Logan Main Flooring SOW.docx
DOCX document 117 KB Posted
- Solicitation number
- 1240LT21Q0092
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1240LT21Q0092.pdf | ||
| DOL Wage Determination.pdf | ||
| ACM LBP - Logan Utah - Final Report.pdf | ||
| Final Specifications.pdf | ||
| Combined Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rocky Mountain Research Station Logan Main Building Flooring Repair
SECTION B- CONSTRUCTION PRICES/COSTS
B-1 Schedule of Items (Base Items)
SCHEDULE OF ITEMS
R22 Rocky Mountain Research Station PROJECT TITLE: Logan Main Building Flooring Repair WORKPLAN ACQUISITION PLAN/REQUISITION NO: 1035771
| Anticipated Delivery Date (Required for Supply and Construction) |
| 9/30/2021 |
SCHEDULE OF ITEMS
ITEM
NUMBER
| DESCRIPTION |
| PAY UNIT |
| EST QTY |
| Unit Price |
| 0001 |
| Mobilization, Bonding, and OH&P |
| LS |
| 1 |
| $_____ |
| 0002 |
| Existing Conditions: Demo, and Asbestos Abatement |
| LS |
| 1 |
| $_____ |
| 0003 |
| Finishes: Vinyl Composite Tile, Carpet Tile, Wall Base, and Transition strips |
| LS |
| 1 |
| $_____ |
| 0004 |
| Furnishings: Entrance Floor Mat |
| LS |
| 1 |
| $_____ |
OH&P - OVERHEAD AND PROFIT
LS - LUMP SUM Award anticipated to be a firm fixed price contract.
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C-1 Scope of Contract
A. Move room furnishings (tables, desk, refrigerators, lab equipment; items identified during Pre-Bid walk-through) and coordinate with the COR the temporary storage/placement of furnishings while work in each individual room is being accomplished.
B. Remove existing carpet, Vinyl Composite Tile, asbestos floor tiling, and asbestos containing mastic from:
1. First Floor Rooms (Approx. 6000 SF): Rooms 100, 101, 102, 103, 104, 110, 111, 112, 114, 115, 116, 117, 118, 119, 120, 121, 122, 123, 124, 125, 126, 127, 128, 129, 130, 131, 132, 133, and 134.
2. Basement Rooms (Approx. 2250 SF): Rooms 01, 02, 03, 12, and the Stairs and Landings.
See drawings for exact location of work areas and attached asbestos inspection report.
C. Install new commercial grade Vinyl Composition Tile (VCT) or Carpet Tiles as new floor covering in all areas where asbestos tile was removed.
D. Provide and install new rubber cove base around new VCT and Carpet Tile flooring.
C-2 Location of Project
A. At the Logan Forestry Science Laboratory at 860 North 1200 East Logan, UT 84321
C-3 Pre-Bid/Pre-Proposal Conference
A. For this project, a Pre-Bid/Pre-Proposal Conference. Prospective Contractors may ask any additional questions they have and may visit the site under coordination from the CO or COR
C-4 Performance Evaluations
A. At the conclusion of the contract or when the Contractor’s performance is considered less than satisfactory, the Government will complete a Contractor’s performance evaluation. The evaluation will consider all aspects of the Contractor’s performance. The Contractor will be provided a copy of the performance evaluation and an opportunity to discuss the evaluation.
C-5 Furnishing of Material and Equipment
A. Unless otherwise stated in the contract, the contractor shall furnish all material and equipment required for performance of the contract. All material and equipment shall comply with the specifications and supplemental documents.
B. The Contractor shall furnish and deliver the material and equipment to the work site in such a manner that their quality and fitness for the work is preserved. The Forest Service reserves the right to reject any damaged materials.
C. Measurement and payment for contract work will be made only for those pay items included in the Schedule of Items.
D. The Contractor shall be responsible for furnishing warning devices and complying with the safety standards included in the specifications of this contract, or superseding document adopted by the Forest Service.
C-6 Coordination of Specifications
A. Standard Specifications:
1. Project specific 33 Division Forest Service Master Specifications attached within the Contract.
B. The Standard Specifications must be read to gain a full understanding of the work required.
C-7 Material Certifications, Testing Reports & Other Submittals
A. Any modification of other items, designs, materials, products made necessary because of a substitution, will be the responsibility of the Contractor without adjustment in contract price or time. The Contracting Officer's approval of any substitute will not affect the Contractor's responsibility for such modification. All substitutions will be requested by the Contractor after award of the contract has been made. No approvals will be made prior to award.
B. Work requiring submittals shall not begin until submittals have been approved.
Submittals shall include:
| Date and Revision Dates. |
| Project Name and Contract Number. |
| Names of Contractor, Subcontractor, Supplier, and Manufacturers. |
| Field Dimensions and Relation to Adjacent Structures. |
Contractor's stamp, initialed or signed, certifying review of submittal, verification of field measurement and compliance with contract documents.
