LOT_52_Plans.pdf
PDF 41 MB Posted
- Attached to
- 24-247893 FMD Access Control Maintenance
- Solicitation number
- 0000038460
- Issued by
- California
About this file
This document consists of construction plans and specifications for Lot 52 Restriping and Lighting Upgrades at the Junipero Serra Building (320 4th Street, Los Angeles, CA 90013), prepared by the California Department of General Services, Real Estate Services Division, in coordination with the Office of Fleet and Asset Management. The project scope encompasses obliterating existing parking stripes and restriping at existing locations throughout the multi-level garage, reinstalling parking stripes, painting bollards and curbs, and replacing existing parking garage lighting fixtures with new LED lights rated at 27 watts manufactured by Lithonia Lighting (Model VCPG LED P1 40K T5M-OPTIC, 120-277V). The project also requires replacement of existing lighting controllers and sensors with integration into the existing Building Management System (BMS). The construction documents are dated July 25, 2025, representing 100% construction documents with three prior progress sets (75% dated March 26, 2025; 95% dated May 30, 2025). The project involves three parking levels: sub-basement, basement, and first floor, with detailed electrical demolition and new work plans provided for each level.
The specifications require the contractor to maintain all existing electrical systems outside the construction area, provide temporary lighting and power provisions during demolition, coordinate with lighting manufacturer Performance Lighting Systems representatives for installation and programming, and submit shop drawings for review and approval prior to work commencement. The contractor is responsible for all permits, licenses, testing, and inspections, with a one-year warranty on all materials and workmanship from the date of final acceptance. Work must comply with the 2022 California Building Code, California Electrical Code, California Fire Code, and related standards. The contractor shall provide comprehensive training to facility maintenance staff for a minimum of 8 hours covering operation and maintenance of the new lighting control and communications system, conducted by factory technicians or authorized vendors. All work must be completed while maintaining the facility in operation and keeping parking stalls available during business hours, with any required power outages requiring seven days' written notice and approval from the facility user, with all overtime costs included in the bid.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C
AD
F ile
\S
A0 1F
IL
3\ Au to C
AD
\P ro je ct s\ xx xx \0
6\ D
W G
\P
LT
\T
TI
TL
E
SH
EE
T.
dw g
P lo t D at e:
A ug
2,
- 1 1:
am
Pl ot te d by
: g ba li
V1
707 Third Street, Suite 4-105
Architecture & Engineering Sections
Project Management & Development Branch Real Estate Services Division
State of California
West Sacramento, California 95605
Department of General Services
C op yr ig ht
4, C al ifo rn ia
D ep ar tm en t o f G en er al
S er vi ce s
- R ea l E st at e Se rv ic es D iv is io n
PROJECT DOES NOT REQUIRE
OSFM REVIEW PER MEMO ISSUED
BY WENDY COLLINS, ASSISTANT
DEPUTY DIRECTOR, OSFM DATED
09-06-2019
PROJECT IS EXEMPT FROM THE DIVISION
THE SCOPE OF WORK INVOLVED IN THIS
OF THE STATE ARCHITECT ACCESSIBILITY
REQUIREMENTS IN ACCORDANCE WITH
TITLE 24, CALIFORNIA CODE OF
REGULATIONS, 2022 CALIFORNIA
BUILDING CODE.
J.WALLERJ.WALLERJ. DIGIORGIO
COVER SHEET
NTS
G001
320 4TH STREET
DEPARTMENT OF GENERAL SERVICES
JUNIPERO SERRA BUILDING
LOT 52 RESTRIPING
AND LIGHTING UPGRADES
LOS ANGELES, CA 90013
000000000014406
N/A
1 3/26/25 75% WD PROGRESS SET
2 5/30/25 95% WD PROGRESS SET
3 7/25/25 BID SET
N/A
OFFICE OF FLEET AND ASSET MANAGEMENT
110 5TH ST
WILSHIRE
6TH ST
4TH ST
OLIV
E
ST
HILL
S T
SP
RIN
G S T
3RD ST
MAI
N S
T
FI
GUER
OA
ST
LITTLE TOKIO
JUNIPERO
SERRA BLDG
TEMPLE ST
FL
OW
ER
S
T
GRAN
D S
T
LO
S
AN
GEL
ES
S
T
7TH ST
8TH ST
SA
N
PE
DR
O S
T
2ND ST
1TH ST DOWNTOWN
LOS ANGELES
N
BR
OAD
W
AY
S T
PROJECT LOCATION
PROJECT NUMBER: 000000000014406
320 4TH STREET
OFFICE OF FLEET AND ASSET MANAGEMENT
LOS ANGELES, CA 90013
LOS ANGELES COUNTY
PROJECT DIRECTORY
PROJECT MANAGER: GAURAV BALI
JESSICA WALLER
PROJECT SCOPEAPPLICABLE CODES
OBLITERATE EXISTING PARKING STRIPES AND STRIPE AT EXISTING LOCATIONS
THROUGHOUT THE GARAGE, ALL LEVELS. REINSTALL PARKING STRIPES AND PAINT
BOLLARDS AND CURBS.
REPLACE EXISTING PARKING GARAGE LIGHTING FIXTURE FOR NEW LED
LIGHTS. REPLACE EXISTING PARKING GARAGE LIGHTING CONTROLLERS AND
SENSORS. INTEGRATE LIGHTING FIXTURES AND CONTROLLERS WITH EXISTING BMS
SYSTEM.
LOCATION MAP
PROJECT LOCATION
LOT 52 RESTRIPING AND LIGHTING UPGRADES
SHEET INDEX
GENERAL NOTES
LEGEND
DEMOLITION NOTES
JUNIPERO SERRA BUILDING
OWNER & OWNERS AGENT
DEPARTMENT OF GENERAL SERVICES,
REAL ESTATE SERVICES DIVISION
PROJECT MANAGEMENT AND DEVELOPMENT BRANCH
707 3RD STREET, 4TH FLOOR
WEST SACRAMENTO, CA. 95605
ALL WORK MUST COMPLY WITH THE LATEST APPLICABLE FOLLOWING CODES AND
REGULATIONS, AS ADOPTED AND AMENDED BY LOCAL, CITY, COUNTY, MUNICIPAL
AND STATE REGULATIONS:
- 2022 BUILDING STANDARDS ADMINISTRATIVE CODE, PART 1, TITLE 24 C.C.R.
- 2022 CALIFORNIA BUILDING CODE (CBC), PART 2, TITLE 24 C.C.R.
- 2022 CALIFORNIA ELECTRICAL CODE (CEC), PART 3, TITLE 24 C.C.R.
NFPA 70 - 2020 EDITION
- 2022 CALIFORNIA ENERGY CODE (CEC), PART 6, TITLE 24 C.C.R.
- 2022 CALIFORNIA FIRE CODE (CFC), PART 9, TITLE 24 C.C.R.
- 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE (CALGREEN), PART 11,
TITLE 24 C.C.R.
- 2022 CALIFORNIA REFERENCE STANDARDS, PART 12, TITLE 24 C.C.R.
- TITLE 19 C.C.R., PUBLIC SAFETY, STATE FIRE MARSHAL REGULATIONS.
REFERENCE CODE SECTION FOR NFPA STANDARDS ARE IN 2022 CBC CHAPTER 35
OR 2022 CFC CHAPTER 80. SEE CHAPTER 35 FOR STATE OF CALIFORNIA
AMENDMENTS TO NFPA STANDARDS.
AMERICANS WITH DISABILITIES ACT TITLE II.
LAYOUT AND HORIZONTAL CONTROL NOTES
1. THE STATE CONSTRUCTION SUPERVISOR WILL ESTABLISH A DATE FOR
DEMOLITION TO BEGIN. CONTRACTOR SHALL PROVIDE A DETAILED PHASING
PLAN AND SCHEDULE FOR THIS PROJECT.
2. CONTRACTOR SHALL, AT ALL TIMES, KEEP THE PREMISES FREE FROM
ACCUMULATION OF WASTE MATERIALS OR RUBBISH CAUSED BY HIS WORK. AT
THE COMPLETION OF THE WORK REMOVE ALL RUBBISH, TOOLS, SURPLUS
MATERIALS AND LEAVE THE JOB IN A BROOM CLEAN CONDITION. VEHICLES
LEAVING CONSTRUCTION SITE SHALL NOT TRACK DIRT/MUD OFF THE STATE
PROPERTY.
3. A LOCATION FOR THE CONTRACTOR'S STAGING AREA WILL BE DESIGNATED BY
THE STATE. CONTRACTOR IS PERMITTED TO FENCE THIS AREA TO PROTECT
OFFICES, STORED MATERIAL AND EQUIPMENT. CONTRACTOR IS RESPONSIBLE
FOR SECURING HIS FACILITIES FROM THEFT OR VANDALISM.
4. THESE DRAWINGS DO NOT CONTAIN THE NECESSARY COMPONENTS FOR
CONSTRUCTION SAFETY. WORKER AND PEDESTRIAN PROTECTION SHALL BE
PROVIDED AND MAINTAINED BY THE CONTRACTOR AT THE CONTRACTOR'S
EXPENSE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE WITH
ALL CURRENTLY APPLICABLE SAFETY LAWS OF ANY JURISDICTIONAL BODY,
INCLUDING BUT NOT LIMITED TO OSHA REQUIREMENTS. FOR INFORMATION
PLEASE CONTACT THE STATE INDUSTRIAL SAFETY DEPARTMENT.
5. THE CONTRACTOR IS FINANCIALLY RESPONSIBLE FOR THE MAINTENANCE OR
REPAIR OF OFFSITE STREET SURFACES WHERE DAMAGE HAS BEEN
SUSTAINED BECAUSE OF THE CONSTRUCTION TRAFFIC.
6. CONSTRUCTION NOISE SHALL BE IN COMPLIANCE WITH THE CITY OF LOS
ANGELES AND COUNTY REQUIREMENTS. CONSULT THEM FOR SPECIFIC
RESTRICTIONS AND HOURS OF OPERATION.
7. SIGN CALLOUTS REFERENCE THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES (CAMUTCD).
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPORTING ALL CONFLICTS,
ERRORS, OMISSIONS, ETC. TO THE STATE IMMEDIATELY UPON DISCOVERY. IF
SO DIRECTED BY THE STATE, THE CONTRACTOR SHALL STOP WORK UNTIL
MITIGATION CAN BE MADE. ANY COSTS INCURRED RESULTING FROM THE
CONTRACTOR'S FAILURE TO STOP WORK AS DIRECTED SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR.
9. THE CONTRACTOR IS RESPONSIBLE FOR SITE CONDITIONS INCLUDING PUBLIC
SAFETY, DUST CONTROL, AND EROSION AND SEDIMENT CONTROL;
CONTINUALLY DURING WORKING HOURS AND DURATION OF THE PROJECT.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE STATE
48-HOURS PRIOR TO COMMENCING WORK AND 24-HOURS PRIOR TO
RESUMPTION AFTER INTERRUPTION. REQUESTS FOR INSPECTION SHALL BE
GIVEN 48-HOURS IN ADVANCE, AND BE PERFORMED BY THE STATE.
11. THE FACILITY SHALL BE OPEN DURING CONSTRUCTION. CONTRACTOR TO
PROVIDE AND MAINTAIN PUBLIC ACCESS AND EMERGENCY EGRESS TO/FROM
BUILDING AT ALL TIMES DURING CONSTRUCTION. CONTRACTOR TO SUBMIT
PHASING PLAN TO KEEP ACCESS TO FACILITY OPEN AT ALL TIMES. PHASING
PLAN TO BE SUBMITTED AND APPROVED BY STATE PRIOR TO COMMENCING
PAVING WORK.
12. CONTRACTOR SHALL PROTECT CONSTRUCTION AREA WHILE MAINTAINING
UNINTERRUPTED PARKING LOT AND ROADWAY CIRCULATION DURING NORMAL
OPERATING HOURS. THE CONTRACTOR SHALL KEEP ALL PARKING STALLS
AVAILABLE DURING BUSINESS HOURS.
13. CONTRACTOR SHALL DESIGN AND IMPLEMENT BEST MANAGEMENT PRACTICES
(BMPs) TO PREVENT ALL CONSTRUCTION POLLUTANTS OR POLLUTION FROM
CONTACTING STORM WATER AND KEEP ALL PRODUCTS OF EROSION FROM
ENTERING RECEIVING WATERS. CONTRACTOR SHALL SUBMIT BMPs TO THE
STATE FOR APPROVAL PRIOR TO START OF CONSTRUCTION. SEE
SPECIFICATIONS.
VICINITY MAP
SHEET NUMBER SHEET TITLE
G001 COVER SHEET
C101 FIRST FLOOR PLAN
C102 BASEMENT FLOOR PLAN
C103
ELECTRICAL
E0.1 E0.2 E1.1 E1.2 E1.3 E2.1 E2.2 E2.3 E3.1 E4.1 E5.1 E6.1 E6.2 E6.3 E6.4 E6.5 E6.6 E6.7 E6.8
SUB-BASEMENT FLOOR PLAN
ELECTRICAL COVER SHEET
ELECTRICAL PANEL AND LIGHTING FIXTURE SCHEDULE
ELECTRICAL DEMOLITION - LIGHTING SUB-BASEMENT FLOOR PLAN
ELECTRICAL DEMOLITION - LIGHTING BASEMENT FLOOR PLAN
ELECTRICAL DEMOLITION - LIGHTING FIRST FLOOR PLAN
ELECTRICAL NEW WORK - LIGHTING SUB-BASEMENT FLOOR PLAN
ELECTRICAL NEW WORK - LIGHTING BASEMENT FLOOR PLAN
ELECTRICAL NEW WORK - LIGHTING FIRST FLOOR PLAN
ELECTRICAL GENERAL DETAILS
ELECTRICAL INDOOR TITLE 24 FORMS
ELECTRICAL SPECIFICATIONS
ELECTRICAL NORMAL PHOTOMETRIC - SUB-BASEMENT FLOOR PLAN
ELECTRICAL EGRESS PHOTOMETRIC - SUB-BASEMENT FLOOR PLAN
ELECTRICAL NORMAL PHOTOMETRIC - BASEMENT FLOOR PLAN
ELECTRICAL EGRESS PHOTOMETRIC - BASEMENT FLOOR PLAN
ELECTRICAL NORMAL PHOTOMETRIC - FIRST FLOOR PLAN
ELECTRICAL EGRESS PHOTOMETRIC - FIRST FLOOR PLAN
ELECTRICAL CONTROLS LAYOUT - SUB-BASEMENT FLOOR PLAN
ELECTRICAL CONTROLS LAYOUT - BASEMENT FLOOR PLAN
E6.9 ELECTRICAL CONTROLS LAYOUT - FIRST FLOOR PLAN
E6.10 ELECTRICAL CONTROLLER DETAILS
ELECTRICAL ENGINEER J.C. CHANG AND ASSOCIATES
310-212-7644
07/25/2025
ISSUE DATE: FEBRUARY 24, 2026
C
AD
F ile
\S
A0 1F
IL
3\ Au to C
AD
\P ro je ct s\ xx xx \0
6\ D
W G
\P
LT
\C
FI
R
ST
F
LO
O R
P
LA
N .d w g
P lo t D at e:
A ug
2,
- 1 1:
te d by
: g ba li
V1
707 Third Street, Suite 4-105
Architecture & Engineering Sections
Project Management & Development Branch Real Estate Services Division
State of California
West Sacramento, California 95605
Department of General Services
C op yr ig ht
4, C al ifo rn ia
D ep ar tm en t o f G en er al
S er vi ce s
- R ea l E st at e Se rv ic es D iv is io n
PROJECT DOES NOT REQUIRE
OSFM REVIEW PER MEMO ISSUED
BY WENDY COLLINS, ASSISTANT
DEPUTY DIRECTOR, OSFM DATED
09-06-2019
PROJECT IS EXEMPT FROM THE DIVISION
THE SCOPE OF WORK INVOLVED IN THIS
OF THE STATE ARCHITECT ACCESSIBILITY
REQUIREMENTS IN ACCORDANCE WITH
TITLE 24, CALIFORNIA CODE OF
REGULATIONS, 2022 CALIFORNIA
BUILDING CODE.
J.WALLERJ.WALLERJ. DIGIORGIO
FIRST FLOOR
PLAN
1/16" = 1'-0"
C101
320 4TH STREET
DEPARTMENT OF GENERAL SERVICES
JUNIPERO SERRA BUILDING
LOT 52 RESTRIPING
AND LIGHTING UPGRADES
LOS ANGELES, CA 90013
000000000014406
N/A
1 3/26/25 75% WD PROGRESS SET
2 5/30/25 95% WD PROGRESS SET
3 7/25/25 BID SET
N/A
OFFICE OF FLEET AND ASSET MANAGEMENT
DEMOLITION/IMPROVEMENT PLAN
C O
M P
A C
T
C O
M P
A C
T
C O
M P
A C
T
C O
M P
A C
T
C O
M P
A C
T C
O M
P A
C T
COMPACT
COMPACT COMPACT COMPACT
C O
M P
A C
T C
O M
P A
C T
C O
M P
A C
T C
O M
P A
C T
C O
M P
A C
T C
O M
P A
C T
C O
M P
A C
T
COMPACT COMPACT COMPACT
COMPACT COMPACT COMPACT
COMPACT COMPACT COMPACT
C O
M P
A C
T
C O
M P
A C
T
C O
M P
A C
T
C O
M P
A C
T
C O
M P
A C
T
C O
M P
A C
T
C O
M P
A C
T
C O
M P
A C
T
C O
M P
A C
T
COMPACT COMPACTCOMPACT COMPACT
YIELD
EXI
T
EXIT
ONLY
C
AD
F ile
\S
A0 1F
IL
3\ Au to C
AD
\P ro je ct s\ xx xx \0
6\ D
W G
\P
LT
\C
BA
SE
M
EN
T
FL
O
O R
P
LA
N .d w g
P lo t D at e:
A ug
2,
- 1 1:
te d by
: g ba li
V1
707 Third Street, Suite 4-105
Architecture & Engineering Sections
Project Management & Development Branch Real Estate Services Division
State of California
West Sacramento, California 95605
Department of General Services
C op yr ig ht
4, C al ifo rn ia
D ep ar tm en t o f G en er al
S er vi ce s
- R ea l E st at e Se rv ic es D iv is io n
PROJECT DOES NOT REQUIRE
OSFM REVIEW PER MEMO ISSUED
BY WENDY COLLINS, ASSISTANT
DEPUTY DIRECTOR, OSFM DATED
09-06-2019
PROJECT IS EXEMPT FROM THE DIVISION
THE SCOPE OF WORK INVOLVED IN THIS
OF THE STATE ARCHITECT ACCESSIBILITY
REQUIREMENTS IN ACCORDANCE WITH
TITLE 24, CALIFORNIA CODE OF
REGULATIONS, 2022 CALIFORNIA
BUILDING CODE.
JWJWJD
BASEMENT
FLOOR PLAN
1/16" = 1'-0"
C102
320 4TH STREET
DEPARTMENT OF GENERAL SERVICES
JUNIPERO SERRA BUILDING
LOT 52 RESTRIPING
AND LIGHTING UPGRADES
LOS ANGELES, CA 90013
000000000014406
N/A
1 3/26/25 75% WD PROGRESS SET
2 5/30/25 95% WD PROGRESS SET
3 7/25/25 BID SET
N/A
OFFICE OF FLEET AND ASSET MANAGEMENT
DEMOLITION/IMPROVEMENT PLAN
3 4
C O
M P
A C
T
Storage Area
C O
M P
A C
T C
O M
P A
C T
C O
M P
A C
T C
O M
P A
C T
C O
M P
A C
T C
O M
P A
C T
C O
M P
A C
T
C O
M P
A C
T C
O M
P A
C T
C O
M P
A C
T
COMPACT COMPACT
COMPACT COMPACT COMPACT COMPACT
C O
M P
A C
T
C O
M P
A C
T
C O
M P
A C
T C
O M
P A
C T
C O
M P
A C
T C
O M
P A
C T
C O
M P
A C
T C
O M
P A
C T
C O
M P
A C
T
C O
M P
A C
T
C O
M P
A C
T
C O
M P
A C
T
C O
M P
A C
T
C O
M P
A C
T
C O
M P
A C
T C
O M
P A
C T
C O
M P
A C
T
C O
M P
A C
T
COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT
EXI
T
EXIT
ONLY
YIELD
ONLY
C
AD
F ile
\S
A0 1F
IL
3\ Au to C
AD
\P ro je ct s\ xx xx \0
6\ D
W G
\P
LT
\C
SU
B
BA
SE
M
EN
T
FL
O
O R
P
LA
N .d w g
P lo t D at e:
A ug
2,
- 1 1:
te d by
: g ba li
V1
707 Third Street, Suite 4-105
Architecture & Engineering Sections
Project Management & Development Branch Real Estate Services Division
State of California
West Sacramento, California 95605
Department of General Services
C op yr ig ht
4, C al ifo rn ia
D ep ar tm en t o f G en er al
S er vi ce s
- R ea l E st at e Se rv ic es D iv is io n
PROJECT DOES NOT REQUIRE
OSFM REVIEW PER MEMO ISSUED
BY WENDY COLLINS, ASSISTANT
DEPUTY DIRECTOR, OSFM DATED
09-06-2019
PROJECT IS EXEMPT FROM THE DIVISION
THE SCOPE OF WORK INVOLVED IN THIS
OF THE STATE ARCHITECT ACCESSIBILITY
REQUIREMENTS IN ACCORDANCE WITH
TITLE 24, CALIFORNIA CODE OF
REGULATIONS, 2022 CALIFORNIA
BUILDING CODE.
JWJWJD
SUB BASEMENT
FLOOR PLAN
1" = 10'-0"
C103
320 4TH STREET
DEPARTMENT OF GENERAL SERVICES
JUNIPERO SERRA BUILDING
LOT 52 RESTRIPING
AND LIGHTING UPGRADES
LOS ANGELES, CA 90013
000000000014406
N/A
1 3/26/25 75% WD PROGRESS SET
2 5/30/25 95% WD PROGRESS SET
3 7/25/25 BID SET
N/A
OFFICE OF FLEET AND ASSET MANAGEMENT
DEMOLITION/IMPROVEMENT PLAN
ELECTRICAL COVER
SHEET
E0.1
C
AD
F ile
: L :\2
4\
0-
Lo t 5
Li gh tin g U pg ra de s, O
FA
M , J un ip er o
Se rra
B ui ld in g\ C
AD
\2
3_ E0
EL
EC
TR
IC
AL
C O
VE
R
S H
EE
T.
dw g
P lo t D at e:
J ul
5,
- 6 :3
5p m te d by
: O rla nd oN aj er a
V1
707 Third Street, Suite 4-105
Architecture & Engineering Sections
Project Management & Development Branch Real Estate Services Division
State of California
West Sacramento, California 95605
Department of General Services
C op yr ig ht
4, C al ifo rn ia
D ep ar tm en t o f G en er al
S er vi ce s
- R ea l E st at e Se rv ic es D iv is io n
JCCA#: 24690-3
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7644 F:310.212.5272I
1 3/26/25 75% WD PROGRESS SET
2 5/30/25 95% WD PROGRESS SET
3 07/25/25 BID SET
320 4TH STREET
JUNIPERO SERRA BUILDING
LOT 52 RESTRIPPING
AND LIGHTING UPGRADE
LOS ANGELES, CA 90013
0#-###### ##-X-####-XX
AS SHOWN
XXXXXXXXXX014406
100% CONSTRUCTION DOCUMENTS
SA ON ON
DEPARTMENT OF GENERAL SERVICES
OFFICE OF FLEET AND ASSET MANAGEMENT
DATE SIGNED: 07/25/2025
DISTANCED
DIAGRAMDIAG.
CALIFORNIA BUILDING CODECBC
CALIFORNIA ELECTRICAL CODECEC
AMERICAN WIRE GAUGEAWG
NTS NOT TO SCALE
BRANCH CIRCUIT DESTINATION (PANEL NAME-CIRCUIT NUMBER)
HOMERUN INDICATES PROVIDING CONDUIT AND CONDUCTORS
MINIMUM CONDUIT SIZE: 3/4"
MINIMUM CONDUCTOR SIZE: #12AWG
PROVIDE 3/4"C-2#12+1#12G WHERE NO CONDUIT/WIRE SIZE IS
STATED. PROVIDE DEDICATED NEUTRAL FOR ALL BRANCH CIRCUIT
WIRING. CONTRACTOR RESPONSIBLE FOR DE-RATING CONDUIT
WITH MORE THAN SIX CURRENT CARRYING CONDUCTORS PER CEC
310.
#12 AWG FOR CIRCUITS UP TO 100'
#10 AWG FOR CIRCUITS FROM 100' TO 200'
#8 AWG FOR CIRCUIT GREATER THAN 200'
P4-10
J
SHEET WHERE DETAIL IS DRAWN
DETAIL NO.
NEW WORK KEY NOTE
DEMOLITION KEY NOTE
RJ11 PHONE JACK PORT - WALL MOUNTED
TRANSFORMER
RJ45 ETHERNET PORT - FLOOR MOUNTED
RJ45 ETHERNET PORT - WALL MOUNTED
120V 20A - DUPLEX - WALL MOUNTED - RECEPTACLE
120V 20A - DUPLEX - FLOOR MOUNTED - RECEPTACLE
120V 20A - QUADPLEX - WALL MOUNTED - RECEPTACLE
120V 20A - QUADPLEX - FLOOR MOUNTED - RECEPTACLE
TOR
EMERGENCY ILLUMINATED EXIT SIGN, 120-277V A.C OPERATION,
FULLY AUTOMATIC MINIMUM 90 MINUTES BATTERY OPERATION.
+90"A.F.F., ARROWS INDICATE DIRECTION OF EGRESS, SURFACE OR
PENDANT, SHADING INDICATES ILLUMINATED FACE
OR
EMERGENCY ILLUMINATED COMBO EXIT SIGN, 120-277V A.C
OPERATION, (2) FULLY ADJUSTABLE GLARE FREE LIGHTING HEADS,
FULLY AUTOMATIC MINIMUM 90 MINUTES BATTERY OPERATION.
+90"A.F.F., ARROWS INDICATE DIRECTION OF EGRESS, SURFACE OR
PENDANT, SHADING INDICATES ILLUMINATED FACE.
EMERGENCY LIGHTING BUG EYE UNIT,120-277V A.C OPERATION,
(2) FULLY ADJUSTABLE GLARE FREE LIGHTING HEADS,
FULLY AUTOMATIC MINIMUM 90 MINUTES BATTERY OPERATION.
+90"A.F.F., DUAL LITE "EZ-2" SERIES.
OS OCCUPANCY SENSOR
LOW-VOLTAGE SWITCH
LOW-VOLTAGE TRIPLE ZONE SWITCH
LOW-VOLTAGE QUADRUPLE ZONE SWITCH
LOW-VOLTAGE DOUBLE ZONE DIMMING SWITCH
LOW-VOLTAGE DOUBLE ZONE SWITCH
D a,b,c D a,b,c,d
D a,b a,b,c,d a,b,c a,b
OS
D
OS
D
ROOM CONTROLLER
ASTRONOMICAL TIMER
PHOTOCELL SENSORPC
RC
TIMER
LOW-VOLTAGE TRIPLE ZONE DIMMING SWITCH
LOW-VOLTAGE QUADRUPLE ZONE DIMMING SWITCH
LOW-VOLTAGE DIMMING SWITCH
LOW-VOLTAGE DIMMING OCCUPANCY SENSOR SWITCH
LOW-VOLTAGE OCCUPANCY SENSOR SWITCH
JUNCTION BOX OR PULL BOX, SIZED PER CODE
(208Y/120V OR 240Y/120V) 3Ø, 4W OR (240/120V) 1Ø, 3W PANELBOARD
480Y/277V, 3Ø, 4W PANELBOARD
SWITCHBOARD, DISTRIBUTION BOARD OR MOTOR CONTROL CENTER
CIRCUIT BREAKER
EXHAUST FAN
FIRE ALARM - STROBE LIGHT - WALL MOUNTED
P
SD
CD
FIRE ALARM - STROBE LIGHT - CEILING MOUNTED
FIRE ALARM - PULL SECTION - WALL MOUNTED
FIRE ALARM - SMOKE OR HEAT DETECTOR - CEILING MOUNTED
CD
GROUNDINGGROUNDING
NEGLIGIBLENEGL
DEMOLISH
EXISTING(E)
CB CIRCUIT BREAKER
EA. EACH
COPPERCU
G, GND GROUND
MCB MAIN CIRCUIT BREAKER
AMP./A AMPERE
FIN FINISHED
CIRCUITCKT
LOW VOLTAGE
AMPERE INTERRUPTING
CAPACITYAIC
ABOVE FINISHED FLOORAFF
BKR BREAKER
WEATHER PROOFWP
SWITCHBOARDSWB
TYP. TYPICAL
UG UNDERGROUND
SWITCH SW
PULL BOXPB
SLD SINGLE LINE DIAGRAM
POLEP
PANELBOARDPNL
(R) RELOCATED
SUB SUBSTATION
NEW(N)
TD TIME DELAY
UNLESS OTHERWISE
NOTEDUON
TRANSFORMERXFMR,
TRANSF.
VD VOLTAGE DROP
(D)
NTS NOT TO SCALE
LV
EM. EMERGENCY
AUTHORITY HAVING
JURISDICTIONAHJ
OS OCCUPANCY SENSOR
PHOTOCELL SENSORPC
PLC
GENERAL CONTRACTORGC
GFCI
GEC
DRAWINGDWG
EGC
L LENGTH
VFD VARIABLE FREQUENCY DRIVE
SCE SOUTHERN CALIFORNIA EDISON
EQUIPMENT GROUNDING
CONDUCTOR
GROUNDING ELECTRODE
CONDUCTOR
GROUND FAULT CURRENT
INTERRUPTER
PROGRAMMABLE LOGICAL
CONTROLLER
THRU THROUGH
MIN. MINIMUM
MFR MANUFACTURER
EQUIP EQUIPMENT
LADWP LOS ANGELES DEPARTMENT
OF WATER AND POWER
ABBREVIATIONSCONTRACTOR NOTES ELECTRICAL NOTES ELECTRICAL LEGEND
1. CONTRACTOR SHALL COORDINATE WITH PROJECT MANAGER, OWNER, AND ELECTRICAL
ENGINEER TO HOST AN ON-SITE PRE-CONSTRUCTION MEETING TO REVIEW
REQUIREMENTS OF PROVIDING AN EFFICIENT SEQUENCE OF CONSTRUCTION TO
MINIMIZE DOWNTIME/POWER OUTAGE TO FACILITY.
2. CONTRACTOR SHALL FIELD VERIFY TO IDENTIFY, LABEL, AND TROUBLESHOOT ALL (E)
BRANCH CIRCUIT POWER DISTRIBUTION WITHIN CONSTRUCTION AREA PRIOR TO
DEMOLITION OF EQUIPMENT. THIS IS TO ENSURE CONTINUITY OF (E) ELECTRICAL
SYSTEM OPERATION BEYOND THE CONSTRUCTION AREA IS KEPT IN OPERATION
DURING AND AFTER CONSTRUCTION.
3. IF ANY BRANCH CIRCUITS ARE BEING SHARED BETWEEN ANY AREAS WITHIN
CONSTRUCTION AND AREAS OUTSIDE OF CONSTRUCTION, CONTRACTOR SHALL
PROVIDE SEPARATE BRANCH CIRCUIT FOR EACH ZONE.
4. ONCE ALL POWER DISTRIBUTION HAS BEEN DISAGGREGATE FROM AREA OF
CONSTRUCTION, CONTRACTOR SHALL PROCEED TO PROVIDING TEMPORARY LIGHTING
SOURCE AND POWER SUPPLY IN PERFORMING THEIR WORK TO AVOID DISRUPTION ON
CLIENTS OPERATION.
5. ONCE ALL PROVISIONS HAVE BEEN MADE, START DEMOLISHING ALL ELECTRICAL
EQUIPMENT WITHIN ELECTRICAL BUILDING IN SECTIONS TO MINIMIZE FACILITY DOWN
TIME. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH PROJECT
MANAGER AND OTHER TRADES DURING CONSTRUCTION.
6. AS EACH SECTION OF THE ELECTRICAL SYSTEM IS BEING DEMOLISHED, PROVIDE
UPDATED PANEL SCHEDULES TO IDENTIFY WHICH BRANCH CIRCUITS ARE
ABANDONED/NOT IN USE AND PROVIDE EXTENSIVE BRANCH CIRCUIT LABELING AT ALL
POINTS OF THE ELECTRICAL SYSTEM.
7. AFTER ENTIRE AREA OF CONSTRUCTION HAS BEEN DEMOLISHED AS DEFINED ON
DEMOLITION PLANS, CONTRACTOR SHALL COORDINATE WITH PROJECT MANAGER TO
PROVIDE NEW WORK SEQUENCE OF CONSTRUCTION TO EFFICIENTLY EXTEND
CONDUITS AND CONDUCTORS AND INSTALL ASSOCIATED EQUIPMENT IN PLACE AS
SHOWN IN NEW WORK PLANS.
