Official M67001Q0030 Logistics Service Support -Questions and Answers.pdf
PDF 841 KB Posted
- Attached to
- Logistics Support Services - Alaska
- Solicitation number
- M6700126Q0030
- Issued by
-
United States Marine Corps
About this file
M67001Q0030 Logistics Service Support – Questions & Answers (Q&A)
This is a Questions and Answers document clarifying requirements for RFQ M67001Q0030 Logistics Service Support. The document confirms that excavation activities at Donnelly Training Area have been pre-coordinated and approved by range personnel. Excavation specifications are 1 foot deep by 2 feet by 2 feet in dimensions, located 50 meters ahead of one firing position at Stinger Range MFP 06V WR 55530 87425. The government clarified that temporary facilities including shower trailers, portable toilets, and handwashing stations will be collocated with existing hardstand facilities at DTA ISB to supplement six structures of which two are inoperable.
The document provides detailed rolling stock information for Wrecker Support Services (MHE) requirements, including cargo offload, recovery, and towing support. Equipment specified includes six JLTV Heavy Guns (13,430 lbs each), one Loader Scoop Type TRAM (37,220 lbs), one MK36 Wrecker (54,000 lbs), two 7-ton Cargo Trucks MTVR (45,751-48,711 lbs), multiple QUADCONs ranging from 2,864 to 5,070 lbs, two generators (2,215 lbs each), four ECUs (472 lbs each), fuel pump modules, and sixcon fuel tanks. All equipment is designated as roadable and container-capable for 20-foot and 40-foot container transport.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DISTRIBUTION: DoD COMMUNITY ONLY
M67001Q0030 Logistics Service Support – Questions & Answers (Q&A)
1. The RFQ notes a requirement to conduct excavation activities during winter. Given that the Donnelly Training Area is managed by Donnelly Training Area (DTA) Range Control / Range Operations, can the Government please confirm whether coordination for excavation activities has already been conducted, and if DTA Range Control / Range Operations has approved the proposed training activities that may require ground disturbance? – Coordination with Range Control has already taken place. Excavation has been approved by range personnel.
2. Can the Government confirm units of measure for excavation (1’ x 2” x 2” OR 1’ x 2’ x 2’) and whether the described excavation is required per firing position or as a single occurrence? - 1 ft deep, 2ft x 2ft in dimensions; 50 meters ahead of (1) firing position.
3. Can the Government identify the specific range or firing point where the excavation work would be performed? - Stinger Range MFP: 06V WR 55530 87425
4. The RFQ includes requirements for shower trailers, portable toilets, and handwashing stations. However, the identified location (DTA ISB) appears to have existing hardstand facilities that provide similar capabilities. Can the Government please confirm whether these requirements remain valid, and clarify whether the temporary facilities are intended to be collocated with and used in addition to the existing facilities, or if they are to be geographically separate from the ISB. – There are hard structures at the ISB, 2 of the 6 structures are inoperable. This requirement for temporary facilities will be collocated and supplement the hard structures.
5. Regarding the Wrecker Support Services (MHE), we acknowledge the requirement to provide cargo offload, recovery, and towing support. Can the Government provide the anticipated quantity and types of rolling stock to help us better understand the expected workload?
Please see below.
Description Associated Length (in) Associated Width (in) Associated Height (in) Gross Weight (lbs) Cargo Type Association Type
ECU 47 48 43 472 Breakbulk None
ECU 47 48 43 472 Breakbulk None
ECU 47 48 43 472 Breakbulk None
ECU 47 48 43 472 Breakbulk None
GENERATOR 75 36 53 2215 Breakbulk None
GENERATOR 75 36 53 2215 Breakbulk None
JLTV HEAVY GUNS 202 96 92 13430 Vehicle None
JLTV HEAVY GUNS 202 96 92 13430 Vehicle None
JLTV HEAVY GUNS 202 96 92 13430 Vehicle None
JLTV HEAVY GUNS 202 96 92 13430 Vehicle None
JLTV HEAVY GUNS 202 96 92 13430 Vehicle None
JLTV HEAVY GUNS 202 96 92 13430 Vehicle None
LOADER, SCOOP TYPE (TRAM) 340 105 133 37220 Vehicle None
MK36 WRECKER 388 98 140 54000 Vehicle None
PUMP MODULE, FUEL (SIXCON) 96 78 48 2300 Breakbulk None
QUADCON 96 58 82 4516 Container Parent
QUADCON 96 57 82 3220 Container None
QUADCON 96 58 82 3219 Container Parent
QUADCON 96 58 82 3217 Container Parent
QUADCON 96 57 82 3930 Container None
QUADCON (AMALS) 96 58 82 2934 Container None
QUADCON (AMALS) 96 58 82 5070 Container None
QUADCON (AMALS) 96 58 82 2864 Container None
TRK, CARGO, 7T, W/O WINCH (MTVR) 315 98 140 48711 Vehicle Parent
SIXCON FUEL TANK 96 78 48 2630 Breakbulk Secondary Load
SIXCON FUEL TANK 96 78 48 2630 Breakbulk Secondary Load
TRK, CARGO, 7T, W/O WINCH (MTVR) 315 98 140 45751 Vehicle Parent
PUMP MODULE, FUEL (SIXCON) 96 78 48 2300 Breakbulk Secondary Load
| M67001Q0030 Logistics Service Support - Questions Answers |
| AE26 _ Cargo Offload Requirements |
| Slide 1 |
| Slide 2 |
| Slide 3 |
| Slide 4 |
| Slide 5 |
File details come from the government source that posted it. Updated .