Samples:
Physical examples shall illustrate materials, equipment, or workmanship, and establish standards by which completed work shall be judged. Samples shall be of sufficient size and quantity to illustrate the functional characteristics of product or material, with integrally related parts and devices.
Manufacturer's requirements:
Supply manufacturer's catalog sheets or brochures with diagrams, schedules, or performance charts. Illustrations shall be clearly marked to identify pertinent materials or models, dimensions, and clearances required. Supplement standard drawings to provide information unique to this project.
Approval or Rejection Time Allowance:
Submittals will be reviewed and either approved or rejected within the time designated in the Award, see example table below. Review time begins from date of receipt by Contracting Officer or COR.
C-8 Definitions and Quantity Measurement Terms
A. The specifications shall define definitions and quantity measurement terms.
C-9 Abbreviations A. Whenever in these specifications, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows:
1 CS -Commercial Standard issued by U.S. Dept. of Commerce.
2 EPA -Environmental Protection Agency.
3 FAR -Federal Acquisition Regulation.
4 NBS -National Bureau of Standards.
5 OSHA -Occupational Safety and Health Act.
6 PS -Product Standard issued by the U.S. Dept. of Commerce.
7 UL -Underwriters Laboratories, Inc.
C-10 Applicability of the Service Contract Act (SCA) and Construction Wage Rates Requirements Statute (CWRRS)
A. The Contractor is responsible for compliance with the Service Contract Act (SCA) and Construction Wage Rates Requirements Statute (CWRRS). The Department of Labor (DOL) is responsible for enforcement of the SCA and CWRRS. Contractor shall contact the DOL to resolve any questions concerning the applicability of the SCA or CWRRS.
C-11 Statement of Work/Specifications (AGAR 452.211-72)(FEB 1988)
A. The Contractor shall furnish the necessary personnel, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
C-12 Attachments to Statements of Work/Specifications (AGAR 452.211-73)(FEB 1988)
A. The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
C-13 Use of Roads and Permitting
(NOT USED)
C-14 Bio Preferred Products
A. The Contractor must comply with Section 9002 of the Farm Security and Rural Investment Act of 2002 (FSRIA), Executive Order (EO) 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” and the Federal Acquisition Regulation to provide biobased products.
B. The Contractor shall utilize products and material made from biobased materials (e.g., biobased greases, biobased hydraulic fluids, biobased absorbents) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer (CO).
C. Biobased products that are designated for preferred procurement under USDA’s Bio- Preferred program must meet the required minimum biobased content as stated in the USDA Final Rule available at www.biopreferred.gov. The Contractor shall provide data for their biobased products such as biobased content.
D. In addition to the biobased products designated by the U.S. Department of Agriculture in the Bio-Preferred Program, the Contractor is encouraged to use other biobased products.
E. The Contractor shall comply with the provision at FAR 52.223-1, Biobased Product Certification. As required by the Farm Security and Rural Investment Act of 2002 and the Energy Policy Act of 2005 (7 U.S.C. 8102(c) (3)), the Offeror certifies, by signing this offer, that biobased products (within categories of products listed by the United States Department of Agriculture in 7 CFR part 3201, subpart B) to be used or delivered in the performance of the contract, other than biobased products that are not purchased by the Offeror as a direct result of this contract, will comply with the applicable specifications or other contractual requirements.
F. The Contractor shall comply with the provision at FAR 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
(a). In the performance of this contract, the contractor shall make maximum use of bio- based products that are United States Department of Agriculture (USDA) designated items unless--
(1) The product cannot be acquired--
(i) Competitively within a time frame providing for compliance with the contract performance schedule;
(ii) Meeting contract performance requirements; or
(iii) At a reasonable price.
(2) The product is to be used in an application covered by a USDA categorical exemption (see 7 CFR 3201.3(e)). For example, all USDA-designated items are exempt from the preferred procurement requirement for the following:
(i) Spacecraft system and launch support equipment.
(ii) Military equipment, i.e., a product or system designed or procured for combat or combat-related missions.
(b). Information about this requirement and these products is available at http://www.biopreferred.gov.
(c). In the performance of this contract, the Contractor shall--
(i) Report to http://www.sam.gov, with a copy to the Contracting Officer, on the product types and dollar value of any USDA-designated biobased products purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30; and
(ii) Submit this report no later than
(iii) October 31 of each year during contract performance.
G. A Contractor may propose more than one product within a product category and/or propose a product or products addressing more than one product category.
