipment.
- Maintain a comprehensive corrosion control program in accordance with paragraph 3.3.
- Recommend appropriate on-hand stock levels for Demand Supported Items (DSI) to the Government.
- Manage the SCRP Hazardous Waste Accumulation Point (HWAP) and maintain the appropriate levels of
Petroleum Oil and Lubricants (POLs) associated with the assigned equipment.
- Ensure equipment is prepared to support training and operations.
- Operate assigned equipment as required in support of amphibious operations.
- Provide oral and written briefings on the status of maintenance and training to principal staff and key billet holders. Provide daily to EOTG OIC, principal staff and key billet holders; weekly to the operational synchronization meeting staff and during Operational Planning Team meetings in support of exercises; or as directed by the EOTG OIC.
- Ensure safety regulations and standards are adhered to and personal protective equipment is worn as required.
1.2.1. Contractor Qualifications and Experience
1.2.1.1. Small Craft Subject Matter Expertise (SME)
Will provide Small Craft SME support services to the EOTG OIC and III MEF Staff. Must possess sufficient experience supporting military small craft operations in order to (IOT) be able to clearly articulate small craft maintenance and operations in III MEF’s AOR.
1.2.1.2 Small Boat Maintenance Support
The contractor’s employees providing maintenance and technical support shall possess sufficient experience in the repair, rebuild, and maintenance of small craft and be certified mechanics on Evinrude Outboards, Yamaha Outboards, BRP Sea Doo personal water crafts, and Wing Inflatable Boats.
1.2.1.3. Boat operations
The contractor’s employees providing support to paragraphs XXX below (list the tasks that will require the contractor to drive a boat) shall be certified as Japanese 1st class boat captains with an endorsement in personal water craft. The contractor shall provide employees to support boat operations who possess sufficient experience supporting military small craft operations (i.e., Parachute Operations PARAOPS, Visit Board Search and Seizure (VBSS) and safety craft support for a ship to shore movement). At least one employee shall have been trained as a USMC Open Water Safety Craft (OWSC) Coxswain and EOTG Rigid Hull Inflatable Boat (RHIB) or commercial equivalent.
1.2.1.4. Language Ability
All contractor provided personnel must be able to read, write, and speak English. All contractor staff, where English is not the first language, are required to have a Language Proficiency Level (LPL) 4 per the language standards below.
LPL TOEIC ALCPT TOEFL CASEC EIKEN PBT CBT iBT 4 (Exceptional) 860-990 N/A 600- 250- 100- N/A 1st
3 (Fluent) 730-859 90-100 550-599 210-249 80-99 870- Pre 1st 2 (Average) 550-729 75-89 460-549 140-209 50-79 560-869 2nd
1 (Elementary) 400-549 65-74 430-459 120-139 40-49 475-559 Pre 2nd Pre-1 (Minimal) 350-399 40-64 N/A N/A N/A N/A 3rd
Note 1: The contractor must provide certification with their technical proposal that all personnel for whom English is not the first language have an LPL 4. All reference material (i.e., technical manuals, operator manuals, nautical charts, and equipment user interfaces are all in English. All maintenance and operator training will be conducted in English. All internal and external small craft communication is in English. Lack of proficiency will have a negative impact on contractor performance and safety.
Note 2: Testing acronyms are defined below.
- TOEIC: Test of English for International Communication
- ALCPT: American Language Course Placement test
- TOEFL: Test of English as a Foreign Language
- PBT: Paper Based Test
- CBT: Computer Based Test
- iBT: Internet based Test
- CASEC: Computerized Assessment System for English Communication
EIKEN: Jitsuyo Eigo Gino Kentei
1.3. Period of Performance
The Period of Performance (POP) of this contract is one base year plus two option years beginning at the end of fiscal year 2021. Tentative dates are listed below:
- Base Year: 26 September 2021 to 25 September 2022
- Option Year 1: 26 September 2022 to 25 September 2023
- Option Year 2: 26 September 2023 to 25 September 2024
1.3.1 Federal Holidays
Generally, the contractor shall not be required to provide services on United States federal holidays. Holiday work may be required if determined to be a mission requirement. Annually, the Commanding General, 3rd Marine Expeditionary Forces (III MEF) and Commanding General, Marine Corps Installations Pacific-Marine Corps Base Butler (MCIPAC-MCBB) release holiday routine calendars.
Federal Holiday Occurrence New Year’s Day 1 January*
Martin Luther King Jr’s Birthday 3rd Monday of January President’s Day 3rd Monday of February Memorial Day last Monday of May
Independence Day 4 July* Labor Day 1st Monday of September
Columbus Day 2nd Monday of October Veteran’s Day 11 November*
Thanksgiving Day 4th Thursday of November Christmas Day 25 December*
* When a federal holiday falls on Sunday, the following Monday will be observed as a holiday by the U.S.
government. When a federal holiday falls on a Saturday, the preceding Friday will be observed as a holiday.
In addition to these federal holidays, if the President of the United States issues an executive order closing the federal government, that date shall also be considered a recognized federal holiday (Reference Executive Order 11582 of February 11, 1971, and 5 U.S.C. 5546 and 6103(b) and other similar statues insofar as they relate to the pay and leave of employees of the United States).
1.3.2. Typhoon Conditions
Japan-based military installations close when Tropical Cyclone Condition of Readiness 1C (TCCOR 1C or TC-1C) is declared by Military Weather Station authorities. The Contractor will be required to depart military bases, remain indoors, and monitor radio/television to determine when the TCCOR changes to TCCOR SW (Storm Watch) or TCCOR AC (All Clear). When TCCOR SW is declared by Military Weather Station authorities, the Contractor shall restart the service within 2 hours. If that occurs after normal business hours, services shall begin the next normal workday at 7:30am.
2.0. Place of Performance
Normal daily operations will be on Camp Hansen, bldg. 2820 EOTG HQ, bldg. 2865 EOTG Small Craft Repair Platoon, and bldg. 2176 III MEF Boathouse. The contractor is required to routinely send employees to support amphibious operations to the following:
- Camp Courtney, Camp Schwab, and Naval Facility White Beach: to support small craft operations.
- MCAS Futenma, Camp Foster, and Kadena Air Base: to coordinate training and planning for small craft operations.
2.1. Hours of Operation
The Contractor shall provide services during normal Government work hours. Normal Government work hours are 0800-1630 Monday through Friday. However, there may be the need for occasional work outside of normal Government working hours. Unless previously coordinated with the COR the contractor will always have one staff on Camp Hansen daily to answer questions about material condition, equipment readiness, and potential impacts to future operations.
3.0. Technical Requirements (Description of Work / Tasks)
3.1. Safety Craft Service Life Extension Maintenance
Two AM 700 RHIBs have been in service for more than 15 years. Both RHIBs require significant maintenance for another 10 years of service. Annually, the contractor will perform the following minimum maintenance on both AM 700 RHIBs.
3.1.1. Safety Craft Disassembly
The contractor will remove the following:
- *Yamaha Outboard Engines
- *Unikas Twin Engine Steering System
- Furuno Navigation System
- All electrical wiring
- All hardware
- Remove crash bars
- *150 gallon fuel tank
- *Hybrid foam collars
*Save for reinstallation.
3.1.2. Safety Craft Restoration
The contractor will perform the following:
- Clean and treat all corrosion
- Fill all unused holes with commercial standard or manufacturer approved fill materials
- Repair any and all cracks
- Add fingers on crash bar for tow rope. Refer to 8m RHIB for example.
- Fabricate radar arch over helm capable of holding the following components (approx. weight 100 lbs):
o Closed array radar o Two navigation lights o Loud hailer o Horn o External GPS antenna
- Fabricate all new dash panels, minimum 5mm aluminum plate.
- Fabricate instrumentation box. Refer to 8m RHIB for example.
- Prime and paint all bare metal.
3.1.3. Safety Craft Reassembly (Use 8m RHIB as example)
The contractor will perform the following on each AM 700:
- Install the following government supplied equipment for each AM 700 RHIB:
o (2) 150HP Yamaha Outboard Engine, one counter and one standard rotation.
o (2) Aluminum propellers, one counter and one standard rotation.
o (1) Unikas Twin Engine Steering System o (1) Hybrid foam collar system o (1) 150 gallon fuel tank
- Supply and install the following vendor supplied equipment for each AM 700 RHIB o (1) Yamaha Command Link Mechanical Twin Engine Kit w/6YC Display o (4) Throttle and shift cables o (1) Furuno GP1971F Chartplotter o (1) C-Map AN-D242.48 “Jieshi Bay to Zhounshan Island Digital Nautical Chart” o (1) Furuno DRS4W 19” 4kW Digital Radar o (1) Furuno Transducer o (1) Furuno GP330B NMEA 200 GPS Receiver o (1) Maretron NMEA 2000 Backbone o (1) Icom M506 Marine Transceiver with Second Station Remote Control Microphone o (1) Icom Hailer / Speaker o (1) Stainless Steel Compact Horn o (1) Shakespeare Quick Disconnect Stainless Ratchet Mount with 3’ Stainless Steel Antenna o (2) Y’s Gear 10 Micron Fuel Water Separators o (1) Fuel line, from tank to engine o (1) 12VDC system that include the following:
(3) 12VDC Absorbent Glass Mat (AGM) batteries (port, stbd, and house)
• Marine Cranking Amps - 1125
• Cold Cranking Amps - 900
• Reserve Capacity - 155
(2) Dual Circuit Plus Battery Switch
• Simultaneously switches two isolated circuits on
• In an emergency isolated circuits can be combined
(2) Marine grade ST Blade Compact 8-Circuit Fuse Blocks
(2) Marine grade Common 150A BusBar 10 Gang with cover
(2) 285 Series Thermal Circuit Breaker, 50A
(1) Waterproof Switch Panel, 8-Circuit
(4) LED Spot/Flood Combo Lights, with minimum 7200 lumin Correct sized wire for above circuits o 5mm aluminum plate for dash panels and instrument box o 50mm aluminum tubing and 5mm plate for radar arch o (3) Drain Plugs o Safety orange epoxy paint and primer for all bare metal
Only one AM 700 RHIB can be worked on at a time. Once the first AM 700 RHIB has been put back into service, work can begin on the second one. The contractor has 10 weeks to complete each AM 700 RHIB and will invoice when each one is complete.
3.2. Maintenance
The purpose of maintenance is simple and direct; to keep equipment in service. Maintenance tasks are grouped into two types, preventative and corrective. Preventative maintenance (PM) is the practice of maintaining equipment on a regular schedule, based on elapsed time, usage, or other condition or event. Corrective maintenance (CM) involves actions that restores non-operational equipment to a serviceable condition. The contractor will reference the “III MEF EOTG Boathouse Maintenance Standard Operating Procedure (SOP)” for proper procedures and if required make recommendations. The contractor shall perform at a minimum the following maintenance on all equipment assigned to the III MEF Boathouse in accordance with original equipment manufacturer’s standards:
- Proper care, use, and operation in accordance with Manufacturer’s guidelines
- Cleaning and lubrication
- Preservation
- Scheduled maintenance
- Diagnosis of equipment malfunctions
- Replacement of major assemblies and modular components
- Adjusting and aligning modules using test measurement, and diagnostic equipment
- Replacing modular components and piece parts
- Installing replacement seals
- Applying external parts
- Installing repair kit pieces
- Diagnosing, isolating, adjusting, calibrating, aligning, and repairing malfunctions to internal pieces
- Replacing defective modular components
- Repairing modular components by grinding and adjusting items such as valves, tappets, and seats
- Performing heavy body and hull damage
- Overhauling or rebuilding end items and modular components
- Perform conditional inspections and modifications that require disassembly or use of test equipment
- With COR approval, manufacture items not provided or available
3.2.1. Safety Craft
All of the safety craft assigned to the III MEF Boathouse are COTS equipment. They require a comprehensive PMCS and DSI to limit downtime. In conjunction with III MEF EOTG Boathouse Maintenance SOP the contractor will develop and implement a holistic PMCS schedule for the following items:
- (1) 31’ United States Marine Corps (USMC) Open Water Safety Craft (OWSC) o (2) 225HP Mercury Verado Outboard Engines or like item o (1) Furuno Navigation and Radar System o (1) Boatmaster OWSC Trailer System
- (1) 31’ SAFE Patrol Boat o (2) 225HP Yamaha Outboard Engines o (1) Furuno Navigation and Radar System o (1) Float-On Trailer System
- (2) Silvership Ambar 800 (AM800) Rigid Hull Inflatable Boats (RHIBs) o (4) 200HP Yamaha Outboard Engines o (2) Furuno Navigation and Radar Systems o (3) Brownwell 10,000 Capacity Trailers
- (2) Silvership Ambar 700 (AM700) RHIBs o (4) 150HP Yamaha Outboard Engines o (2) Float-On Trailer System
- (4) Sea Doo GTX 170 personal water crafts or like item o (2) Loft Double Personal Water Craft Trailer
- (2) Float-On 3-Tier Trailers
3.2.1.1. Safety Craft Readiness and Availability
At a minimum the contractor will maintain the equipment in order to achieve the readiness standards listed below.
All equipment that is not in the maintenance cycle needs to be turn-key. Turn-key equipment is ready for immediate use.
- (6) Twin Engine Safety Craft and their associated trailer system. Four of six must be turn-key at all times.
At least one of the four turn-key always has to be a 31’ twin engine safety craft.
- (4) Personal water crafts. Three of four must be to be turn-key at all times.
- (2) Float-On 3-Tier Trailers. One of two has to be turn-key at all times.
3.2.2. Combat Rubber Reconnaissance Craft (CCRC) and Non-Gasoline Burning Outboard Engines (NBOE)
The contractor shall provide support to the Marines of EOTG’s Small Craft Repair Platoon (SCRP) to manage and maintain the equipment listed below.
- (48) A combination of Zodiac F470 CRRC and Wing P4.7 CRRC and associated SL-3, each CRRC has:
o (4) Aluminum deck plates o (2) 7-foot stringers o (2) Inflation pumps o (1) 18-gallon and 6-gallon collapsible fuel bladder o Appropriate lashing equipment
- (48) Evinrude 55HP NBOE.
- (4) Outboard Engine Maintenance Kits (OEMK)
- (4) Outboard Engine Diagnostic Kits (OEK)
3.2.2.1. Small Craft Repair Platoon Support
The III MEF SCRP comprised of Marines with Military Operational Skill (MOS) 1341 Heavy Equipment Mechanic, 1342 Small Craft Mechanics, and 3531 Motor Vehicle Operators that are assigned to the Platoon from within III MEF via the Fleet Assistance Personnel (FAP) program. These Marines rotate out every six to twelve months. In order to minimize the impacts of this personnel rotation, the contractor SCS will:
- Coordinate with the SCRP Maintenance Chief for the PMCS and corrective maintenance schedule for all CRRCs, NBOEs, and associated SL-3.
- Provide guidance and on the job training to twelve Marines. There is a significant skills gap across the Fleet Marine Force (FMF) of Marines possessing the 1342 MOS. Most mechanics do not have time to master the required skills after their introduction at the MOS school. It is imperative the SCS bridge this gap to get the Marines self-sufficient. The standard of training will be in accordance with the Training and Readiness manual and the MOS Roadmap.
- In conjunction with the SCRP Maintenance Chief, coordinate issue and receipt of equipment with the 31st MEU for their semi-annual Principal End Item (PEI) exchange and EOTG’s Amphibious Raids Branch for their annual equipment requirements to support their amphibious courses.
3.2.2.2. CRRC and NBOE Readiness and Availability
The contractor will assist and advise the SCRP Marines to maintain the equipment readiness listed below.
- One equipment suite (20 CRRC, 20 NBOE, and associated SL-3) deployed in support of the 31st MEU.
All equipment deployed needs to stay at 100% turn-key. If deployed equipment enters the maintenance cycle with significant downtime, it would require to be replaced ahead of the scheduled exchange.
- One equipment suite (20 CRRC, 20 NBOE, and associated SL-3) post PEI exchange will be in 4-6 month maintenance cycle in preparation for its next 31st MEU rotation. Required to be at 100% readiness prior to schedule PEI exchange.
- One equipment suite (8 CRRC, 8 NBOE, and associated SL-3).Six of eight of each craft need to be turn-key at all times.
3.2.3. TSC and Exercise Support Equipment Maintenance
EOTG and the MEF Boathouse support multiple TSC events and exercises annually. In conjunction with III MEF EOTG Boathouse Maintenance SOP, the contractor will develop and implement a holistic PMCS schedule for the following items:
- (8) Inflatable Military Decoys
- (8) Generac XD5000E Generators or like item
- (4) Koshin Gasoline Generators or like item
- (1) Briggs and Stratton Elite 3500/4800 Gasoline Generator or like item
- (1) Mi-T-M Heated Pressure Washer or like item o (1) 13.0HP Honda gasoline engine
- (2) DeWalt 4200 PSI Pressure Washer or like item o (2) 4.0 CAT Triplex Pump o (2) Honda GX390 gasoline engine
3.2.3.1. TSC and Exercise Support Equipment Readiness and Availability At a minimum the contractor will maintain the equipment listed below at the stated standard of readiness. All equipment that is not undergoing preventative or corrective maintenance needs to be turn-key.
- (8) Inflatable Military Decoys. Six of the eight must be turn-key at all times.
- (13) Generators. 10 of 13 must be turn-key at all times. Of the minimum 10 generators required to be fully operational at any time, six of the eight Generac XD5000E must be turn key at all times..
- (3) Pressure Washers. Two of the three need to be turn-key at all times. The heated pressure washer must always be fully operational.
3.3. Corrosion Control and Prevention Maintenance Support
The contractor will develop and implement a holistic corrosion control program to mitigate premature end item and component failure due to operating in a salt laden environment. During daily corrective and preventative maintenance, corrosion should be identified, treated and coated. Sandblasting is the primary method to remove corrosion. Due to the salt laden environment it is imperative that visual inspections are conducted daily to identify corrosion issues.
3.3.1. Pressure Media Blasting
Pressure media blasting systems shall be used to remove coatings and corrosion from components and base metals.
3.3.1.1. Media Blasting Cabinet *
At a minimum the contractor will provide the capability and the following equipment in order to provide corrosion control of equipment smaller than 50 cm x 50 cm x 50 cm:
- A media blasting cabinet
- 40lb media pot and require connections
- Required consumables (i.e., hoses and nozzles)
* Internal space and shop air will be provided in Bldg. 2865 on Camp Hansen.
3.3.1.2. Open Air Blasting ()
At a minimum the contractor will provide the capability and the following equipment to provide corrosion control of equipment larger than 50 cm x 50 cm x 50 cm :
- Portable pressure media pot.
- Required consumables (i.e., hoses and nozzles)
- Media recovery equipment
- Air compressor with minimum operating characteristics: oil and moisture free, 100 Pounds per Square Inch
(PSI) at 45 Cubic Feet Per Minute (CFM).
3.3.2. Mechanical Removal
The contractor will be required to mechanically remove corrosion and coatings from components and base metals.
At a minimum the contractor will provide the capability and equipment (i.e., grinders, sanders, air chisels, and needle guns).
3.3.3. Non-Destructive Testing
The contractor will be required to evaluate properties of a material, component, structure or system for characteristic differences or welding defects and discontinuities without causing damage to the original part. At a minimum the contractor will provide the equipment and capability for the following:
- Leak Testing
- Liquid Penetrant Testing
- Ultrasonic Testing
3.3.4. Powder Coating for Components Smaller than 50 cm x 50 cm x 50 cm Powder coating is the preferred coating after the corrosion has been treated. At a minimum, the contractor will provide the capability and the equipment (i.e., portable booth, spray gun, and curing oven).
3.3.5. 28-Day Corrosion Inspection All equipment receives a scheduled corrosion inspection. It is critical that all equipment be inspected on a routine basis so corrective action can be swift and effective. The contractor will reference the “III MEF EOTG Boathouse Maintenance SOP” for proper procedures and if required make recommendations. All records of 28-Day Corrosion Inspections will be maintained for as long as the equipment is in service.
3.4. SCRP Hazardous Waste Accumulation Point Management Support The contractor will be familiar with MCO 4450.12A, Storage and Handling of Hazardous Materials, and its applicability to all III MEF Boathouse equipment, and will execute the following duties per the reference:
- Ordering and receiving POLs
- Storage of POLs and Hazardous Waste
- Proper handling of POLs and Hazardous Waste
- Safety considerations concerning hazardous materials and all maintenance procedures
- Overseas Hazardous Waste Producer
3.5. Training
To help overcome the high turnover of personnel and the uniqueness of small craft operations the contractor will provide initial hands-on training and follow up with on-the-job training to the Marines assigned to EOTG.
3.5.1. Small Craft Repair Platoon
The contractor will provide training to the twelve Marines assigned to the Small Craft Repair Platoon. The frequency will consist of daily 5-10 minute periods of instruction and monthly scheduled 30-60 minute periods of instruction. The daily on the spot classes will consist of oral instruction related to the maintenance currently being done on the shop floors. The monthly scheduled classes will be assigned by the SCRP Maintenance Chief and come from the applicable MOS Roadmap. At a minimum the contractor will provide the following training to the Marines assigned to SCRP:
- Overview of all CRRC systems
- CRRC Limited Technical Inspections (LTI)
- CRRC PMCS (valve maintenance, and pressure test procedures)
- CRRC corrective maintenance (air holding and non-air holding patches, and installation of accessories)
- CRRC latex procedures
- Overview of all NBOE systems
- NBOE LTI
- NBOE PMCS
- NBOE diagnostic procedures
- NBOE corrective maintenance
- Preparation of equipment for embarkation and debarkation; and loading equipment on associated trailers.
3.5.1.1 Movement of Oversize and Overweight Equipment
Some of the safety craft within the III MEF Boathouse are considered oversized and overweight when towed on Japanese roads. There are certain safety standards and procedures required when towing this equipment (i.e., lead and follow vehicle, and restricted towing times). At a minimum the contractor will provide:
- One vehicle and experienced personnel to lead the oversize and overweight safety craft to its destination on the previously approved route.
- Recovery equipment to anticipate tow vehicle or trailer issues.
- Route brief to all personnel in convoy.
3.5.2. Amphibious Raids Branch (ARB) Support
The ARB is comprised of Marines from the 03 - Infantry occupational field. They are required to operate safety craft from shore to up to 30nm out in support of EOTG amphibious courses, and III MEF TSC events and exercises.
More often than not these Marines have little to no small craft experience. They will require basic operator training and follow-on multi small craft leadership training.
3.5.2.1. Safety Craft Operational Training Support
At a minimum, 4-6 students once per quarter*, the contractor will provide the following training to the Marines assigned to ARB:
- Operator Training (twin engine safety craft and personal water craft) o New Equipment Training (NET) on one of the following; 7m RHIB, 8m RHIB, 31’ Patrol Boat, OWSC or Sea Doo GTX 170 personal water craft.
o Boat Nomenclature and terminology o LTI’s and Pre / Post Operational Checks o Tie required knots, hitches, bends, and mooring systems o Types of seas and adverse local weather o Float Plans o Mooring safety craft o Anchoring o Towing (hasty, short, and long) o Asymmetric propulsion o Use of navigational equipment o Use of RADAR o Man over Board o Search and Recovery o Launch and Recovery o Refueling o Right a capsized personal water craft
- Leadership Training o Location and limitations of Marine Corps Installation Pacific (MCIPAC) Water Surface Areas
(WSA) and associated training areas.
o Leading a multi craft evolutions in our area of operation.
o Ship to helicopter patient transfer via hoisting.
o Leading a multi craft evolution Over the Horizon (OTH), greater than 30nm from shore.
o Supporting Visit Board Search and Seizure training.
o Supporting ParaOps (deliberate landing zone and deliberate water landing operations).
o Supporting the 31st MEU’s Certification Exercise (CERTEX)
* Due to EOTG’s high operational tempo and unique Training, Exercise, and Evaluation Plan (TEEP) one quarter may require more on-water training than another quarter.
Once students have demonstrated mastery, the contractor will recommend to the EOTG OIC that the Marine be appointed as an operator for that piece of equipment.
3.5.2.2. CRRCS AND NBOES:
At a minimum, once per quarter, the contractor will provide the following training to the Marines assigned to ARB.
- Introduction to the Combat Rubber Reconnaissance Craft
- Introduction to the Non-Gasoline Burning Outboard Engine
- Small boat safety procedures
- Maintenance of safety equipment
- Packing and lashing of equipment
- Combat Rubber Reconnaissance Craft launch and recovery
- Small boat handling
- Nautical compass
- Waterproofing equipment
- Towing (hasty, short, and long)
3.5.3. III MEF Personnel
When directed by the EOTG OIC, provide any training from paragraph 3.5 to III MEF personnel not assigned to EOTG. This includes III MEF units and exercises off Okinawa to include but not limited to Hawaii, Australia and Guam.
3.6. Water Safety Craft Operator Support
Within III MEF’s AOR a significant amount of training is conducted on or in close proximity to water that is greater than chest deep. These operations and training evolutions require on water safety craft. III MEF EOTG is not trained or manned at an appropriate level to support all of III MEF’s on water safety requirements. Therefore, III MEF has historically relied upon contracted boat captains who are experienced in operating small craft in waters surrounding Okinawa to provide this required support. At a minimum the contractor will provide the following:
3.6.1. Japanese 1st Class Boat Captains (With personal water craft endorsement) Each contractor shall maintain a Japan Marine Recreation Association (JMRA) First Class Boat Operators License (20 ton up to 100 NM off shore) and have the following prerequisite experience:
3.6.1.1 English Language Proficiency
In accordance with paragraph 1.2.1.4, all boat captains are required to be English speakers. Native English speakers and/or English as a Second Language (ESL) with LPL 4 are required because highly technical information will be passed over radio communication at a moment’s notice, and nothing can be lost in translation.
3.6.1.2. Minimum Seamanship Skills
Contractors performing in support of this task shall have a thorough understanding of The International Regulations for Preventing Collisions at Sea 1972 (72 COLREGs) and at a minimum be capable of performing the following:
- Knowledge of Okinawa’s coastal waterways.
- Day and night launch and recover a twin-engine safety craft from an improved surface.
- Day and night launch and recover a personal water craft or CRRC from over the beach.
- Day and night operate a twin-engine safety craft, CRRC, or personal water craft.
- Day and night operate in a densely trafficked area.
- Accurate assessment of local weather.
- Negotiate local tides to launch and recover safety craft.
- Maneuvering in restricted visibility.
- Communicating with Naval shipping and United States Forces Japan (USFJ) aircraft.
- Traveling over the horizon, greater than 30 nautical miles from shore.
- Negotiating moderate swells and surf.
- Operating in shallow waters in close proximity to coral reef.
- Supporting 6-8 CRRCs with 40-50 personnel afloat.
- Conducting Casualty Evacuation (CASEVAC) and activating Emergency Medical Services (EMS).
3.6.1.3. MCIPAC Water Surface Areas and Associated Training Areas Contractor shall have a thorough understanding of all MCIPAC WSAs and associated training areas primarily in Okinawa, but also Japan, Korea, and MCB Hawaii. It is imperative they understand the capabilities and limitations of each water surface area (i.e. what WSAs can you launch your safety craft at?).
3.6.2. Frequency of Water Craft Operator of Support
The contractor will be required to simultaneously provide two, two-person crews in support water craft operations.
These crews are anticipated to support the following exercises and other similar events:*:
- 31st Marine Expeditionary Unit’s Certification Exercise (CERTEX) 2x per year
- III MEF TSC Events as required
- EOTG Small Craft Courses 1x per quarter
- Safety craft support for adjacent units (i.e., PARAOPS, or Amphibious Assault Vehicle (AAV) water movements) as required
* With less than 48 hours’ notice the contractor must provide water craft operational support, with a minimum of two, two person crews, within normal business hours.
* With greater than 48 hours’ notice the contractor must provide water craft operational support, with a minimum of two, two-person crews at any time.
* Government estimate of 90 days per year required. Exercises generally last 10 days, courses last 5-10 days. Max on the water time of 14 hours with 2 hours pre and post operations.
4.0 Deliverables
The SCS shall submit separate monthly readiness reports to the Support Branch and EOTG OIC.
4.1 Support Branch OIC
The reports shall include, at a minimum, the following:
- CRRC readiness
- NBOE readiness
- Operational supportability
- Inventory levels of DSI
- Inventory levels of POLs
- Status of corrosion control program
- Monthly training schedule
4.2 EOTG OIC
The reports shall include, at a minimum, the following:
- Safety Craft readiness (twin engine and personal water craft)
- Operational supportability
5.0 Applicable Documents
The SCS shall comply with all the documents listed below:
- Marine Corps Tactical Publication (MCTP) 3-40E,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .