M00146-15-T-9016_Amendment_2.doc

DOC document 42 KB Posted

Attached to
Oil Quench Furnace and Gas Generator
Solicitation number
M00146-15-T-9016
Issued by

About this file

The purpose of this amendment is to make changes to specification and extend the due date for receipt of quotes.

View the file

Other files

File Type Posted
M00146-15-T-9016_Q A_Attachment_1.docx DOCX document
M00146-15-T-9016_Amendment_1.doc DOC document
PE-21522F_Attachment_1.pdf PDF
M00146-15-T-9016_RFQ.doc DOC document
Brand_Name_Allen_Bradley_Attachment_3.pdf PDF
Brand_Name_Honeywell_Attachment_2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 02-Jun-2015 01:00 PM to 05-Jun-2015 01:00 PM.

The following have been modified (changes in red):

Paragraph 3. Of the SUMMARY INFORMATION FOR VENDORS has been changed to read as follows:

3. Quotation due date/time: Quotations submitted in response to this requirement must be received at the location specified in paragraph 2) of Addendum to FAR 52.212-1 (See Section L) no later than 1:00 p.m. (EST) on 05 June 2015.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

Specification for an

Integral Quench Furnace and Endothermic Gas Generator

3.9.1 Operator Training. Shall be for a minimum of two (2) eight hour days and shall thoroughly familiarize operators in operation the Oil Quench through actual hands-on instruction with the equipment. The Oil Quench Operator and Maintenance Manual and the Software User Manual shall be used extensively as reference materials during this training.

3.9.2 Maintenance Training. Shall be for a minimum of two (2) eight hour days and shall include mechanical, electrical, and electronic instruction on the Oil Quench and its components through actual hands-on instruction with the equipment. The Oil Quench Operator and Maintenance Manual shall be used extensively as reference materials during this training.

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified (changes in red):

Paragraph 2) a) of Addendum to 52.212-1 has been changed to read as follows:

2) ADDRESS FOR SUBMISSION OF QUOTES.

a) The vendor is responsible for ensuring that quotes are received in the Contracting Office no later than 1:00 P.M. (EST) on 05 June 2015 as indicated on page one (1) of this solicitation. Failure of vendor’s quote to be received prior to the hour and date specified will result in rejection of the quote.

(End of Summary of Changes)