About this file
Amendment M00681-17-T-0011-0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| M00681-17-T-0011_Solicitation,_SF1449.docx | DOCX document | |
| C9_M9332817SULM115_Synopsis.docx | DOCX document | |
| C9_M9332817SULM115_Synopsis.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M00681-17-T-0011
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTIONS AND ANSWERS
Questions and Answers:
Question 1 - In regards to the salient features of the boom lift, 60’, will 2 wheel drive or 4 wheel drive be acceptable? (Reference Performance Work Statement p. 11, Section 3.2, paragraph a)
Answer – 2 wheel drive is the minimum requirement.
Question 2 – In regards to the salient features on the listed dozers, will “standard” blades be acceptable or are there specific blades that will be required? (Reference Performance Work Statement p. 11, Section 3.2, paragraph c,d,e)
Answer – Standard blades are acceptable.
Question 3 – In regards to the salient features on the truck mounted street sweeper, can you provide additional information in regards to a make/model or type? (Reference Performance Work Statement p. 11, Section 3.2, paragraph t)
Answer – The minimum requirement is a mechanical sweeper with a main broom, at least one gutter broom (passenger side), dual operator stations, water spray dust control, dumping debris hopper, 3.0 cubic yard hopper capacity (minimum), and rear and top safety lighting (similar to a Schwarze M6 Avalanche or an Elgin Eagle).
Question 4 – In regards to the salient features on the truck, bucket, insulated, 65’ boom, 2 single man buckets, is the requirement for a 2 single man bucket or a 2 man basket? (Reference Performance Work Statement p. 12, Section 3.2, paragraph w)
Answer – Two single person insulated buckets with dual controls in each bucket. One on each side of the boom assemly to allow work to be performed on two sides of a pole.
Question 5 – The Performance Work Statement states that no scheduled or preventative maintenance shall be performed while the equipment is in possession of the Government. Will preventative maintenance be allowed (while in possession of the Government) when the usage by the Government places the equipment into its next preventative maintenance schedule? (Reference Performance Work Statement p. 12, Section 3.4.1, paragraph 1)
Answer – The intent of this service is to lease equipment for 60 days or less. Considering this, the contractor is expected to perform any scheduled preventative maintenance prior to or following the lease period. If there is an exceptional situation and a specific piece of equipment requires scheduled maintenance, the contractor will coordinate with the Government representative and the Contracting Officer’s Representative to ensure that any required services are performed with the least impact to the Government’s operations.
Question 6 – Where do we put the costs for the mobilization/de-mobilization of the equipment?
Answer – The leasing prices quoted are to be inclusive of any mobilization/de-mobilization costs.
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 10-Mar-2017 12:00 PM to 14-Mar-2017 12:00 PM.
The following have been modified:
PERFORMANCE WORK STATEMENT
Heavy Equipment Leasing Performance Work Statement
1.0 Background – This is a Firm Fixed-Price Indefinite Delivery/Indefinite Quantity contract for one base year and four one year option periods to provide short-term off-road heavy construction equipment leasing services for the United States Marine Corps (USMC) Southwest Regional Fleet Transportation (SWRFT) department. These services are required at Marine Corps Base (MCB) Camp Pendleton, California; Marine Corps Air Station (MCAS) Miramar, California; and Marine Corps Recruit Depot (MCRD) San Diego, California.
2.0 Scope – The services set forth in this Performance Work Statement (PWS) will provide SWRFT with the capability to lease heavy construction equipment on a short-term basis when internal capacity cannot support the installation’s requirements. This equipment will be utilized by USMC personnel to maintain roads, firebreaks, buildings, ranges, landfill, and other extraneous locations when the need for such equipment exceeds the internal capacity available. This contract is for the temporary lease of the listed vehicles without operators. The Government’s obligation under this contract applies only to the lease of heavy construction equipment, and the Government is not precluded from the use of Government owned equipment. The period of each individual lease shall be on a weekly or monthly basis, but no longer than 180 days. The contractor shall provide all of the parts and labor necessary to maintain the Contractor’s equipment in a serviceable and operational condition in accordance with the manufacturer’s service requirements and current industry standards, except for daily/weekly operator maintenance, excluding parts. All parts, supplies, labor, and transportation required to properly service the Contractor’s leased equipment, to include inspections, minor/major repairs, and preventative/remedial maintenance on the Contractor’s equipment, shall be supplied by the Contractor at no additional cost to the Government.
3.0 General Tasks
3.1 General – The Contractor shall provide the equipment specified in each task order. The Contracting Officer, at their sole discretion, will determine whether equipment is “similar” within the requirement of the Contract Line Item Number (CLIN) to be a model number “or similar” and such determination shall not be the basis for claim or request for equitable adjustment. The Government will not pay transportation costs if equipment is rejected because it is not the item ordered, or it is not in proper working condition upon delivery.
3.1.1 The Contractor shall deliver the equipment to the Government worksite on or before the requested date, or shall have five (5) working days after receipt of an immediate delivery task order to deliver the equipment to the Government worksite.
3.1.2 The fuel tank for each piece of equipment shall be full upon delivery and will be filled prior to the return by the Government.
3.1.3 The responsibility for lease payment shall be determined in accordance with the clause at Federal Acquisition Regulations (FAR) 52.208-4 for all equipment subject to this contract. Lease prices shall be quoted on a monthly basis, and any delivery order that contains a fraction of a month shall be prorated at 1/30 the monthly price per day. Adjustment to lease payments will not be made unless the equipment is unavailable or unusable for 24 hours or longer.
3.1.4 All delivery orders will be for a minimum of one week (seven calendar days), and a maximum of no more than 180 days. A monthly lease is defined as thirty calendar days, and all periods of performance will utilize a prorated price based on the quoted monthly rate.
3.2 Required Equipment - The following list is the heavy equipment that is needed:
| a. | Boom Lift, 60 foot, 2 wheel drive minimum (JLG 600 or similar) | |
| b. | Compactor, Landfill (Caterpillar 836 or similar) | |
| c. | Dozer, standard blades (Caterpillar D8T WH or similar) | |
| d. | Dozer, standard blades (Caterpillar D8T or similar) | |
| e. | Dozer, standard blades (Caterpillar D6T or similar) | |
| f. | Excavator, Tracked, (Caterpillar 325 or Similar) | |
| g. | Excavator, Tracked, Mini (Caterpillar 305 or similar) | |
| h. | Excavator, Tracked, 60 foot reach (Caterpillar 322 or similar) | |
| i. | Motor Grader (Caterpillar 140 or similar) | |
| j. | Skid Steer Loader (Caterpillar 236 or similar) | |
| k. | Tractor, Agricultural (Caterpillar MT-85 or similar) | |
| l. | Truck, Water, All wheel Drive, 2000 gallon, with spray bars and side cannon | |
| m. | Loader, Backhoe (Caterpillar 430 or similar) | |
| n. | Loader, Track (Caterpillar 953 or similar) | |
| o. | Loader, Wheel (Caterpillar 910 or similar) | |
| p. | Loader, Wheel (Caterpillar 950 or similar) | |
| q. | Generator, 80KW, Trailer mounted | |
| r. | Generator, 200KW, Trailer Mounted | |
| s. | Generator, 360KW, Trailer Mounted | |
| t. | Sweeper, Street, truck mounted (Schwarze M6 Avalanche or Elgin Eagle or similar) | |
| u. | Tractor, Agriculture (John Deere 5045 or similar) | |
| v. | Truck, Bucket, insulated, 48 foot, 2 man bucket | |
| w. | Truck, Bucket, Insulated, 65 foot boom, 2 single man buckets with dual controls in each bucket | |
| x. | Truck, Line, Boom/Auger, 45 foot reach | |
| y. | Vacuum Excavator (Ditch Witch FX60 or similar) | |
| z. | Over and Above Equipment (attachments, accessories, and ancillary equipment to the listed equipment needed to perform specific tasks) |
3.3 Over and Above Equipment Procedures - The Contracting Officer is the only person(s) with authority to authorize the Contractor to provide equipment beyond the items listed. In the event that an attachment, accessory, or ancillary piece of equipment is needed to complete a project, the Contracting Officer will determine whether the over and above equipment falls within the scope of the contract. Once that determination has been made, the Contractor will provide a quote for the equipment needed. The Contracting Officer will determine whether the price is fair and reasonable prior to awarding a delivery order containing over and above equipment.
3.4 Maintenance: Except for daily/weekly operator checks and services, the Contractor shall provide all labor and parts necessary to maintain the Contractor’s equipment in a satisfactory condition in accordance with the manufacturer’s published specifications and current industry standards. All parts, supplies, labor, and transportation required to perform service inspections and maintenance on the Contractor’s equipment shall be supplied by the Contractor at no additional cost to the Government.
3.4.1 No scheduled or preventative maintenance shall be performed while the equipment is in the possession of the Government. The contractor shall perform scheduled or preventative maintenance before delivering the equipment to the Government or after retrieving the equipment from the Government. If there is an exceptional situation and a specific piece of equipment requires scheduled maintenance, the contractor will coordinate with the Government representative and the Contracting Officer’s Representative to ensure that any required services are performed with the least impact to the Government’s operations.
3.4.2 The Contractor shall perform all repairs to the equipment leased under this contract. In the event that a repair is needed during a delivery order’s period of performance, the contracting officer shall determine whether the equipment will be repaired or whether the equipment will be replaced. If the equipment is to be replaced, the contractor shall bear all costs associated with replacing the equipment. The contractor shall have twenty-four (24) hours to replace the removed piece of equipment with a substitute piece of equipment.
3.4.3 Equipment that requires multiple remedial repairs that are not due to Government neglect or abuse shall be cause for the Government to require replacement of the equipment. For purposes of this paragraph, multiple means more than twice in a one month period.
3.4.4 If the Government requires a replacement piece of equipment due to multiple remedial repairs, the contractor shall have twenty-four (24) hours from the time the equipment replacement determination is made to replace that piece of equipment with one of equal capabilities. The contractor shall bear all costs associated with replacing or “swapping out” pieces of equipment.
3.4.5 After performing maintenance, the Contractor’s clean-up process shall be accomplished in accordance with applicable Federal, State, and local laws and regulations, to include applicable installation regulations. The Contractor shall also clean the immediate work area and remove all debris generated by the Contractor in performance of these maintenance services. The Contractor shall remove and dispose of all fluids, oils, and related hazardous or environmentally sensitive items (i.e. used oil, oil filters, etc.), in accordance with all applicable Federal, State, and local laws and regulations. All spills shall be cleaned by the Contractor and immediately reported to the COR.
3.4.6 The Contractor shall furnish one (1) complete set of operator manuals for each piece of equipment provided, upon delivery of equipment. These will be returned to the Contractor upon completion of the task order.
4.0 Government Responsibilities:
4.1 The Government shall be responsible for performing operator daily/weekly checks and services. Daily/Weekly operator checks and services shall include, but are not limited to, checking oil levels, checking fluid levels, lubing grease fittings, checking tire pressure, and checking track tension.
4.2 Before, during, and after startup of equipment, the Government is responsible for proper engine warm-up and checking for unusual noises. The Government will operate the equipment in accordance with the manufacturer’s operating instructions. The Government will notify the contractor of any malfunctions identified. The Government will provide all fuel necessary to operate the equipment.
4.3 The Government will ensure the fuel tank for each piece of equipment is full upon Contractor pickup.
4.4 Responsibility for loss of, or damage to, equipment leased under this contract shall be subject to the provisions set forth at clause FAR 52.228-8, notwithstanding whether the equipment is otherwise classified as a motor vehicle.
4.5 The clause FAR 52.228-8 – Liability and Insurance – Leased Motor Vehicles addresses the Government’s responsibility for loss of or damage to leased equipment, as well as the Contractor’s insurance requirements for aforementioned vehicles.
1. Performance Requirements: The table below specifies the Performance Objectives and Performance Elements for the contract.
Table 1- Performance Requirements Summary (PRS) Outcome
Performance
| Inspection |
| Incentive |
| Stakeholder Outcome |
| PWS |
Para.
No.
| Standard |
| Acceptable Quality |
Levels
| Inspector |
| Method of Inspection, Frequency |
| Performance Incentive |
| Provide heavy mobile equipment that is operationally ready, safe, and reliable. |
| 2.0, 3.0 |
| Equipment delivered for use will be ready to operate, in a safe operating condition and be reliable for continued use. |
| 90%; No more than 1 valid complaint for every 10 pieces of equipment delivered for use. |
| COR |
| 100% Inspection |
Continuous observation
Review of all customer complaints.
Positive CPAR evaluation and exercise of option year.
| Deliver requested equipment within the stated time frame. |
| 3.1.1, 3.1.2 |
| Deliver the specific type or acceptable substitute equipment. |
Deliver equipment on the agreed upon date.
| 90%; No more than 1 valid complaint for every 10 pieces of equipment delivered for use. |
| COR |
| 100% Inspection |
Continuous observation
Review of all customer complaints.
Positive CPAR evaluation and exercise of option year.
| Perform required maintenance services to return the equipment to a fully operational condition. |
| 3.4.1, 3.4.2, 3.4.3 |
| Upon notification of malfunction, repair equipment to fully operational condition. |
| 95%; Be on site to commence repair work no more than 48 hours after notification. |
95%; Make equipment operational and safe on the agreed upon date.
| COR |
| 100% Inspection |
Continuous observation
Review of all customer complaints.
Positive CPAR evaluation and exercise of option year.
| Provide replacement equipment, if required. |
| 3.4.4 |
| Replace a piece of equipment with a similar piece of equipment if the equipment is non-operational or is not operating as expected. |
| 90%; Replace equipment within 24 hours after decision to replace. |
100%; Replace equipment with an acceptable similar type of equipment.
| COR |
| 100% Inspection |
Continuous observation
Review of all customer complaints.
Positive CPAR evaluation and exercise of option year.
6.0 GENERAL INFORMATION:
6.1 Place of Delivery: The equipment to be furnished hereunder shall be delivered F.O.B. Destination to the designated location on MCB Camp Pendleton, MCRD San Diego, or MCAS Miramar as identified when the task order is placed.
6.2 Time of Delivery: Delivery dates and times will be established at the time task orders are placed and will be entered into all such orders placed against this contract. Task orders shall specify delivery(s) no fewer than five (5) calendar days from the placement of such orders.
6.3 Ship to Addresses: Delivery addresses or unloading points will be established at the time task orders are placed. The Government reserves the right to change the specific unloading point prior to the piece of equipment being unloaded from the delivery vehicle. Any location change will be on the same military installation. Any attachments or accessories are to be delivered at the same time as the equipment they are associated with.
6.4 Late Delivery: In the event the Contractor for any reason anticipates or encounters difficulty in complying with the contract delivery schedule or date, or in meeting any of the other requirements of the contract, the contractor shall immediately notify the Contracting Officer’s Representative in writing, giving pertinent details. However, this data shall be informational only in character and receipt of this information by the Government shall not be construed as an approved waiver by the Government of (1) any delivery schedule or date, or (2) compliance with any other contract requirement by the Contractor or (3) any other rights or remedies provided to the Government by law under this contract.
6.5 Remote Usage: In the event that a leased piece of equipment is needed at an additional location, it will be the Government’s responsibility to move the equipment to the needed location to meet the additional required mission. The Government will also return that piece of equipment back to the originating location for return to the contractor.
6.6 Insurance: The contractor is responsible for obtaining any and all insurance to cover personal injury of contractor employees while working in performance of the contract. The Government shall assume no responsibility or liability for any injury that might occur to contractor personnel during performance of the contract.
6.7 Benefits: This is a Non-Personal Service Contract. No provisions are implied or provided in this contract for any benefits such as medical care, retirement, or worker’s compensation.
6.8 Identification and Base Passes: The contractor shall obtain identification cards and base passes for all employees and vehicles. An Application shall be coordinated through the installation’s S-6 Office. At time of application, the installation’s Provost Marshall’s Office (PMO) may conduct a background check on employees. Upon termination of employment, the contractor shall return identification cards and base passes to PMO within 24 hours.
6.9 Base Regulations: The contractor’s employees shall observe and comply with all base rules and regulations applicable to contract personnel, including those applicable to safe operation of vehicles, and shall not be present in locations not required for proper performance of the contract. Additionally:
1. Contractor personnel entering a military installation may be subject to security checks.
2. Contractor personnel shall abide by any direction given by military Police or other security personnel acting in accordance with their duties.
3. Contractor personnel shall abide by all posted speeds while aboard military installations.
4. All Contractor personnel performing work under this contract, who require access to the military installation, shall obtain the appropriate vehicle passes and identification from the Provost Marshall’s Office (PMO), with the assistance of the Contracting Officer’s Representative.
5. The Government may, at any time, bar any employee who violates Federal regulations pertaining to security, safety, health, or law while aboard a military installation. The removal of an employee from a military installation shall not relieve the Contractor of the requirement to continue performance of this contract.
6. The contractor shall not employ any individual for the performance of this contract, which may violate Department of Defense (DOD) Joint Ethics Regulations, DoD Directive 5500.7 or create a conflict of interest or an appearance of a conflict.
6.10 Travel: No travel costs are permissible while performing task orders awarded under this contract.
6.11 Quality Control: The Contractor is responsible for controlling the quality of services that conform to the contract specifications. As a minimum, the Contractor shall develop quality control procedures addressing the performance objective (heavy construction equipment leasing). The Contractor shall provide an acceptable Quality Control Plan within 10 days of award. Upon acceptance of the plan after contract award, updated copies shall be provided to the Contracting Officer as changes occur. The plan shall include an inspection system covering all the performance evaluation attributes, and records of all inspections conducted by the Contractor and any corrective actions taken. It shall specify the areas to be inspected on either a scheduled or unscheduled basis, how often inspections will be accomplished, the title of the individual(s) performing the inspection, and the methods for identifying and preventing defects in the quality of service performed before the level of performance becomes unacceptable. The records of corrective actions taken shall be available upon the Government’s request.
6.12 Quality Assurance: The Government will regularly inspect the Contractor’s performance under this contract. All findings of incomplete or defective performance will be subject to re-performance. All costs associated with re-performance are the sole responsibility of the Contractor. Inspection of services does not constitute acceptance of services, nor does it relieve the Contractor of any responsibility to take all actions necessary to assure the highest quality of services rendered.
6.13 Safety Requirements: The Government shall not provide safety equipment to the Contractor. All work shall be conducted in a safe manner and shall comply with the requirements described below:
1. No smoking permitted in Government buildings. Smoking in outdoors designated areas only.
1. The Contractor shall report to the appropriate installation Safety Office all accidents that occur in the performance of their duties while aboard this installation within 24 hours of its occurrence.
1. The Contractor shall submit to the Contracting Office, a full report of damage to Government property and/or equipment by Contractor’s personnel. All damages must be reported within 24 hours of the occurrence.
1. The Contractor shall require their employees to wear the appropriate Personal Protective Equipment (PPE) during the performance of this contract.
6.15 Contractor Responsibilities: The Contractor shall provide a point of contact and phone numbers for personnel assigned to administer the contract. The Contractor shall take appropriate action to ensure no delays are caused by the lack of personnel, equipment, parts and tools.
6.16 Government Furnished Property (GFP): None
6.17 Invoicing: Invoicing shall be conducted in accordance with DFARS Clause 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports that will be included in each task order.
6.18 Inspection and Acceptance: The Government appointed Contracting Officer Representative (COR) shall be responsible for performing appropriate inspection and acceptance. In the event the services are not in conformance with the terms of the contract, the Government may require re-performance of the non-conforming services at no additional cost or obligation to the Government.
(End Performance Work Statement)
(End of Summary of Changes) image1.wmf