Rental & Maintenance Deionization Water System Solicitation M67001-20-Q-1062 Questions Received and the Governments Response Question 1: The tanks are a different size than what is being requested for quote. Tanks on site are 8” x 44” versus 9” x 42” in RFQ. There is a slight price difference. The carbon unit on the two bank system is a 12” x 42”. Should we quote what is actually on site or use what is in the RFQ?

Gov’t Response: The dimensions of the tanks are in fact 8’’x42’’. And the Larger tank is a 12’’x 42’’

Question 2: Is the two bank system 1 or 2.

Gov’t Response: Because the systems do not have a "legal" name or label, we call the Clean Line System, System 1. The Lubrication Line, System 2. So, System 1 is the 2 bank system.

Question 3: What is the water source?

Gov’t Response: Cherry Point Water Facility

Question 4: What are the Analyticals of the water?

Gov’t Response: Non-potable water.

Question 5: What is the expected water flow or the expected highest demand for water?

Gov’t Response: Input of system is operating at 30 p.s.i. Output of system is operating at 30 p.s.i.

Question 6: What is the pipe diameter?

Gov’t Response: Input of system ¾” Output of System ¾”

Question 7: Are there restrictions on access hours to work on or service equipment?

Gov’t Response: Monday- Friday 630am-1500pm except Federal Holidays. There will be no personnel present outside of these hours.

Question 8: Is subcontracting or partnering with other contractors acceptable?

Gov’t Response: The purchase order or contract will be with the Prime Contractor and not with a Subcontractor or Partner.

Question: Will my manufacturer be allowed on site, for the purpose of quality control and support?

Gov’t Response: Any person entering MCAS Cherry Point or FRC East must perform the same protocol for entry.