This document consists of construction plans and specifications for Lot 52 Restriping and Lighting Upgrades at the Junipero Serra Building (320 4th Street, Los Angeles, CA 90013), prepared by the California Department of General Services, Real Estate Services Division, in coordination with the Office of Fleet and Asset Management. The project scope encompasses obliterating existing parking stripes and restriping at existing locations throughout the multi-level garage, reinstalling parking stripes, painting bollards and curbs, and replacing existing parking garage lighting fixtures with new LED lights rated at 27 watts manufactured by Lithonia Lighting (Model VCPG LED P1 40K T5M-OPTIC, 120-277V). The project also requires replacement of existing lighting controllers and sensors with integration into the existing Building Management System (BMS). The construction documents are dated July 25, 2025, representing 100% construction documents with three prior progress sets (75% dated March 26, 2025; 95% dated May 30, 2025). The project involves three parking levels: sub-basement, basement, and first floor, with detailed electrical demolition and new work plans provided for each level.

The specifications require the contractor to maintain all existing electrical systems outside the construction area, provide temporary lighting and power provisions during demolition, coordinate with lighting manufacturer Performance Lighting Systems representatives for installation and programming, and submit shop drawings for review and approval prior to work commencement. The contractor is responsible for all permits, licenses, testing, and inspections, with a one-year warranty on all materials and workmanship from the date of final acceptance. Work must comply with the 2022 California Building Code, California Electrical Code, California Fire Code, and related standards. The contractor shall provide comprehensive training to facility maintenance staff for a minimum of 8 hours covering operation and maintenance of the new lighting control and communications system, conducted by factory technicians or authorized vendors. All work must be completed while maintaining the facility in operation and keeping parking stalls available during business hours, with any required power outages requiring seven days' written notice and approval from the facility user, with all overtime costs included in the bid.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C

AD

F ile

\S

A0 1F

IL

3\ Au to C

AD

\P ro je ct s\ xx xx \0

6\ D

W G

\P

LT

\T

TI

TL

E

SH

EE

T.

dw g

P lo t D at e:

A ug

2,

- 1 1:

am

Pl ot te d by

: g ba li

V1

707 Third Street, Suite 4-105

Architecture & Engineering Sections

Project Management & Development Branch Real Estate Services Division

State of California

West Sacramento, California 95605

Department of General Services

C op yr ig ht

4, C al ifo rn ia

D ep ar tm en t o f G en er al

S er vi ce s

- R ea l E st at e Se rv ic es D iv is io n

PROJECT DOES NOT REQUIRE

OSFM REVIEW PER MEMO ISSUED

BY WENDY COLLINS, ASSISTANT

DEPUTY DIRECTOR, OSFM DATED

09-06-2019

PROJECT IS EXEMPT FROM THE DIVISION

THE SCOPE OF WORK INVOLVED IN THIS

OF THE STATE ARCHITECT ACCESSIBILITY

REQUIREMENTS IN ACCORDANCE WITH

TITLE 24, CALIFORNIA CODE OF

REGULATIONS, 2022 CALIFORNIA

BUILDING CODE.

J.WALLERJ.WALLERJ. DIGIORGIO

COVER SHEET

NTS

G001

320 4TH STREET

DEPARTMENT OF GENERAL SERVICES

JUNIPERO SERRA BUILDING

LOT 52 RESTRIPING

AND LIGHTING UPGRADES

LOS ANGELES, CA 90013

000000000014406

N/A

1 3/26/25 75% WD PROGRESS SET

2 5/30/25 95% WD PROGRESS SET

3 7/25/25 BID SET

N/A

OFFICE OF FLEET AND ASSET MANAGEMENT

110 5TH ST

WILSHIRE

6TH ST

4TH ST

OLIV

E

ST

HILL

S T

SP

RIN

G S T

3RD ST

MAI

N S

T

FI

GUER

OA

ST

LITTLE TOKIO

JUNIPERO

SERRA BLDG

TEMPLE ST

FL

OW

ER

S

T

GRAN

D S

T

LO

S

AN

GEL

ES

S

T

7TH ST

8TH ST

SA

N

PE

DR

O S

T

2ND ST

1TH ST DOWNTOWN

LOS ANGELES

N

BR

OAD

W

AY

S T

PROJECT LOCATION

PROJECT NUMBER: 000000000014406

320 4TH STREET

OFFICE OF FLEET AND ASSET MANAGEMENT

LOS ANGELES, CA 90013

LOS ANGELES COUNTY

PROJECT DIRECTORY

PROJECT MANAGER: GAURAV BALI

JESSICA WALLER

PROJECT SCOPEAPPLICABLE CODES

OBLITERATE EXISTING PARKING STRIPES AND STRIPE AT EXISTING LOCATIONS

THROUGHOUT THE GARAGE, ALL LEVELS. REINSTALL PARKING STRIPES AND PAINT

BOLLARDS AND CURBS.

REPLACE EXISTING PARKING GARAGE LIGHTING FIXTURE FOR NEW LED

LIGHTS. REPLACE EXISTING PARKING GARAGE LIGHTING CONTROLLERS AND

SENSORS. INTEGRATE LIGHTING FIXTURES AND CONTROLLERS WITH EXISTING BMS

SYSTEM.

LOCATION MAP

PROJECT LOCATION

LOT 52 RESTRIPING AND LIGHTING UPGRADES

SHEET INDEX

GENERAL NOTES

LEGEND

DEMOLITION NOTES

JUNIPERO SERRA BUILDING

OWNER & OWNERS AGENT

DEPARTMENT OF GENERAL SERVICES,

REAL ESTATE SERVICES DIVISION

PROJECT MANAGEMENT AND DEVELOPMENT BRANCH

707 3RD STREET, 4TH FLOOR

WEST SACRAMENTO, CA. 95605

ALL WORK MUST COMPLY WITH THE LATEST APPLICABLE FOLLOWING CODES AND

REGULATIONS, AS ADOPTED AND AMENDED BY LOCAL, CITY, COUNTY, MUNICIPAL

AND STATE REGULATIONS:

- 2022 BUILDING STANDARDS ADMINISTRATIVE CODE, PART 1, TITLE 24 C.C.R.

- 2022 CALIFORNIA BUILDING CODE (CBC), PART 2, TITLE 24 C.C.R.

- 2022 CALIFORNIA ELECTRICAL CODE (CEC), PART 3, TITLE 24 C.C.R.

NFPA 70 - 2020 EDITION

- 2022 CALIFORNIA ENERGY CODE (CEC), PART 6, TITLE 24 C.C.R.

- 2022 CALIFORNIA FIRE CODE (CFC), PART 9, TITLE 24 C.C.R.

- 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE (CALGREEN), PART 11,

TITLE 24 C.C.R.

- 2022 CALIFORNIA REFERENCE STANDARDS, PART 12, TITLE 24 C.C.R.

- TITLE 19 C.C.R., PUBLIC SAFETY, STATE FIRE MARSHAL REGULATIONS.

REFERENCE CODE SECTION FOR NFPA STANDARDS ARE IN 2022 CBC CHAPTER 35

OR 2022 CFC CHAPTER 80. SEE CHAPTER 35 FOR STATE OF CALIFORNIA

AMENDMENTS TO NFPA STANDARDS.

AMERICANS WITH DISABILITIES ACT TITLE II.

LAYOUT AND HORIZONTAL CONTROL NOTES

1. THE STATE CONSTRUCTION SUPERVISOR WILL ESTABLISH A DATE FOR

DEMOLITION TO BEGIN. CONTRACTOR SHALL PROVIDE A DETAILED PHASING

PLAN AND SCHEDULE FOR THIS PROJECT.

2. CONTRACTOR SHALL, AT ALL TIMES, KEEP THE PREMISES FREE FROM

ACCUMULATION OF WASTE MATERIALS OR RUBBISH CAUSED BY HIS WORK. AT

THE COMPLETION OF THE WORK REMOVE ALL RUBBISH, TOOLS, SURPLUS

MATERIALS AND LEAVE THE JOB IN A BROOM CLEAN CONDITION. VEHICLES

LEAVING CONSTRUCTION SITE SHALL NOT TRACK DIRT/MUD OFF THE STATE

PROPERTY.

3. A LOCATION FOR THE CONTRACTOR'S STAGING AREA WILL BE DESIGNATED BY

THE STATE. CONTRACTOR IS PERMITTED TO FENCE THIS AREA TO PROTECT

OFFICES, STORED MATERIAL AND EQUIPMENT. CONTRACTOR IS RESPONSIBLE

FOR SECURING HIS FACILITIES FROM THEFT OR VANDALISM.

4. THESE DRAWINGS DO NOT CONTAIN THE NECESSARY COMPONENTS FOR

CONSTRUCTION SAFETY. WORKER AND PEDESTRIAN PROTECTION SHALL BE

PROVIDED AND MAINTAINED BY THE CONTRACTOR AT THE CONTRACTOR'S

EXPENSE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE WITH

ALL CURRENTLY APPLICABLE SAFETY LAWS OF ANY JURISDICTIONAL BODY,

INCLUDING BUT NOT LIMITED TO OSHA REQUIREMENTS. FOR INFORMATION

PLEASE CONTACT THE STATE INDUSTRIAL SAFETY DEPARTMENT.

5. THE CONTRACTOR IS FINANCIALLY RESPONSIBLE FOR THE MAINTENANCE OR

REPAIR OF OFFSITE STREET SURFACES WHERE DAMAGE HAS BEEN

SUSTAINED BECAUSE OF THE CONSTRUCTION TRAFFIC.

6. CONSTRUCTION NOISE SHALL BE IN COMPLIANCE WITH THE CITY OF LOS

ANGELES AND COUNTY REQUIREMENTS. CONSULT THEM FOR SPECIFIC

RESTRICTIONS AND HOURS OF OPERATION.

7. SIGN CALLOUTS REFERENCE THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC

CONTROL DEVICES (CAMUTCD).

8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPORTING ALL CONFLICTS,

ERRORS, OMISSIONS, ETC. TO THE STATE IMMEDIATELY UPON DISCOVERY. IF

SO DIRECTED BY THE STATE, THE CONTRACTOR SHALL STOP WORK UNTIL

MITIGATION CAN BE MADE. ANY COSTS INCURRED RESULTING FROM THE

CONTRACTOR'S FAILURE TO STOP WORK AS DIRECTED SHALL BE THE

RESPONSIBILITY OF THE CONTRACTOR.

9. THE CONTRACTOR IS RESPONSIBLE FOR SITE CONDITIONS INCLUDING PUBLIC

SAFETY, DUST CONTROL, AND EROSION AND SEDIMENT CONTROL;

CONTINUALLY DURING WORKING HOURS AND DURATION OF THE PROJECT.

10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE STATE

48-HOURS PRIOR TO COMMENCING WORK AND 24-HOURS PRIOR TO

RESUMPTION AFTER INTERRUPTION. REQUESTS FOR INSPECTION SHALL BE

GIVEN 48-HOURS IN ADVANCE, AND BE PERFORMED BY THE STATE.

