M3361015T0004_U0001.pdf

PDF 410 KB Posted

Attached to
Arc Flash Analysis Federal contract opportunity
Solicitation number
M3361015T0004
Issued by
United States Marine Corps

About this file

Amendment U0001. Vendor Shall Acknowledge prior to award.

View the file

Other files for this federal contract opportunity

Other files attached to Arc Flash Analysis, newest first.
File Type Posted
Power_Distribution_System_MCMWTC_Bridgeport.doc DOC document
M3361015T0004_Conformed_Copy.pdf PDF
Line_Diagram.pdf PDF
Questions_and_Answers.docx DOCX document
M3361015T0004_Arc_Flash.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M3550015SUFSM18

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

This Amendment is being issued for the follow ing reason(s):

a. Provide line diagram

b. Provide Bldg List

c. Provide Answ ers to questions from industry

d. Provide Clarif ication in statement of w ork based on questions

e. Update Clauses

f. Extend Response date to 16 Sep 2015 @ 1100 hrs PT.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 14

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Sep-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X M33610-15-T-0004

X 9B. DATED (SEE ITEM 11)

03-Sep-2014

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Sep-2015

CODE

M33610

MCMWTC

BLDG 1036 ATTN: CONTRACTING OFFICER

HC 83 BOX 1

BRIDGEPORT CA 93517

M33610 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

M33610-15-T-0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 14-Sep-2015 11:00 AM to 16-Sep-2015 11:00 AM.

The following have been added by full text:

5237-102.90 ECMRA

5237.102-90 Enterprise-wide Contractor Manpower Reporting Application

Enterprise-wide Contractor Manpower Reporting Application (ECMRA). The contractor shall report contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Marine Corps Mountain Warfare Training Center via a secure data collection site. Contracted services excluded from reporting are based on Product Service Codes (PSCs). The excluded PSC’s are:

1. W, Lease/Rental of Equipment;

2. X, Lease/Rental of Facilities;

3. Y, Construction of Structures and Facilities;

4. S, Utilities ONLY;

5. V, Freight and Shipping ONLY.

The contractor is required to completely fill in all required data fields using the following web address http://doncmra.nmci.navy.mil.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year

(FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://doncmra.nmci.navy.mil.

BLDG LIST

FACILITY_NAME FACILITY_NO YEAR_BUILT

AREA/

SF

Approx.

Number of Panels

MWTC

GAS STATION OFFICE P1011 1999 256 1

HAZMAT FACILITY P1012 1999 1886 3

STORAGE P-1026 1982 803 1

WASH RACK P-7039 800 3

OPERATIONAL VEHICLE STORAGE P-1028 1990 3400 1

GME DISPATCH/CLASSROOM P1029 1999 1260 1

MAINT/COMM-ELECT P-1036 1986 8202 5

STORAGE P1038 1999 2204 1

AUTO MAINTENANCE SHOP P-1040 1987 6031 3

GENERAL STORAGE P-1999 1956 4020 1

STORAGE P-2000 1952 4020 1

PW/ROICC OFFICE P-2001 1952 4020 2

BEQ P-2002 1986 60168 30

EMERGENCY GENERATOR P2003 1999 2400 4

MEDICAL-DENTAL CLINIC P-3005 1989 8110 6

MESSHALL P-3006 1987 22738 20

CHAPEL P-3015 1990 2636 2

COMMUNICATIONS CENTER P4046 2000 772 3

ADMINISTRATION BLDG P-4048 1986 7718 6

GYM P-4049 1993 13896 5

ALL HAND CLUB P-4051 2003 4093 4

TRANSIENT LODGING P-5016 1986 11808 10

PISTOL RANGE P-521 1959 1

SEWAGE TREATMENT PLANT P-6010 1964 1350 6

POLYMER SLUDGE PUMPING SHED P-6012 1995 64 2

SEWAGE PUMPING STATION P-7016 1961 36 1

BARRACKS/BAS P-7042 1995 11944 3

BARRACKS P-7043 1995 12184 3

BARRACKS P-7044 1995 12184 3

BARRACKS P-7045 1995 12184 3

ARMORY P-7046 1995 1689 1

GEAR STORAGE FACILITY/COC P-7047 1995 11458 2

RECREATION BLDG P-7048 1995 5163 4

BARRACKS P-7049 1995 12184 3

AIRCRAFT OPERATIONS BLDG P-7052 1989 905 1

BARRACKS P-7054 1995 12184 3

STABLES P-7055 1995 4760 1

MAINTENANCE FACILITY P-7056 1995 3936 4

PMO PMO 1600 2

COLEVILLE HOUSING

WASTE WATER TREATMENT PLANT 1000 3

WATER TREATMENT PLANT 800 3

52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014)

In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor (29

CFR part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5332.