8. CONTRACTOR SHALL BE RESPONSIBLE TO CAREFULLY COORDINATE EQUIPMENT LEAD
TIMES WITH CONSTRUCTION TIMELINES. COORDINATE WITH PROJECT MANAGER FOR
APPROPRIATE ONSITE STORAGE LOCATIONS FOR BOTH NEW EQUIPMENT AND TOOLS.
9. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY ALL EXISTING
UNDERGROUND UTILITY LINES BY VIA DIG ALERT 811 PRIOR TO EXCAVATING EXISTING
ASPHALT DRIVEWAY TO AVOID INTERFERENCE AND DAMAGE TO EXISTING
INFRASTRUCTURE.
SEQUENCE OF CONSTRUCTION
1. THE CONTRACTOR SHALL FURNISH ALL LABOR, SUPERVISION, MATERIALS, EQUIPMENT,
TOOLS, TRANSPORTATION, WAREHOUSING, AND ANY OTHER SERVICES REQUIRED TO
COMPLETE THE WORK IN A TIMELY AND EFFICIENT MANNER.
2. INDIVIDUAL ITEMS OF WORK ARE DETAILED IN THE VARIOUS SECTIONS OF THIS SCOPE
OF WORK, THE ATTACHED DRAWINGS, AND THE NOTES AND LEGENDS ON THE
DRAWINGS. THE CONTRACTOR IS RESPONSIBLE TO COMPLETE THE REQUIREMENTS
FOUND IN ANY OF THE ABOVE.
3. CONTRACTOR BIDS ARE TO BE BASED UPON COMPLETING THE WORK WITHIN THE
AMOUNT BID. ANY QUESTIONS PERTAINING TO UNKNOWN CONDITIONS, CHANGES IN
DESIGN, OMISSIONS IN THE DESIGN OR SCOPE OF WORK, MATERIALS, AND
INSTALLATION TECHNIQUE ARE TO BE DISCUSSED WITH THE PROJECT MANAGER. THE
PROJECT MANAGER WILL OBTAIN THE ANSWERS TO QUESTIONS, AS SOON AS
POSSIBLE, IF "ON-THE-SPOT" ANSWERS CAN NOT BE PROVIDED. UNKNOWN CONDITIONS
ENCOUNTERED DURING THE COURSE OF WORK, WHICH MAY DELAY WORK OR ADD
COST, WILL BE REPORTED TO THE PROJECT MANAGER IMMEDIATELY SO THAT PROPER
ARRANGEMENTS CAN BE MADE WITHOUT WORK STOPPAGE.
4. ANY POWER OUTAGES SHALL BE APPROVED BY THE USER OF THE FACILITY. A SEVEN
DAY WRITTEN NOTICE SHALL BE GIVEN FOR ANY OUTAGE REQUEST. POWER
SHUTDOWN SHALL BE DONE AFTER NORMAL WORKING HOURS, AND SHALL BE
PROPERLY COORDINATED IN ADVANCE. CONTRACTOR SHALL INCLUDE IN HIS BID ALL
COST TO COVER OVERTIME.
5. CONTRACTOR SHALL VERIFY EXACT LOCATION OF PANELBOARDS AND CONTROL
PANELS WITH OWNER AND PROJECT MANAGER PRIOR TO INSTALLATION.
6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO INSTALL ALL TEMPORARY
BRACING/SHORING, BARRIERS, TEMPORARY LIGHTING AND POWER PROVISIONS, ETC.
AS REQUIRED TO FACILITATE WORK WHILE INSURING SAFE WORK CONDITIONS
THROUGHOUT CONSTRUCTION.
7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO INSURE THAT ALL
APPLICABLE SAFETY LAWS ARE STRICTLY ENFORCED AND TO MAINTAIN A SAFE
CONSTRUCTION PROJECT.
8. THE CONTRACTOR SHALL REPAIR AND/OR REPAINT ALL AREAS DAMAGED BY
DEMOLITION OR CONSTRUCTION, AND FINISH TO MATCH EXISTING ADJACENT
SURFACES.
9. THE CONTRACTOR SHALL SUBMIT "AS-BUILT" DRAWINGS UPON COMPLETION OF
CONSTRUCTION.
10. DAILY, AND UPON COMPLETION OF WORK, CONTRACTOR SHALL REMOVE DEBRIS,
RUBBISH, WASTE, AND SURPLUS MATERIAL FROM SITE PREMISES.
11. THE CONTRACTOR SHALL PROTECT AND COVER ALL FIXTURES AND EQUIPMENT IN
AREAS AFFECTED BY WORK, AND UPON COMPLETION OF WORK, SHALL THOROUGHLY
CLEAN ALL FIXTURES, EQUIPMENT, WALLS, FLOOR, AND HARDWARE.
12. ALL WORK IS TO BE COMPLETED ON REGULAR AND/OR OFF HOURS AS DIRECTED BY
THE PROJECT MANAGER.
13. NOT ALL JUNCTION BOXES FOR ROUTING EXTENSIONS OF (E) BRANCH CIRCUITS ARE
SHOWN FOR CLARITY. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ADDITIONAL
BOXES, PENETRATIONS, CONDUIT, AND CONDUCTORS AS REQUIRED TO COMPLETE THE
WORK.
14. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS, LICENSES AND FEES
REQUIRED FOR THE EXECUTION OF HIS WORK, AND SHALL ARRANGE FOR AND PAY FOR
ALL REQUIRED TESTS AND INSPECTIONS, AND SHALL GIVE ALL NOTICES REQUIRED BY
ANY AND ALL LAWS, RULES, REGULATIONS AND ORDINANCES WHICH PERTAIN TO THE
CONTRACTOR'S WORK.
15. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOB CONDITIONS AT THE JOB SITE
PRIOR TO THE START OF CONSTRUCTION.
16. THE CONTRACTOR SHALL INSTALL ALL LIGHTING FIXTURES AS INDICATED ON
DRAWINGS. CONTRACTOR SHALL PROVIDE HANGERS AND ACCESSORIES NECESSARY
TO MAKE A COMPLETE INSTALLATION.
17. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING SHOP DRAWINGS FOR ALL
LIGHTING EQUIPMENT AND ANY ASSOCIATED EQUIPMENT WITHIN SCOPE OF WORK AND
AS SHOWN ON THESE PLANS. CONTRACTOR SHALL COORDINATE WITH ALL EQUIPMENT
MANUFACTURERS FOR INSTALLATION REQUIREMENTS, MATERIAL LIST, SHOP
DRAWINGS, AND EQUIPMENT SPECIFICATIONS PRIOR TO PROVIDING A BID OR
PERFORMING ANY WORK.
18. EQUIPMENT AND ACCESSORIES INSTALLED UNDER THIS SECTION SHALL CARRY THE
MANUFACTURER'S GUARANTEE FOR A PERIOD OF NOT LESS THAN ONE YEAR FROM
THE DATE OF ACCEPTANCE OF THE EQUIPMENT. THE CONTRACTOR SHALL GUARANTEE
IN WRITING, IN A FORM ACCEPTABLE TO THE PROJECT MANAGER, THE ENTIRE
ELECTRICAL INSTALLATION AGAINST DEFECTIVE MATERIALS AND/OR IMPROPER
WORKMANSHIP FOR A PERIOD OF ONE YEAR FROM DATE OF FINAL ACCEPTANCE.
DURING THE PERIOD COVERED BY THE GUARANTEE CONTRACTOR SHALL MAKE
NECESSARY REPLACEMENTS AND REPAIR AT NO COST TO CUSTOMER.
19. CONTRACTOR SHALL CONDUCT SUCH TESTS OF ANY PORTION OF INSTALLATIONS AS
MAY BE NECESSARY TO ENSURE FULL COMPLIANCE WITH PLANS AND SPECIFICATIONS.
COST OF TEST SHALL BE BORNE BY CONTRACTOR AND CONTRACTOR SHALL PROVIDE
ALL THE INSTRUMENTS, EQUIPMENT, LABOR AND MATERIALS TO COMPLETE TESTS.
SHOULD THESE TESTS DEVELOP ANY DEFECT IN MATERIALS OR POOR WORKMANSHIP
OR VARIANCE WITH REQUIREMENTS OF SPECIFICATIONS, THEN CONTRACTOR SHALL
MAKE ANY CHANGES NECESSARY AND REMEDY ANY DEFECTS AT THE CONTRACTOR'S
OWN EXPENSE.
20. THE CONTRACTOR SHALL CONSULT AND COOPERATE FULLY WITH ALL OTHER
CONTRACTORS FURNISHING LABOR, MATERIALS OR SERVICES, SO THAT THE WORK AS
A WHOLE, SHALL BE EXECUTED IN THE MOST EFFICIENT MANNER, AND WITHOUT
CONFLICT OR DELAY.
21. CONTRACTOR SHALL CORE DRILL, SAW CUT, PATCH TO MATCH ADJACENT SURFACES,
AND PAINT ALL EXPOSED CONDUITS & BOXES TO MATCH ROOM FINISH.
1. ALL WORK SHALL COMPLY WITH APPLICABLE CODES AND STANDARDS. REFER TO DWG
T0.1 FOR LIST OF APPLICABLE CODES AND STANDARDS.
2. ALL ELECTRICAL EQUIPMENT SHALL BE LABELED, LISTED, OR CERTIFIED BY A UL
NATIONALLY RECOGNIZED TESTING LABORATORY ACCREDITED BY THE UNITED STATE
OCCUPATIONAL SAFETY HEALTH ADMINISTRATIONS (OSHA) OR APPROVED BY THE AHJ
THIRD PARTY TESTING FACILITY.
3. ALL MATERIALS AND EQUIPMENT USED IN THE ELECTRICAL WORK HEREIN SPECIFIED
SHALL BE NEW (UNLESS OTHERWISE NOTED OR SCHEDULED), AND SUITED TO THE
INTENDED USE, AND SHALL BE LISTED BY THE UNDERWRITERS LABORATORIES INC.
AND SHALL MEET THEIR REQUIREMENTS AND BEAR THEIR LABEL WHENEVER
STANDARDS HAVE BEEN ESTABLISHED AND LABEL SERVICE IS REGULARLY FURNISHED
BY THAT AGENCY. ALL MATERIALS AND EQUIPMENT SHALL BE OF THE MAKES AND
TYPES SPECIFIED, AND NO SUBSTITUTIONS WILL BE ALLOWED UNLESS APPROVED IN
WRITING. THE PROJECT MANAGER RESERVES THE RIGHT TO REJECT ANY MATERIAL OR
EQUIPMENT, EITHER BEFORE OR AFTER INSTALLATION, WHICH, IN THE PROJECT
MANAGER'S OPINION IS NOT IN COMPLIANCE WITH THESE SPECIFICATIONS.
4. 130.5(C) VOLTAGE DROP: THE MAXIMUM COMBINED VOLTAGE DROP ON BOTH
INSTALLED FEEDER CONDUCTORS AND BRANCH CIRCUIT CONDUCTORS TO THE
FARTHEST CONNECTED LOAD OR OUTLET SHALL NOT EXCEED 5 PERCENT. APPLICABLE
FOR ALL NEW, ALTERED, OR RELOCATED FEEDER AND BRANCH CIRCUIT CONDUCTORS.
5. PROVIDE IS DEFINED TO MEAN THAT THE CONTRACTOR SHALL FURNISH, INSTALL,
ADJUST, TEST AND INTEGRATE INTO A COMPLETE SYSTEM THE ITEM INDICATED.
INCLUDING ALL HARDWARE, WIRING, AND MISCELLANEOUS ITEMS AS NECESSARY FOR
A COMPLETE AND OPERATIONAL SYSTEM.
6. ALL CONDUITS INSTALLED IN FINISHED AREAS SHALL BE CONCEALED EXCEPT AS
OTHERWISE INDICATED ON THE DRAWINGS OR HEREIN SPECIFIED. ELECTRIC METALLIC
TUBING, IN SIZE ONE (1) INCH OR SMALLER, SHALL BE USED WHERE EXPOSED TO DRY
LOCATIONS, IN STUD WALLS, FURRED CEILINGS AND SIMILAR LOCATIONS. USE RIGID
METAL CONDUIT FOR ALL EXPOSED EXTERIOR WORK. SUPPORT OVERHEAD CONDUIT
10' MAXIMUM ON CENTER WITH 3/8" ROD & 1/2" SELF-DRILLING EXPANSION BOLT
ANCHORED TO SLAB ABOVE. SEAL FIRE RATED WALL PENETRATIONS USING APPROVED
FIRE SEAL METHODS & MATERIALS.
7. ALL COMMUNICATION CONDUIT SHALL BE INSTALLED IN COMPLIANCE WITH INDUSTRY
BEST PRACTICES AND STANDARDS. PROVIDE MIN. 1-1/4" CONDUIT STUBBED 6" ABOVE
CEILING.
8. VERIFY EXACT LOCATION OF OUTLET, SWITCHES, EQUIPMENT, ETC WITH THE PROJECT
MANAGER & USER PRIOR TO INSTALLATION. OWNER RESERVES THE RIGHT TO
RELOCATE ANY UNINSTALLED OUTLET IN ANY DIRECTION.
9. FURNISH AND INSTALL WIRES AND CABLES OF THE SIZE AND TYPE SHOWN ON
DRAWINGS AND AS SPECIFIED HEREIN. UNLESS OTHERWISE SPECIFIED ALL WIRE AND
CABLE SHALL BE U.L. STANDARD ANNEALED COPPER WIRE WITH U.S. 600 VOLT
INSULATION. THE MINIMUM SIZE WIRE FOR LIGHTING OR POWER CIRCUITS SHALL BE
NO.12 AWG. ALL CONDUCTORS SHALL BE STRANDED. INSULATION OF CONDUCTORS
SHALL BE TYPE THHN/THWN.
10. COLOR CODE NO. 12 THROUGH NO. 8 BRANCH CIRCUIT WIRES. USE BLACK, RED, BLUE &
WHITE FOR 120/208V CIRCUITS. USE YELLOW, ORANGE, BROWN & GRAY FOR 277/480V
CIRCUITS. USE GREEN WIRES FOR EQUIPMENT GROUNDS ONLY.
11. ALL NEW WIRING SHALL BE COPPER WITH "THHN-2" OR "THWN", 75°C 600 VOLT
INSULATION COLOR CODE ALL BRANCH CIRCUIT WIRING, U.O.N.
12. CHECK PANEL SCHEDULES IDENTIFICATION FOR VALIDITY. REIDENTIFY ANY OR ALL
CHANGES IN PANEL ON PANEL SCHEDULE CARD. WHILE PANEL COVER IS REMOVED
TURN OFF ANY SPARE BREAKERS AND VERIFY SPARES ARE INDICATED ON PANEL
SCHEDULE CARD.
13. USE "DYMO" LABEL ON FACE OF RECEPTACLE AND SWITCH COVER PLATE AND
JUNCTION BOXES INDICATING THE SOURCE PANEL AND CIRCUIT USED. DYMO LABEL
TAPE SHALL MATCH THE COLOR OF THE COVER PLATE ON RECEPTACLES AND
SWITCHES.
14. ALL FEEDERS SHALL BE TAGGED AT EACH POINT WHERE THE CONDUIT RUN IS BROKEN.
ALL BRANCH CIRCUIT CONDUCTORS AT PANELBOARDS AND SWITCHBOARDS SHALL BE
IDENTIFIED WITH "E-Z" CODE MARKERS.
15. UPON COMPLETION OF THE WORK, COOPERATE IN CONDUCTING AN OPERATING TEST
TO DEMONSTRATE THAT ALL EQUIPMENT IS OPERATING IN A SATISFACTORY MANNER.
16. ALL OUTLETS & DEVICE SHALL BE FLUSH WITH WALL, UNLESS OTHERWISE NOTED AS
SURFACE MOUNTED.
17. ALL DEVICE COLOR SHALL BE WHITE U.O.N.
18. INSTALL ELECTRICAL BOX PAD OVER JUNCTION BOXES WITHIN ALL PARTITIONS
CONTAINING SOUND INSULATION INCLUDING BUT NOT LIMITED TO DEMISING WALLS,
STC WALLS, SOUND WALLS, WALLS ADJACENT TO STAIRWELLS, SHAFTS, ETC.
19. ELECTRICAL BOXES OR FITTINGS SHALL BE FLUSH WITH FINISH SURFACE OR
RECESSED NO MORE THAN 1/4 INCH IN NON-COMBUSTIBLE WALLS OR CEILING.
20. ALL SWITCHES INSTALLED SHALL NOT EXCEED 48" ABOVE FINISH FLOOR
THIS SYMBOLOGY TO BE USED BY ELECTRICAL AND LAYOUT FOR ALL FLOOR
PLANS, EQUIPMENT, DEVICES, UTILITIES, ETC..., SHOWN ON DRAWINGS.
LIGHT, DASHED THIN LINES INDICATE EXISTING
UNDERGROUND CONDUITS AND CONDUCTORS.
LIGHT, CONTINUOUS THIN LINES INDICATE EXISTING OR
EXISTING ABOVE GROUND CONDUITS AND
CONDUCTORS.
MEDIUM, SHORT DASHED LINES INDICATE DEMOLITION
OR REMOVAL.
HEAVY, DASHED THICK LINES INDICATE NEW
UNDERGROUND POWER CONDUITS AND CONDUCTORS.
HEAVY, CONTINUOUS THICK LINES INDICATE NEW OR
NEW ABOVE GROUND CONDUITS AND CONDUCTORS.
HEAVY, BROKEN LINES WITH "COM" TEXTS INDICATE
NEW UNDERGROUND COMMUNICATION CONDUITS AND
CONDUCTORS.
COM COM
TYPICAL PLAN LEGEND
NEW WORK LIGHTING GENERAL NOTES:
1. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING AND COORDINATING WITH ARCHITECTURAL PLANS FOR CLARIFICATION OF THE DIFFERENT TYPES OF
CEILING ELEVATIONS, CEILING TYPES, AND AFTER FINISHED FLOOR MOUNTING HEIGHTS OF ALL LIGHTING FIXTURES. CAREFULLY STUDY ARCHITECTURAL DRAWINGS, WITH SPECIAL ATTENTION TO CEILING TYPES SHOWN IN THE REFLECTED CEILING PLANS. CONTRACTOR IS RESPONSIBLE FOR VERIFYING CEILING TYPES TO PROVIDE PROPER LIGHTING FIXTURE MOUNTING HARDWARE AND MAKING ONSITE FIELD ADJUSTMENTS TO FIXTURES STEMS AND PROVIDE STEM POLE THREADS AS NEEDED.
PROVIDE MOUNTING HARDWARE AS REQUIRED TO SUPPORT AND ANCHOR ALL EQUIPMENT, DEVICES, CONDUITS AND CONDUCTORS SECURELY.
2. CONNECT EMERGENCY LIGHTING FIXTURES AND EXIT FIXTURES TO UNSWITCHED HOT CIRCUIT UPSTREAM OF AREA LIGHTING SWITCHES TO ACTIVATE EMERGENCY
BATTERY UPON LOSS OF NORMAL POWER.
3. ALL LIGHTING FIXTURES HAVE A LETTER AND NUMBER IDENTIFICATION FOR PROGRAMMING/GROUPING LIGHTS TO BE CONTROLLED BY INDIVIDUAL AREA/ENCLOSURE
WIRELESS SWITCH.
4. CONTRACTOR IS RESPONSIBLE TO COMPLY WITH ALL REQUIREMENTS FOR ANY MULTIWIRE BRANCH CIRCUITS THAT ARE SHARING NEUTRALS (GROUNDED CIRCUIT CONDUCTOR) AS LISTED IN CEC 200.4(A) THRU (B) AND 210.4(A) THRU (D). ENSURE THAT EACH UNGROUNDED CONDUCTOR WITHIN A MULTIWIRE BRANCH CIRCUIT IS SUPPLIED BY SEPARATE PHASES (LEGS) IN THE SYSTEM TO PREVENT OVERLOADING NEUTRAL (GROUNDED CIRCUIT CONDUCTOR), IN ADDITION BRANCH CIRCUIT BREAKERS SHALL HAVE THE CAPABILITY TO BE TIED TOGETHER (INTERLOCKED) TO SIMULTANEOUSLY DISCONNECT POWER.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH LIGHTING FIXTURE MANUFACTURER FOR ALL WIRING REQUIREMENTS AND PROVIDING ALL ASSOCIATED CONDUITS, CONDUCTORS, AND HARDWARE TO COMPLY WITH MANUFACTURERS INSTALLATION RECOMMENDATIONS. ALL LOW-VOLTAGE SYSTEMS ARE A DEFERRED SUBMITTAL AND ARE NOT INCLUDED IN THIS PERMIT, CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING SHOP DRAWINGS FROM MANUFACTURER TO DETERMINE ANY ADDITIONAL SCOPE OF WORK TO MAKE THE SYSTEM COMPLETE AND FUNCTIONAL PRIOR TO PROVIDING BID OR STARTING ANY WORK.
6. LIGHTING FIXTURES WITH A SOLID HATCH INDICATES TO PROVIDE A 90 MINUTE EMERGENCY BATTERY BACKUP THAT IS INTEGRATED INTO THE FIXTURE BY THE
LIGHTING MANUFACTURER.
7. COORDINATE WITH THE LIGHTING MANUFACTURER TO PROVIDE PRE-WIRED INSTALLATIONS OF ALL WIRELESS CONTROLLERS INTO EACH LIGHTING FIXTURE AS INDICATED ON THE LIGHTING FLOOR PLANS. REFER TO LIGHTING MANUFACTURER CONSTRUCTION DOCUMENTS FOR CLARIFICATION AND REFERENCE. ALL LIGHTING
FIXTURES SHALL SHALL BE RATED FOR 120-277V.
8. INSTALLER/CONTRACTOR TO VERIFY TYPES/QUANTITIES/PLACEMENT OF OCCUPANCY SENSORS FOR PROPER AND EFFECTIVE COVERAGE OF THE SPACES WITH THE MANUFACTURER OR MANUFACTURERS REPRESENTATIVE TO COMPLY WITH TITLE 24 REQUIREMENTS.
9. CONTRACTOR SHALL INVOLVE MANUFACTURER FOR TRAINING AND PROGRAMMING ALL LIGHTING FIXTURES, DEVICES AND CONTROLLERS BEFORE, DURING, AND
AFTER INSTALLATION.
10. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH LIGHTING MANUFACTURER AND FACILITY BUILDING MAINTENANCE DEPARTMENT TO INTERCONNECT ALL NEW LIGHTING FIXTURES, CONTROLLERS/DEVICES, AND CONTROL PANELS TO (E) BUILDING MANAGEMENT SYSTEM (BMS). CONTRACTOR SHALL PROVIDE ALL ASSOCIATED CONDUITS, CONDUCTORS, AND HARDWARE TO COMPLY WITH THE (E) BUILDING MANAGEMENT SYSTEM (BMS) MANUFACTURER
INTEGRATION RECOMMENDATIONS/REQUIREMENTS.
DEMOLITION LIGHTING GENERAL NOTES:
1. MAINTAIN CONTINUITY TO ALL (E) CIRCUIT BREAKERS AND ASSOCIATED CONDUITS AND CONDUCTORS IN PLACE FOR LOADS NOT IN THE SCOPE OF DEMOLITION.
PORTIONS OF (E) CIRCUITS WITH LOADS THAT ARE NOT TO BE DEMOLISHED MUST STAY IN SERVICE UNLESS NOTED OTHERWISE. THESE CIRCUITS SHALL NOT BE
SHARED WITH (N) LIGHTING SYSTEM.
2. ALL (E) FIRE ALARM DEVICES, WIRELESS ACCESS POINTS, SECURITY CAMERAS, AND INTRUSION DETECTION SYSTEMS SHALL BE PROTECTED IN PLACE, UNLESS
NOTED OTHERWISE.
3. IDENTIFY (E) BRANCH CIRCUITS WITHIN EVERY ENCLOSURE AND PROTECT THEM WITHIN A JUNCTION BOX LABELED WITH THE PANEL NAME AND CIRCUIT NUMBER.
CONTRACTOR IS RESPONSIBLE FOR TRACING ALL BRANCH CIRCUITS TO IDENTIFY ALL DEVICES CONNECTED TO EACH BRANCH CIRCUIT. PROVIDE EXTENSIVE SIGNAGE AT EVERY ELECTRICAL ENCLOSURE, JUNCTION BOX, CONDUIT AND CONDUCTORS TO IDENTIFY THE POWER SOURCE AND RATING OF THE CONDUCTORS
DUE TO MULTIPLE POWER SOURCE AND DIFFERENT VOLTAGE CLASSES.
4. ALL (E) BRANCH CIRCUIT NUMBERS PROVIDED ON DEMOLITION PLANS ARE BASED ON THE BEST AVAILABLE INFORMATION AT THE TIME OF DESIGN FROM AS-BUILTS, FIELD SURVEYS, AND PANEL SCHEDULES. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING AND CONFIRMING (E) CIRCUIT NUMBERS, PANEL NAMES, AND MAKING ADJUSTMENTS AS REQUIRED TO PROVIDE POWER CONTINUITY TO AREAS NOT IN SCOPE OF WORK THAT SHARE THE SAME POWER SUPPLY AS AREAS WITHIN SCOPE
OF WORK.
5. DEMOLISH ALL ABANDONED RECESSED JUNCTION BOXES AND CONDUITS. PATCH DRYWALL OR CHIPPED CONCRETE TO SEAL ANY OPENINGS AND/OR MAKE FLAT
SURFACE TO MATCH (E) CONDITIONS.
6. ALL LIGHTING FIXTURES WITH LAMPS AND BALLASTS THAT ARE DEMOLISHED SHALL BE KEPT ONSITE FOR HAZARDOUS WASTE DISPOSAL.
C
AD
F ile
: L :\2
4\
0-
Lo t 5
Li gh tin g U pg ra de s, O
FA
M , J un ip er o
Se rra
B ui ld in g\ C
AD
\2
3_ E0
EL
EC
TR
IC
AL
P
AN
EL
A
N D
L
IG
H
TI
N G
F
IX
TU
R
E
SC
H
ED
U
LE
.d w g P lo t D at e:
J ul
5,
- 6
:3 te d by : O rla nd oN aj er a
V1
707 Third Street, Suite 4-105
Architecture & Engineering Sections
Project Management & Development Branch Real Estate Services Division
State of California
West Sacramento, California 95605
Department of General Services
C op yr ig ht
4, C al ifo rn ia
D ep ar tm en t o f G en er al
S er vi ce s
- R ea l E st at e Se rv ic es D iv is io n
JCCA#: 24690-3
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7644 F:310.212.5272I
1 3/26/25 75% WD PROGRESS SET
2 5/30/25 95% WD PROGRESS SET
3 07/25/25 BID SET
320 4TH STREET
JUNIPERO SERRA BUILDING
LOT 52 RESTRIPPING
AND LIGHTING UPGRADE
LOS ANGELES, CA 90013
0#-###### ##-X-####-XX
AS SHOWN
XXXXXXXXXX014406
100% CONSTRUCTION DOCUMENTS
SA ON ON
DEPARTMENT OF GENERAL SERVICES
OFFICE OF FLEET AND ASSET MANAGEMENT
DATE SIGNED: 07/25/2025
ELECTRICAL PANEL
AND LIGHTING FIXTURE
SCHEDULES
E0.2
LIGHTING FIXTURE SCHEDULE
MAKE: LITHONIA LIGHTING
MODEL No: VCPG LED P1 40K
T5M-OPTIC TYPE MVOLT
120-277V A
TYPE SYMBOL DESCRIPTION VOLT MANUFACTURER
27W
WATT
SUSPENDED
OR SURFACE
MOUNTING
INDOOR
LOCATION
AE
LED PARKING GARAGE LIGHT
MAKE: LITHONIA LIGHTING
MODEL No: VCPG LED P1 40K
T5M-OPTIC TYPE MVOLT
120-277V 27W SUSPENDED
OR SURFACE INDOOR
LED PARKING GARAGE LIGHT
(INTEGRATED 90 MIN. BACK UP BATTERY)
E1H A-15
BH
A-11
BH
A-11
BH
A-11
E1H A-15
BH
A-11
BHA-11
BHA-11
E1H A-15
BHA-11 E1HA-15 BHA-11
BH
A-11
E1H A-15
E1H A-15
BHA-13BHA-13
E1H A-15
E1H A-15
BH
A-13
BH
A-13
BH
A-13
E1HA-15
E1H A-15
BH
A-13
BHA-13E1HA-15BHA-13
BHA-13BHA-13BHA-13
E1HA-15E1HA-15 BHA-13
BHA-13
E1H A-15
E1H A-15
BH
A-11
BH
A-11
BH
A-11
BH
A-11
E1HA-15
BHA-11BHA-11BHA-11BHA-11
BHA-11BHA-11BHA-11
BHA-11
E1HA-15E1H
A-15
E1H A-15
BH
A-11
BH
A-11
BH
A-11
BH
A-11
ELECTRICAL DEMOLITION -
LIGHTING SUB-BASEMENT FLOOR
PLAN
E1.1
DEMOLITION KEYNOTES:
DISCONNECT AND DEMOLISH LIGHTING FIXTURE AND SUPPORT
SYSTEM.
DISCONNECT AND DEMOLISH CONDUITS AND CONDUCTORS FROM
LIGHTING FIXTURE ALL THE WAY BACK TO NEAREST JUNCTION
BOX. IDENTIFY AND LABEL (E) BRANCH CIRCUIT AND PROTECT IN
PLACE AT NEAREST JUNCTION BOX FOR NEW WORK.
SCALE: 0 202 FEET10
1/16" = 1'-0"
C
AD
F ile
: L :\2
4\
0-
Lo t 5
Li gh tin g U pg ra de s, O
FA
M , J un ip er o
Se rra
B ui ld in g\ C
AD
\2
3_ E1
EL
EC
TR
IC
AL
D
EM
O
LI
TI
O
N
LI
G
H
TI
N G
S U
B-
BA
SE
M
EN
T
FL
O
O R
P
LA
N .d w g
P lo t D at e:
J ul
5,
- 6 :3 te d by
: O rla nd oN aj er a
V1
707 Third Street, Suite 4-105
Architecture & Engineering Sections
Project Management & Development Branch Real Estate Services Division
State of California
West Sacramento, California 95605
Department of General Services
C op yr ig ht
4, C al ifo rn ia
D ep ar tm en t o f G en er al
S er vi ce s
- R ea l E st at e Se rv ic es D iv is io n
JCCA#: 24690-3
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7644 F:310.212.5272I
1 3/26/25 75% WD PROGRESS SET
2 5/30/25 95% WD PROGRESS SET
3 07/25/25 BID SET
320 4TH STREET
JUNIPERO SERRA BUILDING
LOT 52 RESTRIPPING
AND LIGHTING UPGRADE
LOS ANGELES, CA 90013
0#-###### ##-X-####-XX
AS SHOWN
XXXXXXXXXX014406
100% CONSTRUCTION DOCUMENTS
SA ON ON
DEPARTMENT OF GENERAL SERVICES
OFFICE OF FLEET AND ASSET MANAGEMENT
DATE SIGNED: 07/25/2025
ELECTRICAL DEMOLITION - LIGHTING SUB-BASEMENT FLOOR PLAN N
2 TYP.
TYP.
BHA-14
BH
A-14
BHA-14 BHA-14BHA-14 E1HA-19E1HA-19 E1HA-19
E1HA-19E1HA-19
BHA-14 BHA-14
BHA-14
BHA-14 BHA-14
BHA-14
E1H A-19
BH
A-18
E1H A-19
BH
A-18
BH
A-18
BH
A-18
BH
A-18
BH
A-18
E1H A-19
E1H A-19
E1HA-19 E1HA-17 E1HA-17 E1HA-17
BHA-18 BHA-18 BHA-18 BHA-18 BHA-18 BHA-18 BHA-18
BHA-18 BHA-18 BHA-18 BHA-18
BHA-18 BHA-18 BHA-18BHA-18BHA-18
BHA-18 BHA-18
BH
A-16
BHA-16
E1H A-17
BH
A-16
E1H A-17
E1HA-17
E1HA-17
E1H A-17
BH
A-16
BH
A-16
BH
A-16
BH
A-16
BH
A-16
BH
A-16
BH
A-16
BH
A-16
BH
A-16
BH
A-16
BH
A-16
BH
A-16
BH
A-16
BH
A-16
E1H A-17
E1H A-17
PANEL "BHA" MLO/200A MCB,
480/277V, 3PH, 4W, 225A BUS
ELECTRICAL DEMOLITION -
LIGHTING BASEMENT
FLOOR PLAN
E1.2
C
AD
F ile
: L :\2
4\
0-
Lo t 5
Li gh tin g U pg ra de s, O
FA
M , J un ip er o
Se rra
B ui ld in g\ C
AD
\2
3_ E1
EL
EC
TR
IC
AL
D
EM
O
LI
TI
O
N
LI
G
H
TI
N G
B
AS
EM
EN
T
FL
O O
R P
LA
N
.d w g P lo t D at e:
J ul
5,
- 6
:3 te d by : O rla nd oN aj er a
V1
707 Third Street, Suite 4-105
Architecture & Engineering Sections
Project Management & Development Branch Real Estate Services Division
State of California
West Sacramento, California 95605
Department of General Services
C op yr ig ht
4, C al ifo rn ia
D ep ar tm en t o f G en er al
S er vi ce s
- R ea l E st at e Se rv ic es D iv is io n
JCCA#: 24690-3
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7644 F:310.212.5272I
1 3/26/25 75% WD PROGRESS SET
2 5/30/25 95% WD PROGRESS SET
3 07/25/25 BID SET
320 4TH STREET
JUNIPERO SERRA BUILDING
LOT 52 RESTRIPPING
AND LIGHTING UPGRADE
LOS ANGELES, CA 90013
0#-###### ##-X-####-XX
AS SHOWN
XXXXXXXXXX014406
100% CONSTRUCTION DOCUMENTS
SA ON ON
DEPARTMENT OF GENERAL SERVICES
OFFICE OF FLEET AND ASSET MANAGEMENT
DATE SIGNED: 07/25/2025
SCALE: 0 202 FEET10
1/16" = 1'-0"
ELECTRICAL DEMOLITION - LIGHTING BASEMENT FLOOR PLAN N
DEMOLITION KEYNOTES:
DISCONNECT AND DEMOLISH LIGHTING FIXTURE AND SUPPORT
SYSTEM.
DISCONNECT AND DEMOLISH CONDUITS AND CONDUCTORS FROM
LIGHTING FIXTURE ALL THE WAY BACK TO NEAREST JUNCTION
BOX. IDENTIFY AND LABEL (E) BRANCH CIRCUIT AND PROTECT IN
PLACE AT NEAREST JUNCTION BOX FOR NEW WORK.
2 TYP.
BHA-14 E1HA-19BHA-14 BHA-14 BHA-14E1HA-19
E1HA-19
E1HA-19
E1H A-19
E1H A-19
BHA-14
BHA-14
BH
A-
BHA-14
PANEL "E1HA" MLO/200A MCB,
480/277V, 3PH, 4W, 225A BUS
ST
O
R E
TH
E
BR
O
AD
W
AY
D
EP
AR
TM
EN
T
ELECTRICAL DEMOLITION -
LIGHTING FIRST FLOOR PLAN
E1.3
C
AD
F ile
: L :\2
4\
0-
Lo t 5
Li gh tin g U pg ra de s, O
FA
M , J un ip er o
Se rra
B ui ld in g\ C
AD
\2
3_ E1
EL
EC
TR
IC
AL
D
EM
O
LI
TI
O
N
LI
G
H
TI
N G
F
IR
ST
F
LO
O
R P
LA
N
.d w g P lo t D at e:
J ul
5,
- 6
:3 te d by : O rla nd oN aj er a
V1
707 Third Street, Suite 4-105
Architecture & Engineering Sections
Project Management & Development Branch Real Estate Services Division
State of California
West Sacramento, California 95605
Department of General Services
C op yr ig ht
4, C al ifo rn ia
D ep ar tm en t o f G en er al
S er vi ce s
- R ea l E st at e Se rv ic es D iv is io n
JCCA#: 24690-3
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7644 F:310.212.5272I
1 3/26/25 75% WD PROGRESS SET
2 5/30/25 95% WD PROGRESS SET
3 07/25/25 BID SET
320 4TH STREET
JUNIPERO SERRA BUILDING
LOT 52 RESTRIPPING
AND LIGHTING UPGRADE
LOS ANGELES, CA 90013
0#-###### ##-X-####-XX
AS SHOWN
XXXXXXXXXX014406
100% CONSTRUCTION DOCUMENTS
SA ON ON
DEPARTMENT OF GENERAL SERVICES
OFFICE OF FLEET AND ASSET MANAGEMENT
DATE SIGNED: 07/25/2025
SCALE: 0 202 FEET10
1/16" = 1'-0"
ELECTRICAL DEMOLITION - LIGHTING FIRST FLOOR PLAN N
DEMOLITION KEYNOTES:
DISCONNECT AND DEMOLISH LIGHTING FIXTURE AND SUPPORT
SYSTEM.
DISCONNECT AND DEMOLISH CONDUITS AND CONDUCTORS FROM
LIGHTING FIXTURE ALL THE WAY BACK TO NEAREST JUNCTION
BOX. IDENTIFY AND LABEL (E) BRANCH CIRCUIT AND PROTECT IN
PLACE AT NEAREST JUNCTION BOX FOR NEW WORK.
2 TYP.
E1HA-15 BHA-13
E1HA-15 E1HA-15
E1HA-15
E1HA-15
E1HA-15
E1HA-15
E1HA-15
E1HA-15
E1HA-15
E1HA-15
E1HA-15
E1HA-15E1HA-15
E1HA-15
E1HA-15
E1HA-15E1HA-15
E1HA-15
E1HA-15
E1HA-15
E1HA-15
E1HA-15
BHA-13 BHA-13 BHA-13
BHA-13
BHA-13BHA-13
BHA-13
BHA-11BHA-11BHA-11
BHA-11
BHA-11
BHA-11BHA-11
BHA-11 BHA-11 BHA-11
BHA-11BHA-11
BHA-11
BHA-13E1HA-15
BHA-11E1HA-15E1HA-15 BHA-11BHA-11
E1HA-15
BHA-11
E1HA-15
BHA-11E1HA-15E1HA-15
E1HA-15
E1HA-15
BHA-11
BHA-11
E1HA-15
E1HA-15 E1HA-15
E1HA-15
E1HA-15
ELECTRICAL NEW WORK -
LIGHTING SUB-BASEMENT
FLOOR PLAN
E2.1
C
AD
F ile
: L :\2
4\
0-
Lo t 5
Li gh tin g U pg ra de s, O
FA
M , J un ip er o
Se rra
B ui ld in g\ C
AD
\2
3_ E2
EL
EC
TR
IC
AL
N
EW
W O
R K
- L
IG
H
TI
N G
S U
B-
BA
SE
M
EN
T
FL
O
O R
P
LA
N .d w g
P lo t D at e:
J ul
5,
- 6 :3 te d by
: O rla nd oN aj er a
V1
707 Third Street, Suite 4-105
Architecture & Engineering Sections
Project Management & Development Branch Real Estate Services Division
State of California
West Sacramento, California 95605
Department of General Services
C op yr ig ht
4, C al ifo rn ia
D ep ar tm en t o f G en er al
S er vi ce s
- R ea l E st at e Se rv ic es D iv is io n
JCCA#: 24690-3
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7644 F:310.212.5272I
1 3/26/25 75% WD PROGRESS SET
2 5/30/25 95% WD PROGRESS SET
3 07/25/25 BID SET
320 4TH STREET
JUNIPERO SERRA BUILDING
LOT 52 RESTRIPPING
AND LIGHTING UPGRADE
LOS ANGELES, CA 90013
0#-###### ##-X-####-XX
AS SHOWN
XXXXXXXXXX014406
100% CONSTRUCTION DOCUMENTS
SA ON ON
DEPARTMENT OF GENERAL SERVICES
OFFICE OF FLEET AND ASSET MANAGEMENT
DATE SIGNED: 07/25/2025
NEW WORK KEYNOTES:
PROVIDE LIGHTING FIXTURE AS SHOWN ON FLOOR PLAN AND
LIGHTING FIXTURE SCHEDULE. ALL LIGHTING FIXTURE SHALL
HAVE INTEGRATED WIRELESS CONTROLLERS WITH OCCUPANCY
AND DAYLIGHT SENSORS.
EXTEND (E) LIGHTING BRANCH CIRCUIT FROM NEAREST JUNCTION
BOX TO LOCATION OF (N) LIGHTING FIXTURE.
PROVIDE LIGHTING CONTROL COMMUNICATION PANEL. PROVIDE
INTERCONNECTION WITH (E) BMS SYSTEM.
PROVIDE WIRELESS LOCAL MANUAL DIMMING SWITCH.
SCALE: 0 202 FEET10
1/16" = 1'-0"
ELECTRICAL NEW WORK - LIGHTING SUB-BASEMENT FLOOR PLAN N
TYP.
GENERAL NOTES:
1. CONTRACTOR SHALL BE RESPONSIBLE FOR REVIEWING AND
FOLLOWING LIGHTING MANUFACTURERS CONSTRUCTION
DOCUMENTS AND INSTALLATION GUIDELINES. PROVIDE ALL
REQUIRED HARDWARE, CONDUITS AND CONDUCTORS TO ALL
DEVICES AND CONTROLLERS REQUIRED TO HAVE SATISFACTORY
RESULTS IN THE SYSTEMS FUNCTIONALITY.
2. REPAIR ANY DAMAGES OR OPENINGS TO WALLS OR CEILINGS
DURING AND AFTER INSTALLATION.
3. REFER TO SHEET E0.2 FOR ADDITIONAL NEW WORK LIGHTING
GENERAL NOTES.
4. COORDINATE WITH LIGHTING FIXTURE MANUFACTURER FOR
ASSISTANCE WITH INSTALLATION RECOMMENDATIONS AND
PROGRAMMING. REFER TO LIGHTING MANUFACTURER
CONSTRUCTION DESIGN DOCUMENTS FOR INSTALLATION AND
PRODUCT DETAILS.
5. PROVIDE INTERCONNECTION ALL NEW LIGHTING FIXTURES,
CONTROLLERS/DEVICES, AND CONTROL PANELS TO (E) BUILDING
MANAGEMENT SYSTEM (BMS). PROVIDE ALL REQUIRED HARDWARE,
CONDUITS AND CONDUCTORS TO ALL DEVICES AND CONTROLLERS
REQUIRED TO HAVE SATISFACTORY RESULTS IN THE SYSTEMS
FUNCTIONALITY.
6. CONTRACTOR SHALL FIELD VERIFY FIXTURE MOUNTING
ELEVATIONS THROUGHOUT ALL GARAGE PARKING LEVEL. FIELD
ADJUSTMENTS AND THREADING SHALL BE MADE TO ALL FIXTURES
STEMS/SUPPORT SYSTEM AS NEEDED TO MAINTAIN AN
APPROPRIATE VEHICLE CLEARANCE ELEVATION.
A
AE
TYP.1
TYP.2
TYP.2
2 TYP.3
TYP.4
PANEL "BHA" MLO/200A MCB,
480/277V, 3PH, 4W, 225A BUS
E1HA-17
E1HA-17
E1HA-17
E1HA-17
E1HA-17
E1HA-17
E1HA-17 E1HA-17
E1HA-17
E1HA-17
E1HA-19E1HA-19
E1HA-19
E1HA-19
E1HA-17
E1HA-19
E1HA-19
E1HA-19
E1HA-19 E1HA-19
E1HA-19
E1HA-19
E1HA-19 E1HA-19
E1HA-19
E1HA-19 E1HA-17
E1HA-19
E1HA-17
E1HA-17
E1HA-17
E1HA-17
E1HA-17
E1HA-17 E1HA-17
E1HA-17
BHA-16
E1HA-17
BHA-16 BHA-16 BHA-16
BHA-16BHA-16
BHA-16 BHA-16
BHA-16
BHA-16
BHA-16
BHA-16
BHA-18BHA-18
BHA-18
BHA-18
E1HA-17BHA-18
BHA-18BHA-18BHA-18
BHA-18BHA-18
BHA-18
BHA-18BHA-18
BHA-18 BHA-14
BHA-14 BHA-14
BHA-14
BHA-14
BHA-14
BHA-14
BHA-18
BHA-18
E1HA-19
ELECTRICAL NEW WORK -
LIGHTING BASEMENT
FLOOR PLAN
E2.2
C
AD
F ile
: L :\2
4\
0-
Lo t 5
Li gh tin g U pg ra de s, O
FA
M , J un ip er o
Se rra
B ui ld in g\ C
AD
\2
3_ E2
EL
EC
TR
IC
AL
N
EW
W O
R K
- L
IG
H
TI
N G
B
AS
EM
EN
T
FL
O O
R P
LA
N
.d w g P lo t D at e:
J ul
5,
- 6
:3 te d by : O rla nd oN aj er a
V1
707 Third Street, Suite 4-105
Architecture & Engineering Sections
Project Management & Development Branch Real Estate Services Division
State of California
West Sacramento, California 95605
Department of General Services
C op yr ig ht
4, C al ifo rn ia
D ep ar tm en t o f G en er al
S er vi ce s
- R ea l E st at e Se rv ic es D iv is io n
JCCA#: 24690-3
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7644 F:310.212.5272I
1 3/26/25 75% WD PROGRESS SET
2 5/30/25 95% WD PROGRESS SET
3 07/25/25 BID SET
320 4TH STREET
JUNIPERO SERRA BUILDING
LOT 52 RESTRIPPING
AND LIGHTING UPGRADE
LOS ANGELES, CA 90013
0#-###### ##-X-####-XX
AS SHOWN
XXXXXXXXXX014406
100% CONSTRUCTION DOCUMENTS
SA ON ON
DEPARTMENT OF GENERAL SERVICES
OFFICE OF FLEET AND ASSET MANAGEMENT
DATE SIGNED: 07/25/2025
SCALE: 0 202 FEET10
1/16" = 1'-0"
ELECTRICAL NEW WORK - LIGHTING BASEMENT FLOOR PLAN N
NEW WORK KEYNOTES:
PROVIDE LIGHTING FIXTURE AS SHOWN ON FLOOR PLAN AND
LIGHTING FIXTURE SCHEDULE. ALL LIGHTING FIXTURE SHALL
HAVE INTEGRATED WIRELESS CONTROLLERS WITH OCCUPANCY
AND DAYLIGHT SENSORS.
EXTEND (E) LIGHTING BRANCH CIRCUIT FROM NEAREST JUNCTION
BOX TO LOCATION OF (N) LIGHTING FIXTURE.
PROVIDE LIGHTING CONTROL COMMUNICATION PANEL. PROVIDE
INTERCONNECTION WITH (E) BMS SYSTEM.
PROVIDE WIRELESS LOCAL MANUAL DIMMING SWITCH.
TYP.
GENERAL NOTES:
1. CONTRACTOR SHALL BE RESPONSIBLE FOR REVIEWING AND
FOLLOWING LIGHTING MANUFACTURERS CONSTRUCTION
DOCUMENTS AND INSTALLATION GUIDELINES. PROVIDE ALL
REQUIRED HARDWARE, CONDUITS AND CONDUCTORS TO ALL
DEVICES AND CONTROLLERS REQUIRED TO HAVE SATISFACTORY
RESULTS IN THE SYSTEMS FUNCTIONALITY.
2. REPAIR ANY DAMAGES OR OPENINGS TO WALLS OR CEILINGS
DURING AND AFTER INSTALLATION.
3. REFER TO SHEET E0.2 FOR ADDITIONAL NEW WORK LIGHTING
GENERAL NOTES.
4. COORDINATE WITH LIGHTING FIXTURE MANUFACTURER FOR
ASSISTANCE WITH INSTALLATION RECOMMENDATIONS AND
PROGRAMMING. REFER TO LIGHTING MANUFACTURER
CONSTRUCTION DESIGN DOCUMENTS FOR INSTALLATION AND
PRODUCT DETAILS.
5. PROVIDE INTERCONNECTION ALL NEW LIGHTING FIXTURES,
CONTROLLERS/DEVICES, AND CONTROL PANELS TO (E) BUILDING
MANAGEMENT SYSTEM (BMS). PROVIDE ALL REQUIRED HARDWARE,
CONDUITS AND CONDUCTORS TO ALL DEVICES AND CONTROLLERS
REQUIRED TO HAVE SATISFACTORY RESULTS IN THE SYSTEMS
FUNCTIONALITY.
6. CONTRACTOR SHALL FIELD VERIFY FIXTURE MOUNTING
ELEVATIONS THROUGHOUT ALL GARAGE PARKING LEVEL. FIELD
ADJUSTMENTS AND THREADING SHALL BE MADE TO ALL FIXTURES
STEMS/SUPPORT SYSTEM AS NEEDED TO MAINTAIN AN
APPROPRIATE VEHICLE CLEARANCE ELEVATION.
A
AE
TYP.1
TYP.2
TYP.2
2 TYP.3
TYP.4
PANEL "E1HA" MLO/200A MCB,
480/277V, 3PH, 4W, 225A BUS
E1HA-19E1HA-19
E1HA-19
E1HA-19 E1HA-19
E1HA-19
BHA-14BHA-14
BHA-14
BHA-14
BHA-14
E1HA-19
ST
O
R E
TH
E
BR
O
AD
W
AY
D
EP
AR
TM
EN
T
ELECTRICAL NEW WORK -
LIGHTING FIRST FLOOR PLAN
E2.3
C
AD
F ile
: L :\2
4\
0-
Lo t 5
Li gh tin g U pg ra de s, O
FA
M , J un ip er o
Se rra
B ui ld in g\ C
AD
\2
3_ E2
EL
EC
TR
IC
AL
N
EW
W O
R K
- L
IG
H
TI
N G
F
IR
ST
F
LO
O
R P
LA
N
.d w g P lo t D at e:
J ul
5,
- 6
:3 te d by : O rla nd oN aj er a
V1
707 Third Street, Suite 4-105
Architecture & Engineering Sections
Project Management & Development Branch Real Estate Services Division
State of California
West Sacramento, California 95605
Department of General Services
C op yr ig ht
4, C al ifo rn ia
D ep ar tm en t o f G en er al
S er vi ce s
- R ea l E st at e Se rv ic es D iv is io n
JCCA#: 24690-3
385 VAN NESS AVE., SUITE 208, TORRANCE, CA 90501
P: 310.212.7644 F:310.212.5272I
1 3/26/25 75% WD PROGRESS SET
2 5/30/25 95% WD PROGRESS SET
3 07/25/25 BID SET
320 4TH STREET
JUNIPERO SERRA BUILDING
LOT 52 RESTRIPPING
AND LIGHTING UPGRADE
LOS ANGELES, CA 90013
0#-###### ##-X-####-XX
AS SHOWN
XXXXXXXXXX014406
100% CONSTRUCTION DOCUMENTS
SA ON ON
DEPARTMENT OF GENERAL SERVICES
OFFICE OF FLEET AND ASSET MANAGEMENT
DATE SIGNED: 07/25/2025
SCALE: 0 202 FEET10
1/16" = 1'-0"
ELECTRICAL NEW WORK - LIGHTING FIRST FLOOR PLAN N
NEW WORK KEYNOTES:
PROVIDE LIGHTING FIXTURE AS SHOWN ON FLOOR PLAN AND
LIGHTING FIXTURE SCHEDULE. ALL LIGHTING FIXTURE SHALL
HAVE INTEGRATED WIRELESS CONTROLLERS WITH OCCUPANCY
AND DAYLIGHT SENSORS.
EXTEND (E) LIGHTING BRANCH CIRCUIT FROM NEAREST JUNCTION
BOX TO LOCATION OF (N) LIGHTING FIXTURE.
PROVIDE LIGHTING CONTROL COMMUNICATION PANEL. PROVIDE
INTERCONNECTION WITH (E) BMS SYSTEM.
PROVIDE WIRELESS LOCAL MANUAL DIMMING SWITCH.
GENERAL NOTES:
1. CONTRACTOR SHALL BE RESPONSIBLE FOR REVIEWING AND
FOLLOWING LIGHTING MANUFACTURERS CONSTRUCTION
DOCUMENTS AND INSTALLATION GUIDELINES. PROVIDE ALL
REQUIRED HARDWARE, CONDUITS AND CONDUCTORS TO ALL
DEVICES AND CONTROLLERS REQUIRED TO HAVE SATISFACTORY
RESULTS IN THE SYSTEMS FUNCTIONALITY.
2. REPAIR ANY DAMAGES OR OPENINGS TO WALLS OR CEILINGS
DURING AND AFTER INSTALLATION.
3. REFER TO SHEET E0.2 FOR ADDITIONAL NEW WORK LIGHTING
GENERAL NOTES.
4. COORDINATE WITH LIGHTING FIXTURE MANUFACTURER FOR
ASSISTANCE WITH INSTALLATION RECOMMENDATIONS AND
PROGRAMMING. REFER TO LIGHTING MANUFACTURER
CONSTRUCTION DESIGN DOCUMENTS FOR INSTALLATION AND
PRODUCT DETAILS.
5. PROVIDE INTERCONNECTION ALL NEW LIGHTING FIXTURES,
CONTROLLERS/DEVICES, AND CONTROL PANELS TO (E) BUILDING
MANAGEMENT SYSTEM (BMS). PROVIDE ALL REQUIRED HARDWARE,
CONDUITS AND CONDUCTORS TO ALL DEVICES AND CONTROLLERS
REQUIRED TO HAVE SATISFACTORY RESULTS IN THE SYSTEMS
FUNCTIONALITY.
6. CONTRACTOR SHALL FIELD VERIFY FIXTURE MOUNTING
ELEVATIONS THROUGHOUT ALL GARAGE PARKING LEVEL. FIELD
ADJUSTMENTS AND THREADING SHALL BE MADE TO ALL FIXTURES
STEMS/SUPPORT SYSTEM AS NEEDED TO MAINTAIN AN
APPROPRIATE VEHICLE CLEARANCE ELEVATION.
A
TYP.2
TYP.4
TYP.
AE
TYP.
ELECTRICAL GENERAL DETAILS
E3.1
C
AD
F ile
: L :\2
4\
0-
Lo t 5
Li gh tin g U pg ra de s, O
FA
M , J un ip er o
Se rra
B ui ld in g\ C
AD
\2
3_ E3
EL
EC
TR
IC
AL
G
EN
ER
AL
D
ET
A…