Locum House Scope of work insullation 041425.docx
DOCX document 12 KB Posted
- Attached to
- 477 Ferry Remove & Install Insulation
- Solicitation number
- S-X21600-00013613
- Issued by
- Klamath County, Oregon
About this file
This is a Scope of Work document from the Confederated Tribes of Siletz Indians soliciting a contractor to perform insulation removal and replacement services at 477 SW Ferry St. in Siletz, Oregon. The project involves accessing the crawl space beneath a house, removing existing insulation, allowing an exterminator to treat the foundation, rafters, and plywood flooring with insecticide, and then reinstalling new insulation. The contractor must adhere to federal and state building codes and use insulation with a minimum R-value of R-21, replacing any existing insulation with lower ratings.
The contractor will be responsible for proper disposal of old insulation, maintaining a clean work area, and managing project-related debris. Pricing should incorporate prevailing wage requirements. Any project disputes or concerns should be directed to Syd Somes, Public Works Director, who can be contacted at 541-351-0141 or sydneys@ctsi.nsn.us. The scope does not specify exact contract duration, total project cost, or specific response deadlines, but provides clear parameters for the insulation replacement work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Clinic Oven Hood Scope of work 041425.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of work, The Confederated Tribes of Siletz Indians are looking to contract with a company to remove and install insulation at 477 SW Ferry St. Siletz, OR. 97380.
Accessing crawl space under the house and crawling under the house to remove insulation to have the exterminator spray insecticide on the foundation, rafters and plywood flooring under the house. When the exterminator is completed and it is ok to enter the crawl space under the house. The contractor will begin installing insulation back under the crawl space of the house. Contractor is responsible for adhering to Federal and State codes during the removal and installation of insulation. If the R-value rating is below R21 on the old insulation, then R-21 or higher insulation will be used. Make sure your proposal states the R-value of insulation being used. Use prevailing wages in your proposal.
Contractor will be responsible for disposal of old insulation and cleanup of debris initiated by the project. The work area will kept clean and orderly for access of other contractors, house occupants and house guests.
Any disputes and concerns will be directed to Syd Somes, Public Works Director Confederated Tribes of Siletz Indians at 541-351-0141 or by email at sydneys@ctsi.nsn.us .
File details come from the government source that posted it. Updated .