Lower Cedar Valley RFQ Caldwell County.docx

DOCX document 32 KB Posted

Attached to
LOWER CEDAR VALLEY ROAD INDUSTIRAL PARK PROJECT
Solicitation number
410-26-0706
Issued by
Camden County, North Carolina

About this file

This is a Request for Qualifications (RFQ) issued by Caldwell County, North Carolina, for engineering services on the Lower Cedar Valley Road Industrial Park Project. The county seeks a qualified engineering firm to provide a Preliminary Engineering Report (PER), design services, and construction services for early site work at a location on Lower Cedar Valley Road near US-321 in the Town of Sawmills, NC. The PER must include project descriptions, site drawings and layouts, feasibility analysis, permits and approvals documentation, environmental considerations, detailed construction cost estimates, and an estimated construction schedule. Key project elements include demolition and removal of an existing structure, clearing and grubbing, erosion control measures, stream crossing infrastructure installation, mass grading, and connection to an existing water tap. The RFQ was published on June 13, 2026, with a closing date and submission deadline of July 6, 2026, at 2:00 PM. Proposals must be submitted as two hard copies (no more than 30 pages double-sided) and one electronic copy on a flash drive to Ashley Bolick, Economic Development Director, at either the mailing address (PO Box 2200, Lenoir, NC 28645) or physical delivery address (1909 Hickory Blvd SE, Lenoir, NC 28645).

Evaluation criteria are weighted as follows: Experience (Project Team, Funding Program, etc.) at 30 percent, Work Performance (past record) at 30 percent, Capacity to Perform (Available Staff, Location, Schedule) at 30 percent, and Other Factors at 10 percent. Proposals must include labor rates by category with overhead and profit, travel costs, and a list of reimbursables not covered by overhead. The county prioritizes firms with demonstrated experience in ARC and CDBG-funded projects, as the anticipated follow-on design and construction phase will be funded through Appalachian Regional Commission (ARC) funding and managed by the NC Department of Commerce's Community Development Block Grant (CDBG) program. This follow-on contract will require compliance with Davis-Bacon and Related Acts (DBRA), Build America Buy America Act (BABA), Section 3, and the National Environmental Policy Act (NEPA). Caldwell County is an Equal Opportunity Employer and encourages small, minority, and female-owned businesses to submit qualifications. Block ads must be published in a local newspaper, The Charlotte Post, and the NC electronic Vendor Portal (evP) with Fair Housing and EEO logos included.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Caldwell County

RFQ 26-0706

Request for Qualifications for Engineering Services Preliminary Engineering Report Design and Construction Services

Project: Lower Cedar Valley Road Industrial Park Project Caldwell County is seeking a qualified engineering firm for the Preliminary Engineering Report (PER), Design, and Construction Services for the Lower Cedar Valley Road Industrial Park Project. The project site is located on Lower Cedar Valley Road near US-321 in the Town of Sawmills, NC.

1. Preliminary Engineering Report (PER) Caldwell County requires a PER to evaluate options for early site work to include demolition and removal of an existing structure, clearing and grubbing, erosion control measures, installation of stream crossing infrastructure, mass grading, and connection to an existing water tap.

Key Components of the PER:

· Project Description: A detailed account of all project elements.

· Drawings and Layouts: General layouts showing existing site conditions and proposed project components, including rough dimensions and quantities.

· Feasibility Analysis: Assessment of project constructability, including design and construction constraints.

· Permits and Approvals: A list of required permits and a timeline for obtaining them.

· Environmental Considerations: Address potential environmental impacts, including necessary assessments (e.g., biological assessments for endangered species).

· Construction Cost Estimate: A detailed estimate covering quantities, unit costs, and total costs, with a defined basis for construction contingencies.

· Schedule: Estimated construction schedule.

2. Design and Construction Services Caldwell County plans to apply for Appalachian Regional Commission (ARC) funding based on the completed PER. If funding is secured, the County anticipates contracting the firm that supplied the PER for the subsequent design and construction phase. If awarded, the ARC Construction project would be managed by NC Department of Commerce’s Community Development Block Grant (CDBG) program as Basic Agency and must abide by all relevant state and federal guidelines including but not limited to Davis-Bacon and Related Acts (DBRA), the Build America Buy America Act (BABA), Section 3, and the National Environmental Policy Act (NEPA).

This follow-on contract will encompass scheduling, cost estimation, infrastructure design, permitting, specification, bid document preparation, oversight of the bidding process, project administration/inspection, and final certification.

Caldwell County is the official selection entity and the selected firm will be employed by the County.

3. Submission Details and Requirements Contact for Specific Questions:

· Ashley Bolick, Economic Development Director

· Telephone: (828) 728-0768

· Email: abolick@caldwellcountync.org Statement of Qualifications (SOQ) Caldwell County seeks a competent/qualified firm registered to practice in North Carolina with experience in the following areas:

· Specialized Expertise: Appropriate expertise for this type of project.

· Team Capacity: Adequate staff, proposed team, and project manager, including location, past performance on similar work, and current workload.

· Recent Experience: Track record with project costs and schedules.

· Familiarity: Proximity to and familiarity with the project area.

· Success Record: History of successfully completed projects without major legal or technical issues.

· ARC Experience: Demonstrated successful experience with ARC and CDBG funded projects.

· Insurance: Appropriate insurance coverage for the scope of work.

· Other Factors: Any other factors deemed appropriate for the project.

Evaluation Criteria A County staff review committee will rank proposals based on the following criteria:

Criteria
Relative Importance
Experience (Project Team, Funding Program, etc.)
30
Work Performance (past record)
30
Capacity to Perform (Available Staff, Location, Schedule, etc.)
30
Other Factors which may be deemed appropriate
10

Labor Rates/Costs The submittal should include labor rates by category (including overhead and profit), travel costs, and a list of reimbursables not covered by overhead.

Deadlines and Submission

· Publish Date: June 13, 2026

· Closing Date: July 6, 2026, at 2:00 PM (Proposals received after this time will not be considered.)

· Submittal Format: TWO (2) hard copies of the proposal (no more than 30 pages double-sided) and ONE (1) electronic copy on a flash drive.

Submit To (Ashley Bolick, Economic Development Director):

Mailing Address
Physical/Delivery Address
Address:
PO Box 2200, Lenoir, NC 28645
1909 Hickory Blvd SE, Lenoir NC 28645
Phone/TDD:
(828) 728-0768-4280 / TDD # 1-800-735-2962

Caldwell County is an Equal Opportunity Employer and promotes Fair Housing practices, encouraging small, minority, and female-owned businesses to submit qualifications.

Block Ad Publication Requirements The selection process also requires running a block ad:

· Run one time in a local newspaper (Affidavit Required).

· Run one time in The Charlotte Post (Best Black News Publication in North Carolina).

· Post on the NC electronic Vendor Portal (evP).

· Must include Fair Housing and EEO Logos.

image1.png

File details come from the government source that posted it. Updated .