This document is a technical specification for the design/build and delivery of a high-speed catamaran ferry to be used in commuter service between the City of Lynn and Boston, Massachusetts. The vessel shall be designed and constructed to meet the requirements of a 46 CFR Subchapter "T" passenger vessel with a Gross Regulatory Tonnage not to exceed 100 GT. It shall be certified for "Limited Coastwise" and "Cold Water" service and comply with the Federal Transit Administration's minimum 25-year service life requirement. The vessel shall have four diesel engines, four waterjet propulsion systems, and two auxiliary generators, and will be required to meet all applicable Environmental Protection Agency emission standards. The technical specification provides detailed requirements for the vessel's design, construction, documentation, testing, inspection, and delivery.

The technical specification does not provide pricing terms or funding information. However, it does note that the vessel's construction and service life must comply with Federal Transit Administration funding requirements, including the Buy America clause. The City of Lynn is the owner of the vessel, and the Massachusetts Department of Transportation is also involved in this procurement.

View the file

Other files

File Type Posted
Lynn Ferry_Commercial Specification 2020-01-27.docx DOCX document
Addendum 9 - 2020-11-04.docx DOCX document
Addendum 1 follow up Answer to Bidder Delivery Question.docx DOCX document
Ferry QA - 2020-01-27.xlsx XLSX spreadsheet
Lynn Ferry addendum 2.pdf PDF
Addendum 1 - 2020-01-27.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lynn – Boston Passenger Ferry Specification 2019

PASSENGER-ONLY,

SUBCHAPTER “T” FERRY

TO SERVE LYNN, MA AND BOSTON, MA

TECHNICAL PROVISIONS NO. MDOTFEDFERRY

Technical Provisions No. MDOTFEDFERRY i

TABLE OF CONTENTS

000: GENERAL PROVISIONS

001 INTRODUCTION AND GENERAL SCOPE

002 GLOSSARY

002.1 ABBREVIATIONS

002.2 EXPANDED DEFINITIONS

003 REGULATIONS, DOCUMENTATION, CERTIFICATION

003.1 COMPLIANCE

003.2 DOCUMENTATION

003.3 CERTIFICATION

004 GENERAL SPECIFICATION REQUIREMENTS

004.1 GENERAL

004.2 GENERAL VESSEL DESCRIPTION

004.3 GENERAL CHARACTERISTICS

004.4 PVAG REQUIREMENTS

004.5 CONTRACTOR'S OBLIGATION

004.6 MANUFACTURERS' REPRESENTATIVES

005 CORRESPONDENCE & COMMUNICATIONS

006 DOCUMENTATION

006.1 PROPOSAL DRAWINGS

006.2 CONTRACT DRAWINGS

006.3 REQUIRED DRAWINGS AND DOCUMENTS

006.4 INTERFERENCE & ACCESS

006.5 ENGINEERING

006.6 AS-BUILT DRAWINGS

006.7 MANUALS AND MAINTENANCE INSTRUCTIONS

006.8 VESSEL HISTORY BOOKS

006.9 PHOTOGRAPHS

007 DRAWING REVIEW PROCESS

007.1 OVERVIEW

007.2 DESIGN PACKAGES

007.3 DESIGN REVIEW PROCESS

007.3 USCG COORDINATION

008 WEIGHT AND CENTER OF GRAVITY

008.1 WEIGHT ESTIMATE

008.2 WEIGHT SURVEY

009 STABILITY AND SUBDIVISION

009.1 SUBDIVISION

009.2 ACCESS AND LOGISTICAL REQUIREMENTS – STABILITY AND SUBDIVISION TESTS

010 ADMEASUREMENT TONNAGE

010.1 GENERAL

011 ACCESS & MAINTENANCE REQUIREMENTS

011.1 GENERAL

011.2 PIPES, VALVES, ETC

011.3 REMOVAL OF EQUIPMENT/MACHINERY

011.4 DRAINAGE

011.5 LIGHTENING HOLES, MANWAYS, LIMBER HOLES

011.6 MAINTAINABILITY DEMONSTRATION

012 ACCESS TO YARD/VESSEL/DOCUMENTS

012.1 ACCESS TO YARD/VESSEL

012.2 ACCESS TO DOCUMENTS

013 OFFICE

013.1 OFFICE

ii

013.2 CONFERENCE AREA

013.3 PARKING

015 PROGRESS REVIEW MEETINGS

017 MATERIALS & WORKMANSHIP

017.1 MATERIAL - GENERAL

017.2 WORKMANSHIP - GENERAL

017.3 STORAGE/PROTECTION

017.4 WELDING

018 QUALITY ASSURANCE

018.1 CONTRACTOR QUALITY MANAGEMENT SYSTEM

018.2 QUALITY DOCUMENT SUBMITTALS

018.3 CONTRACTOR QUALITY ASSURANCE DOCUMENTATION

018.4 CONTRACTOR QUALITY ASSURANCE AND QUALITY CONTROL PROCEDURES

018.5 CONTRACTOR INSPECTION PLAN

018.6 OWNER’S PARTICIPATION

019 HULL & STRUCTURE PROTECTION

019.1 WELDING

019.2 UNDERWATER HULL INSPECTION (AS APPLICABLE)

020 TRAINING

020.1 OPERATOR TRAINING

020.2 MAINTENANCE TRAINING

020.3 OPERATOR’S MANUAL

021 SPECIAL EQUIPMENT

021.1 PORTABLE TEST UNITS (PTUS)

021.2 SPECIAL TOOLS AND FIXTURES

022 SPARES

100. STRUCTURAL

100 GENERAL

100.1 HULLS, EQUIPMENT, ACCESS

100.2 SUPERSTRUCTURES, ACCOMMODATIONS

100.3 CLASSIFICATION

100.4 RIDE CONTROL

110 HULLS

110.1 MATERIALS AND DESIGN

110.2 SHEAR GUARDS

123 TANKS

123.1 POTABLE WATER TANK

123.2 FUEL OIL TANKS

123.3 COLLECTION AND HOLDING TANKS (CHT)

130 DECKS, FRAMING, & BRIDGE PLATE

130.1 DESIGN AND CONSTRUCTION

130.2 MAIN DECK

130.3 UPPER DECK

130.4 BRIDGE PLATES (TRANSITION PLATES) AND HOLDERS

150 SUPERSTRUCTURE

150.1 MAIN DECK TO UPPER DECK

150.2 UPPER DECK

151 ENGINE FOUNDATIONS

155 WATER JET INTAKE TUNNELS

167 WATERTIGHT HATCHES & SCUTTLES

167.1 GENERAL

167.2 HATCHES (SCUTTLES)

167.3 ENGINE ROOM ACCESS HATCHES

167.4 ENGINE REMOVAL ACCESS

168 WEATHERTIGHT DOORS

iii

171 MASTS

200. MECHANICAL

233 PROPULSION – DIESEL ENGINES

233.1 GENERAL

233.2 MAIN PROPULSION ENGINES

233.3 OPTION: ENGINE MONITORING SYSTEM

241 REVERSE/ REDUCTION GEARS

242 COUPLINGS, SHAFTING, SEALS

246 JET TUNNELS, WATER JETS

252 PROPULSION CONTROL SYSTEM

259 EXHAUST SYSTEMS

261 FUEL OIL SYSTEM

261.1 SYSTEM

261.2 FILTERS

261.3 FUEL SOUNDING

261.4 SHUT DOWNS

261.5 PUMPS

261.6 VENTS

262 LUBE OIL SYSTEM

300. ELECTRICAL

300 GENERAL

311 SHIP SERVICE DIESEL GENERATORS

313 BATTERIES & CHARGERS

313.1 EMERGENCY SERVICE 24V DC

313.2 ANTICIPATED 24V DC EMERGENCY LOADS

313.3 ALTERNATORS

313.4 MAIN ENGINE STARTING BATTERIES

313.5 GENERATOR STARTING BATTERIES

321 POWER DISTRIBUTION

321.1 SHORE POWER

321.2 POWER SOURCE TRANSFER

321.3 SHORE POWER RECEPTACLE & CABLES

324 SWITCHBOARD & POWER PANELS

324.1 MAIN SWITCHBOARD

324.2 POWER PANELS

324.3 CIRCUIT BREAKERS

324.4 COMMISSARY

331 LIGHTING FIXTURES & ILLUMINATION

331.1 GENERAL

331.2 INTERIOR LIGHTING

331.3 EXTERIOR LIGHTING

331.4 NAVIGATION LIGHTS & PANEL

331.5 FLOODLIGHTS

331.6 DECK LIGHTS

331.7 SEARCHLIGHT

331.8 STEP LIGHTS

400. NAVIGATION, COMMUNICATION AND SAFETY EQUIPMENT

421 NAVIGATION SYSTEMS

421.1 FLAGS & SHAPES

421.2 EMERGENCY SIGNALS

421.3 EPIRB

421.4 ANCHOR SIGNAL BELL

421.5 MAGNETIC COMPASS

421.6 SHIP’S HORN

421.7 THERMAL IMAGING CAMERA

iv

422 NAVIGATION LIGHTS & PANEL

423 NAVIGATION & EXTERIOR COMMUNICATION SYSTEMS (ELECTRONIC)

432 TELEPHONE/INTERCOM SYSTEM

433 PUBLIC ADDRESS & ALARM SYSTEMS

433.1 PUBLIC ADDRESS & ALARM SYSTEM

433.2 LOUD HAILER

434 AUDIO/VISUAL, WI-FI, & PASSENGER INFORMATION SYSTEM

434.1 AUDIO/VISUAL PASSENGER ENTERTAINMENT SYSTEM

434.2 WI-FI

434.3 PASSENGER INFORMATION SYSTEM

434.4 INDUCTION LOOP SYSTEM

436 SAFETY DEVICES

436.1 PERSONAL FLOATATION DEVICE (PFD) STORAGE

436.2 INFLATABLE BUOYANT APPARATUS (IBA)

439 CLOSED CIRCUIT TV (CCTV)

439.1 CCTV GENERAL REQUIREMENTS

439.2 OPTION: CCTV PASSENGER AREAS

439.3 OPTION: CCTV LIVE LOOK-IN FEATURE

441VHF RADIO

446 AUTOMATIC IDENTIFICATION SYSTEM (AIS)

500. PIPING, INSULATION, HVAC, FIRE SAFETY, ANCHORING & MOORING

501 PIPING SYSTEMS

508 INSULATION

508.1 THERMAL

508.2 ENGINE ROOM COMPARTMENT INSULATION

508.3 EXHAUST LAGGING & INSULATION

511 HEATING, VENTILATION AND AIR CONDITIONING (HVAC)

511.1 GENERAL

511.2 MAIN CABIN

511.3 PILOT HOUSE

511.4 HEADS

511.6 OTHER SPACES

511.7 MACHINERY SPACE VENTILATION

520 SEA CHESTS & VALVES

521 FIRE MAIN & BILGE PUMP SYSTEM

521.1 FIRE MAIN SYSTEM

521.2 BILGE SYSTEM

526 SCUPPERS AND DECK DRAINS

526.1 GENERAL

526.2 LOADING AREA DRAIN PANS

526.3 INTERIOR DECK DRAINS

528 PLUMBING DRAINS & SEWAGE SYSTEM

528.1 GENERAL

533 POTABLE WATER SYSTEM

555 FIRE EXTINGUISHING

555.1 FIXED SYSTEM

555.2 PORTABLE EQUIPMENT

568 MANEUVERING & CONTROL SYSTEM

568.1 GENERAL

568.2 SYSTEM DESCRIPTION

581 ANCHOR HANDLING AND STOWAGE

582 MOORING SYSTEM

600. OUTFITTING & MARKINGS

602 SIGNAGE & MARKINGS

602.1 GENERAL

v

602.2 REGULATORY HULL MARKINGS

602.3 COMPANY NAME & LOGOS

602.4 BUILDER’S PLAQUE

602.5 OWNER’S STANDARD SIGNAGE

611.1 HULL FITTINGS

611.1 DOORS, EXTERIOR WEATHER-TIGHT

611.2 DOORS, INTERIOR JOINER

611.3 TONNAGE OPENINGS

611.4 BITTS, CHOCKS, & FAIRLEADS

612 RAILS & STANCHIONS

621 NON-STRUCTURAL BULKHEADS

622 FLOOR PLATES, GUARDS, & LIFTING GEAR

622.1 FLOOR PLATES

622.2 GUARDS

622.3 LIFTING GEAR

623 LADDERS, STAIRS, & GATES

623.1 VERTICAL LADDERS

623.2 INCLINED STAIRS

623.3 GATES

623.4 PIER TO VESSEL INTERFACE

625 WINDOWS

625.1 PILOTHOUSE WINDOWS

