Att II_QA 21Q1026 RS NAS Rewire.docx
DOCX document 21 KB Posted
- Attached to
- Recruiting Station Nashville - Rewire
- Solicitation number
- M0026321Q1026
- Issued by
-
United States Marine Corps
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final 21Q1026 U0002.docx | DOCX document | |
| 21Q1026 U0001 Extension.docx | DOCX document | |
| D1 COMBINED SYNOPSIS 21Q1026.docx | DOCX document | |
| D1 Final SF 1449 21Q1026.docx | DOCX document | |
| D1 Att I Brand Name Justification RS NAS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment II M0026321Q1026 U0001
1. Would you be able to tell me what the licensing requirements will be for these project?
The Statement of Work calls out standards that are required. The bidder is encouraged to ensure they are meeting any local or municipal standards for licensing with the appropriate local body.
2. Where is the Current Main Point of Entry Located? And How far is it from the New MDF?
The demarc location is approximately 370 ft away on the far side of the building.
3. Is a lift needed to install cable or conduit anywhere?
The vendor’s selection of pathway should permit installation without a lift. There are no terminal locations that would require a lift to service.
4. Is this a Single-Story Facility?
Yes.
5. What is the Ceiling Type and Height? (T-Bar), (Hard-Lid) (Puzzle Tile) (Standard Ceiling Height) or (Tall) T-Bar, 2’x2’ tiles. Approximately 9’ high
6. In your request you mentioned if there was no access to wall-mount stations to use wire molding. Do you know how many locations might be affected? Are the walls open above the ceiling so we can fish the walls and cut in a new outlet?
There are no identified locations where wall mounted outlets are required at this time.
7. I did not see anything about Wireless Access points or Paging Speakers, would you like us to include any if needed?
These items are not subject to this requirement.
8. I counted up (56) Total Quad Cat6 Workstation Outlet Locations and (18) Dual Cat6 TV Monitor Locations for a Grand Total of (74) Customer Identified locations.
This count appears to be more correct.
9. In the RFP you mentioned that you would like the color of the cable to be (Blue), (Black), (Grey) and (Green) are you looking for all (4) colors at each outlet or does it mean to choose one of the (4) colors mentioned?
All horizontal cables shall be one color, and that color will be selected from the enumerated list of colors.
10. In the RFP it did not mention specifically about providing patch cables at the New MDF and End User Workstation cables at the desktop locations but it did mention the following:
a. Incidental Equipment/Materials. The contractor shall furnish all wiring, cables, connectors, fixtures, woodwork, hardware, and hardware necessary to connect and mount the various components of the Unified Communications Infrastructure as required for a professional, complete, and operable system.
There is no requirement for the vendor to provide patch cables for the MDF for this requirement.
11. It did not specifically call out for Plenum-Rated Cat6 Cabling or Non-Plenum / Riser-Rated Cat6 Cabling.
All horizontal cable should be Plenum-Rated.
12. Can you provide estimate percentage of user locations requiring surface mount raceway and boxes?
The anticipated number is zero, but issues may arise during installation that would require surface mounted boxes.
13. Can you provide estimate of how many blank plates are needed?
It is anticipated that all existing locations will be suitable for reuse, and as such this number should be zero.
14. Can J hooks be used throughout with ladder tray installed in new comm room?
Vendor should be able to determine pathways that would allow appropriately sized J-hooks should meet the requirements. No known impediment to this approach exists, and it does conform to specifications.
15. Can you provide drawing showing demarcation point or answer with footage distance and amounts of turns?
Please see question 2. No measured drawing is available that shows the requested information. The number of turns could be greatly impacted by the contents of the plenum space, but is estimated to be a minimum of 3.
16. Do we provide busbar on wall per 5.4 East Wall 1.2?
Yes.
17. Do you have a specific style and color of floor box trim in conference room?
Black and as flush as possible.
18. What is the approximate number of old cables to be removed?
50-60
19. Can I have an electrician come on site to look at trenching and conduit SOW for conference room, if asked?
Site visit has already passed. If awarded, a visit could be arranged with appropriate notice, and coordination.
20. What type of flooring is in the conference room?
Concrete
21. What was the temp cabling from the current server room to the new space?
There is no temp cabling between existing communications space and new communications space.