11. THE FACILITY SHALL BE OPEN DURING CONSTRUCTION. CONTRACTOR TO

PROVIDE AND MAINTAIN PUBLIC ACCESS AND EMERGENCY EGRESS TO/FROM

BUILDING AT ALL TIMES DURING CONSTRUCTION. CONTRACTOR TO SUBMIT

PHASING PLAN TO KEEP ACCESS TO FACILITY OPEN AT ALL TIMES. PHASING

PLAN TO BE SUBMITTED AND APPROVED BY STATE PRIOR TO COMMENCING

PAVING WORK.

12. CONTRACTOR SHALL PROTECT CONSTRUCTION AREA WHILE MAINTAINING

UNINTERRUPTED PARKING LOT AND ROADWAY CIRCULATION DURING NORMAL

OPERATING HOURS. THE CONTRACTOR SHALL KEEP ALL PARKING STALLS

AVAILABLE DURING BUSINESS HOURS.

13. CONTRACTOR SHALL DESIGN AND IMPLEMENT BEST MANAGEMENT PRACTICES

(BMPs) TO PREVENT ALL CONSTRUCTION POLLUTANTS OR POLLUTION FROM

CONTACTING STORM WATER AND KEEP ALL PRODUCTS OF EROSION FROM

ENTERING RECEIVING WATERS. CONTRACTOR SHALL SUBMIT BMPs TO THE

STATE FOR APPROVAL PRIOR TO START OF CONSTRUCTION. SEE

SPECIFICATIONS.

VICINITY MAP

SHEET NUMBER SHEET TITLE

G001 COVER SHEET

C101 FIRST FLOOR PLAN

C102 BASEMENT FLOOR PLAN

C103

ELECTRICAL

E0.1 E0.2 E1.1 E1.2 E1.3 E2.1 E2.2 E2.3 E3.1 E4.1 E5.1 E6.1 E6.2 E6.3 E6.4 E6.5 E6.6 E6.7 E6.8

SUB-BASEMENT FLOOR PLAN

ELECTRICAL COVER SHEET

ELECTRICAL PANEL AND LIGHTING FIXTURE SCHEDULE

ELECTRICAL DEMOLITION - LIGHTING SUB-BASEMENT FLOOR PLAN

ELECTRICAL DEMOLITION - LIGHTING BASEMENT FLOOR PLAN

ELECTRICAL DEMOLITION - LIGHTING FIRST FLOOR PLAN

ELECTRICAL NEW WORK - LIGHTING SUB-BASEMENT FLOOR PLAN

ELECTRICAL NEW WORK - LIGHTING BASEMENT FLOOR PLAN

ELECTRICAL NEW WORK - LIGHTING FIRST FLOOR PLAN

ELECTRICAL GENERAL DETAILS

ELECTRICAL INDOOR TITLE 24 FORMS

ELECTRICAL SPECIFICATIONS

ELECTRICAL NORMAL PHOTOMETRIC - SUB-BASEMENT FLOOR PLAN

ELECTRICAL EGRESS PHOTOMETRIC - SUB-BASEMENT FLOOR PLAN

ELECTRICAL NORMAL PHOTOMETRIC - BASEMENT FLOOR PLAN

ELECTRICAL EGRESS PHOTOMETRIC - BASEMENT FLOOR PLAN

ELECTRICAL NORMAL PHOTOMETRIC - FIRST FLOOR PLAN

ELECTRICAL EGRESS PHOTOMETRIC - FIRST FLOOR PLAN

ELECTRICAL CONTROLS LAYOUT - SUB-BASEMENT FLOOR PLAN

ELECTRICAL CONTROLS LAYOUT - BASEMENT FLOOR PLAN

E6.9 ELECTRICAL CONTROLS LAYOUT - FIRST FLOOR PLAN

E6.10 ELECTRICAL CONTROLLER DETAILS

ELECTRICAL ENGINEER J.C. CHANG AND ASSOCIATES

310-212-7644

07/25/2025

ISSUE DATE: FEBRUARY 24, 2026

C

AD

F ile

\S

A0 1F

IL

3\ Au to C

AD

\P ro je ct s\ xx xx \0

6\ D

W G

\P

LT

\C

FI

R

ST

F

LO

O R

P

LA

N .d w g

P lo t D at e:

A ug

2,

- 1 1:

te d by

: g ba li

V1

707 Third Street, Suite 4-105

Architecture & Engineering Sections

Project Management & Development Branch Real Estate Services Division

State of California

West Sacramento, California 95605

Department of General Services

C op yr ig ht

4, C al ifo rn ia

D ep ar tm en t o f G en er al

S er vi ce s

- R ea l E st at e Se rv ic es D iv is io n

PROJECT DOES NOT REQUIRE

OSFM REVIEW PER MEMO ISSUED

BY WENDY COLLINS, ASSISTANT

DEPUTY DIRECTOR, OSFM DATED

09-06-2019

PROJECT IS EXEMPT FROM THE DIVISION

THE SCOPE OF WORK INVOLVED IN THIS

OF THE STATE ARCHITECT ACCESSIBILITY

REQUIREMENTS IN ACCORDANCE WITH

TITLE 24, CALIFORNIA CODE OF

REGULATIONS, 2022 CALIFORNIA

BUILDING CODE.

J.WALLERJ.WALLERJ. DIGIORGIO

FIRST FLOOR

PLAN

1/16" = 1'-0"

C101

320 4TH STREET

DEPARTMENT OF GENERAL SERVICES

JUNIPERO SERRA BUILDING

LOT 52 RESTRIPING

AND LIGHTING UPGRADES

LOS ANGELES, CA 90013

000000000014406

N/A

1 3/26/25 75% WD PROGRESS SET

2 5/30/25 95% WD PROGRESS SET

3 7/25/25 BID SET

N/A

OFFICE OF FLEET AND ASSET MANAGEMENT

DEMOLITION/IMPROVEMENT PLAN

C O

M P

A C

T

C O

M P

A C

T

C O

M P

A C

T

C O

M P

A C

T

C O

M P

A C

T C

O M

P A

C T

COMPACT

COMPACT COMPACT COMPACT

C O

M P

A C

T C

O M

P A

C T

C O

M P

A C

T C

O M

P A

C T

C O

M P

A C

T C

O M

P A

C T

C O

M P

A C

T

COMPACT COMPACT COMPACT

COMPACT COMPACT COMPACT

COMPACT COMPACT COMPACT

C O

M P

A C

T

C O

M P

A C

T

C O

M P

A C

T

C O

M P

A C

T

C O

M P

A C

T

C O

M P

A C

T

C O

M P

A C

T

C O

M P

A C

T

C O

M P

A C

T

COMPACT COMPACTCOMPACT COMPACT

YIELD

EXI

T

EXIT

ONLY

C

AD

F ile

\S

A0 1F

IL

3\ Au to C

AD

\P ro je ct s\ xx xx \0

6\ D

W G

\P

LT

\C

BA

SE

M

EN

T

FL

O

O R

P

LA

N .d w g

P lo t D at e:

A ug

2,

- 1 1:

te d by

: g ba li

V1

707 Third Street, Suite 4-105

Architecture & Engineering Sections

Project Management & Development Branch Real Estate Services Division

State of California

West Sacramento, California 95605

Department of General Services

C op yr ig ht

4, C al ifo rn ia

D ep ar tm en t o f G en er al

S er vi ce s

- R ea l E st at e Se rv ic es D iv is io n

PROJECT DOES NOT REQUIRE

OSFM REVIEW PER MEMO ISSUED

BY WENDY COLLINS, ASSISTANT

DEPUTY DIRECTOR, OSFM DATED

09-06-2019

PROJECT IS EXEMPT FROM THE DIVISION

THE SCOPE OF WORK INVOLVED IN THIS

OF THE STATE ARCHITECT ACCESSIBILITY

REQUIREMENTS IN ACCORDANCE WITH

TITLE 24, CALIFORNIA CODE OF

REGULATIONS, 2022 CALIFORNIA

BUILDING CODE.

JWJWJD

BASEMENT

FLOOR PLAN

1/16" = 1'-0"

C102

320 4TH STREET

DEPARTMENT OF GENERAL SERVICES

JUNIPERO SERRA BUILDING

LOT 52 RESTRIPING

AND LIGHTING UPGRADES

LOS ANGELES, CA 90013

000000000014406

N/A

1 3/26/25 75% WD PROGRESS SET

2 5/30/25 95% WD PROGRESS SET

3 7/25/25 BID SET

N/A

OFFICE OF FLEET AND ASSET MANAGEMENT

DEMOLITION/IMPROVEMENT PLAN

3 4

C O

M P

A C

T

Storage Area

C O

M P

A C

T C

O M

P A

C T

C O

M P

A C

T C

O M

P A

C T

C O

M P

A C

T C

O M

P A

C T

C O

M P

A C

T

C O

M P

A C

T C

O M

P A

C T

C O

M P

A C

T

COMPACT COMPACT

COMPACT COMPACT COMPACT COMPACT

C O

M P

A C

T

C O

M P

A C

T

C O

M P

A C

T C

O M

P A

C T

C O

M P

A C

T C

O M

P A

C T

C O

M P

A C

T C

O M

P A

C T

C O

M P

A C

T

C O

M P

A C

T

C O

M P

A C

T

C O

M P

A C

T

C O

M P

A C

T

C O

M P

A C

T

C O

M P

A C

T C

O M

P A

C T

C O

M P

A C

T

C O

M P

A C

T

COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT

EXI

T

EXIT

ONLY

YIELD

ONLY

C

AD

F ile

\S

A0 1F

IL

3\ Au to C

AD

\P ro je ct s\ xx xx \0

6\ D

W G

\P

LT

\C

SU

B

BA

SE

M

EN

T

FL

O

O R

P

LA

N .d w g

P lo t D at e:

A ug

2,

- 1 1:

te d by

: g ba li

V1

707 Third Street, Suite 4-105

Architecture & Engineering Sections

Project Management & Development Branch Real Estate Services Division

State of California

West Sacramento, California 95605

Department of General Services

C op yr ig ht

4, C al ifo rn ia

D ep ar tm en t o f G en er al

S er vi ce s

- R ea l E st at e Se rv ic es D iv is io n

PROJECT DOES NOT REQUIRE

OSFM REVIEW PER MEMO ISSUED

BY WENDY COLLINS, ASSISTANT

DEPUTY DIRECTOR, OSFM DATED

09-06-2019

PROJECT IS EXEMPT FROM THE DIVISION

THE SCOPE OF WORK INVOLVED IN THIS

OF THE STATE ARCHITECT ACCESSIBILITY

REQUIREMENTS IN ACCORDANCE WITH

TITLE 24, CALIFORNIA CODE OF

REGULATIONS, 2022 CALIFORNIA

BUILDING CODE.