625.2 MAIN DECK WINDOWS

625.3 HEAD WINDOWS

631 PAINTING

631.1 GENERAL

631.2 EXTERIOR

631.3 INTERIOR

631.4 PAINTING AND STYLING SCHEMES

633 CATHODIC PROTECTION

634 INTERIOR DECK COVERINGS

634.1 MAIN DECK

634.2 ENTRANCE MATTING

634.3 PILOTHOUSE INTERIOR

634.4 SAFETY MATTING

644 SANITARY SYSTEM, SPACES AND FIXTURES

644.1 PASSENGER HEADS

645 PASSENGER SPACES

645.1 GENERAL

645.2 MAIN DECK PASSENGER SPACE

645.3 UPPER DECK

646 PILOTHOUSE SPACE

646.1 PILOTHOUSE CONSOLE MOCK UP [CDRL 645-2]

651 COMMISSARY SPACE

654 UTILITY SPACES

671 LUGGAGE STOWAGE

672 TICKET COUNTER

673 BICYCLE RACKS

900. TESTS, INSPECTIONS, TRIALS & SERVICES

901 IN-PROCESS INSPECTIONS

901.1 GENERAL

901.2 SCHEDULING & ATTENDANCE

901.3 PREPARATIONS

901.4 REQUIRED INSPECTION POINTS

901.5 RE-INSPECTIONS

vi

902 FIRST ARTICLE INSPECTIONS

981 SURVEY & MEASUREMENT

982 TRIALS - GENERAL

982.1 GENERAL

982.2 TEST & INSPECTION PLAN

982.3 TEST PROCEDURES

982.4 TEST AND INSPECTION REPORTS

983 FUNCTIONAL TESTS (SUPPORTED AND APPROVED BY VENDOR REPRESENTATIVES)

984 DOCK TRIALS

984.1 GENERAL

984.2 REQUIRED DOCK TRIALS

985 Sea Trials

985.1 GENERAL

985.2 SCHEDULING & ATTENDANCE

985.3 ATTENDEES

985.4 SEA TRIAL LOCATION

985.5 SEA TRIAL DEADWEIGHT

985.6 SEA TRIAL VESSEL & AMBIENT CONDITIONS

985.7. REQUIRED SEA TRIALS

986 POST-DELIVERY TRIALS IN OWNER’S VENUE

986.1 BOARDING & DEBARKING/DOCK INTERFACE

986.2 NEW TO ZONE USCG SECTOR INSPECTION

987 DELIVERY

988 CERTIFICATIONS, REGISTRATIONS, AND OTHER REQUIRED DOCUMENTATION OR APPROVALS

994 CLEANING

997 DRYDOCKING

- SECTION NUMBERING CONFORMS TO THE STANDARD SHIP WORK BREAKDOWN STRUCTURE “SWBS” SYSTEM -

000: GENERAL PROVISIONS

001 INTRODUCTION AND GENERAL SCOPE

These SPECIFICATIONS are performance based and provide details of an RFP for the

Design/Build of one, 28-knot (at full load capacity and 85% power), catamaran ferry for use in commuter service between the City of Lynn and Boston for the City of Lynn, hereinafter referenced in these specifications as the OWNER. The vessel shall be designed and constructed to be fully capable in all respects of providing reliable, year-round service on the Lynn, MA to downtown Boston, MA route, and to be fully capable of providing seasonal service out to 20 miles from a safe harbor of refuge (Limited Coastwise).

The vessel shall have four (4) resiliently mounted diesel engines that meet all applicable

Environmental Protection Agency (EPA) Emission Standards for newly manufactured marine engines of their class at such time that the construction of the vessel commences (in conformance with EPA Emissions Standards “keel laying” requirements); four (4) waterjets; and two auxiliary generators. The vessel shall conform to all of the regulations that apply to a 46 CFR Subchapter

“T” Passenger Vessel with a Gross Regulatory Tonnage not to exceed 100GT (Gross Tons).

The vessel’s construction and service life shall comply with Federal Transit Administration (FTA) funding requirements. The Minimum Service Life of this vessel shall be (25) twenty-five years, as detailed in the latest version of FTA circulars 4220.1 and 5010.1. The CONTRACTOR is to comply with the provisions of the FTA Buy America requirements, where applicable, and as detailed in the Terms and Conditions.

References to particular manufacturers, vendors, or products are NOT to be interpreted as an endorsement by the OWNER. Such references are provided for information and guidance as to products which will be suitable, and to assist the CONTRACTOR in assessing and meeting the material and operational requirements of the proposed vessel. The CONTRACTOR shall make all reasonable efforts to select products and components for use in the vessel that would be expected to be supported by their manufacturers for ten (10) years after the date of vessel acceptance. Should this not be possible, as in the case of software, or should a part for which there is no competitive equivalent available in the market place become unavailable through the

CONTRACTOR during that time period, the CONTRACTOR agrees to assist the OWNER with drawings and specifications to facilitate component procurement by the OWNER when necessary.

The CONTRACTOR shall deliver the vessel to the OWNER at a facility designated, which will be located in the greater Boston, MA harbor or Lynn, MA. Upon delivery, all vessel systems shall be in operation, and ready for service. The CONTRACTOR shall assist the OWNER in obtaining a valid USCG Certificate of Inspection.

002 GLOSSARY

002.1 ABBREVIATIONS

As used throughout these Specifications, the following partial list of terms and abbreviations shall have the meanings stated:

ABS American Bureau of Shipping (classification society)

ADA Americans with Disabilities Act

AIS Automatic Identification System

ANSI American National Standards Institute

ASME American Society of Mechanical Engineers

ASTM American Society of Testing and Materials

CCTV Closed Circuit TV

CDRL Contract Deliverable Requirements List

CFR Code of Federal Regulations

CHT Sewage Tank “Collection & Holding Tank”

CMR Code of Massachusetts Regulations

. COI Certificate of Inspection

COLREGS Navigation Rules of the Road

CONTRACTOR (same as YARD or SHIPYARD)

CONTRACT Construction Contract between OWNER and the CONTRACTOR.

The Contract shall include these Specifications and Addendums

CuNi Copper Nickel Alloy

CRES Stainless Steel (SST)

DFT Dry Film Thickness

DGPS Differential Global Positioning System

DNV Det Norske Veritas (classification society)

DOJ U.S. Dept. of Justice

DOT U.S. Dept. of Transportation

DVTP Design Verification Test Procedure

DWG Contract Drawing

ECM Engine Control Module

EDM Electronic Display Module

E-LIGHT Light on Emergency Lighting Circuit

EPA Environmental Protection Agency

EPIRB Emergency Position Indicating Radio Beacon

ER Engine Room

FAI First Article Inspection

FCC Federal Communications Commission

FMEA Failure Mode Effects Analysis

FO Fuel Oil (in US gallons)

FRP Fiber Reinforced Plastic

FTA Federal Transit Administration

FW Freshwater (in US gallons)

GPM Gallons per Minute

HP Horsepower

HVAC Heating, Ventilation, and Air Conditioning

IBA Inflatable Buoyant Apparatus

IEEE Institute of Electrical & Electronics Engineers

IES Illumination Engineering Society

ITC International Tonnage Commission

JCM Jet Control Module

JR Jet Room

LCG Longitudinal Center of Gravity

LRU Lowest Replaceable Unit – a modular component that is designed to be replaced in the field by swapping out with another identical unit.

This is the lowest level of component that would be removed in regular maintenance, with any repair thereof performed elsewhere.

