M00681-15-T-0002_Performance_Requirements_Summary.doc
DOC document 28 KB Posted
- Attached to
- VEHICLE MONITORING SYSTEM
- Solicitation number
- M00681-15-T-0002
- Issued by
-
United States Marine Corps
About this file
PAST PERFORMANCE REQUIREMENTS SUMMARY Quality Assurance Surveillance Plan (QASP) will be provided at time of award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE REQUIREMENTS SUMMARY:
| Outcome |
| Performance |
| Inspection |
| Incentive |
| Performance Requirement |
| Performance Measure |
| Performance |
Standard Acceptable
Quality Level (AQL)
| Inspector |
| Surveillance |
Method Performance Incentive
| Managed Services/ Reports |
| Technical Accuracy |
| Work proceeds according to the Performance Work Statement |
| 100% |
Inspection
| COR |
| Reports/ Quarterly |
| Option exercise; CPARS rating |
File details come from the government source that posted it. Updated .