SECTION D – PACKAGING AND MARKING
{For this Solicitation, there are NO clauses in this Section}
SECTION E – INSPECTION AND ACCEPTANCE
E.1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov/browse/index/far
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
The following clause applies to all ordered service tasks:
FAR 52.246-4 Inspection of Services--Fixed-Price (AUG 1996)
The following clause applies to all ordered construction tasks:
FAR 52.246-12 Inspection of Construction (AUG 1996)
The following clause applies to all project work paid for by the hour:
FAR 52.246-6 Inspection – Time-and-Material Labor-Hour (MAY 2001)
SECTION F--DELIVERIES OR PERFORMANCE
F-1 Clauses Incorporated by Reference (FAR 52.252-2)(FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): https://www.acquisition.gov/browse/index/far
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
The following clause applies to all ordered construction tasks:
52.242-14 Suspension of Work (APR 1984)
The following clause applies to all ordered service tasks:
52.242-15 Stop Work Order (AUG 1989) 52.242-17 Government Delay of Work (APR 1984)
SECTION G – CONTRACT ADMINISTRATION DATA
G-1 Invoice and Payment
A. The Department of Agriculture (USDA) mandated the transition of all Integrated Acquisition System (IAS) payments to the US Treasury Invoice Processing Platform (IPP). This allows electronic routing and approval of IAS related invoices. It will be necessary for contractors to login to their IPP accounts every 90 days to keep their IPP accounts active. The contractor must follow the instructions on how to register and submit invoices via IPP as prescribed in the previous communications from USDA and Treasury. All invoices are to be submitted via the electronic Invoice Processing Platform. This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information located on the IPP website. Please make sure that your company has registered with IPP to establish your account.
B. The invoice format/template the contractor shall use in submitting invoices is to reflect the award document with the individual line items through the IPP platform. The contractor shall attach their company’s version of the paper invoice to the IPP invoice. Contractor shall submit invoices to the IPP platform. IN ACCORDANCE TO THE TERMS AND CONDITIONS OF THIS CONTRACT.
C. Contractor and government personnel will decide on the method of payment, whether it be partial payments, based on some measure, or as one deliverable at the end of the project.
D. Payment for Materials Off Site may be made in accordance with Clause 52.232-5, progress payments may include payment for materials stored off site. Contractor shall provide a copy of the paid invoice; provide evidence that the material will be included in the finished project; and identify the location where the materials are stored, so that the government may make visual inspection if the Contracting Officer deems it necessary. The Contractor shall be liable for loss, damage, or destruction of the materials until such time as the materials are physically in the possession and control of the government. The Contractor will not be held liable to the extent that the Contracting Officer determines that the loss, damage, or destruction occurred through the fault or negligence of the government or its agents.
E. Payments are made by the US Department of Treasury through information from System for Award Management (SAM) in accordance with 48 CFR § 52.232-33 - Payment by Electronic Funds Transfer - System for Award Management.
G-2 Post Award Conference (AGAR 452.215-73)(NOV 1996)
A. A post award conference with the successful offeror is required at the award. It will be scheduled within 15 days after the date of contract award. The conference will be held virtually.
G-3 Designation of Contracting Officer’s Representative
A. The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.
B. The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly.
C. On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.
SECTION H – SPECIAL CONTRACT REQUIREMENTS
H-1 AGAR 452.236-77 Emergency Control (JUL 1985)
A. Contractor's Responsibility for Fire Fighting. (1) The Contractor, under the provisions of FAR clause 52.236-9, PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS, shall immediately extinguish all fires on the work site other than those fires in use as a part of the work. (2) The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor's agents or employees.
B. Contractor’s Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.
C. Contractor's Responsibility for Responding to Emergencies. When directed by the Contracting Officer, the Contractor shall allow the Government to temporarily use employees and equipment from the work site for emergency work (anticipated to be restricted to fire fighting). An equitable adjustment for the temporary use of employees and equipment will be made under the CHANGES clause, FAR 52.243-4.
H-2 Safety Plan
A. The Contractor shall prepare a Safety Plan which addresses the specific hazards of the work site and shall include working in areas of dead trees and falling debris. The Contractor shall identify the specific conditions that s/he considers is a hazard. The Safety Plan shall also address the personal protective equipment and mitigating measures the Contractor will do to increase safety on the worksite.
H-3 Fire Control
H. 7. Fire Control
H.7.1. Contractor's Responsibility for Contractor-Caused Fires. The Contractor, whether or not directed by the Forest Service, shall immediately extinguish, without expense to the Government, all fires on or in the vicinity of the project which are caused by Contractor's employees, whether set directly or indirectly as a result of Contractor operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation resulting from fires set or caused by the Contractor's employees or resulting from contract operations.
H-4 Use of Premises
A. Contractor shall have used of the facility and all associated utilities for the duration of the contract.
B. A storage site MAY be permitted within the project area upon written approval by the CO. The Forest Service assumes no liability for materials stored within the storage site. The Contractor will be allowed to erect a temporary fence to secure materials and equipment, however, the fence shall be removed and the site restored prior to final acceptance of the contract.
