About this file

This document contains a justification for using other than full and open competition for an acquisition under the simplified acquisition threshold. The justification is for the purchase of 25 disconnect switches from Littelfuse Inc, part number LS7RO5002PS00L, for $1500V DC 500A. The disconnect switch is required by a non-deviational drawing and only Littelfuse Inc is acceptable due to being the original equipment manufacturer. Using an alternative part would require permission from the contracted design agency, which can take between 6 months to a year to receive approval, and additional time would be needed to update technical documentation if approved. Pursuing competition would not result in significant cost savings due to the administrative efforts and time required. The related solicitation is for the same disconnect switches, requests quotes by February 11, 2024, and is a 100% small business set-aside conducted by the Department of the Navy Naval Sea Systems Command.

View the file

Other files for this federal contract opportunity

Other files attached to Disconnect Switches, newest first.
File Type Posted
24Q0042 Combined Synopsis.pdf PDF
24Q0042 RFQ.pdf PDF
Attachment 1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(This is only applicable to acquisitions under the Simplified Acquisition Threshold. Acquisition using FAR Subpart 13.5 shall follow the special documentation requirements at FAR 13.501.)

USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION

UNDER THE SIMPLIFIED ACQUISITION THRESHOLD

I. BACKGROUND:

1. FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contracting Officers may solicit from one source if the Contracting Officer determines that the circumstances of the contract action deem only one source reasonably available (e.g., urgency, exclusive licensing agreements, brand-name or industrial mobilization).

2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition, as only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.

II. DESCRIPTION OF ITEM OR SERVICE:

JML DOC #: 3289V302 QUANTITY: 25 EACH

DISCONNECT SWITCH: 1500VDC 500A DC DISCONNECT SWITCH, LITTLE FUSE

COMPANY P/N LS7RO5002PS00L.

III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN

COMPETITION IS BASED ON THE FOLLOWING (select all that apply):

A. ___ ONLY ONE RESPONSIBLE SOURCE (select all that apply):

1. ___ RESTRICTIVE RIGHTS. The source has established proprietary rights, limited rights in data, patent rights, copyrights or secret processes in the item or service required.

Explain what rights are restricted, why the restrictive rights make the required item or service available from only one source, and why another company could not satisfy the Government’s need.

2. ___ EXCLUSIVE LICENSING AGREEMENTS. The item or service is only available from the Original Equipment Manufacturer (OEM), or there is only one authorized distributor or technical representative for the OEM.

Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.

OR

Identify the distributor(s)/authorized technical representative(s) for the item or service. Provide evidence of the exclusive licensing agreement as an attachment to this document. NOTE: If there is more than one distributor/authorized technical representative for an OEM part, then Part B, BRAND NAME SOLE SOURCE, is applicable, and Part A, ONLY ONE RESPONSIBLE SOURCE, should be left blank).

3. ___ OTHER REASONS. Other reason not identified above. Provide details on mission impact if requirement is not solicited from only one source.

B. _X_ BRAND NAME. Item required must be a brand name product, or feature of a product, particular to one manufacturer.

DISCONNECT SWITCH LITTLE FUSE COMPANY P/N LS7RO5002PS00L, IS

REQUIRED BY A NON-DEVEATIONAL DRAWING CED 0021. LITTLE FUSE

COMPANY HAS DISTRIUTORS.

A DIFFERENT PART WOULD REQUIRE THE SHIPYARD TO REQUEST

PERMISSION TO USE THE NEW PART FROM THE CONTRACTED DESIGN

AGENCY (CDA). THE CDA WILL MAKE THE TECHNICAL DECISION IF THE

PART IS INTERCHANGEABLE WITH THE PART LISTED ON THE DRAWING.

THIS PROCEDURE CAN TAKE BETWEEN 6 MONTHS TO A YEAR TO RECEIVE

AN ANSWER. IF THE PART WAS ACCEPTABLE, IT WOULD HAVE TO BE ADDED

INTO CURRENT TECHNICAL DOCUMENTATION AS AN ACCEPTABLE

ALTERNATIVE. THIS PROCESS WOULD TAKE A SIGNIFICANT AMOUNT OF

TIME, ADMINISTRATIVE EFFORTS, AND FINANCIAL IMPACT, NONE OF WHICH

WOULD RESULT IN ANY SIGNIFICANT RELIZED COST SAVINGS THROUGH

COMPETITION.

C. ___UNUSUAL AND COMPELLING URGENCY. The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits bids or proposals.

Urgent requirements are supplies or services that will result in a work stoppage, or are mission critical and the routine processing time would result in injury to the Government. The determination that the procurement for the above item/service is an urgent and compelling requirement is based on the following:

1. Date on which the requirement was first identified:

2. Required delivery date/period of performance:

3. Explanation of why delivery/commencement of services by the date mentioned above is required: Explain the impact to the mission if the date above is not met, any special circumstances or conditions that exist which validate the requirement as “urgent,” estimated production lead time for the item, etc.

4. If appropriate, include any additional pertinent information:

IV. CERTIFICATIONS/APPROVALS:

A. Technical / Requirements Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.