LT Long Ton - 2240 pounds

OWNER Owner, Lynn/MassDOT

MAAB Massachusetts Architectural Access Board

MARPOL International Convention for Prevention of Pollution from Ships

MassDOT Massachusetts Department of Transportation

ME Main Engine

MIG Metal Inert Gas (Welding)

MSO Marine Safety Office, USCG

MSC Marine Safety Center, USCG (Washington, DC)

NEMA National Electrical Manufacturer’s Association

NIST National Institute of Standards & Technology

NTP Notice to Proceed

NUC Not Under Command

NVIC Navigation and Vessel Inspection Circular

OCMI Officer in Charge of Marine Inspection

OF or OFE “Owner Furnished” or “Owner Furnished Equipment”

OREP Owner’s Representative

OWNER City of Lynn, Massachusetts)

P Port

P&S Port and Starboard

PFD Personal Flotation Device

PLC Programmable Logic Controllers

POC Point of Contact

PSTP Periodic Safety Test Procedure

PTU Portable Test Unit

PVAG Passenger Vessel Accessibility Guidelines 2013

QA Quality Assurance

QAWT Quick Acting Watertight

QMS Quality Management System

RFP Request for Proposal

S Starboard

SEAL WELD Structure which is double continuously welded

SHIPYARD CONTRACTOR or YARD

SNAME Society of Naval Architects & Marine Engineers

SST Stainless Steel (CRES)

SW Saltwater

SWBS Ship Work Breakdown Structure (numbering system)

TIG Tungsten Inert Gas (Welding)

TLI Tank Level Indicator

TWIC Transportation Workers Identity Card

UL Underwriters Laboratories

USAB United States Access Board

USCG United States Coast Guard

USCG/MSC United States Coast Guard Marine Safety Center (Washington DC)

USG U.S. Gallons

USPHS United States Public Health Service

UV Ultra-violet

VCG Vertical center of gravity

VESSEL Ship under contract

VMS Variable Message Sign

WTD Watertight Door(s)

YARD Contracting Shipyard (same as CONTRACTOR)

002.2 EXPANDED DEFINITIONS

002.2.1 CONTRACTOR-FURNISHED EQUIPMENT

Unless otherwise stated, the terms “provide,” “supply,” “install,” and other similar terms, as related to the CONTRACTOR, shall be understood to mean that the

CONTRACTOR is responsible for purchasing, integrating, installing, and warranting the associated piece of equipment or system in working condition. This includes all associated wiring, piping, and other connections, as well as consumables such as fluids, necessary for the proper functioning of the equipment or system.

For example: floodlights or navigation lights that are to be “provided” and “installed” will be purchased by the CONTRACTOR, installed with foundations, wired, powered, switched, and tested complete. This includes any necessary integration with other systems and consideration of interference and other effects on the vessel. The lights, and all associated parts required for the proper installation and operation of the lights

(excluding consumables) will also be warranted per the requirements of these

SPECIFICATIONS. If cable is required to bring power to that light, the cable shall be provided, integrated, installed and warranted as part and parcel of the light installation. If a kick-pipe is required, that kick-pipe shall be part of the installation.

002.2.2 OWNER-FURNISHED EQUIPMENT

All equipment herein specified as OWNER-furnished (OFE) is to be installed by the

YARD in such condition that it is completely operational and serviceable under normal conditions of vessel operations. Such installations are to adhere to all applicable specifications of regulatory agencies, and are to be to the satisfaction of the OWNER.

This includes, but is not limited to, the following:

a. Time and materials for assembly

b. Time and materials for positioning and proper securing

c. Time and materials for connections of piping, wiring, etc.

d. Time and materials for operational testing

OFE equipment, when specified, shall be new equipment in current production. It shall be supplied to the CONTRACTOR with installation instructions, vendor references, and vendor POC. All equipment, which is NOT herein specified as OFE, shall be CONTRACTOR furnished.

With the exception of purchasing the equipment, all other CONTRACTOR responsibilities for CONTRACTOR furnished equipment apply for OFE equipment.

002.2.3 GOOD SHIPBUILDING PRACTICE

The term "good shipbuilding practice" means construction practices which are in accordance with soundly engineered and detailed drawings, approved by the OWNER and USCG. These drawings are to meet the requirements contained within these

SPECIFICATIONS. Construction and testing shall conform to regulatory agency and industry accepted standards, so as to ensure that each vessel will meet the general and particular design requirements.

002.2.4 MINIMUM SERVICE LIFE/USEFUL LIFE

As a Federally funded procurement, the vessel supplied under this contract must be designed and built to meet the FTA’s defined minimum service life of 25 years for passenger ferry vessels. Per FTA Circular 5010-1, the service life – also called useful life – is defined as, “The expected lifetime of project property, or other acceptable period of use in service.”

002.2.5 SOLE SOURCE/BID SUBSTITUTIONS

Trade names and/or manufacturers’ names and part numbers shown throughout this specification are not “sole source” items, unless expressly stated in these

SPECIFICATIONS. The items specified in the opinion of the OWNER will meet the operating requirements of reliability, maintainability, life expectancy and interchangeability.

The CONTRACTOR is responsible for selecting equipment to provide a fully functional, integrated vessel and equipment, meeting all regulatory requirements and the performance criteria in these SPECIFICATIONS. The CONTRACTOR is permitted to submit bids containing substitutions (“or equals”), as long as such substitutions are clearly stated and detailed. Any substitution must be equal to the specified model, must be sufficiently documented to prove quality, and must meet the performance requirements of each vessel.

The CONTRACTOR is responsible for all additional costs associated with proposed substitutions including, but not limited to, required engineering expenses, and modifications to foundations, connection sizes, electrical interfaces, etc. which will render the substitution fully compatible with other installed equipment. In this regard, the SPECIFICATIONS herein are guidelines for minimum performance requirements.

If those SPECIFICATIONS are not offered by a particular manufacturer, product, or model, the CONTRACTOR will be expected to include a separate list of all discrepancies. Substituted manufacturers, products, or models will not be considered unless they have been demonstrated to be equal to or exceeding the quality, durability and design and the minimum performance functions of the specified equipment. Any proposed substitution must conform substantially to the specified requirements for the machinery and/or equipment, including manufacturer’s product support for (10) ten years.

Where the CONTRACTOR desires to provide substitute equipment or components for those specified in these SPECIFICATIONS, the DRAWINGS, or the

CONTRACTOR’s Proposal, the CONTRACTOR shall present, for the OWNER's review and approval, written documentation that the equipment and/or components proposed qualify as equal to those specified, and that spare parts and service for them are readily available.

Proposed substitutions shall not adversely affect any other component or system in the vessel; adversely affect the vessel's total performance; or relieve the CONTRACTOR from any obligation related to performance, warranty, etc. Any proposed substitution shall function as effectively as the equipment specified, with no increase in required maintenance or need for premature replacement.

002.2.6IN-PROGRESS SUBSTITUTIONS

It is the intent of these SPECIFICATIONS that all equipment shall be provided as specified herein. Substitutions shall be considered on a "case by case" basis upon timely written notice from the CONTRACTOR to the OWNER; or, in the case of the

OWNER’s generated substitution, upon timely written notice from the OWNER to the

CONTRACTOR. Such written notice shall include written documentation that the equipment and/or components proposed qualify as equal to those specified and that spare parts and service for them are readily available. The OWNER or

CONTRACTOR is under no obligation to accept substitutions by either party of any materials or equipment unless this written process is adhered to and both have signed off in agreement. The OWNER has the final decision concerning the acceptance of substitutions.

002.2.7 SUBSTITUTION CHECK LIST

The following items should be considered, and documented as part of the written substitution request, when bidding substitutions or proposing in-progress substitutions. Particular attention shall be paid to quality, reliability, performance, maintenance requirements, technical support and safety.

1. Functionality:

Functional characteristics

Electrical characteristics

Capacities (GPM, pressure, volume, wattage, HP, etc.)

2. Performance:

Industry performance

Rate service duty life

Reliability in similar applications

3. Quality:

Quality of fabrication, welding, and construction details

Materials of Construction (high quality marine grade)

4. Maintenance

Maintenance life cycle

Ease of maintenance

Manufacturer’s ability to support

5. Standards & Regulations:

Regulatory Body approval

Constructed to recognized standards (UL, IEEE, ANSI, ASTM, etc.)

Effect on vessel’s compliance with FTA Buy America

6. Safety Features

7. Form:

Conformance to salient features

Dimensional characteristics

Weight

003 REGULATIONS, DOCUMENTATION, CERTIFICATION

003.1 COMPLIANCE

The vessel, as delivered, shall comply with the requirements of applicable Local, State and

Federal Regulatory Agencies. These shall include, but shall not be limited to:

USCG: 46 CFR Subchapter “T” & “S” Passenger Vessel (Limited Coastwise)

Buy America clauses, as detailed in the Terms and Conditions

USPHS: Publication No.393, "Handbook on Sanitation of Vessel Construction"

USCG: International Rules of the Road (COLREGS)

Institute of Electrical & Electronics Engineers Standards #45 (IEEE)

Federal Communications Commission (FCC)

United States Access Board (USAB) (PVAG) Revised Draft Passenger Vessel

Accessibility Guidelines, as published in the Federal Register on June 25, 2013, USDOT

49 CFR Parts 39, Transportation for Individuals with Disabilities: Passenger Vessels. All interior passenger elements not specifically addressed by PVAG, shall conform with US

DOT 49 CFR Part 37 (and Subpart C) as well as 49 CFR Part 39.

If a conflict exists between State and Federal accessibility requirement/code the more stringent code must be followed. In addition, all design elements shall comply with the minimum

Federal requirements/code even if a State requirement/code is less stringent. The

CONTRACTOR is responsible for ensuring compliance with all applicable regulations. Any error or omission in these SPECIFICATIONS shall not relieve the CONTRACTOR from this obligation, and the obligation to immediately bring all discrepancies to the attention of the

OWNER.

003.2 DOCUMENTATION

All necessary certifications and/or documents covering the approval of, and indicating compliance with, applicable regulations shall be obtained by the CONTRACTOR and supplied to the OWNER. The OWNER shall provide the CONTRACTOR, in writing, the vessel names, Port of Documentation, and company name upon the CONTRACTOR’s request to complete the Application for Initial Documentation (CG-1258) and the application for an

Official Number. It is the OWNER's responsibility to provide the CONTRACTOR with a receipt for documents received and to retain these documents for presentation to Regulatory inspectors as and when required. When the OWNER receives the Bill of Sale and Builder’s

Certificate, the OWNER shall be responsible for obtaining the final Certificate of

Documentation.

003.3 CERTIFICATION

The vessel will be designed, constructed, and outfitted to meet the regulations of 46 CFR

Subchapter “T” Small Passenger Vessels (under 100 GT). It shall be certified for “Limited

Coastwise” and “Cold Water” service. The OWNER is responsible to notify the

CONTRACTOR of any special USCG requirements or mandates which shall be imposed by the USCG Local OCMI in the OWNER’s operating venue. A notification of any such requirement shall be made prior to Contract Award.

The CONTRACTOR is responsible for providing a vessel that will meet all requirements to receive the necessary certifications, including those obtained by the CONTRACTOR and by the OWNER. This includes, but is not limited to:

Stability Letter

Certificate of Inspection

FCC Documents

Fire Safety Instructions

Compass Deviation Card

MARPOL placard

Emergency Evacuation Plan

The latest amendments to all laws, regulations, rules and conventions, which are in force at the time of Contract Award, are to be considered as part of the Contract. Any amendment to such requirements or any new laws, regulations, rules or conventions that come into force after

Contract Award, shall be treated as a change to the CONTRACT, if not otherwise covered by these SPECIFICATIONS.

003.3.1 CERTIFICATION DISPLAY CASES

The CONTRACTOR shall provide and install on the vessel: two (2) OWNER-approved, aluminum, Plexi-glass front cases with hinged door(s) and lock provided.

One shall be installed in the pilothouse, and one in the passenger space, in OWNER-approved locations for display of the following documents:

Pilothouse:

Stability Letter

FCC Documents

Compass Deviation Card

MARPOL placard

Passenger Space:

Certificate of Inspection

Fire Safety Instructions

Emergency Evacuation Plan

Operator’s Licenses

003.3.2 CONTRACTOR-SUPPLIED CERTIFICATIONS

At delivery of the vessel, the CONTRACTOR shall provide the OWNER with the following documentation, posted in the certification display cases:

Stability Letter [CDRL 6-1]

FCC Documents [CDRL 6-2]

Fire Safety Instructions [CDRL6-3]

Compass Deviation Card [CDRL 6-4]

MARPOL placard [CDRL 6-5]

Emergency Evacuation Plan [CDRL 6-6]

004 GENERAL SPECIFICATION REQUIREMENTS

004.1 GENERAL

These TECHNICAL SPECIFICATIONS (“SPECIFICATIONS”) provide details of a Request for Proposal (RFP) for the design/build and delivery of a high-speed catamaran ferry. The vessel shall have resiliently mounted diesel engines that meet all applicable EPA Emission

Standards for newly manufactured Marine Engines of their class (in conformance with EPA

Emissions Standards “keel laying” requirements); waterjet propulsion systems;

reverse/reduction gears, and two auxiliary generators. The vessel shall conform to all of the regulations that apply to a 46 CFR Subchapter “T” Passenger Vessel with a Gross Regulatory

Tonnage not to exceed 100 GT. The vessels shall be designed and certified for “Limited

Coastwise” and “Cold Water” service. The vessel shall comply with the requirements of Buy

America, as detailed in the Terms and Conditions.

