This Quality Assurance Surveillance Plan outlines performance monitoring for a Marine Corps contract providing professional analysis and liaison services. Key performance areas include quality of work, responsiveness, compliance, and control of costs and schedules. Performance will be evaluated monthly on a weighted scale across these areas using methods such as inspections, demonstrations, and statistical analysis. Ratings of excellent, acceptable, or unacceptable will be assigned for each weighted performance characteristic in the Performance Requirements Survey table to determine compliance with contract requirements.
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN
1. Objective. This Quality Assurance Surveillance Plan (QASP) serves as the principal basis for assessing overall performance quality associated with the Marine Corps Center for Lessons Learned (MCCLL) Professioanl Support Services tasks. This document will be used by the Government to assess the effectiveness of the Contractor’s quality with respect to management and technical services provided. This QASP provides the methodology by which the Contractor's performance will be monitored to determine compliance with established performance objectives and to establish performance benchmarks that ensure a quantifiable basis for measuring effectiveness. The plan is designed so that surveillance is limited to that which is necessary to verify the Contractor is performing management and technical services satisfactorily and relates directly to performance objectives of the performance objectives delineated in the PWS.
2. Government Surveillance. The COR will serve as the administering authority for this task, and her/his authority will be limited to administering specific technical aspects of the task order as set forth at Inspection and Acceptance. The COR will not provide direction that is outside the scope of responsibilities delineated under this task order and will defer any conditional interpretations to the Contracting Officer. The COR will:
· Maintain a detailed knowledge of the technical requirements of the contract;
· Document Contractor performance in accordance with the QASP;
· Identify and immediately forward notifications of deficient, or non-compliant performance to the Contracting Officer;
· Approve priorities of support, resources, and associated schedules.
3. Surveillance Methods. Surveillance of Contractor performance is the method used by the Government to determine whether the contractor is effectively and efficiently complying with all terms and conditions of the task order. In addition to statistical analysis, the functional expertise of the Technical Representative plays a critical role in adequately evaluating contractor performance. The below listed methods of surveillance shall be used in the administration of this QASP and the standards are delineated by WBS element in the Performance Requirements Survey (PRS) table:
Demonstration - A qualification method that is carried out by operation and relies on observable functional operation. It does not require the use of instrumentation or special test equipment;
Inspections: A qualitative inspections can be accomplished through one of the following techniques:
· Random or Stratified Sampling: With random sampling, services are sampled to determine if the level of performance is acceptable. Random sampling works best when the number of instances of the services being performed is very large and a statistically valid sample can be obtained. Stratified sampling focuses on selected parts of total contractor output for sampling. Computer programs may be available to assist in establishing sampling procedures.
· Periodic Inspection, Judgmental Inspection or Planned Sampling: This method, sometimes called "planned sampling, " consists of the evaluation of tasks selected on other than a 100% or random basis.
4. Performance Requirements. The performance requirements set forth in this section correspond to the material content cited in the PWS and the evaluation factors at FAR 52.212-2 ADDENDUM. Corresponding ratings will be generated for each of the weighted performance areas and aggregated monthly. The COR will track performance using a moving average and reconcile performance with the Contractors Program Mgr. This information will also be shared with the Contracting Officer and included in CPARs reports and any past performance assistance requests:
| Performance Characteristic / Wt. |
| RFP Relationship |
| Evaluation Rating[footnoteRef:1] [1: ] |
| Quality of Work Performed: .65 |
| Factor 1 – Technical Capability |
| Excellent / Exceeds: >.95 |
Acceptable / Meets: .85 - .94 Unacceptable: <.85
| Responsiveness / Planning: .20 |
| Factor 1 - Technical Capability |
| Excellent / Exceeds: >.95 |
Acceptable / Meets: .85 - .94 Unacceptable: <.85
| Management & Administration: .15 |
| Factor 1 - Technical Capability |
Excellent / Exceeds: >.95 Acceptable / Meets: .85 - .94 Unacceptable: <.85
Numerical values for the adjectival ratings are: >.95 – Excellent – Exceeds standard compliance; .85 - .94 standard compliance – Acceptable; and <.85 – unacceptable.
The criteria that will used to accomplish the evaluation ratings is derived from the RFQ and from the elements of performance determined to be most influential to performance.
PERFORMANCE REQUIREMENTS SURVEY (PRS)
| Performance Objective (Task) |
| Deliverable |
| Performance Standard |
| Acceptable Quality Level (AQL) |
| Surveillance Method |
| Task 1 Program Management & Planning (PWS section 4.1) |
| Services provided and all submitted CDRLs |
| Compliant with all general requirements of the PWS (Section 3), successful and timely execution of CDRLs and adequately safeguarding government information. |
Performance is acceptable when:
1. All support provided is professionally delivered and in accordance with contract terms.
2. Support services identifies and precludes problems, or resolve issues.
3. All written products are provided timely within contract standards. Reports are complete, accurate, and prepared to a professional standard and without grammatical errors. No more than one revision of each written product delivered.
Observation made by technical monitors, government personnel and COR on contractor provided services.
Inspection of all written products.
Issuance of performance surveys to Government offices supported by the contractor under this contract.
COR assessment of monthly status report.
| Task 2 Lessons Learned Program Support (PWS section 4.2) |
| Services provided and all submitted CDRLs |
| Successful and timely execution of CDRLs, Sharepoint updates and data readiness, compliance with applicable MCO, certified personnel providing SharePoint Site Administration support. |
| Performance is acceptable when: |
1. All support provided is professionally delivered and in accordance with contract terms.
2. Support services identifies and precludes problems, or resolve issues.
3. All written products are provided timely within contract standards. Reports are complete, accurate, and prepared to a professional standard and without grammatical errors. No more than one revision of each written product delivered.
Certified personnel is assigned to provide SharePoint Site Administration support.
Observation made by technical monitors, government personnel and COR on contractor provided services.
Inspection of all written products.
Issuance of performance surveys to Government offices supported by the contractor under this contract.
| Task 3 Lessons Learned Collection and Analysis Support (PWS section 4.3) |
| Services provided and all submitted CDRLs |
| Successful and timely execution of CDRLs, MAGTIF support, compliance with applicable MCO, certified personnel providing SharePoint Site Administration support. |
| Performance is acceptable when: |
1. All support provided is professionally delivered and in accordance with contract terms.
2. Support services identifies and precludes problems, or resolve issues.
3. All written products are provided timely within contract standards. Reports are complete, accurate, and prepared to a professional standard and without grammatical errors. No more than one revision of each written product delivered.
Certified personnel is assigned to provide SharePoint Site Administration support.
Observation made by technical monitors, government personnel and COR on contractor provided services.
Inspection of all written products.
Issuance of performance surveys to Government offices supported by the contractor under this contract.
| Task 4 Event (Operations, Deployments, Exercises, Experiments) Support (PWS section 4.4) |
| Services provided and all submitted CDRLs |
| Attendance to conferences and events, successful and timely execution of CDRLs, compliance with applicable MCOs, execution of exercises and operations, deployments, and experiments. |
Performance is acceptable when:
1. All support provided is professionally delivered and in accordance with contract terms.
2. Support services identifies and precludes problems, or resolve issues.
3. All written products are provided timely within contract standards. Reports are complete, accurate, and prepared to a professional standard and without grammatical errors. No more than one revision of each written product delivered.
Observation made by technical monitors, government personnel and COR on contractor provided services.
Inspection of all written products.
Issuance of performance surveys to Government offices supported by the contractor under this contract.