LSJ Redacted.pdf
PDF 985 KB Posted
- Solicitation number
- N3904027Q0008
About this file
This is a Limited Source Justification (LSJ) form used to document the rationale for awarding a contract to a single source rather than conducting full and open competition under simplified acquisition procedures.
The document, revised September 30, 2020, authorizes contracting officers to solicit from one source for purchases not exceeding the Simplified Acquisition Threshold ($350,000) when circumstances justify limited competition. The justification requires technical certification and contracting officer approval before execution. The specific acquisition detailed in this instance involves inspection, structural modification, fabrication, welding, and installation services for an Arctic SUBLAB (Submarine Base) modification project. The work includes structural enhancement, stiffener and gusset fabrication, caster/roller upgrades, dimensional and interface corrections, blast coating per NAVSEA specifications, testing, and impingement services on a rail assembly. The contracting officer determined Swift Powder Coat Inc. as the only responsible source capable of performing the integrated modification without introducing unacceptable technical and schedule risk, citing the firm's certified welders and inspectors, ASTM A36 fabrication capacity, NAVSEA-specified coating capability, and in-house capacity to complete the full race track modification within the required 75-day performance window. Technical certification was provided by Patrick Turner, and contracting officer approval was granted by Lisa Fielding on September 24, 2026.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SAP
Limited Source Justification
Rev 09/30/2020
(This is only applicable to acquisitions under the Simplified Acquisition Threshold )
4. If appropriate, include any additional pertinent information:
IV. CERTIFICATIONS/APPROVALS:
A. Technical / Requirements Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.
Signature Name (Printed) / Phone # Date
B. Contracting Officer Approval:
Signature Name (Printed) / Phone # Date
File details come from the government source that posted it. Updated .