Questions_and_Answers.docx
DOCX document 14 KB Posted
- Attached to
- Arc Flash Analysis Federal contract opportunity
- Solicitation number
- M3361015T0004
- Issued by
- United States Marine Corps
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| M3361015T0004_U0001.pdf | ||
| Power_Distribution_System_MCMWTC_Bridgeport.doc | DOC document | |
| M3361015T0004_Conformed_Copy.pdf | ||
| Line_Diagram.pdf | ||
| M3361015T0004_Arc_Flash.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers:
1. Question:
If available, please provide single line diagrams and record drawings for the Medium and low voltage Electrical distribution system components which requiring Arc Flash analysis described by the Scope of Work.
Answer: Daigram has been added as an item to the FBO.GOV package
2. Question:
Please clarify if Distribution panels, MCC's etc. less than 240V shall be included in study or to what extent they are to be labeled, see C.1.3.
Answer: If labeling is not required by NEC 70E, minimal PPE Category label shall be placed on the electrical distribution panel..
3. Question:
Refer to C.1.5; is an equipment study comparing the calculated SCR to existing equipment short circuit interrupting ratings required and if so how far do we carry that verification into the distribution system?
Answer: Building point of entry
4. Question:
Items C2.2 and C.4.1; imply that an overcurrent protective device coordination study is required. Please confirm that a coordination study is part of this contract and if so how far do we carry that verification into the distribution system?
Answer: Overcurrent protective device coordination study is not required. Short circuit and arc flash calculations will be required.
5. Question:
Please confirm the duration to complete the entire job shall be 30 days.
Answer: Start within 15 days of award. Job shall be completed within 30 days of start.
6. Question:
Does the study include the CDC, WWTP, WTP and PX mech. at the Coleville facility?
Answer: WWTP and the WTP only