THIS STATEMENT IS FOR INFORMATION ONLY: IT IS NOT A WAGE DETERMINATION

Employee Class Monetary Wage-Fringe Benefits

WL Rate 1 Grade 7 $22.35

(End of clause)

The following have been modified:

PWS

SCOPE OF WORK

Arc Flash Hazard Analysis

Marine Corps Mountain Warfare Training Center

Bridgeport, CA 93517

GENERAL INTENT:

Marine Corps Mountain Warfare Training Center (MCMWTC) is soliciting proposals from qualified licensed engineering firms to provide technical engineering services required to perform an arc flash hazard analysis for facilities maintenance. Proposal shall include MWTC base and Coleville housing’s Waste Water Treatment Plant and Water Treatment Plant. MCMWTC objectives for this RFP are as follows:

A. Determine the level of hazard and the proper rating of the personal protective equipment (PPE) necessary for personnel arc flash protection.

B. Ensure that MCMWTC is in compliance with applicable industry standards for arc flash hazard identification and protection, i.e. NFPA 70E, OSHA, NEC, ANSI.

To ensure consistency across multiple facilities, MCMWTC seeks the services of a single contractor to perform applicable arc flash analysis services at all referenced facilities.

The contractor shall provide all design, labor, materials, tools, equipment, transportation, and supervision to perform the scope of work.

For any work requiring digging, welding, or outages of station utilities including roads, electrical, water, gas, cable, or sewer, the contractor shall obtain the appropriate station permits through the ROICC/FEAD office. Allow fourteen (14) days for submittal for processing and approval.

The assessment/study shall be in conjunction with sound electrical engineering practices. The contractor shall comply with all federal, state, and local codes, standards, regulations, and ordinances including all environmental regulations, except where specifically stated herein, including but not limited to, the latest additions of applicable codes published by the following organizations and other codes used in this proposal. The date of the term “latest revision addition” of the codes shall be the cut-off date indicated by the date of the proposal due date.

ANSI American National Standards Institute

ASTM American Society of Testing and Materials

AWS American Welding Society

CFR Code of Federal Regulations

COE Corps of Engineers-EM-385-12-1, Safety and Health Requirements Manual

EIA Electronic Industries Association

EM EM-385-1, Safety and Health Requirements

FM Factory Mutual

IEEE Institute of Electrical and Electronic Engineers

ICEA Institute of Cable Engineers Association

IBC International Building Code

NEC National Electric Code

NESC National Electrical Safety Code

NETA National Electrical Testing Association

NEMA National Electrical Manufacturers Association

NFPA National Fire Protection Association

UL Underwriters Laboratories

UFC Uniform Fire Code

GENERAL ORDERS

NO. 95/128 Public Commission of the State of California

The assessment shall be prepared in accordance with the A-E Guide prepared by Southwest Division, NAVFACENGCOM, Dated January, 2000; MAGTFTC, MCAGCC Supplemental A/E Guide; The Military

Handbooks (Electrical Engineering Preliminary Design Considerations MIL-HDBK-1004/1, Dated 30 May 1988;

Power Distribution Systems MIL-HDBK-1004/2A, Dated 15 January 1992; Electrical Utilization Systems MIL-

HDBK-1004/4; Dated 13 October 1987 and Safety of Electrical Transmission and Distribution Systems, MIL-

KDBK 1025/10, Dated 1 December 1998, except as noted in the scope of work and the criteria and detailed instructions to be furnished by the Engineer in Charge (EIC).

Installation shall conform to the latest applicable rules of the NFPA Standard NO. 70 NEC, the State of California

Public Utilities Commission and General Orders No. 128 “Rules for the Construction of Underground Electric

Supply, NO. 95 “Rules for the Overhead Electrical Line Construction,” and ANSI C2 NESC.

All work involving, moving, or removal of existing or new equipment shall be coordinated through the

ROICC/FEAD Department. This work includes all necessary items for a complete and usable project. Site improvements shall consist of all necessary site clearing and demolition.

The superintendent and quality control manager may be one and the same person.

SCOPE OF WORK:

C.1 Arc Flash Analysis

C.1.1 Contractor shall conduct an initial assessment of MWTC by collecting a count of electrical panels (calculation points,) to include breaker panels, electrical disconnects, switch gears, MCC’s, MCC buckets, bus taps (bus plugs,) and control panels, number of buildings, and number of utility feeds into the buildings.