These SPECIFICATIONS are intended to give the CONTRACTOR all necessary information for the completion and submittal to the OWNER of a Design/Build Proposal. The submitted

Design/Build Proposal shall provide for delivery to the OWNER of one completely constructed, outfitted, integrated, seaworthy, and operational vessel that meets all applicable requirements of the applicable CFRs, pertinent regulatory bodies, and these

SPECIFICATIONS.

004.2 GENERAL VESSEL DESCRIPTION

The vessel described by these SPECIFICATIONS shall be a waterjet drive, diesel propelled, catamaran, Subchapter “T” passenger vessel with an arrangement of accommodations, stores, tanks, machinery, etc. suitable for a commuter service with the characteristics of the Lynn –

Boston service.

A “Z” bow configuration shall be considered to be advantageous; however, proposals are not limited to “Z” bow designs, and Contractor shall propose a bow configuration that is best suited to the Lynn service.

Passenger embarking and debarking shall be provided both over the bow and at side loading stations P&S aft giving access to the interior main deck passenger cabin. The U-shaped dock at the Lynn Terminal has a length of 60-70 feet along the sides, meaning that any side loading of the vessel would have to be positioned within the front 60-70 feet of the vessel. There are currently no provisions for bow loading at the Lynn Terminal.

Bow loading terminals are equipped with floating piers and are intended to be used with minimal height differential from dock surface to vessel deck. CONTRACTOR shall indicate in their proposal how their design will provide boarding and alighting over the bow without the use of stairs. Side loading terminals are equipped with floating piers that may require pier side modifications to meet ADA requirements. It is the responsibility of the CONTRACTOR to maintain open communication with the OWNER as to the details of bow and side loading requirements so that the vessels are outfitted to mate with pier structures and ramps in conformance with ADA regulations and the OWNER’s operational requirements.

004.3 GENERAL CHARACTERISTICS

CONTRACTOR shall be responsible for designing a vessel that is suitable for year round commuter service from Lynn to Boston. It must be suitable for use at major docks in the

Boston Harbor area, including Long Wharf, Rowes Wharf, Fan Pier, World Trade Center, and

Logan Airport as well as at Lynn’s Blossom Street Dock. While the final dimensions of the vessel shall be determined by the CONTRACTOR’s design, estimated approximate dimensions and characteristics are as follows:

Maximum Length Overall (approximate) 29 meters (95 feet)

Maximum Beam Overall (approximate) 10.4 meters (34 feet)

Maximum Draft (approximate) 1.5 meters (4.9 feet)

Top Speed: The vessel shall achieve a Trial Speed of

30 knots while carrying the Sea Trial

Deadweight detailed in Section 982.

Service Speed: 28 knots at 85% power while carrying the Sea Trial Deadweight detailed in

Section 982

Tank volumes for potable water, sewage and fuel oil shall be designed such that servicing is required no more frequently than once per day. This shall assume a maximum service day of

18 hours and 10 round trips between Lynn and Boston.

004.4 PVAG REQUIREMENTS

The vessel shall comply with all applicable accessibility laws and regulations applicable at the time of submission of proposal by the CONTRACTOR, including requirements documented in the United States Access Board (USAB) Draft Passenger Accessibility

Guidelines (PVAG) as published in the Federal Register on June 25, 2013, United States

Department of Justice (DOJ), United States Department of Transportation (DOT), Federal

Transit Administration (FTA), and Massachusetts Architectural Access Board (MAAB).

Within ninety (90) days of NTP, CONTRACTOR shall submit to OWNER for approval, arrangement drawings to demonstrate compliance with ADA requirements [CDRL 4-1].

PVAG Guideline references are provided in the following paragraphs for general guidance only. It shall be the CONTRACTOR’s responsibility to carefully review the applicability of all USAB PVAG 2013 Guidelines in respect to their proposed vessel design and to design in accordance with all applicable Sections.

ADA passenger access (PVAG Section V206) is mandatory from the main deck bow loading area and main deck side loading areas, port and starboard, to all areas of the main deck passenger spaces, including the commissary counter, ADA-accessible passenger head, aisles between seating and table sections, luggage stowage racks, etc. Accessible ADA seating, which is comparable to the exterior passenger seating available on the upper deck, shall be made available on the main deck. Aisle widths, wheelchair turning radii, table and seating configuration and construction, thresholds, door forces, etc. shall be carefully adhered to

(PVAG Sections V221 & V802).

The ADA passenger head shall be fully accessible in all respects, including, but not limited to door width and force, turning radii, toilet configuration, transfer bars, sink, mirror, towel and tissue dispensers, and baby changing table (PVAG Sections V213 & V603, V604, V606, V609).

The commissary counter shall be fully accessible (PVAG Sections V227, V308, V904).

OWNER-approved, raised text/Braille signage shall be provided for all passenger accessible spaces, do not enter rooms/areas, etc. (PVAG Sections V216, V703). All communication equipment shall be designed and operated to ensure customer service information is broadcast in dual-mode (audibly and visually) (PVAG Sections V219, V706).

All interior passenger elements not specifically addressed by PVAG, shall conform with US

DOT 49 CFR Part 37 (and Subpart C) as well as 49 CFR Part 39.

ADA Passenger Vessel Accessibility Guidelines can be viewed at:

http://www.federalregister.gov/articles/2013/06/25/2013-14367/passenger-vessels-accessibility-guidelines

The vessel design shall adequately address the requirements of PVAG Section V206 and all other applicable sections. The vessel design will provide for passenger boarding and http://www.federalregister.gov/articles/ debarking on the main deck only. It is anticipated that the design will not provide ADA access to the upper deck. The design, however, will provide for open deck passenger access on the upper deck. Therefore, a comparable open deck area must be provided for ADA access on the main deck. (Note PVAG Section V206.2.1 and applicable exceptions in sub-sections).

These SPECIFICATIONS interpret PVAG 2013 Section V206.1 as:

1. If a non-disabled passenger can access an open deck area, a disabled passenger must also be provided access to an open deck area that provides an equivalent experience.

2. If an open deck area is provided on the upper deck that is not accessible, an open deck area providing a reasonably similar experience shall be provided on the main deck.

3. If an open deck area is provided on the upper deck that provides wind screens and/or protection from the elements and/or vessel spray and is not accessible, an open deck area providing reasonably similar wind screens and/or protection from the elements and/or vessel spray shall be provided on the main deck.

