Lot Summary.xls
XLS spreadsheet 31 KB Posted
- Attached to
- COLLETON TRADITIONAL MOWING 2022-2023
- Solicitation number
- 5400022485
- Issued by
- Richland County, South Carolina
About this file
This is a Lot Summary document for the Colleton County, South Carolina Traditional Mowing contract for the 2022-2023 period. The document outlines fourteen line items detailing roadway and vegetation maintenance activities across three road classifications: Interstate highways (I, R, RS), Primary roads (US, SC), and Secondary roads (S, SF). Services include routine mowing of shoulders, medians, interchanges, signs and structures; brush management; guardrail mowing; ditch mowing; ODA (Other Designated Area) mowing; and bridge vegetation mowing. Quantities vary significantly by activity type, ranging from 5 acres for ODA mowing on Interstate highways to 1,347.3 acres for routine mowing on Secondary roads. Cycle frequencies range from one to six annual cycles depending on the road classification and activity type, with completion days specified for each line item ranging from 21 to 90 days.
The document provides detailed specifications for contractor performance requirements but does not include pricing terms, set-aside provisions, incumbent information, funding amounts, or contract award details. This summary document serves as the basis for bidders to understand the scope and scale of maintenance activities required across Colleton County's roadway system, enabling accurate cost estimation and resource planning for proposal submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Maps Part 1.pdf | ||
| Maps Part 4.pdf | ||
| Maps Part 2.pdf | ||
| Solicitation Document.pdf | ||
| Maps Part 3.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix2
| APPENDIX 2: LOT SUMMARY | |||||
| COUNTY: | COLLETON | ||||
| Line | Business | Unit | |||
| Item | Activity | Days | Quantity | Estimated | |
| No. | to | No. of Cycles | |||
| Complete | Of Units | ||||
| Cycle | |||||
| 1 | Routine Mowing (Interstate: I, R, RS)* | 21 | 572.71 | Acre | 6 |
| 2 | Routine Mowing (Primary: US, SC)* | 30 | 848.68 | Acre | 6 |
| 3 | Routine Mowing (Secondary: S, SF)* | 30 | 1347.3 | Acre | 4 |
| 4 | Brush Management (Interstate) | 30 | 20 | Acre | 1 |
| 5 | Brush Management (Primary and/or Secondary) | 90 | 1242 | Acre | 1 |
| 6 | Guardrail Mowing (Interstate: I, R, RS) | 21 | 109529 | Linear Feet | 6 |
| 7 | Guardrail Mowing (Primary: US, SC) | 30 | 148055 | Linear Feet | 6 |
| 8 | Guardrail Mowing (Secondary: S, SF) | 30 | 30893 | Linear Feet | 4 |
| 9 | Ditch Mowing (Interstate: I, R, RS) | 21 | 189.97 | Acre | 2 |
| 10 | ODA Mowing (Interstate: I, R, RS) | 21 | 5 | Acre | 2 |
| 11 | ODA Mowing (Primary: US, SC) | Insert No. | Insert No. | Acre | Insert No. |
| 12 | Bridge Veg. Mowing (Interstate: I, R, RS) | 21 | 23.74 | Acre | 2 |
| 13 | Bridge Veg. Mowing (Primary: US, SC) | 30 | 10 | Acre | 1 |
| 14 | Bridge Veg Mowing (Secondary: S, SF) | 30 | 10 | Acre | 1 |
| *Routine Mowing includes shoulders, medians, interchanges, signs and structures. |
File details come from the government source that posted it. Updated .