LSJ 23-WEST-09973 Redacted .pdf
PDF 1 MB Posted
- Attached to
- Up to 8 month lease of 36 MFDs
- Solicitation number
- SP7000-23-P-0197
- Issued by
-
Defense Logistics Agency
About this file
This document contains a justification for a sole source contract award. The justification cites exception 6.302-1 for a follow-on acquisition from a previous contract to lease 36 multifunction devices from an incumbent vendor for a period of up to eight months. The Defense Logistics Agency intends to issue solicitation number SP7000-23-P-0197 for this limited competition contract. No market research was conducted due to this being a follow-on acquisition from a prior contract.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. A description of efforts made to ensure that offers are solicited from as many potential sources as is practicable, including whether a notice was or will be publicized as required by Subpart 5.2 and, if not, which exception under 5.202 applies:
6. A description of the market research conducted (see Part 10) and the results or a statement of the reason market research was not conducted:
7. Any other facts supporting the use of other than full and open competition, such as:
Explanation of why technical data packages, specifications, engineering descriptions, statements of work, or purchase descriptions suitable for full and open competition have not been developed or are not available.
When 6.302-1 is cited for follow-on acquisitions as described in 6.302-1(a)(2)(ii), an estimate of the cost to the Government that would be duplicated and how the estimate was derived.
• Include a copy of the previous justification.
• The approval authority shall determine whether the planned actions were completed. If the actions were not completed, the justification for the follow-on acquisition shall be approved by the approval authority one-level above the approval authority for the previous justification (see FAR 6.304). If the previous justification was approved by the Senior Procurement Executive (SPE), the approval remains at the SPE level. DFARS PGI
206.304 (a)(s-70)(ii)
When 6.302-2 is cited, data, estimated cost, or other rationale as to the extent and nature of the harm to the Government.
8. A listing of the sources, if any, that expressed, in writing, an interest in the acquisition (Include the results of the request for information or the sources sought notification in accordance with DFARS PGI 206.302-1 or include the waiver from the HCA or designee):
File details come from the government source that posted it. Updated .