Lompoc_Wastewater_Master_Plan_Volume_I_-_Report.pdf

PDF 11 MB Posted

Attached to
HEADWORKS and INFLUENT METER IMPROVEMENTS PROJECT
Solicitation number
2025-RFP-015DW
Issued by
Santa Barbara County, Long Beach City, California

About this file

Lompoc Wastewater Master Plan Volume I – Report Summary

This file is a master planning report prepared for the City of Lompoc, California, documenting infrastructure assessment and planning for the Regional Wastewater Reclamation Plant. The report supports the current Headworks and Influent Meter Improvements Project, which seeks design and engineering services for critical wastewater treatment facility upgrades. The project scope includes replacing the 1974 influent gate and actuator, installing three new bar screens, rehabilitating concrete influent channels, developing a bypass pumping plan, and implementing an odor control system. A mandatory pre-bid job walk is scheduled for May 14, 2025, with proposals due by June 30, 2025, at 3:00 pm. All proposals must remain valid for 90 calendar days after the bid opening date. The City will award the contract to the most responsive and responsible bidder based on comprehensive evaluation of technical capabilities and proposed approach. The contract compensation will be based on approved actual time and materials, not to exceed an agreed-upon "Not-to-Exceed Fee," with progress-based payments contingent on task completion.

The project builds upon previous master planning efforts, including a 2002 master plan by Kennedy/Jenks Consultants and a 2005 design report by Brown and Caldwell. The facility currently serves approximately 9,000 sewer connections with an Average Dry Weather Flow capacity of 5.0 MGD. Previous design reports estimated total project costs for various plant improvements ranging from approximately $300,000 to over $41 million for comprehensive upgrades. Insurance requirements mandate $1,000,000 in Errors and Omissions Professional Insurance, with additional coverage for general liability, automobile liability, and worker's compensation. The contract does not explicitly specify set-aside designations for disadvantaged enterprises. This project represents part of a phased approach to modernizing the facility's infrastructure in Santa Barbara County.

View the file

Other files

File Type Posted
HEADWORKS_and_INFLUENT_METER_IMPROVEMENTS_PROJECT_(Addendum_#2_Revision).pdf PDF
LRWRP_Design_Report_Chapter_9.pdf PDF
LRWRP_Design_Report_Cover_Page.pdf PDF
Lompoc_Salts_Mgt_Plan_010611.pdf PDF
LRWRP_Design_Report_Chapter_10.pdf PDF
LRWRP_Design_Report_Chapter_4.pdf PDF
LRWRP_Design_Report_Chapter_5.pdf PDF
LRWRP_Design_Report_Chapter_6.pdf PDF
LRWRP_Design_Report_Chapter_6.pdf PDF
LRWRP_Design_Report_Cover_Page.pdf PDF
LRWRP_Design_Report_Chapter_3.pdf PDF
LRWRP_Design_Report_Chapter_4.pdf PDF
LRWRP_Design_Report_TOC.pdf PDF
LRWRP_Design_Report_Cover_Page.pdf PDF
Lompoc_Salts_Mgt_Plan_010611.pdf PDF
LRWRP_Design_Report_Chapter_3.pdf PDF
LRWRP_Design_Report_Chapter_4.pdf PDF
LRWRP_Design_Report_Chapter_5.pdf PDF
LRWRP_Design_Report_TOC.pdf PDF
LRWRP_Design_Report_Chapter_10.pdf PDF
LRWRP_Design_Report_Chapter_8.pdf PDF
LRWRP_Design_Report_Appendix_A.pdf PDF
LRWRP_Design_Report_Appendix_C.pdf PDF
LRWRP_Design_Report_Appendix_F.pdf PDF
Lompoc_Wastewater_Master_Plan.pdf PDF
Lompoc_Wastewater_Master_Plan_Volume_III_-_Executive_Summary.pdf PDF
LRWRP_Design_Report_Appendix_B.pdf PDF
LRWRP_Design_Report_Appendix_C.pdf PDF
LRWRP_Design_Report_Appendix_D.pdf PDF
LRWRP_Design_Report_Appendix_E.pdf PDF
Lompoc_Wastewater_Master_Plan_Volume_III_-_Executive_Summary.pdf PDF
LRWRP_Design_Report_Appendix_A.pdf PDF
LRWRP_Design_Report_Appendix_C.pdf PDF
LRWRP_Design_Report_Appendix_E.pdf PDF
Lompoc_Wastewater_Master_Plan_Volume_III_-_Executive_Summary.pdf PDF
LRWRP_Design_Report_Chapter_1.pdf PDF
LRWRP_Design_Report_Chapter_2.pdf PDF
Lompoc_Wastewater_Master_Plan_Volume_I_-_Report.pdf PDF
LRWRP_Design_Report_Appendix_F.pdf PDF
LRWRP_Design_Report_Chapter_2.pdf PDF
Vol.I_MasterPlan.pdf PDF
LRWRP_Design_Report_Appendix_F.pdf PDF
Vol.I_MasterPlan.pdf PDF
LRWRP_Design_Report_Appendix_D.pdf PDF
LRWRP_Design_Report_Appendix_E.pdf PDF
Consultant_Services_Agreement_2025.doc DOC document
Consultant_Services_Agreement_2025.doc DOC document
Consultant_Services_Agreement_2025.doc DOC document
INDEMNITY_AND_INSURANCE_REQUIREMENTS.docx DOCX document
INDEMNITY_AND_INSURANCE_REQUIREMENTS.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lompoc Wastewater Master Plan Volume I - Report (a) Lompoc Wastewater Master Plan Volume I - Report (b)

File details come from the government source that posted it. Updated .