Questions_and_Answers.docx

DOCX document 14 KB Posted

Attached to
Arc Flash Analysis Federal contract opportunity
Solicitation number
M3361015T0004
Issued by
United States Marine Corps

View the file

Other files for this federal contract opportunity

Other files attached to Arc Flash Analysis, newest first.
File Type Posted
M3361015T0004_U0001.pdf PDF
Power_Distribution_System_MCMWTC_Bridgeport.doc DOC document
M3361015T0004_Conformed_Copy.pdf PDF
Line_Diagram.pdf PDF
M3361015T0004_Arc_Flash.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers:

1. Question:

If available, please provide single line diagrams and record drawings for the Medium and low voltage Electrical distribution system components which requiring Arc Flash analysis described by the Scope of Work.

Answer: Daigram has been added as an item to the FBO.GOV package

2. Question:

Please clarify if Distribution panels, MCC's etc. less than 240V shall be included in study or to what extent they are to be labeled, see C.1.3.

Answer: If labeling is not required by NEC 70E, minimal PPE Category label shall be placed on the electrical distribution panel..

3. Question:

Refer to C.1.5; is an equipment study comparing the calculated SCR to existing equipment short circuit interrupting ratings required and if so how far do we carry that verification into the distribution system?

Answer: Building point of entry

4. Question:

Items C2.2 and C.4.1; imply that an overcurrent protective device coordination study is required. Please confirm that a coordination study is part of this contract and if so how far do we carry that verification into the distribution system?

Answer: Overcurrent protective device coordination study is not required. Short circuit and arc flash calculations will be required.

5. Question:

Please confirm the duration to complete the entire job shall be 30 days.

Answer: Start within 15 days of award. Job shall be completed within 30 days of start.

6. Question:

Does the study include the CDC, WWTP, WTP and PX mech. at the Coleville facility?

Answer: WWTP and the WTP only