M27 PSS SOW V1.pdf

PDF 438 KB Posted

Attached to
M27 Parts Federal contract opportunity
Solicitation number
N0017424Q0011
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This performance work statement outlines requirements for the manufacturing of hardware components using Naval Surface Warfare Center Indian Head Division drawings. Key details include:

The contractor shall fabricate, inspect, test, and deliver firing pin, spring, and initiator components according to technical drawings and specifications. First article samples are required for new contractors or items not delivered within the past three years. The contractor must maintain quality control processes, including dimensional inspection, material certification, and calibration of measuring equipment. Products include housings, pins, springs, and initiators to be delivered to Naval Surface Warfare Center Indian Head Division. Export compliance is also required under International Trafficking in Arms Regulations or Joint Certification Program registration.

The related federal contract opportunity is a solicitation from the Department of the Navy Naval Sea Systems Command for the manufacturing of the parts detailed in the performance work statement. Delivery locations and quantities are provided for first article and production hardware.

View the file

Other files for this federal contract opportunity

Other files attached to M27 Parts, newest first.
File Type Posted
Pin Initiator 10520553 Form 43.pdf PDF
N0017424Q0011 - Request for Quote.pdf PDF
Spring Initiator 10520412 Form 43.pdf PDF
Housing Firing Pin 10520410 Form 43.pdf PDF
Pin Safety 10522817 Form 43.pdf PDF
Pin Firing 10520411 Form 43.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MANUFACTURING OF HARDWARE USING NSWC IHD DRAWINGS

PERFORMANCE WORK STATEMENT

1.0 Scope of Work

The requirements in this document contain the information necessary to manufacture hardware for assembly in fleet-deliverable Aviation Critical Safety Items (ACSIs) at Naval Surface

Warfare Center Indian Head Division (NSWC IHD).

2.0 Applicable Documents

M27 - CDRL_A001_Inspection

M27 - CDRL_A002_CoA

M27 - CDRL_A003_CoC

M27 – CDRL_A004_Inspection Plan

10520410 REV D – Housing, Firing Pin

10520410 REV D Form 16

10520410 Form 43

10520411 REV D – Pin, Firing

10520411 REV D Form 16

10520411 Form 43

10520412 Rev D – Spring, Initiator

10520412 Rev D Form 16

10520412 Form 43

10520553 Rev C – Pin, Initiator

10520553 Rev C Form 16

10520553 Form 43

10522817 Rev D – Pin, Safety

10522817 Rev D Form 16

10522817 Form 43

A-A-59588 Rev B

MIL-DTL-60292 Rev B

MIL-DTL-60525 Rev B

SAE AMS-F-7190 Rev B

SAE AMS-S-6758 Rev B

SAE AMS-QQ-P-416 Rev F

SAE AMS6327 Rev L

SAE AMS6349 Rev E

SAE AMS6382 Rev R

SAE AMS6415 Rev V

SAE AMS6484 Rev F

2.1 General Specifications

American National Standards Institute (ANSI)/American Society for Quality (ASQ)

Standards:

ANSI/ASQ Z1.4 Sampling Procedures and Tables for Inspection by Attributes

Code of Federal Regulations (CFR):

22 CFR 121 The United States Munitions List

22 CFR 122 Registration of Manufacturers and Exporters

Department of Defense (DoD) Directives:

5230.25 Withholding of Unclassified Technical Data From Public Disclosure

International Organization for Standardization (ISO)/International Electrotechnical

Commission (IEC) Standards:

ISO 9001 Quality Management Systems

ISO/IEC 17025 General Requirements for the Competence of Testing and Calibration

Laboratories

2.2 Technical Drawings

Department of Defense Drawings:

10520410 REV D – Housing, Firing Pin

10520411 REV D – Pin, Firing

10520412 Rev D – Spring, Initiator

10520553 Rev C – Pin, Initiator

10522817 Rev D – Pin, Safety

2.3 Conflicting Document Requirements

If there are any conflicts between specifications, drawings, or requirements listed herein, the contractor shall notify the Contracting Officer (KO) and the Technical Point of Contact (TPOC), in writing for interpretation, clarification, and resolution.

3.0 Requirements

3.1 General Manufacturing

The Contractor shall fabricate, inspect, test, and deliver components in accordance with the applicable drawings and specifications. Components shall be packaged by part number and ready for use. The Contractor shall provide, design, and fabricate all necessary tooling to manufacture and dimensionally inspect the components, and provide data as detailed herein.

The Prime Contractor shall bear the ultimate responsibility for all deliveries and performance of all requirements under this contract. The Prime Contractor shall monitor and maintain all subcontractor relationships. At the Government’s sole discretion, the Government may apply quality and/or on-time delivery issues stemming from the work of a subcontractor to the Prime

Contractor’s quality performance metrics.

3.2 Test and Inspection

The Contractor shall maintain and control processes to inspect and test components as described in this PWS. These processes should cover all phases from the ordering of the material to the

Government acceptance of the finished product.

3.2.1 First Article Testing

The Contractor shall submit First Article Test (FAT) samples to the Government if the

Contractor has not provided contract deliverables for the same drawing numbers within the last 3 years.

The Contractor shall submit an Inspection Test Plan in accordance with DI-QCIC-81110 per

CDRL A004 to the Government for review and approval prior to first article manufacture and delivery. The Contractor shall submit a first article sample of 5EA complete units prior to the first delivery of any production hardware. The first article units shall be fully representative of those proposed for production, and demonstrate the adequacy and suitability of the Contractor's processes and procedures in complying with the requirements set forth by the drawings and specifications.

Any production by the Contractor before formal acceptance of the first article sample shall be at the Contractor’s cost risk.

3.2.2 Dimensional Inspection

The Contractor is responsible for performing in-house inspections to ensure each first article or production component and dimension conforms 100% to the contract, PWS, and product dimensional requirements. The Contractor shall provide copies of in-process dimensional data and/or proof of inspections, such as floor shop travelers or final QA inspections, as requested by the Government.

The Contractor shall submit a Final Dimensional Inspection Report in accordance with DI-NDTI-

80809 per CDRL A001 for each deliverable line item. The final dimensional inspection report shall include either a list of all drawing dimensions and tolerances, and their actual measured values, or a marked-up copy of the drawing with actual measured values written in red next to the corresponding dimension.

3.2.3 Product Certification

The Contractor shall submit a certificate of compliance in accordance with DI-QCIC-81356 per

CDRL A002 to accompany the shipment of each first article and/or production lot, as required by

Table 3. The certificate shall state compliance of the material with its respective drawing or specification, and contract/order requirements. The certificate shall as a minimum state the company name, contract/order number, drawing or specification number, and date.

The Contractor shall submit a certificate of analysis/test in accordance with DI-QCIC-82386 per

CDRL A003, showing the first article and/or production material has been sampled and/or tested and found to be within the minimum requirements of the specification/drawing/contract, as required by Table 1. The certificate shall be forwarded to the Government; one (1) copy to accompany the shipment (in the packing list envelope), and one (1) copy mailed to arrive at time of receipt of the shipment (mark the certificate to the attention of the designated POC above).

Each certificate must be traceable to the material covered by the certificate. The certificate shall state, above the signature of a legally authorized representative of the company the following:

Both Certificates of Analysis and Compliance shall state, above the signature of a legally authorized representative of the company, the following:

“This certification concerns a matter within the jurisdiction of an agency of the United States and making a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code 1001.”

Test Requirement Certificate

Dwg Location Material 10520411 REV D – Pin, Firing IAW DWG Note #2 (M101) Analysis

Hardness 10520411 REV D – Pin, Firing IAW DWG Note #6 Analysis

Heat Treat 10520411 REV D – Pin, Firing IAW DWG Note #6 Compliance

Plating 10520411 REV D – Pin, Firing IAW DWG note #4 (M102) Compliance

Dimensional 10520411 REV D – Pin, Firing IAW DWG Note #5 (M103) Compliance

Material 10520412 REV D – Spring, Initiator IAW DWG Note #2 Analysis

Plating 10520412 REV D – Spring, Initiator IAW DWG Note #3 Compliance

Dimensional 10520412 REV D – Spring, Initiator IAW DWG Note #4 & #6 Compliance

Material 10520553 REV C – Pin, Initiator IAW DWG Note #2 (M101) Analysis

Hardness 10520553 REV C – Pin, Initiator IAW DWG Note #5 Analysis

Heat Treat 10520553 REV C – Pin, Initiator IAW DWG Note #5 Compliance

Plating 10520553 REV C – Pin, Initiator IAW DWG Note #4 Compliance

Material 10522817 Rev D – Pin, Safety IAW DWG Note #2 (M101) Analysis

Plating 10522817 Rev D – Pin, Safety IAW DWG Note #3 (M102) Compliance

Finishing 10522817 Rev D – Pin, Safety IAW DWG Note #4. Compliance

Table 1: Certification Requirements

3.3 Quality Control

3.3.1 Quality System and Quality Control Processes

The Contractor shall maintain a quality system which adheres, at minimum, to the requirements of ISO 9001:2015 standards.

The Contractor quality management system shall ensure products are in compliance with the applicable drawings, specifications, and contract. The quality management system shall outline processes to identify, record, and disposition nonconforming material or other characteristic discrepancies for the entire duration of this contract. Procedures, planning, and all other relevant documentation and data which comprise the quality management system, if requested, shall be made available to the Government for review.

3.3.2 Calibration of Measuring and Testing Equipment

Measuring and testing equipment used by the contractor shall, at a minimum, adhere to the requirements of ISO/IEC 17025:2017.

3.3.3 Acceptance of Product

Final acceptance of first article samples and production deliverables will be determined by

Government dimensional inspection and certification verification at Government destination for each deliverable line item. The Government shall complete sample testing within 60 days of receipt of all documentation and deliverables relevant to the relevant line item. Unless otherwise stated, the Government sampling plan shall be in accordance with Table 2. The Government reserves the right to perform additional inspection and testing of hardware to verify acceptability.

This may include testing at other facilities.

ASQ Z1.4 [ANSI/ASQ Z1.4-2003 (R2013) – October 2013]:

Critical: 100%

Major: Level II

Minor: Level I

Table 2: ACSI Sampling Plan

3.3.4 Government-Identified Nonconformity Reporting Procedures

The Government shall alert the Contractor to any nonconforming deliverables within one (1) working day of identifying the nonconformity. The Contractor shall respond with their recommended disposition on the deliverables within one (1) working day.

3.4 Export Control

The Contractor shall comply with either one, or both, of the export control options below.

3.4.1 International Trafficking in Arms Regulations (ITAR) Compliance

The Contractor shall maintain ITAR compliance through registration in accordance with 22 CFR

122 to export Category III and IV munitions components, as defined by 22 CFR 121.

3.4.2 Joint Certification Program (JCP) Registration

The Contractor shall maintain JCP registration and a DD Form 2345 to comply with DoD

Directive 5230.25.

3.5 Preservation

The Contractor shall be responsible for packing and packaging of deliverables to prevent any potential damage during transport. The Contractor shall label completed parts packaging to include component name, quantity, contract number, drawing number, revision, and manufacturer name and date. Packaging quantities and methods shall be in accordance with applicable Form 43.

4.0 Deliverables

The Technical Point of Contact and Contracting Officer (KO) for this contract will approve all deliverables as specified. The following Certificates shall include the signature of the Contractor’s representative authorized to make such certification.

CDRL Spec Section Title

A001 DI-NDTI-80809 3.2.2 Final Dimensional Inspection Report

A002 DI-QCIC-81356 3.2.3 Certificate of Compliance

A003 DI-QCIC-82386 3.2.3 Certificate of Analysis

A004 DI-QCIC-81110 3.2.1 Inspection Test Plan

4.1 Hardware Delivery

The Contractor shall notify the Contracting Officer 30 days in advance if the Contractor cannot meet the contract delivery schedule.

The Contractor shall be responsible for coordinating and shipping all the units below to the required destination.

Item Year Drawing Rev Nomenclature Qty UOI

1 Base 10520410 D Housing, Firing Pin (FAT) 5 EA

2 Base 10520410 D Housing, Firing Pin 920 EA

3 Base 10520411 D Pin, Firing (FAT) 5 EA

4 Base 10520411 D Pin, Firing 920 EA

5 Base 10520412 D Spring, Initiator (FAT) 5 EA

6 Base 10520412 D Spring, Initiator 920 EA

7 Base 10520553 C Pin, Initiator (FAT) 5 EA

8 Base 10520553 C Pin, Initiator 370 EA

9 Base 10522817 D Pin, Safety (FAT) 5 EA

10 Base 10522817 D Pin, Safety 920 EA

Delivery address provided below:

Naval Surface Warfare Center Indian Head Division

ATTN: Joseph Shiflett/ Kim Gore

4522 McMahon Road

Bldg. 116, Suite 100

Indian Head, MD 20640

File details come from the government source that posted it. Updated .