SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
MODIFICATIONS TO SOW
The following paragraphs in the Statement of Work (SOW) have been amended, changed or deleted. The amended SOW will be provided as a separate attachment and also will be posted in FedBizOps. You may access this amendment and the attachment at the following website: www.fbo.gov.
Paragraph 3.2.1.b.(2) – In the four sentence, the words “or run in tandem” have been removed.
Paragraph 3.2.1.b.(14) – The following has been added to the sentence, “for initial start up and testing.”
Paragraph 3.2.2. – The following sentence has been removed from the paragraph. “The Contractor shall provide a copy of his general contractors license with his bid.”
Paragraph 3.3.1.2. – The last two sentences have been modified into one sentence to read, “The air compressor shall maintain a stable set point pressure of 100 psig + 2 psig due to possible large variations in loads (i.e., 15% to 100%).”
Paragraph 3.3.1.8. – The last three sentences have been deleted and the following sentence added: “Some faults and alarms shall be provided by the compressor and dryer.”
Paragraph 3.3.1.9.5. – The following sentence has been removed from the paragraph. “The unit shall be designed to operate at 200 percent rated load for a minimum of 5 seconds before protective devices operate.”
Paragraph 3.3.2.6.2. – The last sentence has been removed and is replaced by the following sentence, “The contractor shall provide two (2) dry contacts (run and fault status) and shall be connected to the new RSC system (dryer and compressor) for possible future communication upgrade.”
Paragraph 3.3.2.9. – The last three sentences have been removed and are replaced by the following sentence, “The dewpoint monitor shall be provided with two (2) dry contacts (low and high dewpoint alarm) and connected to the controller of the dryer of RSC system for possible future communication upgrade.”
Paragraph 4.5 has been added to the SOW and is an OPTIONAL ITEM. It reads as follows:
4.5 OPTIONAL ITEM. The Contractor shall connect the control system of each RSC piece of equipment to Johnson Controls METASYS Facility Management System (FMS). The Contractor shall ensure all RSC equipment (compressor, dryer and dewpoint monitor) control panel readings ( faults, warnings and alarms) shall be monitored and displayed by FMS. (Contact FMS POC: Heather Hogan at 910-523-1286.)
(End of Summary of Changes)