PART II – CONTRACT CLAUSES
SECTION I – CONTRACT CLAUSES
I-1 Clauses Incorporated by Reference (FAR 52.252-2)(FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): FAR | Acquisition.GOV AGRICULTURE ACQUISITION REGULATION AGAR (usda.gov)
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
Applicable to Both Service and Construction Clauses
| 52.203-3 |
| Gratuities (APR 1984) |
| 52.203-5 |
| Covenant Against Contingent Fees (MAY 2014) |
| 52.203-7 |
| Anti-Kickback Procedures (JUN 2020) |
| 52.203-8 |
| Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (MAY |
2014)
| 52.203-10 |
| Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014) |
| 52.203-12 |
| Limitation on Payments to Influence Certain Federal Transactions (JUN 2020) |
| 52.203-17 |
| Contractor Employee Whistleblower Rights and Requirement to Inform Employees of |
Whistleblower Rights (JUN 2020)
| 52.204-4 |
| Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (MAY 2011) |
| 52.204-7 |
| System for Award Management (OCT 2018) |
| 52.209-6 |
| Protecting the Government's Interest when Subcontracting with Contractors Debarred, |
Suspended, or Proposed for Debarment (JUN 2020)
| 52.215-2 |
| Audit and Records --Negotiation (JUN 2020) |
| 52.215-8 |
| Order of Precedence--Uniform Contract Format (OCT 1997) |
| 52.219-6 |
| Notice of Total Small Business Set-Aside (NOV 2020) |
| 52.219-8 |
| Utilization of Small Business Concerns (OCT 2018) |
| 52.222-3 |
| Convict Labor (JUN 2003) |
| 52.222-21 |
| Prohibition of Segregated Facilities (APR 2015) |
| 52.222-26 |
| Equal Opportunity (SEP 2016) |
| 52.222-35 |
| Equal Opportunity Veterans (JUN 2020) |
| 52.222-36 |
| Equal Opportunity for Workers with Disabilities (JUN 2020) |
| 52.222-37 |
| Employment Reports on Veterans (JUN 2020) |
| 52.222-50 |
| Combating Trafficking in Persons (OCT 2020) |
| 52.222-54 |
| Employment Eligibility Verification (OCT 2015) |
| 52.223-5 |
| Pollution Prevention and Right-to-Know Information (MAY 2011) |
| 52.223-6 |
| Drug-Free Workplace (MAY 2001) |
| 52.223-17 |
| Affirmative Procurement of EPA-designated Items in Service and Construction |
Contracts (AUG 2018)
| 52.223-18 |
| Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) |
| 52.225-13 |
| Restrictions on Certain Foreign Purchases (FEB 2021) |
| 52.227-1 |
| Authorization and Consent (JUN 2020) |
| 52.227-2 |
| Notice and Assistance Regarding Patent and Copyright Infringement (JUN 2020) |
| 52.229-3 |
| Federal, State, and Local Taxes (FEB 2013) |
| 52.232-17 |
| Interest (MAY 2014) |
| 52.232-18 |
| Availability of Funds (APR 1984) |
| 52.232-23 |
| Assignment of Claims (MAY 2014) |
| 52.232-33 |
| Payment by Electronic Funds Transfer – System for Award Management (OCT 2018) |
| 52.233-1 |
| Disputes (MAY 2014) |
| 52.233-3 |
| Protest After Award (AUG 1996) |
| 52.233-4 |
| Applicable Law for Breach of Contract Claim (OCT 2004) |
| 52.242-13 |
| Bankruptcy (JUL 1995) |
| 52.244-6 |
| Subcontracts for Commercial Items (NOV 2020) |
| 52.245-1 |
| Government Property (JAN 2017) |
| 52.249-2 |
| Termination for Convenience of the Government (Fixed-Price) (APR 2012) |
| 52.253-1 |
| Computer Generated Forms (JAN 1991) |
Construction Clauses
| 52.211-18 |
| Variation in Estimated Quantity (APR 1984) |
| 52.222-6 |
| Construction Wage Rate Requirements (AUG 2018) |
| 52.222-7 |
| Withholding of Funds (MAY 2014) |
| 52.222-9 |
| Apprentices and Trainees (JUL 2005) |
| 52.222-10 |
| Compliance with Copeland Act Requirements (FEB 1988) |
| 52.222-11 |
| Subcontracts (Labor Standards) (MAY 2014) |
| 52.222-12 |
| Contract Termination -Debarment (MAY 2014) |
| 52.222-13 |
| Compliance with Construction Wage Rate Requirements and Related Regulations (MAY |
2014)
| 52.222-14 |
| Disputes Concerning Labor Standards (FEB 1988) |
| 52.222-15 |
| Certification of Eligibility (MAY 2014) |
| 52.222-27 |
| Affirmative Action Compliance Requirements for Construction (APR 2015) |
| 52.228-12 |
| Prospective Subcontractor Requests for Bonds (MAY 2014) |
| 52.228-14 |
| Irrevocable Letter of Credit (NOV 2014) |
| 52.228-15 |
| Performance and Payment Bonds -Construction. (JUN 2020) |
| 52.232-5 |
| Payments under Fixed-Price Construction Contracts (MAY 2014) |
| 52.232-27 |
| Prompt Payment for Construction Contracts (JAN 2017) |
| 52.236-2 |
| Differing Site Conditions (APR 1984) |
| 52.236-3 |
| Site Investigation and Conditions Affecting the Work (APR 1984) |
| 52.236-5 |
| Material and Workmanship (APR 1984) |
| 52.236-6 |
| Superintendence by the Contractor (APR 1984) |
| 52.236-7 |
| Permits and Responsibilities (NOV 1991) |
| 52.236-8 |
| Other Contracts (APR 1984) |
| 52.236-9 |
| Protection of Existing Vegetation, Structures, Equipment, Utilities, and |
Improvements (APR 1984)
| 52.236-10 |
| Operations and Storage Areas (APR 1984) |
| 52.236-11 |
| Use and Possession Prior to Completion (APR 1984) |
| 52.236-12 |
| Cleaning Up (APR 1984) |
| 52.236-15 |
| Schedules for Construction Contracts (APR 1984) |
| 52.243-4 |
| Changes (JUN 2007) |
| 52.246-21 |
| Warranty of Construction (MAR 1994) |
| 52.249-10 |
| Default (Fixed-Price Construction) (APR 1984) |
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
| 452.236-73 | Archaeological or Historic Sites (FEB 1988) |
| 452.236-74 | Control of Erosion, Sedimentation, and Pollution (NOV 1996) |
| 452.236-77 | Emergency Control (JUL 1985) |
| 452.237-75 | Restrictions Against Disclosure (FEB 1988) |
FAR 52.204-7 System for Award Management (OCT 2018)
(a) Definitions. As used in this provision—
"Electronic Funds Transfer (EFT) indicator means a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for Award Management records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.
Registered in the System for Award Management (SAM) means that–
(1) The Offeror has entered all mandatory information, including the unique entity identifier and the EFT indicator, if applicable, the Commercial and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see subpart 4.14) into SAM
(2) The offeror has completed the Core, Assertions, and Representations and Certifications, and Points of Contact sections of the registration in SAM;
(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The offeror will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and
(4) The Government has marked the record "Active".
Unique entity identifier means a number or other identifier used to identify a specific commercial, nonprofit, or Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.
(b) (1) An Offeror is required to be registered in SAM when submitting an offer or quotation, and shall continue to be registered until time of award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
(2) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation "Unique Entity Identifier" followed by the unique entity identifier that identifies the Offeror's name and address exactly as stated in the offer. The Offeror also shall enter its EFT indicator, if applicable. The unique entity identifier will be used by the Contracting Officer to verify that the Offeror is registered in the SAM.
(c) If the Offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for establishment of the unique entity identifier directly to obtain one. The Offeror should be prepared to provide the following information:
(1) Company legal business name.
(2) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(3) Company physical street address, city, state, and Zip Code.t
(4) Company mailing address, city, state and Zip Code (if separate from physical).
(5) Company telephone number.
(6) Date the company was started.
(7) Number of employees at your location.
(8) Chief executive officer/key manager.
(9) Line of business (industry).
(10) Company headquarters name and address (reporting relationship within your entity).
(d) Processing t ime should be taken into consideration when registering. Offerors who are not registered in SAM should consider applying for registration immediately upon receipt of this solicitation. See https://ww.sam.gov for information on registration.
(End of provision)
I-2 FAR 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020)
(a) Definitions. As used in this clause:
Executive means officers, managing partners, or any other employees in management positions.
First-tier subcontract means a subcontract awarded directly by the Contractor for the purpose of acquiring supplies or services (including construction) for performance of a prime contract. It does not include the Contractor’s supplier agreements with vendors, such as long-term arrangements for materials or supplies that benefit multiple contracts and/or the costs of which are normally applied to a Contractor’s general and administrative expenses or indirect costs.
Month of award means the month in which a contract is signed by the Contracting Officer or the month in which a first-tier subcontract is signed by the Contractor.
Total compensation means the cash and noncash dollar value earned by the executive during the Contractor’s preceding fiscal year and includes the following (for more information see 17 CFR 229.402(c)(2)):
(1) Salary and bonus.
(2) Awards of stock, stock options, and stock appreciation rights. Use the dollar amount recognized for financial statement reporting purposes with respect to the fiscal year in accordance with the Financial Accounting Standards Board’s Accounting Standards Codification (FASB ASC) 718, Compensation-Stock Compensation.
(3) Earnings for services under non-equity incentive plans. This does not include group life, health, hospitalization or medical reimbursement plans that do not discriminate in favor of executives, and are available generally to all salaried employees.
(4) Change in pension value. This is the change in present value of defined benefit and actuarial pension plans.
(5) Above-market earnings on deferred compensation which is not tax-qualified.
(6) Other compensation, if the aggregate value of all such other compensation (e.g., severance, termination payments, value of life insurance paid on behalf of the employee, perquisites or property) for the executive exceeds $10,000.
(b) Section 2(d)(2) of the Federal Funding Accountability and Transparency Act of 2006 (Pub. L. 109-282), as amended by section 6202 of the Government Funding Transparency Act of 2008 (Pub. L. 110-252), requires the Contractor to report information on subcontract awards. The law requires all reported information be made public, therefore, the Contractor is responsible for notifying its subcontractors that the required information will be made public.
(c) Nothing in this clause requires the disclosure of classified information
(d) (1) Executive compensation of the prime contractor. As a part of its annual registration requirement in the System for Award Management (SAM) (Federal Acquisition Regulation (FAR) provision 52.204-7), the Contractor shall report the names and total compensation of each of the five most highly compensated executives for its preceding completed fiscal year, if–
(i) In the Contractor’s preceding fiscal year, the Contractor received-
(A) 80 percent or more of its annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants), cooperative agreements, and other forms of Federal financial assistance; and
(B) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants), cooperative agreements, and other forms of Federal financial assistance; and
(ii) The public does not have access to information about the compensation of the executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986. (To determine if the public has access to the compensation information, see the U.S. Security and Exchange Commission total compensation filings at http://www.sec.gov/answers/execomp.htm.)
(2) First-tier subcontract information. Unless otherwise directed by the Contracting Officer, or as provided in paragraph (g) of this clause, by the end of the month following the month of award of a first-tier subcontract valued at or above the threshold specified in FAR 4.1403(a) on the date of subcontract award, the Contractor shall report the following information at http://www.fsrs.gov for that first-tier subcontract. (The Contractor shall follow the instructions at http://www.fsrs.gov to report the data.)
(i) Unique entity identifier for the subcontractor receiving the award and for the subcontractor's parent company, if the subcontractor has a parent company.
(ii) Name of the subcontractor.
(iii) Amount of the subcontract award.
(iv) Date of the subcontract award.
(v) A description of the products or services (including construction) being provided under the subcontract, including the overall purpose and expected outcomes or results of the subcontract.
(vi) Subcontract number (the subcontract number assigned by the Contractor).
(vii) Subcontractor’s physical address including street address, city, state, and country. Also include the nine-digit zip code and congressional district.
(viii) Subcontractor’s primary performance location including street address, city, state, and country. Also include the nine-digit zip code and congressional district.
(ix) The prime contract number, and order number if applicable.
(x) Awarding agency name and code.
(xi) Funding agency name and code.
(xii) Government contracting office code.
(xiii) Treasury account symbol (TAS) as reported in FPDS.
(xiv) The applicable North American Industry Classification System code (NAICS).
(3) Executive compensation of the first-tier subcontractor. Unless otherwise directed by the Contracting Officer, by the end of the month following the month of award of a first-tier subcontract valued at or above the threshold specified in FAR 4.1403(a) on the date of subcontract award, and annually thereafter (calculated from the prime contract award date), the Contractor shall report the names and total compensation of each of the five most highly compensated executives for that first-tier subcontractor for the first-tier subcontractor’s preceding completed fiscal year at http://www.fsrs.gov, if-
(i) In the subcontractor’s preceding fiscal year, the subcontractor received-
(A) 80 percent or more of its annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants), cooperative agreements, and other forms of Federal financial assistance; and
(B) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants), cooperative agreements, and other forms of Federal financial assistance; and
(ii) The public does not have access to information about the compensation of the executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986. (To determine if the public has access to the compensation information, see the U.S. Security and Exchange Commission total compensation filings at http://www.sec.gov/answers/execomp.htm.)
(e) The Contractor shall not split or break down first-tier subcontract awards to a value below the threshold specified in FAR 4.1403(a), on the date of subcontract award, to avoid the reporting requirements in paragraph (d) of this clause.
(f) The Contractor is required to report information on a first-tier subcontract covered by paragraph (d) when the subcontract is awarded. Continued reporting on the same subcontract is not required unless one of the reported data elements changes during the performance of the subcontract. The Contractor is not required to make further reports after the first-tier subcontract expires.
(g) (1) If the Contractor in the previous tax year had gross income, from all sources, under $300,000, the Contractor is exempt from the requirement to report subcontractor awards.
(2) If a subcontractor in the previous tax year had gross income from all sources under $300,000, the Contractor does not need to report awards for that subcontractor.
(h) The FSRS database at http://www.fsrs.gov will be prepopulated with some information from SAM and the FPDS database. If FPDS information is incorrect, the contractor should notify the contracting officer. If the SAM information is incorrect, the contractor is responsible for correcting this information.
(End of clause)
I-3 FAR 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters. (OCT 2018)
(a) The Contractor shall update the information in the Federal Awardee Performance and Integrity Information System (FAPIIS) on a semi-annual basis, throughout the life of the contract, by posting the required information in the System for Award Management via https://www.sam.gov.
(b) As required by section 3010 of the Supplemental Appropriations Act, 2010 (Pub. L. 111-212), all information posted in FAPIIS on or after April 15, 2011, except past performance reviews, will be publicly available. FAPIIS consists of two segments-
(1) The non-public segment, into which Government officials and the Contractor post information, which can only be viewed by-
(i) Government personnel and authorized users performing business on behalf of the Government; or
(ii) The Contractor, when viewing data on itself; and
(2) The publicly-available segment, to which all data in the non-public segment of FAPIIS is automatically transferred after a waiting period of 14 calendar days, except for-
(i) Past performance reviews required by subpart 42.15;
(ii) Information that was entered prior to April 15, 2011; or
(iii) Information that is withdrawn during the 14-calendar-day waiting period by the Government official who posted it in accordance with paragraph (c)(1) of this clause.
(c) The Contractor will receive notification when the Government posts new information to the Contractor’s record.
(1) If the Contractor asserts in writing within 7 calendar days, to the Government official who posted the information, that some of the information posted to the non-public segment of FAPIIS is covered by a disclosure exemption under the Freedom of Information Act, the Government official who posted the information must within 7 calendar days remove the posting from FAPIIS and resolve the issue in accordance with agency Freedom of Information procedures, prior to reposting the releasable information. The contractor must cite 52.209-9 and request removal within 7 calendar days of the posting to FAPIIS.
(2) The Contractor will also have an opportunity to post comments regarding information that has been posted by the Government. The comments will be retained as long as the associated information is retained, i.e., for a total period of 6 years. Contractor comments will remain a part of the record unless the Contractor revises them.
(3) As required by section 3010 of Pub. L. 111-212, all information posted in FAPIIS on or after April 15, 2011, except past performance reviews, will be publicly available.
(d) Public requests for system information posted prior to April 15, 2011, will be handled under Freedom of Information Act procedures, including, where appropriate, procedures promulgated under E.O. 12600.
(End of clause)
I-4 FAR 52.222-4 Contract Work Hours and Safety Standards —Overtime Compensation (MAR 2018)
(a) Overtime requirements. No Contractor or subcontractor employing laborers or mechanics (see Federal Acquisition Regulation 22.300) shall require or permit them to work over 40 hours in any workweek unless they are paid at least 1 and 1/2 times the basic rate of pay for each hour worked over 40 hours.
(b) Violation; liability for unpaid wages; liquidated damages. The responsible Contractor and subcontractor are liable for unpaid wages if they violate the terms in paragraph (a) of this clause. In addition, the Contractor and subcontractor are liable for liquidated damages payable to the Government. The Contracting Officer will assess liquidated damages at the rate specified at 29 CFR 5.5(b)(2) per affected employee for each calendar day on which the employer required or permitted the employee to work in excess of the standard workweek of 40 hours without paying overtime wages required by the Contract Work Hours and Safety Standards statute (found at 40 U.S.C. chapter 37). In accordance with the Federal Civil Penalties Inflation Adjustment Act of 1990 (28 U.S.C. 2461 Note), the Department of Labor adjusts this civil monetary penalty for inflation no later than January 15 each year.
(c) Withholding for unpaid wages and liquidated damages. The Contracting Officer will withhold from payments due under the contract sufficient funds required to satisfy any Contractor or subcontractor liabilities for unpaid wages and liquidated damages. If amounts withheld under the contract are insufficient to satisfy Contractor or subcontractor liabilities, the Contracting Officer will withhold payments from other Federal or federally assisted contracts held by the same Contractor that are subject to the Contract Work Hours and Safety Standards statute
(d) Payrolls and basic records. (1) The Contractor and its subcontractors shall maintain payrolls and basic payroll records for all laborers and mechanics working on the contract during the contract and shall make them available to the Government until 3 years after contract completion. The records shall contain the name and address of each employee, social security number, labor classifications, hourly rates of wages paid, daily and weekly number of hours worked, deductions made, and actual wages paid. The records need not duplicate those required for construction work by Department of Labor regulations at 29 CFR 5.5(a)(3) implementing the Construction Wage Rate Requirements statute.
(2) The Contractor and its subcontractors shall allow authorized representatives of the Contracting Officer or the Department of Labor to inspect, copy, or transcribe records maintained under paragraph (d)(1) of this clause. The Contractor or subcontractor also shall allow authorized representatives of the Contracting Officer or Department of Labor to interview employees in the workplace during working hours.
(e) Subcontracts. The Contractor shall insert the provisions set forth in paragraphs (a) through (d) of this clause in subcontracts that may require or involve the employment of laborers and mechanics and require subcontractors to include these provisions in any such lower tier subcontracts. The Contractor shall be responsible for compliance by any subcontractor or lower-tier subcontractor with the provisions set forth in paragraphs (a) through (d) of this clause.
I-11 FAR 52.222-8 Payrolls and Basic Records (AUG 2018)
Payrolls and Basic Records (Aug 2018)
(a) Payrolls and basic records relating thereto shall be maintained by the Contractor during the course of the work and preserved for a period of 3 years thereafter for all laborers and mechanics working at the site of the work. Such records shall contain the name, address, and social security number of each such worker, his or her correct classification, hourly rates of wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in 40 U.S.C. 3141(2)(B) (Construction Wage Rate Requirement statute)), daily and weekly number of hours worked, deductions made, and actual wages paid. Whenever the Secretary of Labor has found, under paragraph (d) of the clause entitled Construction Wage Rate Requirements, that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated in providing benefits under a plan or program described in 40 U.S.C. 3141(2)(B), the Contractor shall maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs anticipated or the actual cost incurred in providing such benefits. Contractors employing apprentices or trainees under approved programs shall maintain written evidence of the registration of apprenticeship programs and certification of trainee programs, the registration of the apprentices and trainees, and the ratios and wage rates prescribed in the applicable programs.
