Clinic Oven Hood Scope of work 041425.docx
DOCX document 12 KB Posted
- Attached to
- 477 Ferry Remove & Install Insulation
- Solicitation number
- S-X21600-00013613
- Issued by
- Klamath County, Oregon
About this file
This is a Scope of Work document issued by the Confederated Tribes of Siletz Indians for installation of an oven hood and ventilation system at the Siletz Community Health Clinic located at 200 NE Gwee-Shut Rd., Siletz, Oregon 97380. The project requires installation of an oven hood, fan, and associated ducting for ventilation in a break room on the third floor of the facility. The contractor is responsible for procuring all necessary supplies, determining the optimal routing for ducting and building exit point in consultation with the owner, and managing all debris cleanup. The work area must be maintained in a clean and orderly condition to accommodate access for other contractors, employees, and Confederated Tribes of Siletz Indians workers. All inquiries and disputes should be directed to Syd Somes, Public Works Director, at 541-351-0141 or sydneys@ctsi.nsn.us.
Bids must be submitted using prevailing wage rates. The owner will be responsible for providing electrical work to supply power to the hood fan and oven, limiting the contractor's scope to mechanical installation and ductwork. No specific budget, timeline, or contract term information is provided in the scope of work. The project does not include electrical work or any incumbent vendor information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Locum House Scope of work insullation 041425.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of work, The confederated Tribes of Siletz Indians is looking to contract to have an oven hood and fan installed at the Siletz Community Health Clinic located at 200 NE Gwee-Shut Rd. Siletz Oregon 97380.
The contractor is responsible for procuring necessary supplies to complete the project 100%. Ducting for ventilation will be needed and discussing with owner the best area to run ducting and where to have the ducting exit building. This is in a break room three stories up. Owner will be responsible for electrician work that will supply electricity to the hood fan and oven. Submit bid using prevailing wage.
Contractor will be responsible for cleanup of debris initiated by the project. The work area will kept clean and orderly for access of other contractors, employees and CTSI workers.
Any disputes and concerns will be directed to Syd Somes, Public Works Director Confederated Tribes of Siletz Indians at 541-351-0141 or by email at sydneys@ctsi.nsn.us .