C.1.2 The contractor shall furnish an Arc Flash Hazard Analysis per NFPA 70E Standard for Electrical Safety in the

Workplace, reference Article 130.3 and Annex D; based on the formulas found in IEEE 1584 or equivalent, and satisfying the requirements of OSHA 29 CFR 1910.132(d).

C.1.3 This study shall apply to equipment rated 240 volts or greater and equipment rated lower than 240 volts when served from a transformer 125 kva and larger unless an expanded scope of services is selected by MCMWTC. If labeling is not required by NEC 70E, minimal PPE Category label shall be placed on the electrical distribution panel.

C.1.4 Field Data Collection – The contractor shall collect and record all pertinent electrical component field data and create model drawings for the plant’s electric power distribution system. The contractor shall be escorted by designated MCMWTC personnel with specialized authorization to access equipment included in the assessment.

Typical field data shall include but is not limited to transformers, switchgears, switchboards, motor control centers, panel boards, circuit breakers, protective relays, fuses, bus ducts, bus plugs, conductors, etc.

C.1.5 Short Circuit Current Study (SCCS) in accordance with ANSI Std. C37 and IEEE Std. 141-1993 (Red Book) for all applicable electrical components. This study shall also include an Equipment Evaluation Study to check the computed available fault current against existing equipment short circuit interrupting ratings to Building point of entry.

C.1.6 Arc flash hazard analysis shall compute incident energy levels, proper ratings of PPE, NFPA 70E shock approach boundary distances at specified equipment locations, arc flash and shock protection boundaries, and warning label requirements. Incident energy and arc flash protection boundaries shall be computed using IEEE Std.

1584, “IEEE Guide for Performing Arc Flash Hazard Calculations” and the NFPA 70E Guidelines. The contractor shall perform this study for all applicable exposure areas in respect to inclusive facilities. The arc flash hazard analysis shall also include identifying the available fault current at equipment buses as well as clearing time for applicable protective devices to determine proper PPE requirements. The PPE determination shall be based upon potential arc flash incident energy exposure levels and shall determine:

Proper PPE for each applicable piece of electrical equipment.

Working distance for each applicable piece of electrical equipment.

Incident energy level for each applicable piece of equipment.

Flash protection boundary for each applicable piece of equipment.

C.2 Arc Flash Warning Labels

C.2.1 Produce Arc Flash Hazard Warning Labels – The contractor shall furnish and install arc flash hazard warning label information for all applicable equipment and work spaces in accordance with ANSI Z535.4, NEC 110.16 and

NFPA 70E 130.3, UL 969 guidelines. The labeling requirements shall include:

1. Voltage rating of equipment

2. Arc flash protection boundary (in.)

3. Arc flash incident energy at the working distance (cal/cm

4. Working distance (in.)

5. Recommended protection including glove rating

6. Limited, restricted and prohibited approach distances (in.)

7. Bus and protective device identifier

8. Bolted fault current

9. Date of issue

10. Service Provider contact information

C.3 Install Arc Flash Hazard Warning Labels

C.3.1 The contractor shall provide a line item in the proposal to install the manufactured arc flash warning labels at the applicable equipment locations in accordance with NEC-2008 article 110.16. If labeling is not required by NEC

70E, minimal PPE Category label shall be placed on the electrical distribution panel. The contractor shall be escorted by designated MCMWTC personnel with specialized authorization to access equipment included in the assessment.

C.4 Deliver Final Report

C.4.1 The contractor shall furnish a complete report for all system assessment/studies in both electronic (Adobe PDF format on compact disk media) and soft cover, spiral bound, hard copy, color document form. The report(s) shall include the results of all studies/assessments; to include, the short circuit, device evaluation, arc flash calculations, the coordination curves and all input data, recommendations for changes to settings or equipment, and conclusions.

SUBMITTALS:

Within ten days after the award of the contract, the contractor shall submit to the ROICC/FEAD Department in building 2001, the manufacturer’s literature on the following:

SAFETY REQUIREMENTS:

The contractor is required to conform to the most current edition of the U.S. Army Corps of Engineers Safety and

Health requirements, EM385-1-1 (note the 2014 revision has been released) and all applicable OSHA standards. All pathways/work areas shall be clear and free of slip/trip hazards; this includes snow and ice removal daily or more/less frequent as required.

CLEAN-UP AND DISPOSAL:

Work areas shall be left in a neat and orderly manner with all debris being picked up at the end of each day.

Contractor shall remove all debris associated with the performance of this contract, from MCMWTC and dispose of at a landfill approved by Mono County for the acceptance of such waste. There is no landfill aboard MCMWTC.

SCHEDULE:

The contractor is required to commence work prior to the (15th) calendar day after the date of award, (unless otherwise directed) and shall complete the entire job not later than (30) calendar days after the required commencement of work. The time stated includes final clean up of the job site.

Within (72) hours of award and prior to starting work, the contractor shall provide the Contract Surveillance

Representative (CSR) at building 2001 with a written work schedule, and shall notify the CSR within (24) hours of starting work. The contractor shall adhere to the submitted schedule unless prior written notification is submitted.

The contractor shall also provide (24) hours notice to arrange for final inspection.

DAILY REPORTS:

The contractor shall submit completed daily QA, Safety, and Production reports to the (CSR) before 10:00 A.M. on the following day of production. The daily reports shall directly reflect the work that was performed the previous production day.

(CSR) ROICC/FEAD ET roger.donahue@navy.mil (775) 400-0212

(CSR) ROICC/FEAD CM carla.richards@navy.mil (760) 932-1567

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR

EXECUTIVE ORDERS--COMMERCIAL ITEMS (MAY 2015)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Dec 2014) mailto:roger.donahue@navy.mil mailto:carla.richards@navy.mil

(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19

U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995)

(41 U.S.C. 4704 and 10 U.S.C. 2402).

____ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Apr 2010) (41 U.S.C. 3509).

____ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June

2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment

Act of 2009.)

___ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (July 2013) (Pub. L. 109-

282) (31 U.S.C. 6101 note).

___ (5) [Reserved] x (6) 52.204-14, Service Contract Reporting Requirements (JAN 2014) (Pub. L. 111-117, section 743 of Div. C).

___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (JAN 2014) (Pub. L.

111-117, section 743 of Div. C).

___ (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Aug, 2013) (31 U.S.C. 6101 note).

____ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (July 2013) (41

U.S.C. 2313).

____ (10) [Reserved]

____ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).

____ (ii) Alternate I (NOV 2011) of 52.219-3.

____ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014)

(if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

____ (ii) Alternate I (JAN 2011) of 52.219-4.

____ (13) [Reserved] x (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).

____ (ii) Alternate I (NOV 2011).

____ (iii) Alternate II (NOV 2011).

____ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).

____ (ii) Alternate I (Oct 1995) of 52.219-7.

____ (iii) Alternate II (Mar 2004) of 52.219-7.

____ (16) 52.219-8, Utilization of Small Business Concerns (OCT 2014) (15 U.S.C. 637(d)(2) and (3)).

____ (17)(i) 52.219-9, Small Business Subcontracting Plan (OCT 2014) (15 U.S.C. 637(d)(4)).

____ (ii) Alternate I (Oct 2001) of 52.219-9.

____ (iii) Alternate II (Oct 2001) of 52.219-9.

____ (iv) Alternate III (OCT 2014) of 52.219-9.

____ (18) 52.219-13, Notice of Set-Aside of Orders (NOV 2011) (15 U.S.C. 644(r)).

____ (19) 52.219-14, Limitations on Subcontracting (NOV 2011) (15 U.S.C. 637(a)(14)).

____ (20) 52.219-16, Liquidated Damages—Subcon-tracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).

____ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (NOV 2011) (15 U.S.C.

657f).

x (22) 52.219-28, Post Award Small Business Program Rerepresentation (July 2013) (15 U.S.C. 632(a)(2)).

____ (23) 52.219-29, Notice of Set-Aside for Economically Disadvantaged Women-Owned Small Business

(EDWOSB) Concerns (July 2013) (15 U.S.C. 637(m)).

____ (24) 52.219-30, Notice of Set-Aside for Women-Owned Small Business (WOSB) Concerns Eligible Under the

WOSB Program (July 2013) (15 U.S.C. 637(m)).

x (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).

x (26) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (JAN 2014) (E.O. 3126).

x (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

x (28) 52.222-26, Equal Opportunity (Apr 2015) (E.O. 11246).

____ (29) 52.222-35, Equal Opportunity for Veterans (Jul 2014)(38 U.S.C. 4212).

____ (30) 52.222-36, Equal Opportunity for Workers with Disabilities (July 2014) (29 U.S.C. 793).

____ (31) 52.222-37, Employment Reports on Veterans (July 2014) (38 U.S.C. 4212).

____ (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O.

13496).

x (33)(i) 52.222-50, Combating Trafficking in Persons (March 2, 2015) (22 U.S.C. chapter 78 and E.O. 13627).

____ (ii) Alternate I (March 2, 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

____ (34) 52.222-54, Employment Eligibility Verification (Aug 2013). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

____ (35)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May

2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

____ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

____ (36) (i) 52.223-13, Acquisition of EPEAT® Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and

13514).

____ (ii) Alternate I (Jun 2014) of 52.223-13.

____ (37)(i) 52.223-14, Acquisition of EPEAT® Registered Televisions (Jun 2014) (E.O.s 13423 and 13514).

____ (ii) Alternate I (Jun 2014) of 52.223-14.

____ (38) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).

____ (39)(i) (i) 52.223-16, Acquisition of EPEAT® -Registered Personal Computer Products (Jun 2014) (E.O.s

13423 and 13514).

____ (ii) Alternate I (Jun 2014) of 52.223-16.

x (40) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) (E.O. 13513).

____ (41) 52.225-1, Buy American--Supplies (May 2014) (41 U.S.C. chapter 83).

____(42) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (May 2014) (41 U.S.C. chapter

83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L.

103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

____ (ii) Alternate I (May 2014) of 52.225-3.

____ (iii) Alternate II (May 2014) of 52.225-3.

____ (iv) Alternate III (May 2014) of 52.225-3.

____ (43) 52.225-5, Trade Agreements (Nov 2013) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

____ (44) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

____ (45) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Jul 2013)

(Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

____ (46) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150

____ (47) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C.

5150).

____ (48) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 4505, 10

U.S.C. 2307(f)).

____ (49) 52.232-30, Installment Payments for Commercial Items (Oct 1995) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

x (50) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (July 2013) (31 U.S.C.

3332).

____ (51) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (July

2013) (31 U.S.C. 3332).

____ (52) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).

____ (53) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).

____ (54)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C.

Appx. 1241(b) and 10 U.S.C. 2631).

____ (ii) Alternate I (Apr 2003) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

x(1) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495).

x (2) 52.222-41, Service Contract Labor Standards (MAY 2014) (41 U.S.C. chapter 67).

x (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C.

chapter 67).

_____ (4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (Multiple

Year and Option Contracts) (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

_____ (5) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (MAY

2014) (29 U.S.C 206 and 41 U.S.C. chapter 67).

_____ (6) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for

Maintenance, Calibration, or Repair of Certain Equipment--Requirements (MAY 2014) (41 U.S.C. chapter 67).

_____ (7) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain

Services--Requirements (MAY 2014) (41 U.S.C. chapter 67).

_____ (8) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2014) (E.O. 13658).

_____ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (MAY 2014) (42 U.S.C. 1792).

_____ (10) 52.237-11, Accepting and Dispensing of $1 Coin (Sept 2008) (31 U.S.C. 5112(p)(1)).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph

(d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records--Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the

Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1)in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (APR 2010) (41 U.S.C. 3509).

(ii) 52.219-8, Utilization of Small Business Concerns (OCT 2014) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $650,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(iii) 52.222-17, Nondisplacement of Qualified Workers (MAY 2014) (E.O. 13495). Flow down required in accordance with paragraph (l) of FAR clause 52.222-17.

(iv) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

(v) 52.222-26, Equal Opportunity (APR 2015) (E.O. 11246).

(vi) 52.222-35, Equal Opportunity for Veterans (JUL 2014) (38 U.S.C. 4212).

(vii) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).

(viii) 52.222-37, Employment Reports on Veterans (Jul 2014) (38 U.S.C. 4212).

(ix) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).

Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

(x) 52.222-41, Service Contract Labor Standards (May 2014), (41 U.S.C. chapter 67).

(xi) _____ (A) 52.222-50, Combating Trafficking in Persons (March 2, 2015) (22 U.S.C. chapter 78 and E.O.

13627).

_____ (B) Alternate I (March 2, 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

(xii) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (May 2014) (41 U.S.C. chapter 67.)

(xiii) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain

Services--Requirements (May 2014) (41 U.S.C. chapter 67)

(xiv) 52.222-54, Employment Eligibility Verification (Aug 2013).

(xv) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2014) (E.O. 13658).

(xvi) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Jul 2013) (Section

862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

(xvii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (May 2014) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.

(xviii) 52.247-64, Preference for Privately-Owned U.S. Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx

1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.

(2) While not required, the contractor May include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.

(End of clause)

The following have been deleted:

SITE SURVEY

(End of Summary of Changes)