LRS Audiovisual - SOW - 23 July.pdf
PDF 152 KB Posted
- Attached to
- LRS Heritage Room A/V Upgrade
- Solicitation number
- FA462126Q0032
About this file
This is a Statement of Work (SOW) for the installation of an audiovisual system in Building 1169, Room 120 at McConnell Air Force Base, Kansas, dated 23 July 2026.
The contractor must furnish and install a complete audiovisual system with sound support, including a motorized tensioned projection screen (87" x 139", not exceeding 125-150 lbs), high-brightness laser projector (not exceeding 40 lbs), HDMI presentation switcher with signal receiver, network-based AV control processor with integrated DSP, seven-inch touchscreen control panel, wall-mounted control panel, managed PoE network switch, dual-channel wireless microphone system with handheld and bodypack transmitters, lavalier microphone, two-bay battery charging station, two-channel 70V audio power amplifier, pendant ceiling loudspeakers (quantity determined by contractor's professional judgment), and floor-standing stationary equipment rack with associated components. The contractor is responsible for all cabling, conduit work (white conduit required in open ceiling), labor, equipment delivery, assembly, installation, waste disposal, and on-site training. The Government will provide electrical work as specified, power outlets, secure equipment storage, and afford schedule flexibility with coordination required to ensure the space is operational on the last duty day of each month for military ceremonies. The contractor must schedule initial setup and one-day training for up to five personnel within five days of delivery, with a control system programmer on site for programming adjustments. All equipment must comply with DISA requirements and be vetted through the Wing Cyber Security office using the DISA-approved products list. Standard federal contracting requirements apply, including contractor personnel background checks (NCI), base identification and vehicle passes, security compliance, waste disposal off-base, and transfer of all commercial warranties to the Government. Work must be performed during normal duty hours (Monday-Friday, 0800-1600 CST) excluding weekends, Wing down days, and Federal Holidays.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B1169 Lighting Plan.pdf | ||
| B1169 Power Plan.pdf | ||
| Attachment 2 - Photos and Markup of Installation area.pdf | ||
| Solicitation - FA462126Q0032.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
STATEMENT OF WORK
FOR BLDG 1169 AUDIOVISUAL
McConnell AFB, Kansas
23 July 2026
1. DESCRIPTION OF SERVICES.
The purpose of the project is to install audiovisual system, sound support, and provide initial set-up and training in building 1169, room 120. The Contractor shall furnish all the audiovisual system, sound support, and provide initial set-up and training.
2. GOVERNMENT SERVICES PROVIDED.
The Government will provide the following in support of the install:
All required electrical work as stated by the vendor.
Power outlets for the AV rack, projector, and screen.
Storage for equipment: The vendor may ship ahead of time, and the Government can store the equipment securely until installation starts and throughout the install process.
Note on existing infrastructure: There is currently only 1 data drop present, located where the projector projects onto the wall. There is no existing AV equipment or low-voltage cable pathway outlined in the as-builts that requires removal or integration.
3. SCOPE OF WORK.
All equipment will be furnished by the contractor. The Contractor shall furnish the necessary personnel, labor, supervision, material, equipment, tools, transportation, and services to move in the new equipment, and assembly and installation of all components listed on the vendor quotation.
Waste Disposal: The contractor will dispose of all packaging material that accompanies shipment.
Timeline and Scheduling: The Government will afford the contractor maximum schedule flexibility and adequate time as necessary to complete the installation. While the room is utilized on average only 2 to 3 times per month, the contractor must coordinate work to ensure the space is fully operational and available on the last duty day of the month for scheduled military ceremonies.
Parking and Unloading: Accommodations can be made, as necessary. There is a spot in the back of the building that can be utilized for unloading, but after unloading, the vehicle will have to be moved to a regular parking spot.
Equipment Lifts: No lifts will be provided by the Government, but they can be stored in a secure area in the supply warehouse.
Permits and Compliance: Contractor shall keep in effect all necessary permits, licenses, and insurance. All work shall be completed in accordance with all federal, state, and local regulations and the terms and conditions of this Statement of Work (SOW).
4. MINIMUM PROJECT REQUIREMENTS.
The following requirements are the minimum specifications for the project. All quotes must meet or exceed these requirements.
Infrastructure and Cabling Requirements:
Ceiling Construction: The exact rating of the ceiling is unknown, but it is confirmed to support a 125-150lb screen and a 40lb projector.
Conduit: Wires run in the open ceiling must be covered with white conduit.
Network Connectivity: The system will operate as a standalone AV network. Only the laptop will connect to the AV equipment.
Equipment Requirements:
• Motorized tensioned projection screen for large-format presentation display 87" x 139" (must not exceed 125-150lbs)
• High-brightness laser projector for presentation and video content (must not exceed 40lbs)
• Projector lens compatible with the projector
• Heavy-duty ceiling projector mount
• Adjustable projector mount extension column
• Ceiling mounting plate for projector support
• HDMI presentation switcher with integrated signal transmitter
• HDMI signal receiver for connection to the projector
• Network-based AV control processor with integrated DSP
• Seven-inch touchscreen control panel for system operation
• Tabletop stand for touchscreen placement
• Wall-mounted control panel (Quantity: One, placed where the stand is located)
• Managed PoE network switch for AV system devices
• Dual-channel wireless microphone receiver
• Wireless handheld microphone transmitter
• Wireless bodypack microphone transmitter
• Lavalier microphone
• Two-bay battery charging station for wireless microphones
• Two-channel 70V audio power amplifier
• Pendant ceiling loudspeakers for distributed audio coverage. (Quantity: Based on the contractor's professional judgment for the room dimensions, with the minimum requirement just to be able to hear clearly all the way to the back of the room. There are no special acoustic considerations as the area is mostly quiet).
• Floor-standing equipment rack enclosure (Must be stationary, not mobile)
• Rack-mounted single gang device panel
• Rack equipment shelf
• Rack-mounted power distribution unit
• Rack accessory drawer
• Rack blank panels for rack spacing and airflow
Compliance Specifications:
Defense Information Systems Agency (DISA) Compliance: Any component/equipment that has a potential to be connected to the base network submitted as part of the vendor’s quote must be vetted through the Wing Cyber Security office in accordance with (IAW) the DISA-approved products list. https://aplits.disa.mil/processAPList.action
5. CONTRACTOR RESPONSIBILITIES.
The contractor shall coordinate with either the contracting officer and/or contract administrator to schedule initial set-up and on-site training within 5 days of delivery. Any damage to building structures or machines incurred due to work executed herein shall be repaired or replaced by the contractor at no additional cost to the government.
6. CONTRACTOR QUALITY ASSURANCE.
The Contractor shall be responsible for the quality of all completed work. The Contractor shall also ensure that the installed system and all associated components have been inspected for operability and manufacturer/material defects. The contractor will be responsible for safeguarding government property.
7. DELIVERABLES AND SUPPORT REQUIREMENTS
a) Security: The following security measures must be followed: Removing objects from refuse for personal use is unauthorized and may result in termination. Contractor personnel must request items through the unit designee. Contractors must adhere to current installation security policies.
b) Re-wiring: The contractor must inform and coordinate with the Contracting Officer if re-wiring is needed to make systems fully functional. The contractor must take precautions to prevent damage to government property. Damaged areas must be repaired at no additional cost to the government, as directed by the Contracting Officer.
c) On-site Project Installation Support Hours: Contractor personnel must be available on-site during normal duty hours (Monday-Friday, 0800-1600 CST). Concessions may be made for religious holidays, at the discretion of the US, if they do not interfere with operations.
d) Acceptance Criteria & Training Session: Training for all systems will serve as the Government's final acceptance criteria. The prime contractor shall provide a one-day training session for up to five personnel, covering a system overview and operations of the touch panel control system. A control system programmer shall be on site to make programming adjustments, as necessary.
8. GENERAL INFORMATION.
8.1. HOURS OF PERFORMANCE. The normal working duty hours are 8:00 a.m. to 4:00 p.m., Monday through Friday excluding Saturdays, Sundays, Wing down days, and Federal Holidays. Initial set-up and on-site training will be performed in Building 1169, room 120.
8.2 The US Government will not provide any equipment, fuel, personnel, utilities, or facilities to the contractor for the execution of this contract. In the event of an emergency, only necessary basic lifesaving and life support measures will be provided.
8.3 The contractor shall comply with all base fire, safety, and confined space regulations while completing their install. Work will be accomplished during normal hours of operation, Monday through Friday, 0800-1600 hours CST, excluding Saturdays, Sundays, Wing down days, and Federal Holidays.