(b) (1) The Contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the Contracting Officer. The payrolls submitted shall set out accurately and completely all of the information required to be maintained under paragraph (a) of this clause, except that full social security numbers and home addresses shall not be included on weekly transmittals. Instead the payrolls shall only need to include an individually identifying number for each employee (e.g., the last four digits of the employee’s social security number). The required weekly payroll information may be submitted in any form desired. Optional Form WH-347 is available for this purpose and may be obtained from the U.S. Department of Labor Wage and Hour Division website at http://www.dol.gov/whd/forms/wh347.pdfdol.gov/whd/forms/wh347.pdf . The Prime Contractor is responsible for the submission of copies of payrolls by all subcontractors. Contractors and subcontractors shall maintain the full social security number and current address of each covered worker, and shall provide them upon request to the Contracting Officer, the Contractor, or the Wage and Hour Division of the Department of Labor for purposes of an investigation or audit of compliance with prevailing wage requirements. It is not a violation of this section for a Prime Contractor to require a subcontractor to provide addresses and social security numbers to the Prime Contractor for its own records, without weekly submission to the Contracting Officer.
(2) Each payroll submitted shall be accompanied by a "Statement of Compliance," signed by the Contractor or subcontractor or his or her agent who pays or supervises the payment of the persons employed under the contract and shall certify-
(i) That the payroll for the payroll period contains the information required to be maintained under paragraph (a) of this clause and that such information is correct and complete;
(ii) That each laborer or mechanic (including each helper, apprentice, and trainee) employed on the contract during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly from the full wages earned, other than permissible deductions as set forth in the Regulations, 29 CFR Part 3; and
(iii) That each laborer or mechanic has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification of work performed, as specified in the applicable wage determination incorporated into the contract.
(3) The weekly submission of a properly executed certification set forth on the reverse side of Optional Form WH-347 shall satisfy the requirement for submission of the "Statement of Compliance" required by paragraph (b)(2) of this clause.
(4) The falsification of any of the certifications in this clause may subject the Contractor or subcontractor to civil or criminal prosecution under Section 1001 of Title 18 and Section 3729 of Title 31 of the United States Code.
(c) The Contractor or subcontractor shall make the records required under paragraph (a) of this clause available for inspection, copying, or transcription by the Contracting Officer or authorized representatives of the Contracting Officer or the Department of Labor. The Contractor or subcontractor shall permit the Contracting Officer or representatives of the Contracting Officer or the Department of Labor to interview employees during working hours on the job. If the Contractor or subcontractor fails to submit required records or to make them available, the Contracting Officer may, after written notice to the Contractor, take such action as may be necessary to cause the suspension of any further payment. Furthermore, failure to submit the required records upon request or to make such records available may be grounds for debarment action pursuant to 29 CFR 5.12.
(End of clause)
I-12 FAR 52.222-30 Construction Wage Rate Requirements—Price Adjustment (None or Separately Specified Method)(AUG 2018)
Construction Wage Rate Requirements-Price Adjustment (None or Separately Specified Method) (Aug 2018)
(a) The wage determination issued under the Construction Wage Rate Requirements statute by the Administrator, Wage and Hour Division, U.S. Department of Labor, that is effective for an option to extend the term of the contract, will apply to that option period.
(b) The Contracting Officer will make no adjustment in contract price, other than provided for elsewhere in this contract, to cover any increases or decreases in wages and benefits as a result of-
(1) Incorporation of the Department of Labor’s wage determination applicable at the exercise of the option to extend the term of the contract;
(2) Incorporation of a wage determination otherwise applied to the contract by operation of law; or
(3) An increase in wages and benefits resulting from any other requirement applicable to workers subject to the Construction Wage Rate Requirements statute.
I-13 FAR 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (DEC 2010)
(a) During the term of this contract, the Contractor shall post an employee notice, of such size and in such form, and containing such content as prescribed by the Secretary of Labor, in conspicuous places in and about its plants and offices where employees covered by the National Labor Relations Act engage in activities relating to the performance of the contract, including all places where notices to employees are customarily posted both physically and electronically, in the languages employees speak, in accordance with 29 CFR471.2 (d) and (f).
(1) Physical posting of the employee notice shall be in conspicuous places in and about the Contractor’s plants and offices so that the notice is prominent and readily seen by employees who are covered by the National Labor Relations Act and engage in activities related to the performance of the contract.
(2) If the Contractor customarily posts notices to employees electronically, then the…