This is a Statement of Work for preventative maintenance, inspection, and repair services on a Mobile Racking System located in Building 917 at the United States Military Academy, West Point, New York.

The contractor shall provide all labor, travel, materials, parts, equipment, and supervision necessary to perform quarterly preventive maintenance and inspection services, as well as unscheduled maintenance and repairs on the mobile racking systems during standard warehouse operating hours (0730–1630, Monday–Friday, excluding federal holidays). All repairs must ensure the movable racking systems remain fully operational with functional safety bumper and strike rebound hardware, ground-level operator control panels, secured junction boxes, flexible conduits, and electrical cables capable of operating at proper load-bearing capacities and speeds, including mobile travel and safety stops, in full compliance with OSHA regulations. The contractor shall provide a Mobile Racking System Inspection Checklist for each system and submit written reports within five business days of completion of each quarterly service detailing any replacement recommendations for parts falling outside industry standard preventive maintenance practices. The contractor must immediately notify the Contract Officer's Representative (COR) of any parts in jeopardy of becoming obsolete and shall attempt to source comparable replacements. Standard industry warranty or better on all parts and labor is required. Performance standards require a 95 percent repair rate within four business days and 100 percent within ten business days for unscheduled maintenance issues, 100 percent repair of safety features within five business days, 100 percent OSHA compliance, and 100 percent coordination rate with the Warehouse Manager for quarterly PMCS appointments. Unscheduled repair work beyond quarterly preventive maintenance may only be accomplished when work does not exceed the amount specified for Emergency Repair CLINs or after issuance of a signed and funded modification by the Contracting Officer.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

UNITED STATES MILITARY ACADEMY

WEST POINT, NY 10996-1514

Preventative Maintenance/Inspection & Repair Mobile Racking System Cadet Services Warehouse Warehouse Bldg 917

1. GENERAL REQUIREMENTS - The contractor shall provide all labor, travel, materials, parts, equipment, and supervision necessary to perform Quarterly Preventive Maintenance and Inspection service and required unscheduled maintenance on the Mobile Racking System located in Building 917, U.S. Military Academy, West Point, N.Y. in accordance with the terms of the contract.

1.1. The contractor shall perform repairs so that the movable racking systems are fully operational and incorporates safety bumper/strike rebound hardware, ground level operator control panels, fully secured junction boxes, flexible conduits and electrical cables to operate all movable units at proper load bearing capacities and speeds, to include mobile travel and safety stops. The contractor shall ensure that the movable racking systems are in full compliance with OSHA.

2. INSPECTION CHECK LIST – Contractor shall provide for information purposes a Mobile Racking System Inspection Checklist for each system.

3. WORK HOURS- Standard operating hours of the Cadet Supply Warehouse is 0730 - 1630, Monday-Friday, excluding Federal holidays. All repairs must be completed during these timeframes and shall not require the government to alter normal operating hours unless specifically requested and/or authorized by the COR in official written correspondence.

4. WARRANTY – Standard Industry warranty or better on all parts and labor shall be included.

5. PREVENTIVE MAINTENANCE INSPECTION - REPAIRS - The contractor shall perform quarterly preventive inspections, repairs and maintenance.

5.1. At no additional cost to the Government, the contractor will provide and install all parts typical with Mobile Racking System Preventive Maintenance regimen.

5.2. If necessary, within 5 business days of completion of each quarterly service, the contractor will provide a written report via official email to the Contract Officer’s Representative (COR) on the systems, to include replacement recommendations of parts that fall out of industry standard Preventive Maintenance that could lead to potential or actual failures. Complete part information is required, including sources, so the government may adjudicate the need for further maintenance.

6. PARTS OBSOLESENCE - The contractor shall notify the COR in the event any part is in jeopardy of becoming obsolete. The contractor shall attempt every reasonable effort and method to source comparable This notification shall be immediate upon the contractor learning of the potential part unavailability.

7. EMERGENCY REPAIRS & REPAIRS IN ADDITION TO QUARTERLY PREVENTATIVE

MAINTENANCE- Unscheduled Repair work to the Mobile Racking systems, if deemed necessary by the government in addition to quarterly preventative maintenance, may only be accomplished under this purchase order when the work does not exceed the amount for the applicable Emergency Repair CLIN(S). Repair work to the Mobile Racking system, if deemed necessary by the government in addition to quarterly preventative maintenance and emergency repair, may only be accomplished under this purchase order after issuance of a signed and funded modification by the Contracting Officer.

8. RESPONSE TIME – IAW PERFORMANCE REQUIREMENTS SUMMARY TABLE

9. APPLICABLE

9.1. Occupational Safety and Health Administration (OSHA) 26 CFR 1910 NYS DOT Manual of Uniform Traffic Control Devices PERFORMANCE REQUIREMENTS SUMMARY PRS. The rights of the Government and remedies described in this PRS are in addition to other rights and remedies set forth in the contract.

9.2. The Performance Requirements Summary table lists the Required Services (RS), the standard of performance by which the Government will measure contractor performance, the allowable degree of deviation from perfect performance, the primary surveillance methods the Government will use to evaluate the Contractor’s performance in meeting the contract requirements, and the method which will be used to determine the amount of deduction from the maximum payment.

9.3. Surveillance Methods. The primary method of surveillance the Government will use to evaluate the contractor’s performance is provided in the PRS table. The Government is not restricted to using only the method shown. The Government may supplement and/or modify the primary surveillance method and frequency of inspections as it deems necessary via the bilateral modification process.

9.4. Valid Customer Complaints. Customer Complaints constitute a surveillance method based on customer awareness and satisfaction and is mainly used to supplement other surveillance methods. Customers familiar with contract requirements notify the Government when there is a case of poor performance or nonperformance. Upon notification, the Government investigates the report and, if valid, documents the performance problem, notifies the contractor and the Contracting Officer.

9.5. Contractor Self-Reporting. The contractor provides a weekly, or as often as necessary, update to the designated government representative on progress made towards meeting the documented maintenance issues.

THIS AREA INTENTIONALLY LEFT BLANK

PERFORMANCE REQUIREMENTS SUMMARY TABLE

Specific Task
Standard
AQL
Method

Provide Labor and Parts required to repair mobile racks

All racks must operate properly 95% repair rate within 4 business days of notification of unscheduled maintenance issue.

100% repair rate within 10 business days of notification.

Inspection/Acceptance

Ensure Safety features (bumpers and sensors) are operational

Sensors and bumpers must operate and stop the motion of the racks when activated

100% repair within 5 business days

Inspection/Acceptance

OSHA compliance
The Mobile Racks

must be kept in compliance with OSHA regulations 100% compliance with OSHA regulations

Inspection/Acceptance

Conduct quarterly PMCS services Apply Preventative Maintenance Checks and Services on all Mobile Racks

100% inspection during quarterly PMCS

Inspection/Acceptance

Provide report detailing additional maintenance needs if necessary
Industry standard report
100% on time submission within 5 business days
Official email correspondence
Scheduling of PMCS appointments
Coordinate PMCS appointments with Warehouse Manager once per quarter
100% coordination rate with Warehouse Manager on a quarterly basis

Inspection/Acceptance

Perform required repairs as needed Apply any required repairs to bring the rack back into full service 95% repair rate within 4 business days of notification of unscheduled maintenance issue.

100% repair rate within 10 business days of notification.

Inspection/Acceptance

Identify any impending parts obsolences Inform the COR of any part(s) in jeopardy of becoming obsolete

95% reporting rate within 4 business days of identification. 100% reporting rate within 7 business days.
Industry standard reporting methods
Provide Mitigation strategies for obsolete items
Identify methods and alternative options for obsolete parts and structures in a formal report to the COR when necessary
Provide industry standard report with strategy for all identified obsolete parts, structures and associated items within 14 business days of identification
Industry standard report methods