8.4. CONTRACTOR CONSENT TO BACKGROUND CHECKS. The contractor and, as applicable, subcontractor shall not employ persons for work on this contract if such employee is identified as a potential threat to the health, safety, security, general well being or operational mission of the installation and its population, nor shall the contractor or subcontractor employ persons under this contract who have an outstanding criminal warrant as identified by the National Crime Information Center (NCI). NCI checks will verify if a person is wanted by local, state, and federal agencies. All contractor and subcontractor personnel must consent to NCI background checks. Contractor and subcontractor personnel who do not consent to a NCI check will be denied access to the installation. Information required conducting a NCI check includes:
your full name, address, social security number, date of birth, driver’s license number and state and completion of a background check questionnaire. The contractor shall provide this information using the McConnell AFB Form 114, Contractor/Vendor Access List, and shall submit it in conjunction with the contractor’s request for either base or vehicle passes.
Completion of a successful NCI check does not invalidate the requirement for an escort when contractor or subcontractor personnel are working within controlled or restricted areas. 8.4.1.
The contractor shall not be entitled to any compensation for delays or expenses associated with complying with the provisions of this clause (see AFFARS 5352.242-9000, Contractor Access to Air Force Installations). Furthermore, nothing in this clause shall excuse the contractor from proceeding with the contract as required.
8.5. CONTRACTOR EMPLOYEES. Contractor personnel shall present a neat appearance and be easily identified as contractor employees. The contractor shall obtain base identification and vehicle passes for all employees who perform work on McConnell AFB. Contractor personnel are required to wear or prominently display installation identification while visiting or performing work on the installation. The contractor shall not employ persons for work on this contract identified to the contractor by the Contracting Officer as a potential threat to the health, safety, security, general well being or operational mission of the installation and its population.
Each employee will be easily identified by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges that contain the company name and employee names.
8.6. SECURITY REQUIREMENTS. All personnel employed by the contractor in the performance of this contract, or any representative of the contractor entering the Government installation, shall abide by all security regulations of the installation. The contractor shall obtain the following pass and identification items for each employee as required (see AFFARS 5352.242-9000, Contractor Access to Air Force Installations). The contractor shall be provided all forms required for U.S. Government documents; the contractor shall complete and submit said forms in accordance with established DoD and Air Force directives, and shall ensure employees possess all required documentation.
8.6.1. RANDOM SEARCHES. Contractor personnel are subject to random personal and vehicle searches. If the contractor’s personnel refuse to be searched, they will be denied entry to the base. Denial of entry to personnel who refuse to be searched, or detention of personnel found to be in possession of contraband, may result in loss of base driving privileges, debarment from the base, or other administrative action.
8.7. VEHICLES AND PASSES. Each vehicle must have a vehicle pass. The application for a vehicle pass must be accompanied by the state vehicle registration and proof of insurance.
Vehicle passes must remain with the vehicle for which issued. Entrance to the base must be through the west gate. Contractor vehicles are subject to search prior to entering and exiting the base and while on the base. Further, the vehicles and equipment may be escorted during exercise operations and may be rendered immobile when not in operation by the removal of ignition keys or by other readily reversible means.
8.8. WASTE DISPOSAL: All waste, rubble and trash shall be disposed of off-base. Contractor vehicles shall be equipped with covers to prevent spills of waste materials on, or off-base.
8.9. WARRANTY: The Contractor shall pass on all commercial warranties to the government.
A copy of each warranty shall be furnished to the Contracting Officer not later than the date of the final inspection.
9. 5.1. Base Passes: Should the contractor and/or subcontractors need a base identification card or vehicle pass; each employee must have possession of his/her pass at all times while working on this contract. Contract employees will not enter any restricted areas. No security clearance is required, but the Contractor shall provide, on company letterhead, the names of each employee entering the installation with the following information: Social Security, date of birth, vehicle tag number, REAL ID compliant driver’s license, and home address not later than five business days before access is needed to the installation. The Contractor shall be responsible for the return of passes issued to employees who separate from the contract before the expiration date of each contract period including any extensions to the contract. Lost or stolen passes shall be reported immediately to the contracting officer with a written follow-up to the contracting officer within 72 hours.
5.2. Contractor personnel shall have in their possession a valid and current driver’s license at all times while on McConnell AFB, Kansas.
9.1. OZONE DEPLETING SUBSTANCES/CHEMICALS POLICY: As per SAF/AQC Ozone Depleting Substance/Chemicals Policy dated 11 Jun 93 and AFFARS 5310.002-71(90)
(c) the Air Force must not require the Contractor to deliver or use Class I Ozone Depleting Chemicals (ODCs) in performance of the contract. The Contractor will furnish a written statement certifying that this project does not require or install any equipment or fitting with the use of ODCs. Contractor will submit the letter with their proposal.
File details come from the government source that posted it. Updated .