4. CONTRACTOR’s design shall be subject to OWNER approval.

004.5 CONTRACTOR'S OBLIGATION

The CONTRACTOR is to provide all plant infrastructure, labor, and transportation for shipyard employees. The CONTRACTOR is responsible for vessel supplies as required during construction, tests and trials, and delivery, including, but not limited to: Fuel oil, lube oil, potable water, cooling system additives, filter cartridges, power, lighting, pressurized air, crane and forklift services, shipyard communications, line handling, wharfage, towing and shifting services. This obligation shall include equipment and power services to prevent cold weather freeze up, as well as adequate hot weather ventilation. This obligation encompasses all requirements of vessel deliveries as detailed in Section 983.

004.6 MANUFACTURERS' REPRESENTATIVES

Whether or not it is specifically stated in these SPECIFICATIONS, when it is required by the equipment manufacturer; by the specialized technical nature of the installation; for warranty purposes; or when work is outside the normal scope of the CONTRACTOR’s work force; the

CONTRACTOR is to provide the services of manufacturers' representatives. All

Manufacturer Rep services shall be at the CONTRACTOR’s cost. Assistance and expertise as is required for proper installation, on-line testing, calibration, adjustments, etc. shall receive certified Technical Support at the CONTRACTOR’s expense. At a minimum, manufacturers’ representatives shall be employed for supervision of the installation and testing of main engines, reduction gears, waterjets, generators, control systems, switchboards, and navigational electronics.

005 CORRESPONDENCE & COMMUNICATIONS

The CONTRACTOR shall provide the OWNER with a copy of all communications relating to vessel construction which the CONTRACTOR has with regulatory bodies, in particular, the USCG

Marine Safety Center (USCG/MSC) Washington, and the Local OCMI.

The CONTRACTOR shall invite the OWNER to be present during all discussions which relate to the vessel’s construction and operation which are held with the attending USCG Inspectors or other representatives of the Local OCMI.

These documents and discussions shall include, but are not limited to, the design, construction of modules, installation of equipment and machinery, testing, sea trials, delivery, and operation of the vessels.

Requirements for planning, scheduling, drawings, material specifications, instruction manuals, etc.

are detailed herein. The CONTRACTOR shall submit proposed Drawing, Correspondence, and

Communication Procedures to the OWNER for approval within 30 days after Contract Award

[CDRL 5-1].

006 DOCUMENTATION

The CONTRACTOR shall submit Proposal Drawings as an integral part of their response to the

RFP. As the design is developed, the CONTRACTOR shall submit Contract Drawings to the

OWNER for review, comments, and approval per the drawing review process described in Section

007. It is also the CONTRACTOR’s responsibility to submit drawings, as required, to the USCG

Marine Safety Center (USCG/MSC) Washington (and subsequently to the Local OCMI when directed by USCG/MSC) for review, comments, and/or approval.

006.1 PROPOSAL DRAWINGS

The CONTRACTOR’s response to the RFP shall include a Proposal Drawing Package as described in the Contract Terms & Conditions.

006.2 CONTRACT DRAWINGS

CONTRACTOR shall be responsible for preparation of standard drawing sheets with borders and title and application blocks. All drawings must be of a quality consistent with industry best practice.

All drawings shall be prepared on the OWNER's standard size sheets or as mutually agreed to by OWNER and CONTRACTOR.

All drawings shall include:

Title Blocks - All drawings shall utilize the CONTRACTOR’s standard title block in the lower right corner and the OWNER's standard application block in the upper right corner.

The OWNER has the option to add a logo beside the CONTRACTOR’s title block.

Unique Drawing Number - Drawing numbers shall include the CONTRACTOR’s assigned vessel job number, and an individual drawing designation.

Revision Level – Each drawing shall include a revision level. With each released revision of the drawing, its revision level shall increase.

Bill of Materials - All drawings shall include a Bill of Material with a numbering system for easy identification on the drawing. Bills of Material shall be carried on the drawings, or on attached sheets of the same size which shall bear the drawing number.

Piece part and assembly weights.

US equivalent materials.

Dimensions – shown in both English and metric units

English units shall be shown consistently on all drawings in either inches and fractions, or inches and decimals. Decimals shall be shown with maximum of three significant figures to the right of the decimal point as required. A one-inch mark (") shall be shown to the right of each English unit dimension.

Metric units shall be shown as millimeters and decimals. Millimeter units shall be accompanied by one blank space and the letters "mm" to the right of the figures.

Dimensions shall be shown in one of the following forms:

i. English dimensions followed by metric dimensions, enclosed in parentheses.

ii. Where longitudinal space is limited, English dimensions shall be shown as the numerators, and metric dimensions in parentheses shall be shown as the denominators, in fractional format.

iii. Where longitudinal and vertical space is limited, English dimensions only, or no dimensions, and a distinctive symbol shall be shown on the view or detail, and metric dimensions shall be shown by a key on the bottom edge of the drawing.

iv. CONTRACTOR’s standard format, if approved by the OWNER.

006.3 REQUIRED DRAWINGS AND DOCUMENTS

The detail and extent of the Contract Drawing package shall be determined by the

CONTRACTOR; however, the Contract Drawing package must include all drawings and calculation documents as required by USCG Marine Safety Center, and include at a minimum, drawings and calculations addressing the following titles. The OWNER’s primary purpose for this review of the design information, drawings, documents and data are to determine whether the requirements of this specification have been met, and the suitability of the design for its intended purpose.

The CONTRACTOR shall submit to the OWNER within 30 days of NTP, a master list of all contract drawings and documents indicating the title and revision of each, an updated version of this document shall be submitted to the OWNER monthly [CDRL6-1]:

1. General Arrangements

2. Emergency Evacuation Plan

3. Fire/Safety Plan

4. Outboard Profile

5. Tank Capacity Plan

6. Tonnage Plan & Calculations

7. Performance Calculations

8. Weight Estimate

9. Stability Calculations

10. Intact & Damaged Stability Analysis

11. Structural Drawings & Calculations

12. Machinery & Equipment Foundations

13. Hull Drawings

14. HVAC Systems & Calculations

15. Seachests

16. Ladders & Gratings

17. Rails & Bulwarks

18. Cathodic Protection

19. Doors, Hatches, Windows, Manholes

20. Superstructure

21. Mooring & Anchoring

22. Tankage Plan

23. Machinery Arrangements

24. Sea Water Systems

25. Fresh Water System

26. Sanitary System

27. Fuel Oil System

28. Lube Oil System

29. Deck Drains

30. Vents, Fills, Sounds

31. Waterjet Installations

32. Bilge System

33. Fire Main System

34. Lighting and Receptacle Plan

35. Electronic Controls

36. Main & Generator Starting Systems

37. Navigation & Communications Systems

38. Ventilation Systems

39. Shore Power

40. AC Electrical Load Analysis

41. DC Electrical Load Analysis

42. Commissary – Electrical

43. Machinery Miscellaneous

44. AC One-line Diagram

45. DC One-line Diagram

46. FMEA or USCG approved equal

47. DVTP or USCG approved equal

48. PSTP or USCG approved equal

49. Sanitary spaces

50. Accessible and Priority Seating Areas

51. Counters & Commissary

52. Boarding & debarking areas, bridging mechanisms

53. Coamings and drainage

54. Passenger Seating Arrangement

55. Switchboard Arrangement

56. Signage

006.4 INTERFERENCE & ACCESS

The elimination of all equipment interference; and the location of machinery, pumps, piping, wiring, ductwork and miscellaneous equipment; to allow proper access for operation and maintenance, is the CONTRACTOR’s responsibility. It is essential that the CONTRACTOR is aware of this obligation. The CONTRACTOR is responsible for ensuring that all installations are arranged and constructed using "good shipbuilding practice" and that they adhere to the requirements of the CFR. The CONTRACTOR and the OWNER are mutually responsible for the maintenance of ongoing communications, inspections, and approvals during construction.

A maintainability demonstration shall be required per Section 011.6 Maintainability

Demonstration.

006.5 ENGINEERING

The CONTRACTOR is responsible to provide competent and professional construction, engineering and design support to construct the vessel.

Notwithstanding any requirements of these SPECIFICATIONS, it shall be the

CONTRACTOR’s sole responsibility to determine and develop working drawings, which shall be necessary to complete the construction and delivery of the vessel. Working drawings shall be made available for timely inspection, comments, and approval by the OWNER.

Any construction details that are not shown on the Contract Plans (commonly referred to as

“Working Drawings” or “Yard Sketches”) that shall be required for fabrication and/or construction guidance shall be developed by the CONTRACTOR and shall be approved by the OWNER and, when required, by the USCG.

The CONTRACTOR shall provide sufficient and well-developed details to OWNER prior to the construction of the specific area in question. This requirement is particularly applicable to foundation sketches for all significant pieces of machinery.

When the OWNER grants approval to the CONTRACTOR for installation of a different (or equal) piece of equipment other than specified, per the terms and conditions of Section 0.2.2.5 or 0.2.2.6, the CONTRACTOR shall be responsible to revise any and all drawings, calculations, integration analyses and other documentation associated with the installation of the equipment.

006.5.1 CONTRACTOR’S REPRESENTATIVE (ENGINEERING & DESIGN)

The CONTRACTOR’s proposal, shall designate the individual who will serve as the

CONTRACTOR’s Representative for this Contract. Within ten (10) days of NTP, the

CONTRACTOR shall notify the OWNER of the CONTRACTOR Representative’s contact information [CDRL 6-2]. This individual shall serve as the contact person

(POC) between the OWNER and the CONTRACTOR in matters of engineering and design until another individual is so designated.

006.6 AS-BUILT DRAWINGS

Within 30-days following delivery of the vessel to OWNER, the CONTRACTOR shall provide the OWNER with a full set of “AS-BUILT” drawings, (10) copies in “D” size paper and (10) copies on PDF file CD for that vessel [CDRL6-3]. The OWNER will certify that these As-Built drawings will be used only for purposes of maintenance and repair on the

Contracted vessel as delivered and shall not be made available to other owners, shipyards, or contractors for the construction of subsequent vessels. The “As-Built” drawing package shall be received and approved by the OWNER prior to the release of final contract installment payment monies on the vessel delivered.

006.7 MANUALS AND MAINTENANCE INSTRUCTIONS

No later than 10 days prior to delivery of the vessel to the OWNER, the CONTRACTOR shall provide the OWNER with five (5) copies of all equipment cut sheets, engine and machinery manuals, parts manuals, and equipment information brochures [CDRL 6-4].

A complete set of maintenance instructions specifically prepared for this Contract that are to be incorporated into the Maintenance Instruction Book, including all cut sheets and diagrams, shall be submitted for review by the OWNER no later than thirty (30) days in advance of delivery of the vessel. [CDRL 6-6]

006.8 VESSEL HISTORY BOOKS

The CONTRACTOR shall furnish to the OWNER an 8.5 in. x 11 in. (216 mm x 279 mm) loose-leaf type Vessel History Book for the vessel, the pages of which shall be reproducible by black and white print process. CONTRACTOR shall confer with the OWNER to the format of this book, which shall include, but is not limited to:

1. Vessel Name, Official Number, Hull Number, and other identifying information

2. Equipment serial numbers

3. Tests & Trial reports

4. USCG Marine Safety Center communications

5. USCG Local OCMI communications

6. USCG Inspection reports

7. Regulatory Body reports and certifications

8. QA reports

9. Yard Progress Logs

10. Meeting Minutes

It shall be the responsibility of the CONTRACTOR to employ an acceptable system of configuration control in keeping individual Vessel History Books current throughout the construction and testing process.

The Vessel History Book shall be delivered incorporating serial record data as soon as practical [CDRL 6-7], but no later than prior to the start of the vessel delivery to the OWNER.

006.9 PHOTOGRAPHS

The CONTRACTOR shall provide the OWNER with a photographic record of the construction process for the vessel. General photos of progress shall be taken weekly. Photos of special events shall be taken at the time of the event. All photos shall be placed on CDs in

JPEG format, or another format approved by the OWNER, labeled, and provided to the

OWNER for inclusion in the vessel construction records [CDRL 6-8].

007 DRAWING REVIEW PROCESS

007.1 OVERVIEW

The design of the vessel shall be provided to the OWNER for review and comment through the submittal of design packages (see Section 007.2) in a formal review process.

CONTRACTOR shall develop a design package for each system on the vessel, including, but not limited to those listed in Section 007.2.2.

The review process includes three formal design review phases, listed below. The level of detail required for each design package increases as the design progresses from Conceptual

Design to Final Design.

Conceptual Design Review – provides general overview of the complete vessel and all major systems to form an agreement on the general functional, design and performance requirements within the scope of the contract.

Preliminary Design Review – one for each system or part of the vessel to review the detailed system design and allow for OWNER comment.

Final Design Review – one for each system or part of the vessel to review the detail design that addresses the OWNER’s comments from the Preliminary Design Review.

The OWNER may choose to review design submittals and respond via written correspondence.

However, for more complicated systems, it may be necessary for the CONTRACTOR to participate in design review meetings with the OWNER at which systems and concerns can be discussed in greater detail to resolve issues quickly

007.2 DESIGN PACKAGES

007.2.1 DESIGN PACKAGE CONTENTS

Design packages shall include, at a minimum:

System Functional Description which shall describe the system’s composition, functionality, design criteria, and any other information required to understand the system and its conformance to the OWNER’s specification, including any applicable regulations and standards.

Complete drawings package for the system, meeting the requirements of Section

006.2.

Electrical, pneumatic or other schematics, where applicable.

Calculations and Safety analyses, where applicable.

Any other information necessary to fully convey the concept and details of the design…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .