M6740021Q0013-0003.pdf
PDF 210 KB Posted
- Solicitation number
- M6740021Q0013
- Issued by
-
United States Marine Corps
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QA 3_M6740021Q0013.pdf | ||
| QA 2_M6740021Q0013.pdf | ||
| M6740021Q0013-0002.pdf | ||
| QA 1_M6740021Q0013.pdf | ||
| M6740021Q0013-0001.pdf | ||
| M6740021Q0013.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M9545020SU05626
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is as follow s:
1) Correct the Foreign Currency Rate of FAR clause 52.225-17,
2) Provide the information in reply to Questions (#13 ~ 15),
3) Update ATTACHMENT 1, and
4) Extend the required response date for 2 days from 10 February 2021, 10:00AM (JST) to 12 February 2021, 10:00AM (JST).
POC: Mayumi Nakai Ph: 098-970-8145 (Local) / 645-8145 (DSN) E-mail: mayumi.nakai.ja@usmc.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Feb-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X M6740021Q0013
X 9B. DATED (SEE ITEM 11)
20-Jan-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Feb-2021
CODE
MCIPAC REGIONAL CONTRACTING OFFICE
MCB CAMP S.D. BUTLER
OKINAWA 904-0100
M67400 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
M6740021Q0013
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 10-Feb-2021 10:00 AM to 12-Feb-2021 10:00 AM.
The following have been modified:
ATTACHMENT 1
CLIN 0001
A. SEDAN, COMPACT – MINIMUM SALIENT CHARACTERISTICS
B. GENERAL DESCRIPTION
Automobile, Sedan, Compact, 4-door, 5-passenger, 4X2, and right hand drive.
All vehicles shall be the newest model and year at the time of delivery and ready for use. Vehicle/Equipment and furnished accessories shall comply with Japanese Motor Vehicle Safety Standards, including, but not limited to, exhaust emission control requirement, in effect on the date of manufacture.
C. MINIMUM VEHICLE REQUIREMENTS
(1) Quantity: Five (5)
(2) MINIMUM DIMENSIONS (Metric/Inches and feet).
Millimeter Inches
Overall Length 4,460 175.6
Overall Width 1,695 66.7
Overall Height 1,440 56.7
Wheel Base 2630 103.5
(3) Exterior and Interior color: Manufacturer’s standard white or silver.
(4) Identification Markings and Registration Numbers: Not Required
(5) Rust proofing and Undercoating: Manufacturer’s standard for Okinawa.
(6) Engine Displacement: Minimum 1,496 cc gasoline engine.
(7) Transmission System: Manufacturer’s standard automatic.
(8) Suspension: Manufacturer's standard
(9) Electrical System: Manufacturer's standard
(10) Air Conditioner: Full auto type or normal.
(11) Brakes: Antilock brake systems (ABS).
(12) Air Bags: For front compartment, driver’s and passenger’s side.
(13) AM or AM/FM Radio and Speaker.
(14) Tires and Wheels: Manufacturer's standard
(15) Seats: Manufacturer's standard leather seat, synthetic leather, or cover made of fabric with synthetic applied on top.
(16) Seat Belts: Shall be installed on all passenger seats and driver's seat
(17) Windows: Power windows and manufacturer’s standard
(18) Door Lock: Central locking control with keyless remote entry.
(19) Steering: Power steering.
D. OTHER MISCELLANEOUS REQUIREMENTS
(1) Accessories
a. Floor Mats: Both front and rear compartment.
M6740021Q0013
b. Triangle Reflector.
c. Class ABC fire extinguisher 1.0kg.
(2) Warranty:
a) Manufacturer’s standard basic whole vehicle warranty
b) All warranty service and repair parts must be available locally in Okinawa
c) Inspection date will be responsibility of the Contractor company to conduct joint inspections once the vehile is delivered prior to acceptance from the vendor. The date and time is to be determined based on availability of the vendor.
(3) Certificate of Transfer for each vehicle to be furnished for consignee by Contractor at time of vehicle(s) delivery.
(4) Technical Publication (In Japanese. CD or CD ROM is acceptable.): One (1) set of operator manual for each vehicle(s). One (1) set of Technical (shop repair) manual and parts catalog to be furnished by Contractor at time of vehicle(s) delivery.
52.225-17 EVALUATION OF FOREIGN CURRENCY OFFERS (FEB 2000)
If the Government receives offers in more than one currency, the Government will evaluate offers by converting the foreign currency to United States currency using $1.00 = 100 (JPY) Currency Rate in effect as follows:
(a) For acquisitions conducted using sealed bidding procedures, on the date of bid opening.
(b) For acquisitions conducted using negotiation procedures--
(1) On the date specified for receipt of offers, if award is based on initial offers; otherwise
(2) On the date specified for receipt of proposal revisions.
(End of provision)
(End of Summary of Changes)
File details come from the government source that posted it. Updated .