52.212-1_Addendum_to_FAR_Provision_LPG_19-Q-0015.doc
DOC document 44 KB Posted
- Solicitation number
- M0031819Q0015
- Issued by
-
United States Marine Corps
About this file
Addendum to FAR 52.212-1 for LPG 06
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW_LP_GAS_06.doc | DOC document | |
| LPG_06_CLINs_for_Quote.doc | DOC document | |
| 52.212-2_Evaluation_Commercial_Items_LPTA_and_checking_the_PPIRS_SR_NG_database_2018.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM TO FAR PROVISION 52.212-1
INSTRUCTIONS TO OFFERORS FOR RFQ M00318-19-Q-0015
1. Offerors shall submit only one (1) offer in response to this RFQ. Therefore, the Offeror’s submission should demonstrate the optimal capability in response to the requirements. Offers shall be hand-carried or mailed and received at the following location by 2:00 PM HAWAII STANDARD TIME (HST), 13 September 2019:
Commanding Officer, Marine Corps Base Hawaii
Attn: Steven Takasaki Regional Contracting Office Hawaii
2nd Street, Building 209
MCBH Kaneohe Bay, HI 96863-3063
(808) 257-5716 Offerors are advised that proposals sent by conventional US Mail service are not routed directly to the above address. Therefore, the possibility that a proposal will not comply with the stated closing date/time exists; in such case the proposal will be considered a “late submission.” Offerors who choose to send their submission via the US Postal Service (USPS) should address their proposals to the address cited above. The physical address specified above should be utilized for delivery in person and mailing by an express mail service such as FedEx and UPS.
All questions shall be submitted, in writing via e-mail, to Steven Takasaki at steven.takasaki@usmc.mil by 2:00 PM Hawaii Standard Time, 5 September 2019. The Government does not anticipate extending the due date for receipt of proposals, therefore, review the RFQ and these instructions thoroughly so all of your concerns/questions can be addressed.
2. Offerors shall submit the following with their proposal:
(a) RFQ – M00318-19-Q-0015. A signed copy of a vendor’s proposal indicating agreement to the provisions and clauses therein. All unit prices should be filled in as well as the total prices.
(b) Technical Factors. Describe in detail how your company satisfies the 2 mandatory technical factors.
3. Format. Offerors shall prepare and submit their response to the solicitation as set forth in Table 1. The titles and contents of the sections are defined in Table 1 of this document, all of which shall be within the required page limits (including all attachments, figures, etc.) and with the number of copies specified in the table. An electronic copy of all documents (technical and price) shall also be submitted on a single (1) CD-ROM. Proposals shall be prepared using “Arial” or “Times New Roman” 11-point font style on 8½ x 11 inch white paper. Tables and illustrations may use a reduced font style, not less than 8 point. Foldouts are not allowed. Margins shall be one (1) inch on all sides. All material submitted may be single-spaced. Offerors should ensure that each page provides identification of the submitting Offeror in the header or footer. The “original” folder shall be marked “ORIGINAL.” The price proposal should be in a separate folder. Each volume of the proposal shall be separately bound and include a cover sheet clearly marked as to solicitation number, volume number, title of acquisition and the Offeror's name. IAW FAR Subpart 4.8, the Government will retain one copy of all proposals.
Table 1 – Required Format for Proposals
| Volume |
| Title |
| Maximum Number of pages |
| Hard copies |
| Format for document on CD-ROM |
| I |
| Technical Proposal |
| 10 |
| 1 Original and 3 copies |
| MS Word or pdf |
| II |
| Price/Business Proposal |
| As required |
| 1 |
| MS Excel spreadsheet |
4. Volume I: Technical Proposal: The Offerors shall submit one original and 3 printed versions. The CD-ROM shall include the original.
Instruction to Offerors:
Offerors are expected to present their proposal in a thorough yet clear and concise manner with sufficient detail for effective evaluation and for substantiating the validity of stated claims. Offerors shall assume that the Government has no prior knowledge of their abilities and products and will base its evaluation on the information presented in the offeror’s proposal. Submission of offers which are unnecessarily verbose, unclear, disorganized, or difficult to understand, may result in unfavorable consideration.
Offeror’s responses to the factors will be evaluated against the evaluation criteria defined in the Evaluation Criteria section of the solicitation. For the purposes of evaluation, the proposal shall clearly address these mandatory evaluation criteria:
Technical Factors
1) Experience: Address contractor experience and how it meets the requirement for 7 years of experience in supplying LPG to multiple tank locations on a campus or base setting. Give specific examples in sufficient detail to enable the evaluators to determine whether your firm meets this experience requirement. This factor is mandatory; therefore, if sufficient detail is not provided, the offeror runs the risk of being found technically unacceptable. Provide an overall summary of contractor experience and then provide specific examples that give proof of meeting the experience requirements. For each specific example of experience provide:
i. Customer and contact information
ii. Contract/Order number
iii. Contract type
iv. Program name
v. Total contract value
vi. Number of Years working with this customer
vii. Detailed description of work performed
viii. Any other information that will provide evidence of the required experience
The Government reserves the right to contact any cited customers to verify the accuracy of the experience description.
2) Tank Availability: The offeror must provide evidence of an inventory of the proper amount and size of metered tanks available to fulfill the requirements of the SOW, OR provide the evidence of the ability to obtain the proper amount and size of thanks needed to fulfill the requirements of the SW by 1 October 2019. This is also a mandatory factor; therefore, it is critical to provide sufficient information to allow the evaluators to determine whether this evaluation factor is met.
The offer can meet these requirements via Prime, or Subcontractor.
5. Volume II. Price Proposal. The Offeror must complete the “CLINs for Quote sheet” with the Contract Line Item (CLIN) Unit Prices) in its entirety. The unit prices shall include all costs to provide for delivery of the LPG and rental of tanks, including the maintenance and installation of Contractor owned tanks.
Additional Data. Data beyond what is stated in these instructions are not required and shall not be submitted unless it is essential to document or support the Offeror’s price quote. All information relating to the proposed price including required supporting documentation must be included in the section of the proposal designated as the Price Proposal. Under no circumstances shall this information and documentation be included elsewhere in the proposal.
File details come from the government source that posted it.