JWJWJD

SUB BASEMENT

FLOOR PLAN

1" = 10'-0"

C103

320 4TH STREET

DEPARTMENT OF GENERAL SERVICES

JUNIPERO SERRA BUILDING

LOT 52 RESTRIPING

AND LIGHTING UPGRADES

LOS ANGELES, CA 90013

000000000014406

N/A

1 3/26/25 75% WD PROGRESS SET

2 5/30/25 95% WD PROGRESS SET

3 7/25/25 BID SET

N/A

OFFICE OF FLEET AND ASSET MANAGEMENT

DEMOLITION/IMPROVEMENT PLAN

ELECTRICAL COVER

SHEET

E0.1

C

AD

F ile

: L :\2

4\

0-

Lo t 5

Li gh tin g U pg ra de s, O

FA

M , J un ip er o

Se rra

B ui ld in g\ C

AD

\2

3_ E0

EL

EC

TR

IC

AL

C O

VE

R

S H

EE

T.

dw g

P lo t D at e:

J ul

5,

- 6 :3

5p m te d by

: O rla nd oN aj er a

V1

707 Third Street, Suite 4-105

Architecture & Engineering Sections

Project Management & Development Branch Real Estate Services Division

State of California

West Sacramento, California 95605

Department of General Services

C op yr ig ht

4, C al ifo rn ia

D ep ar tm en t o f G en er al

S er vi ce s

- R ea l E st at e Se rv ic es D iv is io n

JCCA#: 24690-3

385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501

P: 310.212.7644 F:310.212.5272I

1 3/26/25 75% WD PROGRESS SET

2 5/30/25 95% WD PROGRESS SET

3 07/25/25 BID SET

320 4TH STREET

JUNIPERO SERRA BUILDING

LOT 52 RESTRIPPING

AND LIGHTING UPGRADE

LOS ANGELES, CA 90013

0#-###### ##-X-####-XX

AS SHOWN

XXXXXXXXXX014406

100% CONSTRUCTION DOCUMENTS

SA ON ON

DEPARTMENT OF GENERAL SERVICES

OFFICE OF FLEET AND ASSET MANAGEMENT

DATE SIGNED: 07/25/2025

DISTANCED

DIAGRAMDIAG.

CALIFORNIA BUILDING CODECBC

CALIFORNIA ELECTRICAL CODECEC

AMERICAN WIRE GAUGEAWG

NTS NOT TO SCALE

BRANCH CIRCUIT DESTINATION (PANEL NAME-CIRCUIT NUMBER)

HOMERUN INDICATES PROVIDING CONDUIT AND CONDUCTORS

MINIMUM CONDUIT SIZE: 3/4"

MINIMUM CONDUCTOR SIZE: #12AWG

PROVIDE 3/4"C-2#12+1#12G WHERE NO CONDUIT/WIRE SIZE IS

STATED. PROVIDE DEDICATED NEUTRAL FOR ALL BRANCH CIRCUIT

WIRING. CONTRACTOR RESPONSIBLE FOR DE-RATING CONDUIT

WITH MORE THAN SIX CURRENT CARRYING CONDUCTORS PER CEC

310.

#12 AWG FOR CIRCUITS UP TO 100'

#10 AWG FOR CIRCUITS FROM 100' TO 200'

#8 AWG FOR CIRCUIT GREATER THAN 200'

P4-10

J

SHEET WHERE DETAIL IS DRAWN

DETAIL NO.

NEW WORK KEY NOTE

DEMOLITION KEY NOTE

RJ11 PHONE JACK PORT - WALL MOUNTED

TRANSFORMER

RJ45 ETHERNET PORT - FLOOR MOUNTED

RJ45 ETHERNET PORT - WALL MOUNTED

120V 20A - DUPLEX - WALL MOUNTED - RECEPTACLE

120V 20A - DUPLEX - FLOOR MOUNTED - RECEPTACLE

120V 20A - QUADPLEX - WALL MOUNTED - RECEPTACLE

120V 20A - QUADPLEX - FLOOR MOUNTED - RECEPTACLE

TOR

EMERGENCY ILLUMINATED EXIT SIGN, 120-277V A.C OPERATION,

FULLY AUTOMATIC MINIMUM 90 MINUTES BATTERY OPERATION.

+90"A.F.F., ARROWS INDICATE DIRECTION OF EGRESS, SURFACE OR

PENDANT, SHADING INDICATES ILLUMINATED FACE

OR

EMERGENCY ILLUMINATED COMBO EXIT SIGN, 120-277V A.C

OPERATION, (2) FULLY ADJUSTABLE GLARE FREE LIGHTING HEADS,

FULLY AUTOMATIC MINIMUM 90 MINUTES BATTERY OPERATION.

+90"A.F.F., ARROWS INDICATE DIRECTION OF EGRESS, SURFACE OR

PENDANT, SHADING INDICATES ILLUMINATED FACE.

EMERGENCY LIGHTING BUG EYE UNIT,120-277V A.C OPERATION,

(2) FULLY ADJUSTABLE GLARE FREE LIGHTING HEADS,

FULLY AUTOMATIC MINIMUM 90 MINUTES BATTERY OPERATION.

+90"A.F.F., DUAL LITE "EZ-2" SERIES.

OS OCCUPANCY SENSOR

LOW-VOLTAGE SWITCH

LOW-VOLTAGE TRIPLE ZONE SWITCH

LOW-VOLTAGE QUADRUPLE ZONE SWITCH

LOW-VOLTAGE DOUBLE ZONE DIMMING SWITCH

LOW-VOLTAGE DOUBLE ZONE SWITCH

D a,b,c D a,b,c,d

D a,b a,b,c,d a,b,c a,b

OS

D

OS

D

ROOM CONTROLLER

ASTRONOMICAL TIMER

PHOTOCELL SENSORPC

RC

TIMER

LOW-VOLTAGE TRIPLE ZONE DIMMING SWITCH

LOW-VOLTAGE QUADRUPLE ZONE DIMMING SWITCH

LOW-VOLTAGE DIMMING SWITCH

LOW-VOLTAGE DIMMING OCCUPANCY SENSOR SWITCH

LOW-VOLTAGE OCCUPANCY SENSOR SWITCH

JUNCTION BOX OR PULL BOX, SIZED PER CODE

(208Y/120V OR 240Y/120V) 3Ø, 4W OR (240/120V) 1Ø, 3W PANELBOARD

480Y/277V, 3Ø, 4W PANELBOARD

SWITCHBOARD, DISTRIBUTION BOARD OR MOTOR CONTROL CENTER

CIRCUIT BREAKER

EXHAUST FAN

FIRE ALARM - STROBE LIGHT - WALL MOUNTED

P

SD

CD

FIRE ALARM - STROBE LIGHT - CEILING MOUNTED

FIRE ALARM - PULL SECTION - WALL MOUNTED

FIRE ALARM - SMOKE OR HEAT DETECTOR - CEILING MOUNTED

CD

GROUNDINGGROUNDING

NEGLIGIBLENEGL

DEMOLISH

EXISTING(E)

CB CIRCUIT BREAKER

EA. EACH

COPPERCU

G, GND GROUND

MCB MAIN CIRCUIT BREAKER

AMP./A AMPERE

FIN FINISHED

CIRCUITCKT

LOW VOLTAGE

AMPERE INTERRUPTING

CAPACITYAIC

ABOVE FINISHED FLOORAFF

BKR BREAKER

WEATHER PROOFWP

SWITCHBOARDSWB

TYP. TYPICAL

UG UNDERGROUND

SWITCH SW

PULL BOXPB

SLD SINGLE LINE DIAGRAM

POLEP

PANELBOARDPNL

(R) RELOCATED

SUB SUBSTATION

NEW(N)

TD TIME DELAY

UNLESS OTHERWISE

NOTEDUON

TRANSFORMERXFMR,

TRANSF.

VD VOLTAGE DROP

(D)

NTS NOT TO SCALE

LV

EM. EMERGENCY

AUTHORITY HAVING

JURISDICTIONAHJ

OS OCCUPANCY SENSOR

PHOTOCELL SENSORPC

PLC

GENERAL CONTRACTORGC

GFCI

GEC

DRAWINGDWG

EGC

L LENGTH

VFD VARIABLE FREQUENCY DRIVE

SCE SOUTHERN CALIFORNIA EDISON

EQUIPMENT GROUNDING

CONDUCTOR

GROUNDING ELECTRODE

CONDUCTOR

GROUND FAULT CURRENT

INTERRUPTER

PROGRAMMABLE LOGICAL

CONTROLLER

THRU THROUGH

MIN. MINIMUM

MFR MANUFACTURER

EQUIP EQUIPMENT

LADWP LOS ANGELES DEPARTMENT

OF WATER AND POWER

ABBREVIATIONSCONTRACTOR NOTES ELECTRICAL NOTES ELECTRICAL LEGEND

1. CONTRACTOR SHALL COORDINATE WITH PROJECT MANAGER, OWNER, AND ELECTRICAL

ENGINEER TO HOST AN ON-SITE PRE-CONSTRUCTION MEETING TO REVIEW

REQUIREMENTS OF PROVIDING AN EFFICIENT SEQUENCE OF CONSTRUCTION TO

MINIMIZE DOWNTIME/POWER OUTAGE TO FACILITY.

2. CONTRACTOR SHALL FIELD VERIFY TO IDENTIFY, LABEL, AND TROUBLESHOOT ALL (E)

BRANCH CIRCUIT POWER DISTRIBUTION WITHIN CONSTRUCTION AREA PRIOR TO

DEMOLITION OF EQUIPMENT. THIS IS TO ENSURE CONTINUITY OF (E) ELECTRICAL

SYSTEM OPERATION BEYOND THE CONSTRUCTION AREA IS KEPT IN OPERATION

DURING AND AFTER CONSTRUCTION.

3. IF ANY BRANCH CIRCUITS ARE BEING SHARED BETWEEN ANY AREAS WITHIN

CONSTRUCTION AND AREAS OUTSIDE OF CONSTRUCTION, CONTRACTOR SHALL

PROVIDE SEPARATE BRANCH CIRCUIT FOR EACH ZONE.

4. ONCE ALL POWER DISTRIBUTION HAS BEEN DISAGGREGATE FROM AREA OF

CONSTRUCTION, CONTRACTOR SHALL PROCEED TO PROVIDING TEMPORARY LIGHTING

SOURCE AND POWER SUPPLY IN PERFORMING THEIR WORK TO AVOID DISRUPTION ON

CLIENTS OPERATION.

5. ONCE ALL PROVISIONS HAVE BEEN MADE, START DEMOLISHING ALL ELECTRICAL

EQUIPMENT WITHIN ELECTRICAL BUILDING IN SECTIONS TO MINIMIZE FACILITY DOWN

TIME. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH PROJECT

MANAGER AND OTHER TRADES DURING CONSTRUCTION.

6. AS EACH SECTION OF THE ELECTRICAL SYSTEM IS BEING DEMOLISHED, PROVIDE

UPDATED PANEL SCHEDULES TO IDENTIFY WHICH BRANCH CIRCUITS ARE

ABANDONED/NOT IN USE AND PROVIDE EXTENSIVE BRANCH CIRCUIT LABELING AT ALL

POINTS OF THE ELECTRICAL SYSTEM.

7. AFTER ENTIRE AREA OF CONSTRUCTION HAS BEEN DEMOLISHED AS DEFINED ON

DEMOLITION PLANS, CONTRACTOR SHALL COORDINATE WITH PROJECT MANAGER TO

PROVIDE NEW WORK SEQUENCE OF CONSTRUCTION TO EFFICIENTLY EXTEND

CONDUITS AND CONDUCTORS AND INSTALL ASSOCIATED EQUIPMENT IN PLACE AS

SHOWN IN NEW WORK PLANS.

8. CONTRACTOR SHALL BE RESPONSIBLE TO CAREFULLY COORDINATE EQUIPMENT LEAD

TIMES WITH CONSTRUCTION TIMELINES. COORDINATE WITH PROJECT MANAGER FOR

APPROPRIATE ONSITE STORAGE LOCATIONS FOR BOTH NEW EQUIPMENT AND TOOLS.

9. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY ALL EXISTING

UNDERGROUND UTILITY LINES BY VIA DIG ALERT 811 PRIOR TO EXCAVATING EXISTING

ASPHALT DRIVEWAY TO AVOID INTERFERENCE AND DAMAGE TO EXISTING

INFRASTRUCTURE.

SEQUENCE OF CONSTRUCTION

1. THE CONTRACTOR SHALL FURNISH ALL LABOR, SUPERVISION, MATERIALS, EQUIPMENT,

TOOLS, TRANSPORTATION, WAREHOUSING, AND ANY OTHER SERVICES REQUIRED TO

COMPLETE THE WORK IN A TIMELY AND EFFICIENT MANNER.

2. INDIVIDUAL ITEMS OF WORK ARE DETAILED IN THE VARIOUS SECTIONS OF THIS SCOPE

OF WORK, THE ATTACHED DRAWINGS, AND THE NOTES AND LEGENDS ON THE

DRAWINGS. THE CONTRACTOR IS RESPONSIBLE TO COMPLETE THE REQUIREMENTS

FOUND IN ANY OF THE ABOVE.

3. CONTRACTOR BIDS ARE TO BE BASED UPON COMPLETING THE WORK WITHIN THE

AMOUNT BID. ANY QUESTIONS PERTAINING TO UNKNOWN CONDITIONS, CHANGES IN

DESIGN, OMISSIONS IN THE DESIGN OR SCOPE OF WORK, MATERIALS, AND

INSTALLATION TECHNIQUE ARE TO BE DISCUSSED WITH THE PROJECT MANAGER. THE

PROJECT MANAGER WILL OBTAIN THE ANSWERS TO QUESTIONS, AS SOON AS

POSSIBLE, IF "ON-THE-SPOT" ANSWERS CAN NOT BE PROVIDED. UNKNOWN CONDITIONS

ENCOUNTERED DURING THE COURSE OF WORK, WHICH MAY DELAY WORK OR ADD

COST, WILL BE REPORTED TO THE PROJECT MANAGER IMMEDIATELY SO THAT PROPER

ARRANGEMENTS CAN BE MADE WITHOUT WORK STOPPAGE.

4. ANY POWER OUTAGES SHALL BE APPROVED BY THE USER OF THE FACILITY. A SEVEN

DAY WRITTEN NOTICE SHALL BE GIVEN FOR ANY OUTAGE REQUEST. POWER

SHUTDOWN SHALL BE DONE AFTER NORMAL WORKING HOURS, AND SHALL BE

PROPERLY COORDINATED IN ADVANCE. CONTRACTOR SHALL INCLUDE IN HIS BID ALL

COST TO COVER OVERTIME.

5. CONTRACTOR SHALL VERIFY EXACT LOCATION OF PANELBOARDS AND CONTROL

PANELS WITH OWNER AND PROJECT MANAGER PRIOR TO INSTALLATION.

6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO INSTALL ALL TEMPORARY

BRACING/SHORING, BARRIERS, TEMPORARY LIGHTING AND POWER PROVISIONS, ETC.

AS REQUIRED TO FACILITATE WORK WHILE INSURING SAFE WORK CONDITIONS

THROUGHOUT CONSTRUCTION.

7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO INSURE THAT ALL

APPLICABLE SAFETY LAWS ARE STRICTLY ENFORCED AND TO MAINTAIN A SAFE

CONSTRUCTION PROJECT.

8. THE CONTRACTOR SHALL REPAIR AND/OR REPAINT ALL AREAS DAMAGED BY

DEMOLITION OR CONSTRUCTION, AND FINISH TO MATCH EXISTING ADJACENT

SURFACES.

9. THE CONTRACTOR SHALL SUBMIT "AS-BUILT" DRAWINGS UPON COMPLETION OF

CONSTRUCTION.

10. DAILY, AND UPON COMPLETION OF WORK, CONTRACTOR SHALL REMOVE DEBRIS,

RUBBISH, WASTE, AND SURPLUS MATERIAL FROM SITE PREMISES.

11. THE CONTRACTOR SHALL PROTECT AND COVER ALL FIXTURES AND EQUIPMENT IN

AREAS AFFECTED BY WORK, AND UPON COMPLETION OF WORK, SHALL THOROUGHLY

CLEAN ALL FIXTURES, EQUIPMENT, WALLS, FLOOR, AND HARDWARE.

12. ALL WORK IS TO BE COMPLETED ON REGULAR AND/OR OFF HOURS AS DIRECTED BY

THE PROJECT MANAGER.

13. NOT ALL JUNCTION BOXES FOR ROUTING EXTENSIONS OF (E) BRANCH CIRCUITS ARE

SHOWN FOR CLARITY. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ADDITIONAL

BOXES, PENETRATIONS, CONDUIT, AND CONDUCTORS AS REQUIRED TO COMPLETE THE

WORK.

14. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, LICENSES AND FEES

REQUIRED FOR THE EXECUTION OF HIS WORK, AND SHALL ARRANGE FOR AND PAY FOR

ALL REQUIRED TESTS AND INSPECTIONS, AND SHALL GIVE ALL NOTICES REQUIRED BY

ANY AND ALL LAWS, RULES, REGULATIONS AND ORDINANCES WHICH PERTAIN TO THE

CONTRACTOR'S WORK.

15. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOB CONDITIONS AT THE JOB SITE

PRIOR TO THE START OF CONSTRUCTION.

16. THE CONTRACTOR SHALL INSTALL ALL LIGHTING FIXTURES AS INDICATED ON

DRAWINGS. CONTRACTOR SHALL PROVIDE HANGERS AND ACCESSORIES NECESSARY

TO MAKE A COMPLETE INSTALLATION.

17. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING SHOP DRAWINGS FOR ALL

LIGHTING EQUIPMENT AND ANY ASSOCIATED EQUIPMENT WITHIN SCOPE OF WORK AND

AS SHOWN ON THESE PLANS. CONTRACTOR SHALL COORDINATE WITH ALL EQUIPMENT

MANUFACTURERS FOR INSTALLATION REQUIREMENTS, MATERIAL LIST, SHOP

DRAWINGS, AND EQUIPMENT SPECIFICATIONS PRIOR TO PROVIDING A BID OR

PERFORMING ANY WORK.

18. EQUIPMENT AND ACCESSORIES INSTALLED UNDER THIS SECTION SHALL CARRY THE

MANUFACTURER'S GUARANTEE FOR A PERIOD OF NOT LESS THAN ONE YEAR FROM

THE DATE OF ACCEPTANCE OF THE EQUIPMENT. THE CONTRACTOR SHALL GUARANTEE

IN WRITING, IN A FORM ACCEPTABLE TO THE PROJECT MANAGER, THE ENTIRE

ELECTRICAL INSTALLATION AGAINST DEFECTIVE MATERIALS AND/OR IMPROPER

WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM DATE OF FINAL ACCEPTANCE.

DURING THE PERIOD COVERED BY THE GUARANTEE CONTRACTOR SHALL MAKE

NECESSARY REPLACEMENTS AND REPAIR AT NO COST TO CUSTOMER.

19. CONTRACTOR SHALL CONDUCT SUCH TESTS OF ANY PORTION OF INSTALLATIONS AS

MAY BE NECESSARY TO ENSURE FULL COMPLIANCE WITH PLANS AND SPECIFICATIONS.

COST OF TEST SHALL BE BORNE BY CONTRACTOR AND CONTRACTOR SHALL PROVIDE

ALL THE INSTRUMENTS, EQUIPMENT, LABOR AND MATERIALS TO COMPLETE TESTS.

SHOULD THESE TESTS DEVELOP ANY DEFECT IN MATERIALS OR POOR WORKMANSHIP

OR VARIANCE WITH REQUIREMENTS OF SPECIFICATIONS, THEN CONTRACTOR SHALL

MAKE ANY CHANGES NECESSARY AND REMEDY ANY DEFECTS AT THE CONTRACTOR'S

OWN EXPENSE.

20. THE CONTRACTOR SHALL CONSULT AND COOPERATE FULLY WITH ALL OTHER

CONTRACTORS FURNISHING LABOR, MATERIALS OR SERVICES, SO THAT THE WORK AS

A WHOLE, SHALL BE EXECUTED IN THE MOST EFFICIENT MANNER, AND WITHOUT

CONFLICT OR DELAY.

21. CONTRACTOR SHALL CORE DRILL, SAW CUT, PATCH TO MATCH ADJACENT SURFACES,

AND PAINT ALL EXPOSED CONDUITS & BOXES TO MATCH ROOM FINISH.

1. ALL WORK SHALL COMPLY WITH APPLICABLE CODES AND STANDARDS. REFER TO DWG

T0.1 FOR LIST OF APPLICABLE CODES AND STANDARDS.

2. ALL ELECTRICAL EQUIPMENT SHALL BE LABELED, LISTED, OR CERTIFIED BY A UL

NATIONALLY RECOGNIZED TESTING LABORATORY ACCREDITED BY THE UNITED STATE

OCCUPATIONAL SAFETY HEALTH ADMINISTRATIONS (OSHA) OR APPROVED BY THE AHJ

THIRD PARTY TESTING FACILITY.

3. ALL MATERIALS AND EQUIPMENT USED IN THE ELECTRICAL WORK HEREIN SPECIFIED

SHALL BE NEW (UNLESS OTHERWISE NOTED OR SCHEDULED), AND SUITED TO THE

INTENDED USE, AND SHALL BE LISTED BY THE UNDERWRITERS LABORATORIES INC.

AND SHALL MEET THEIR REQUIREMENTS AND BEAR THEIR LABEL WHENEVER

STANDARDS HAVE BEEN ESTABLISHED AND LABEL SERVICE IS REGULARLY FURNISHED

BY THAT AGENCY. ALL MATERIALS AND EQUIPMENT SHALL BE OF THE MAKES AND

TYPES SPECIFIED, AND NO SUBSTITUTIONS WILL BE ALLOWED UNLESS APPROVED IN

WRITING. THE PROJECT MANAGER RESERVES THE RIGHT TO REJECT ANY MATERIAL OR

EQUIPMENT, EITHER BEFORE OR AFTER INSTALLATION, WHICH, IN THE PROJECT

MANAGER'S OPINION IS NOT IN COMPLIANCE WITH THESE SPECIFICATIONS.

4. 130.5(C) VOLTAGE DROP: THE MAXIMUM COMBINED VOLTAGE DROP ON BOTH

INSTALLED FEEDER CONDUCTORS AND BRANCH CIRCUIT CONDUCTORS TO THE

FARTHEST CONNECTED LOAD OR OUTLET SHALL NOT EXCEED 5 PERCENT. APPLICABLE

FOR ALL NEW, ALTERED, OR RELOCATED FEEDER AND BRANCH CIRCUIT CONDUCTORS.

5. PROVIDE IS DEFINED TO MEAN THAT THE CONTRACTOR SHALL FURNISH, INSTALL,

ADJUST, TEST AND INTEGRATE INTO A COMPLETE SYSTEM THE ITEM INDICATED.

INCLUDING ALL HARDWARE, WIRING, AND MISCELLANEOUS ITEMS AS NECESSARY FOR

A COMPLETE AND OPERATIONAL SYSTEM.

6. ALL CONDUITS INSTALLED IN FINISHED AREAS SHALL BE CONCEALED EXCEPT AS

OTHERWISE INDICATED ON THE DRAWINGS OR HEREIN SPECIFIED. ELECTRIC METALLIC

TUBING, IN SIZE ONE (1) INCH OR SMALLER, SHALL BE USED WHERE EXPOSED TO DRY

LOCATIONS, IN STUD WALLS, FURRED CEILINGS AND SIMILAR LOCATIONS. USE RIGID

METAL CONDUIT FOR ALL EXPOSED EXTERIOR WORK. SUPPORT OVERHEAD CONDUIT

10' MAXIMUM ON CENTER WITH 3/8" ROD & 1/2" SELF-DRILLING EXPANSION BOLT

ANCHORED TO SLAB ABOVE. SEAL FIRE RATED WALL PENETRATIONS USING APPROVED

FIRE SEAL METHODS & MATERIALS.

7. ALL COMMUNICATION CONDUIT SHALL BE INSTALLED IN COMPLIANCE WITH INDUSTRY

BEST PRACTICES AND STANDARDS. PROVIDE MIN. 1-1/4" CONDUIT STUBBED 6" ABOVE

CEILING.

8. VERIFY EXACT LOCATION OF OUTLET, SWITCHES, EQUIPMENT, ETC WITH THE PROJECT

MANAGER & USER PRIOR TO INSTALLATION. OWNER RESERVES THE RIGHT TO

RELOCATE ANY UNINSTALLED OUTLET IN ANY DIRECTION.

9. FURNISH AND INSTALL WIRES AND CABLES OF THE SIZE AND TYPE SHOWN ON

DRAWINGS AND AS SPECIFIED HEREIN. UNLESS OTHERWISE SPECIFIED ALL WIRE AND

CABLE SHALL BE U.L. STANDARD ANNEALED COPPER WIRE WITH U.S. 600 VOLT

INSULATION. THE MINIMUM SIZE WIRE FOR LIGHTING OR POWER CIRCUITS SHALL BE

NO.12 AWG. ALL CONDUCTORS SHALL BE STRANDED. INSULATION OF CONDUCTORS

SHALL BE TYPE THHN/THWN.

10. COLOR CODE NO. 12 THROUGH NO. 8 BRANCH CIRCUIT WIRES. USE BLACK, RED, BLUE &

WHITE FOR 120/208V CIRCUITS. USE YELLOW, ORANGE, BROWN & GRAY FOR 277/480V

CIRCUITS. USE GREEN WIRES FOR EQUIPMENT GROUNDS ONLY.

11. ALL NEW WIRING SHALL BE COPPER WITH "THHN-2" OR "THWN", 75°C 600 VOLT

INSULATION COLOR CODE ALL BRANCH CIRCUIT WIRING, U.O.N.

12. CHECK PANEL SCHEDULES IDENTIFICATION FOR VALIDITY. REIDENTIFY ANY OR ALL

CHANGES IN PANEL ON PANEL SCHEDULE CARD. WHILE PANEL COVER IS REMOVED

TURN OFF ANY SPARE BREAKERS AND VERIFY SPARES ARE INDICATED ON PANEL

SCHEDULE CARD.

13. USE "DYMO" LABEL ON FACE OF RECEPTACLE AND SWITCH COVER PLATE AND

JUNCTION BOXES INDICATING THE SOURCE PANEL AND CIRCUIT USED. DYMO LABEL

TAPE SHALL MATCH THE COLOR OF THE COVER PLATE ON RECEPTACLES AND

SWITCHES.

14. ALL FEEDERS SHALL BE TAGGED AT EACH POINT WHERE THE CONDUIT RUN IS BROKEN.

ALL BRANCH CIRCUIT CONDUCTORS AT PANELBOARDS AND SWITCHBOARDS SHALL BE

IDENTIFIED WITH "E-Z" CODE MARKERS.

15. UPON COMPLETION OF THE WORK, COOPERATE IN CONDUCTING AN OPERATING TEST

TO DEMONSTRATE THAT ALL EQUIPMENT IS OPERATING IN A SATISFACTORY MANNER.

16. ALL OUTLETS & DEVICE SHALL BE FLUSH WITH WALL, UNLESS OTHERWISE NOTED AS

SURFACE MOUNTED.

17. ALL DEVICE COLOR SHALL BE WHITE U.O.N.

18. INSTALL ELECTRICAL BOX PAD OVER JUNCTION BOXES WITHIN ALL PARTITIONS

CONTAINING SOUND INSULATION INCLUDING BUT NOT LIMITED TO DEMISING WALLS,

STC WALLS, SOUND WALLS, WALLS ADJACENT TO STAIRWELLS, SHAFTS, ETC.

19. ELECTRICAL BOXES OR FITTINGS SHALL BE FLUSH WITH FINISH SURFACE OR

RECESSED NO MORE THAN 1/4 INCH IN NON-COMBUSTIBLE WALLS OR CEILING.

20. ALL SWITCHES INSTALLED SHALL NOT EXCEED 48" ABOVE FINISH FLOOR

THIS SYMBOLOGY TO BE USED BY ELECTRICAL AND LAYOUT FOR ALL FLOOR

PLANS, EQUIPMENT, DEVICES, UTILITIES, ETC..., SHOWN ON DRAWINGS.

LIGHT, DASHED THIN LINES INDICATE EXISTING

UNDERGROUND CONDUITS AND CONDUCTORS.

LIGHT, CONTINUOUS THIN LINES INDICATE EXISTING OR

EXISTING ABOVE GROUND CONDUITS AND

CONDUCTORS.

MEDIUM, SHORT DASHED LINES INDICATE DEMOLITION

OR REMOVAL.

HEAVY, DASHED THICK LINES INDICATE NEW

UNDERGROUND POWER CONDUITS AND CONDUCTORS.

HEAVY, CONTINUOUS THICK LINES INDICATE NEW OR

NEW ABOVE GROUND CONDUITS AND CONDUCTORS.

HEAVY, BROKEN LINES WITH "COM" TEXTS INDICATE

NEW UNDERGROUND COMMUNICATION CONDUITS AND

CONDUCTORS.

COM COM

TYPICAL PLAN LEGEND

NEW WORK LIGHTING GENERAL NOTES:

1. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING AND COORDINATING WITH ARCHITECTURAL PLANS FOR CLARIFICATION OF THE DIFFERENT TYPES OF

CEILING ELEVATIONS, CEILING TYPES, AND AFTER FINISHED FLOOR MOUNTING HEIGHTS OF ALL LIGHTING FIXTURES. CAREFULLY STUDY ARCHITECTURAL DRAWINGS, WITH SPECIAL ATTENTION TO CEILING TYPES SHOWN IN THE REFLECTED CEILING PLANS. CONTRACTOR IS RESPONSIBLE FOR VERIFYING CEILING TYPES TO PROVIDE PROPER LIGHTING FIXTURE MOUNTING HARDWARE AND MAKING ONSITE FIELD ADJUSTMENTS TO FIXTURES STEMS AND PROVIDE STEM POLE THREADS AS NEEDED.

PROVIDE MOUNTING HARDWARE AS REQUIRED TO SUPPORT AND ANCHOR ALL EQUIPMENT, DEVICES, CONDUITS AND CONDUCTORS SECURELY.

2. CONNECT EMERGENCY LIGHTING FIXTURES AND EXIT FIXTURES TO UNSWITCHED HOT CIRCUIT UPSTREAM OF AREA LIGHTING SWITCHES TO ACTIVATE EMERGENCY

BATTERY UPON LOSS OF NORMAL POWER.

3. ALL LIGHTING FIXTURES HAVE A LETTER AND NUMBER IDENTIFICATION FOR PROGRAMMING/GROUPING LIGHTS TO BE CONTROLLED BY INDIVIDUAL AREA/ENCLOSURE

WIRELESS SWITCH.

4. CONTRACTOR IS RESPONSIBLE TO COMPLY WITH ALL REQUIREMENTS FOR ANY MULTIWIRE BRANCH CIRCUITS THAT ARE SHARING NEUTRALS (GROUNDED CIRCUIT CONDUCTOR) AS LISTED IN CEC 200.4(A) THRU (B) AND 210.4(A) THRU (D). ENSURE THAT EACH UNGROUNDED CONDUCTOR WITHIN A MULTIWIRE BRANCH CIRCUIT IS SUPPLIED BY SEPARATE PHASES (LEGS) IN THE SYSTEM TO PREVENT OVERLOADING NEUTRAL (GROUNDED CIRCUIT CONDUCTOR), IN ADDITION BRANCH CIRCUIT BREAKERS SHALL HAVE THE CAPABILITY TO BE TIED TOGETHER (INTERLOCKED) TO SIMULTANEOUSLY DISCONNECT POWER.

5. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH LIGHTING FIXTURE MANUFACTURER FOR ALL WIRING REQUIREMENTS AND PROVIDING ALL ASSOCIATED CONDUITS, CONDUCTORS, AND HARDWARE TO COMPLY WITH MANUFACTURERS INSTALLATION RECOMMENDATIONS. ALL LOW-VOLTAGE SYSTEMS ARE A DEFERRED SUBMITTAL AND ARE NOT INCLUDED IN THIS PERMIT, CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING SHOP DRAWINGS FROM MANUFACTURER TO DETERMINE ANY ADDITIONAL SCOPE OF WORK TO MAKE THE SYSTEM COMPLETE AND FUNCTIONAL PRIOR TO PROVIDING BID OR STARTING ANY WORK.

6. LIGHTING FIXTURES WITH A SOLID HATCH INDICATES TO PROVIDE A 90 MINUTE EMERGENCY BATTERY BACKUP THAT IS INTEGRATED INTO THE FIXTURE BY THE

LIGHTING MANUFACTURER.

7. COORDINATE WITH THE LIGHTING MANUFACTURER TO PROVIDE PRE-WIRED INSTALLATIONS OF ALL WIRELESS CONTROLLERS INTO EACH LIGHTING FIXTURE AS INDICATED ON THE LIGHTING FLOOR PLANS. REFER TO LIGHTING MANUFACTURER CONSTRUCTION DOCUMENTS FOR CLARIFICATION AND REFERENCE. ALL LIGHTING

FIXTURES SHALL SHALL BE RATED FOR 120-277V.

8. INSTALLER/CONTRACTOR TO VERIFY TYPES/QUANTITIES/PLACEMENT OF OCCUPANCY SENSORS FOR PROPER AND EFFECTIVE COVERAGE OF THE SPACES WITH THE MANUFACTURER OR MANUFACTURERS REPRESENTATIVE TO COMPLY WITH TITLE 24 REQUIREMENTS.

9. CONTRACTOR SHALL INVOLVE MANUFACTURER FOR TRAINING AND PROGRAMMING ALL LIGHTING FIXTURES, DEVICES AND CONTROLLERS BEFORE, DURING, AND

AFTER INSTALLATION.

10. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH LIGHTING MANUFACTURER AND FACILITY BUILDING MAINTENANCE DEPARTMENT TO INTERCONNECT ALL NEW LIGHTING FIXTURES, CONTROLLERS/DEVICES, AND CONTROL PANELS TO (E) BUILDING MANAGEMENT SYSTEM (BMS). CONTRACTOR SHALL PROVIDE ALL ASSOCIATED CONDUITS, CONDUCTORS, AND HARDWARE TO COMPLY WITH THE (E) BUILDING MANAGEMENT SYSTEM (BMS) MANUFACTURER

INTEGRATION RECOMMENDATIONS/REQUIREMENTS.

DEMOLITION LIGHTING GENERAL NOTES:

1. MAINTAIN CONTINUITY TO ALL (E) CIRCUIT BREAKERS AND ASSOCIATED CONDUITS AND CONDUCTORS IN PLACE FOR LOADS NOT IN THE SCOPE OF DEMOLITION.

PORTIONS OF (E) CIRCUITS WITH LOADS THAT ARE NOT TO BE DEMOLISHED MUST STAY IN SERVICE UNLESS NOTED OTHERWISE. THESE CIRCUITS SHALL NOT BE

SHARED WITH (N) LIGHTING SYSTEM.

2. ALL (E) FIRE ALARM DEVICES, WIRELESS ACCESS POINTS, SECURITY CAMERAS, AND INTRUSION DETECTION SYSTEMS SHALL BE PROTECTED IN PLACE, UNLESS

NOTED OTHERWISE.

3. IDENTIFY (E) BRANCH CIRCUITS WITHIN EVERY ENCLOSURE AND PROTECT THEM WITHIN A JUNCTION BOX LABELED WITH THE PANEL NAME AND CIRCUIT NUMBER.

CONTRACTOR IS RESPONSIBLE FOR TRACING ALL BRANCH CIRCUITS TO IDENTIFY ALL DEVICES CONNECTED TO EACH BRANCH CIRCUIT. PROVIDE EXTENSIVE SIGNAGE AT EVERY ELECTRICAL ENCLOSURE, JUNCTION BOX, CONDUIT AND CONDUCTORS TO IDENTIFY THE POWER SOURCE AND RATING OF THE CONDUCTORS

DUE TO MULTIPLE POWER SOURCE AND DIFFERENT VOLTAGE CLASSES.

4. ALL (E) BRANCH CIRCUIT NUMBERS PROVIDED ON DEMOLITION PLANS ARE BASED ON THE BEST AVAILABLE INFORMATION AT THE TIME OF DESIGN FROM AS-BUILTS, FIELD SURVEYS, AND PANEL SCHEDULES. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING AND CONFIRMING (E) CIRCUIT NUMBERS, PANEL NAMES, AND MAKING ADJUSTMENTS AS REQUIRED TO PROVIDE POWER CONTINUITY TO AREAS NOT IN SCOPE OF WORK THAT SHARE THE SAME POWER SUPPLY AS AREAS WITHIN SCOPE

OF WORK.

5. DEMOLISH ALL ABANDONED RECESSED JUNCTION BOXES AND CONDUITS. PATCH DRYWALL OR CHIPPED CONCRETE TO SEAL ANY OPENINGS AND/OR MAKE FLAT

SURFACE TO MATCH (E) CONDITIONS.

6. ALL LIGHTING FIXTURES WITH LAMPS AND BALLASTS THAT ARE DEMOLISHED SHALL BE KEPT ONSITE FOR HAZARDOUS WASTE DISPOSAL.

C

AD

F ile

: L :\2

4\

0-

Lo t 5

Li gh tin g U pg ra de s, O

FA

M , J un ip er o

Se rra

B ui ld in g\ C

AD

\2

3_ E0

EL

EC

TR

IC

AL

P

AN

EL

A

N D

L

IG

H

TI

N G

F

IX

TU

R

E

SC

H

ED

U

LE

.d w g P lo t D at e:

J ul

5,

- 6

:3 te d by : O rla nd oN aj er a

V1

707 Third Street, Suite 4-105

Architecture & Engineering Sections

Project Management & Development Branch Real Estate Services Division

State of California

West Sacramento, California 95605

Department of General Services

C op yr ig ht

4, C al ifo rn ia

D ep ar tm en t o f G en er al

S er vi ce s

- R ea l E st at e Se rv ic es D iv is io n

JCCA#: 24690-3

385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501

P: 310.212.7644 F:310.212.5272I

1 3/26/25 75% WD PROGRESS SET

2 5/30/25 95% WD PROGRESS SET

3 07/25/25 BID SET

320 4TH STREET

JUNIPERO SERRA BUILDING

LOT 52 RESTRIPPING

AND LIGHTING UPGRADE

LOS ANGELES, CA 90013

0#-###### ##-X-####-XX

AS SHOWN

XXXXXXXXXX014406

100% CONSTRUCTION DOCUMENTS

SA ON ON

DEPARTMENT OF GENERAL SERVICES

OFFICE OF FLEET AND ASSET MANAGEMENT

DATE SIGNED: 07/25/2025

ELECTRICAL PANEL

AND LIGHTING FIXTURE

SCHEDULES

E0.2

LIGHTING FIXTURE SCHEDULE

MAKE: LITHONIA LIGHTING

MODEL No: VCPG LED P1 40K

T5M-OPTIC TYPE MVOLT

120-277V A

TYPE SYMBOL DESCRIPTION VOLT MANUFACTURER

27W

WATT

SUSPENDED

OR SURFACE

MOUNTING

INDOOR

LOCATION

AE

LED PARKING GARAGE LIGHT

MAKE: LITHONIA LIGHTING

MODEL No: VCPG LED P1 40K

T5M-OPTIC TYPE MVOLT

120-277V 27W SUSPENDED

OR SURFACE INDOOR

LED PARKING GARAGE LIGHT

(INTEGRATED 90 MIN. BACK UP BATTERY)

E1H A-15

BH

A-11

BH

A-11

BH

A-11

E1H A-15

BH

A-11

BHA-11

BHA-11

E1H A-15

BHA-11 E1HA-15 BHA-11

BH

A-11

E1H A-15

E1H A-15

BHA-13BHA-13

E1H A-15

E1H A-15

BH

A-13

BH

A-13

BH

A-13

E1HA-15

E1H A-15

BH

A-13

BHA-13E1HA-15BHA-13

BHA-13BHA-13BHA-13

E1HA-15E1HA-15 BHA-13

BHA-13

E1H A-15

E1H A-15

BH

A-11

BH

A-11

BH

A-11

BH

A-11

E1HA-15

BHA-11BHA-11BHA-11BHA-11

BHA-11BHA-11BHA-11

BHA-11

E1HA-15E1H

A-15

E1H A-15

BH

A-11

BH

A-11

BH

A-11

BH

A-11

ELECTRICAL DEMOLITION -

LIGHTING SUB-BASEMENT FLOOR

PLAN

E1.1

DEMOLITION KEYNOTES:

DISCONNECT AND DEMOLISH LIGHTING FIXTURE AND SUPPORT

SYSTEM.

DISCONNECT AND DEMOLISH CONDUITS AND CONDUCTORS FROM

LIGHTING FIXTURE ALL THE WAY BACK TO NEAREST JUNCTION

BOX. IDENTIFY AND LABEL (E) BRANCH CIRCUIT AND PROTECT IN

PLACE AT NEAREST JUNCTION BOX FOR NEW WORK.

SCALE: 0 202 FEET10

1/16" = 1'-0"

C

AD

F ile

: L :\2

4\

0-

Lo t 5

Li gh tin g U pg ra de s, O

FA

M , J un ip er o

Se rra

B ui ld in g\ C

AD

\2

3_ E1

EL

EC

TR

IC

AL

D

EM

O

LI

TI

O

N

LI

G

H

TI

N G

S U

B-

BA

SE

M

EN

T

FL

O

O R

P

LA

N .d w g

P lo t D at e:

J ul

5,

- 6 :3 te d by

: O rla nd oN aj er a

V1

707 Third Street, Suite 4-105

Architecture & Engineering Sections

Project Management & Development Branch Real Estate Services Division

State of California

West Sacramento, California 95605

Department of General Services

C op yr ig ht

4, C al ifo rn ia

D ep ar tm en t o f G en er al

S er vi ce s

- R ea l E st at e Se rv ic es D iv is io n

JCCA#: 24690-3

385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501

P: 310.212.7644 F:310.212.5272I

1 3/26/25 75% WD PROGRESS SET

2 5/30/25 95% WD PROGRESS SET

3 07/25/25 BID SET

320 4TH STREET

JUNIPERO SERRA BUILDING

LOT 52 RESTRIPPING

AND LIGHTING UPGRADE

LOS ANGELES, CA 90013

0#-###### ##-X-####-XX

AS SHOWN

XXXXXXXXXX014406

100% CONSTRUCTION DOCUMENTS

SA ON ON

DEPARTMENT OF GENERAL SERVICES

OFFICE OF FLEET AND ASSET MANAGEMENT

DATE SIGNED: 07/25/2025

ELECTRICAL DEMOLITION - LIGHTING SUB-BASEMENT FLOOR PLAN N

2 TYP.

TYP.

BHA-14

BH

A-14

BHA-14 BHA-14BHA-14 E1HA-19E1HA-19 E1HA-19

E1HA-19E1HA-19

BHA-14 BHA-14

BHA-14

BHA-14 BHA-14

BHA-14

E1H A-19

BH

A-18

E1H A-19

BH

A-18

BH

A-18

BH

A-18

BH

A-18

BH

A-18

E1H A-19

E1H A-19

E1HA-19 E1HA-17 E1HA-17 E1HA-17

BHA-18 BHA-18 BHA-18 BHA-18 BHA-18 BHA-18 BHA-18

BHA-18 BHA-18 BHA-18 BHA-18

BHA-18 BHA-18 BHA-18BHA-18BHA-18

BHA-18 BHA-18

BH

A-16

BHA-16

E1H A-17

BH

A-16

E1H A-17

E1HA-17

E1HA-17

E1H A-17

BH

A-16

BH

A-16

BH

A-16

BH

A-16

BH

A-16

BH

A-16

BH

A-16

BH

A-16

BH

A-16

BH

A-16

BH

A-16

BH

A-16

BH

A-16

BH

A-16

E1H A-17

E1H A-17

PANEL "BHA" MLO/200A MCB,

480/277V, 3PH, 4W, 225A BUS

ELECTRICAL DEMOLITION -

LIGHTING BASEMENT

FLOOR PLAN

E1.2

C

AD

F ile

: L :\2

4\

0-

Lo t 5

Li gh tin g U pg ra de s, O

FA

M , J un ip er o

Se rra

B ui ld in g\ C

AD

\2

3_ E1

EL

EC

TR

IC

AL

D

EM

O

LI

TI

O

N

LI

G

H

TI

N G

B

AS

EM

EN

T

FL

O O

R P

LA

N

.d w g P lo t D at e:

J ul

5,

- 6

:3 te d by : O rla nd oN aj er a

V1

707 Third Street, Suite 4-105

Architecture & Engineering Sections

Project Management & Development Branch Real Estate Services Division

State of California

West Sacramento, California 95605

Department of General Services

C op yr ig ht

4, C al ifo rn ia

D ep ar tm en t o f G en er al

S er vi ce s

- R ea l E st at e Se rv ic es D iv is io n

JCCA#: 24690-3

385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501

P: 310.212.7644 F:310.212.5272I

1 3/26/25 75% WD PROGRESS SET

2 5/30/25 95% WD PROGRESS SET

3 07/25/25 BID SET

320 4TH STREET

JUNIPERO SERRA BUILDING

LOT 52 RESTRIPPING

AND LIGHTING UPGRADE

LOS ANGELES, CA 90013

0#-###### ##-X-####-XX

AS SHOWN

XXXXXXXXXX014406

100% CONSTRUCTION DOCUMENTS

SA ON ON

DEPARTMENT OF GENERAL SERVICES

OFFICE OF FLEET AND ASSET MANAGEMENT

DATE SIGNED: 07/25/2025

SCALE: 0 202 FEET10

1/16" = 1'-0"

ELECTRICAL DEMOLITION - LIGHTING BASEMENT FLOOR PLAN N

DEMOLITION KEYNOTES:

DISCONNECT AND DEMOLISH LIGHTING FIXTURE AND SUPPORT

SYSTEM.

DISCONNECT AND DEMOLISH CONDUITS AND CONDUCTORS FROM

LIGHTING FIXTURE ALL THE WAY BACK TO NEAREST JUNCTION

BOX. IDENTIFY AND LABEL (E) BRANCH CIRCUIT AND PROTECT IN

PLACE AT NEAREST JUNCTION BOX FOR NEW WORK.

2 TYP.

BHA-14 E1HA-19BHA-14 BHA-14 BHA-14E1HA-19

E1HA-19

E1HA-19

E1H A-19

E1H A-19

BHA-14

BHA-14

BH

A-

BHA-14

PANEL "E1HA" MLO/200A MCB,

480/277V, 3PH, 4W, 225A BUS

ST

O

R E

TH

E

BR

O

AD

W

AY

D

EP

AR

TM

EN

T

ELECTRICAL DEMOLITION -

LIGHTING FIRST FLOOR PLAN

E1.3

C

AD

F ile

: L :\2

4\

0-

Lo t 5

Li gh tin g U pg ra de s, O

FA

M , J un ip er o

Se rra

B ui ld in g\ C

AD

\2

3_ E1

EL

EC

TR

IC

AL

D

EM

O

LI

TI

O

N

LI

G

H

TI

N G

F

IR

ST

F

LO

O

R P

LA

N

.d w g P lo t D at e:

J ul

5,

- 6

:3 te d by : O rla nd oN aj er a

V1

707 Third Street, Suite 4-105

Architecture & Engineering Sections

Project Management & Development Branch Real Estate Services Division

State of California

West Sacramento, California 95605

Department of General Services

C op yr ig ht

4, C al ifo rn ia

D ep ar tm en t o f G en er al

S er vi ce s

- R ea l E st at e Se rv ic es D iv is io n

JCCA#: 24690-3

385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501

P: 310.212.7644 F:310.212.5272I

1 3/26/25 75% WD PROGRESS SET

2 5/30/25 95% WD PROGRESS SET

3 07/25/25 BID SET

320 4TH STREET

JUNIPERO SERRA BUILDING

LOT 52 RESTRIPPING

AND LIGHTING UPGRADE

LOS ANGELES, CA 90013

0#-###### ##-X-####-XX

AS SHOWN

XXXXXXXXXX014406

100% CONSTRUCTION DOCUMENTS

SA ON ON

DEPARTMENT OF GENERAL SERVICES

OFFICE OF FLEET AND ASSET MANAGEMENT

DATE SIGNED: 07/25/2025

SCALE: 0 202 FEET10

1/16" = 1'-0"

ELECTRICAL DEMOLITION - LIGHTING FIRST FLOOR PLAN N

DEMOLITION KEYNOTES:

DISCONNECT AND DEMOLISH LIGHTING FIXTURE AND SUPPORT

SYSTEM.

DISCONNECT AND DEMOLISH CONDUITS AND CONDUCTORS FROM

LIGHTING FIXTURE ALL THE WAY BACK TO NEAREST JUNCTION

BOX. IDENTIFY AND LABEL (E) BRANCH CIRCUIT AND PROTECT IN

PLACE AT NEAREST JUNCTION BOX FOR NEW WORK.

2 TYP.

E1HA-15 BHA-13

E1HA-15 E1HA-15

E1HA-15

E1HA-15

E1HA-15

E1HA-15

E1HA-15

E1HA-15

E1HA-15

E1HA-15

E1HA-15

E1HA-15E1HA-15

E1HA-15

E1HA-15

E1HA-15E1HA-15

E1HA-15

E1HA-15

E1HA-15

E1HA-15

E1HA-15

BHA-13 BHA-13 BHA-13

BHA-13

BHA-13BHA-13

BHA-13

BHA-11BHA-11BHA-11

BHA-11

BHA-11

BHA-11BHA-11

BHA-11 BHA-11 BHA-11

BHA-11BHA-11

BHA-11

BHA-13E1HA-15

BHA-11E1HA-15E1HA-15 BHA-11BHA-11

E1HA-15

BHA-11

E1HA-15

BHA-11E1HA-15E1HA-15

E1HA-15

E1HA-15

BHA-11

BHA-11

E1HA-15

E1HA-15 E1HA-15

E1HA-15

E1HA-15

ELECTRICAL NEW WORK -

LIGHTING SUB-BASEMENT

FLOOR PLAN

E2.1

C

AD

F ile

: L :\2

4\

0-

Lo t 5

Li gh tin g U pg ra de s, O

FA

M , J un ip er o

Se rra

B ui ld in g\ C

AD

\2

3_ E2

EL

EC

TR

IC

AL

N

EW

W O

R K

- L

IG

H

TI

N G

S U

B-

BA

SE

M

EN

T

FL

O

O R

P

LA

N .d w g

P lo t D at e:

J ul

5,

- 6 :3 te d by

: O rla nd oN aj er a

V1

707 Third Street, Suite 4-105

Architecture & Engineering Sections

Project Management & Development Branch Real Estate Services Division

State of California

West Sacramento, California 95605

Department of General Services

C op yr ig ht

4, C al ifo rn ia

D ep ar tm en t o f G en er al

S er vi ce s

- R ea l E st at e Se rv ic es D iv is io n

JCCA#: 24690-3

385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501

P: 310.212.7644 F:310.212.5272I

1 3/26/25 75% WD PROGRESS SET

2 5/30/25 95% WD PROGRESS SET

3 07/25/25 BID SET

320 4TH STREET

JUNIPERO SERRA BUILDING

LOT 52 RESTRIPPING

AND LIGHTING UPGRADE

LOS ANGELES, CA 90013

0#-###### ##-X-####-XX

AS SHOWN

XXXXXXXXXX014406

100% CONSTRUCTION DOCUMENTS

SA ON ON

DEPARTMENT OF GENERAL SERVICES

OFFICE OF FLEET AND ASSET MANAGEMENT

DATE SIGNED: 07/25/2025

NEW WORK KEYNOTES:

PROVIDE LIGHTING FIXTURE AS SHOWN ON FLOOR PLAN AND

LIGHTING FIXTURE SCHEDULE. ALL LIGHTING FIXTURE SHALL

HAVE INTEGRATED WIRELESS CONTROLLERS WITH OCCUPANCY

AND DAYLIGHT SENSORS.

EXTEND (E) LIGHTING BRANCH CIRCUIT FROM NEAREST JUNCTION

BOX TO LOCATION OF (N) LIGHTING FIXTURE.

PROVIDE LIGHTING CONTROL COMMUNICATION PANEL. PROVIDE

INTERCONNECTION WITH (E) BMS SYSTEM.

PROVIDE WIRELESS LOCAL MANUAL DIMMING SWITCH.

SCALE: 0 202 FEET10

1/16" = 1'-0"

ELECTRICAL NEW WORK - LIGHTING SUB-BASEMENT FLOOR PLAN N

TYP.

GENERAL NOTES:

1. CONTRACTOR SHALL BE RESPONSIBLE FOR REVIEWING AND

FOLLOWING LIGHTING MANUFACTURERS CONSTRUCTION

DOCUMENTS AND INSTALLATION GUIDELINES. PROVIDE ALL

REQUIRED HARDWARE, CONDUITS AND CONDUCTORS TO ALL

DEVICES AND CONTROLLERS REQUIRED TO HAVE SATISFACTORY

RESULTS IN THE SYSTEMS FUNCTIONALITY.

2. REPAIR ANY DAMAGES OR OPENINGS TO WALLS OR CEILINGS

DURING AND AFTER INSTALLATION.

3. REFER TO SHEET E0.2 FOR ADDITIONAL NEW WORK LIGHTING

GENERAL NOTES.

4. COORDINATE WITH LIGHTING FIXTURE MANUFACTURER FOR

ASSISTANCE WITH INSTALLATION RECOMMENDATIONS AND

PROGRAMMING. REFER TO LIGHTING MANUFACTURER

CONSTRUCTION DESIGN DOCUMENTS FOR INSTALLATION AND

PRODUCT DETAILS.

5. PROVIDE INTERCONNECTION ALL NEW LIGHTING FIXTURES,

CONTROLLERS/DEVICES, AND CONTROL PANELS TO (E) BUILDING

MANAGEMENT SYSTEM (BMS). PROVIDE ALL REQUIRED HARDWARE,

CONDUITS AND CONDUCTORS TO ALL DEVICES AND CONTROLLERS

REQUIRED TO HAVE SATISFACTORY RESULTS IN THE SYSTEMS

FUNCTIONALITY.

6. CONTRACTOR SHALL FIELD VERIFY FIXTURE MOUNTING

ELEVATIONS THROUGHOUT ALL GARAGE PARKING LEVEL. FIELD

ADJUSTMENTS AND THREADING SHALL BE MADE TO ALL FIXTURES

STEMS/SUPPORT SYSTEM AS NEEDED TO MAINTAIN AN

APPROPRIATE VEHICLE CLEARANCE ELEVATION.

A

AE

TYP.1

TYP.2

TYP.2

2 TYP.3

TYP.4

PANEL "BHA" MLO/200A MCB,

480/277V, 3PH, 4W, 225A BUS

E1HA-17

E1HA-17

E1HA-17

E1HA-17

E1HA-17

E1HA-17

E1HA-17 E1HA-17

E1HA-17

E1HA-17

E1HA-19E1HA-19

E1HA-19

E1HA-19

E1HA-17

E1HA-19

E1HA-19

E1HA-19

E1HA-19 E1HA-19

E1HA-19

E1HA-19

E1HA-19 E1HA-19

E1HA-19

E1HA-19 E1HA-17

E1HA-19

E1HA-17

E1HA-17

E1HA-17

E1HA-17

E1HA-17

E1HA-17 E1HA-17

E1HA-17

BHA-16

E1HA-17

BHA-16 BHA-16 BHA-16

BHA-16BHA-16

BHA-16 BHA-16

BHA-16

BHA-16

BHA-16

BHA-16

BHA-18BHA-18

BHA-18

BHA-18

E1HA-17BHA-18

BHA-18BHA-18BHA-18

BHA-18BHA-18

BHA-18

BHA-18BHA-18

BHA-18 BHA-14

BHA-14 BHA-14

BHA-14

BHA-14

BHA-14

BHA-14

BHA-18

BHA-18

E1HA-19

ELECTRICAL NEW WORK -

LIGHTING BASEMENT

FLOOR PLAN

E2.2

C

AD

F ile

: L :\2

4\

0-

Lo t 5

Li gh tin g U pg ra de s, O

FA

M , J un ip er o

Se rra

B ui ld in g\ C

AD

\2

3_ E2

EL

EC

TR

IC

AL

N

EW

W O

R K

- L

IG

H

TI

N G

B

AS

EM

EN

T

FL

O O

R P

LA

N

.d w g P lo t D at e:

J ul

5,

- 6

:3 te d by : O rla nd oN aj er a

V1

707 Third Street, Suite 4-105

Architecture & Engineering Sections

Project Management & Development Branch Real Estate Services Division

State of California

West Sacramento, California 95605

Department of General Services

C op yr ig ht

4, C al ifo rn ia

D ep ar tm en t o f G en er al

S er vi ce s

- R ea l E st at e Se rv ic es D iv is io n

JCCA#: 24690-3

385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501

P: 310.212.7644 F:310.212.5272I

1 3/26/25 75% WD PROGRESS SET

2 5/30/25 95% WD PROGRESS SET

3 07/25/25 BID SET

320 4TH STREET

JUNIPERO SERRA BUILDING

LOT 52 RESTRIPPING

AND LIGHTING UPGRADE

LOS ANGELES, CA 90013

0#-###### ##-X-####-XX

AS SHOWN

XXXXXXXXXX014406

100% CONSTRUCTION DOCUMENTS

SA ON ON

DEPARTMENT OF GENERAL SERVICES

OFFICE OF FLEET AND ASSET MANAGEMENT

DATE SIGNED: 07/25/2025

SCALE: 0 202 FEET10

1/16" = 1'-0"

ELECTRICAL NEW WORK - LIGHTING BASEMENT FLOOR PLAN N

NEW WORK KEYNOTES:

PROVIDE LIGHTING FIXTURE AS SHOWN ON FLOOR PLAN AND

LIGHTING FIXTURE SCHEDULE. ALL LIGHTING FIXTURE SHALL

HAVE INTEGRATED WIRELESS CONTROLLERS WITH OCCUPANCY

AND DAYLIGHT SENSORS.

EXTEND (E) LIGHTING BRANCH CIRCUIT FROM NEAREST JUNCTION

BOX TO LOCATION OF (N) LIGHTING FIXTURE.

PROVIDE LIGHTING CONTROL COMMUNICATION PANEL. PROVIDE

INTERCONNECTION WITH (E) BMS SYSTEM.

PROVIDE WIRELESS LOCAL MANUAL DIMMING SWITCH.

TYP.

GENERAL NOTES:

1. CONTRACTOR SHALL BE RESPONSIBLE FOR REVIEWING AND

FOLLOWING LIGHTING MANUFACTURERS CONSTRUCTION

DOCUMENTS AND INSTALLATION GUIDELINES. PROVIDE ALL

REQUIRED HARDWARE, CONDUITS AND CONDUCTORS TO ALL

DEVICES AND CONTROLLERS REQUIRED TO HAVE SATISFACTORY

RESULTS IN THE SYSTEMS FUNCTIONALITY.

2. REPAIR ANY DAMAGES OR OPENINGS TO WALLS OR CEILINGS

DURING AND AFTER INSTALLATION.

3. REFER TO SHEET E0.2 FOR ADDITIONAL NEW WORK LIGHTING

GENERAL NOTES.

4. COORDINATE WITH LIGHTING FIXTURE MANUFACTURER FOR

ASSISTANCE WITH INSTALLATION RECOMMENDATIONS AND

PROGRAMMING. REFER TO LIGHTING MANUFACTURER

CONSTRUCTION DESIGN DOCUMENTS FOR INSTALLATION AND

PRODUCT DETAILS.

5. PROVIDE INTERCONNECTION ALL NEW LIGHTING FIXTURES,

CONTROLLERS/DEVICES, AND CONTROL PANELS TO (E) BUILDING

MANAGEMENT SYSTEM (BMS). PROVIDE ALL REQUIRED HARDWARE,

CONDUITS AND CONDUCTORS TO ALL DEVICES AND CONTROLLERS

REQUIRED TO HAVE SATISFACTORY RESULTS IN THE SYSTEMS

FUNCTIONALITY.

6. CONTRACTOR SHALL FIELD VERIFY FIXTURE MOUNTING

ELEVATIONS THROUGHOUT ALL GARAGE PARKING LEVEL. FIELD

ADJUSTMENTS AND THREADING SHALL BE MADE TO ALL FIXTURES

STEMS/SUPPORT SYSTEM AS NEEDED TO MAINTAIN AN

APPROPRIATE VEHICLE CLEARANCE ELEVATION.

A

AE

TYP.1

TYP.2

TYP.2

2 TYP.3

TYP.4

PANEL "E1HA" MLO/200A MCB,

480/277V, 3PH, 4W, 225A BUS

E1HA-19E1HA-19

E1HA-19

E1HA-19 E1HA-19

E1HA-19

BHA-14BHA-14

BHA-14

BHA-14

BHA-14

E1HA-19

ST

O

R E

TH

E

BR

O

AD

W

AY

D

EP

AR

TM

EN

T

ELECTRICAL NEW WORK -

LIGHTING FIRST FLOOR PLAN

E2.3

C

AD

F ile

: L :\2

4\

0-

Lo t 5

Li gh tin g U pg ra de s, O

FA

M , J un ip er o

Se rra

B ui ld in g\ C

AD

\2

3_ E2

EL

EC

TR

IC

AL

N

EW

W O

R K

- L

IG

H

TI

N G

F

IR

ST

F

LO

O

R P

LA

N

.d w g P lo t D at e:

J ul

5,

- 6

:3 te d by : O rla nd oN aj er a

V1

707 Third Street, Suite 4-105

Architecture & Engineering Sections

Project Management & Development Branch Real Estate Services Division

State of California

West Sacramento, California 95605

Department of General Services

C op yr ig ht

4, C al ifo rn ia

D ep ar tm en t o f G en er al

S er vi ce s

- R ea l E st at e Se rv ic es D iv is io n

JCCA#: 24690-3

385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501

P: 310.212.7644 F:310.212.5272I

1 3/26/25 75% WD PROGRESS SET

2 5/30/25 95% WD PROGRESS SET

3 07/25/25 BID SET

320 4TH STREET

JUNIPERO SERRA BUILDING

LOT 52 RESTRIPPING

AND LIGHTING UPGRADE

LOS ANGELES, CA 90013

0#-###### ##-X-####-XX

AS SHOWN

XXXXXXXXXX014406

100% CONSTRUCTION DOCUMENTS

SA ON ON

DEPARTMENT OF GENERAL SERVICES

OFFICE OF FLEET AND ASSET MANAGEMENT

DATE SIGNED: 07/25/2025

SCALE: 0 202 FEET10

1/16" = 1'-0"

ELECTRICAL NEW WORK - LIGHTING FIRST FLOOR PLAN N

NEW WORK KEYNOTES:

PROVIDE LIGHTING FIXTURE AS SHOWN ON FLOOR PLAN AND

LIGHTING FIXTURE SCHEDULE. ALL LIGHTING FIXTURE SHALL

HAVE INTEGRATED WIRELESS CONTROLLERS WITH OCCUPANCY

AND DAYLIGHT SENSORS.

EXTEND (E) LIGHTING BRANCH CIRCUIT FROM NEAREST JUNCTION

BOX TO LOCATION OF (N) LIGHTING FIXTURE.

PROVIDE LIGHTING CONTROL COMMUNICATION PANEL. PROVIDE

INTERCONNECTION WITH (E) BMS SYSTEM.

PROVIDE WIRELESS LOCAL MANUAL DIMMING SWITCH.

GENERAL NOTES:

1. CONTRACTOR SHALL BE RESPONSIBLE FOR REVIEWING AND

FOLLOWING LIGHTING MANUFACTURERS CONSTRUCTION

DOCUMENTS AND INSTALLATION GUIDELINES. PROVIDE ALL

REQUIRED HARDWARE, CONDUITS AND CONDUCTORS TO ALL

DEVICES AND CONTROLLERS REQUIRED TO HAVE SATISFACTORY

RESULTS IN THE SYSTEMS FUNCTIONALITY.

2. REPAIR ANY DAMAGES OR OPENINGS TO WALLS OR CEILINGS

DURING AND AFTER INSTALLATION.

3. REFER TO SHEET E0.2 FOR ADDITIONAL NEW WORK LIGHTING

GENERAL NOTES.

4. COORDINATE WITH LIGHTING FIXTURE MANUFACTURER FOR

ASSISTANCE WITH INSTALLATION RECOMMENDATIONS AND

PROGRAMMING. REFER TO LIGHTING MANUFACTURER

CONSTRUCTION DESIGN DOCUMENTS FOR INSTALLATION AND

PRODUCT DETAILS.

5. PROVIDE INTERCONNECTION ALL NEW LIGHTING FIXTURES,

CONTROLLERS/DEVICES, AND CONTROL PANELS TO (E) BUILDING

MANAGEMENT SYSTEM (BMS). PROVIDE ALL REQUIRED HARDWARE,

CONDUITS AND CONDUCTORS TO ALL DEVICES AND CONTROLLERS

REQUIRED TO HAVE SATISFACTORY RESULTS IN THE SYSTEMS

FUNCTIONALITY.

6. CONTRACTOR SHALL FIELD VERIFY FIXTURE MOUNTING

ELEVATIONS THROUGHOUT ALL GARAGE PARKING LEVEL. FIELD

ADJUSTMENTS AND THREADING SHALL BE MADE TO ALL FIXTURES

STEMS/SUPPORT SYSTEM AS NEEDED TO MAINTAIN AN

APPROPRIATE VEHICLE CLEARANCE ELEVATION.

A

TYP.2

TYP.4

TYP.

AE

TYP.

ELECTRICAL GENERAL DETAILS

E3.1

C

AD

F ile

: L :\2

4\

0-

Lo t 5

Li gh tin g U pg ra de s, O

FA

M , J un ip er o

Se rra

B ui ld in g\ C

AD

\2

3_ E3

EL

EC

TR

IC

AL

G

EN

ER

AL

D

ET

A…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .