Local Telephone Service PWS-31 Mar 25.docx

DOCX document 74 KB Posted

Attached to
Telephone Services Federal contract opportunity
Solicitation number
W50S8Z-25-Q-A017
Issued by
Department of the Army Oregon Army National Guard

About this file

This Performance Work Statement (PWS) details a local telephone service contract for the Oregon Army National Guard at Kingsley Field Air National Guard Base in Klamath Falls, Oregon. The contract requires replacing existing low-speed time-division multiplexed (LSTDM) circuits with emulated session initiation protocol (SIP) circuits, providing local exchange access and transport services with specific technical requirements. The scope includes installing 1,100 Direct-Inward-Dialing (DID) directory numbers, analog and digital trunks, and ensuring E911 and Government Emergency Telecommunications Service (GETS) compatibility.

The contract term is one base year with four 12-month option years, with service performance requirements including 99.999% reliability and specific outage response protocols ranging from routine to catastrophic levels. Key technical specifications include managing local telephone services across analog and ISDN Primary Rate Interface (PRI) trunks, with precise requirements for circuit signaling, demarcation points, and communication infrastructure. The contractor must provide all necessary personnel, equipment, and infrastructure to ensure seamless integration with the government's existing communication systems, following FCC, DoD, and industry standards.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

FOR

Telephone Services

1.0 General:

1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform Telephone Services, as defined in this PWS. These services shall include any equipment, wiring, or infrastructure to ensure the Contractor’s proposed solution is compatible with the Government’s current infrastructure without additional Government expense. Access to the local exchange shall also include operator assistance functions. These services shall not include residential or business services for non-Government entities or Government contractors. The Contractor shall follow all Federal Communications Commission (FCC), Public Utility Commission (PUC), Department of Defense (DoD), AF, and industry standards for this requirement.

1.1.1 Objectives: This requirement will replace essential Local Telecommunication Services (LTS) and Long-Distance (LD) that are currently provided on a low-speed time-division multiplexed (LSTDM) circuit with emulated session initiation protocol (SIP) circuits. All connectivity requirements and features currently transported over the existing LSTDM must be migrated to an emulated SIP path without loss of capabilities. This PWS is for managed SIP trunks. The installation of all transport circuits and equipment, as well as the porting of all Direct-Inward-Dialing (DID) Directory Numbers.

1.2 Background: The Department of Defense (DoD) Chief Information Officer (CIO) has mandated all LSTDM transport technologies used for mission-related tasks be retired and replaced with IP based technologies. This is due to commercial support and hardware for LSTDM equipment being more difficult to find or phased out entirely. Due to changes in technology, equipment, and processes, it has become evident that the Government should acquire these services in a performance-based manner, consistent with the principles contained in Air Force Instruction (AFI) 63-138 “Acquisition of Services.” These services are considered Information Technology (IT) In Accordance With (IAW) Defense Federal Acquisition Regulation Supplement (DFARS) 239.74 “Telecommunications Services.” The requirement herein represents the site’s performance-based requirements for local, long distance “dial-tone”, and ancillary services as defined herein. As a part of the new process, the Air Force (AF) encourages the Contractor to identify or suggest improvements to existing LTS processes, operating procedures, systems, or applications to the Contracting Officer (CO).

1.3 Period of Performance (PoP): The Period of Performance shall be one (1) Base Year of 12 months and four (4) 12-month option years.

1.4 General Information:

1.4.1 Place and Performance of Services: The contractor shall provide services between the hours of 0730-1630 on Monday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at 210 Gentile St. Kingsley Field ANGB, Klamath Falls, OR 97603. The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.

1.4.1.1 Telework: The Government does not permit the contractor to telework in support of this requirement. In furtherance of Continuity of Operations Planning (COOP), a telework program may be enacted to ensure that the Government's mission-critical operations stay operational during times of national emergency or incidents of national significance. Telework shall be at no additional cost to the Government.

1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.

1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation, including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.

1.4.2 Recognized Holidays: The following are recognized United States (US) holidays. The contractor shall not perform services on these days:

1.4.2.1 New Year’s Day: January 1st

1.4.2.2 Martin Luther King, Jr.’s Birthday

1.4.2.3 President’s Day

1.4.2.4 Memorial Day

1.4.2.5 Juneteenth National Independence Day: June 19th

1.4.2.6 Independence Day: July 4th

1.4.2.7 Labor Day

1.4.2.8 Columbus Day

1.4.2.9 Veteran’s Day: November 11th

1.4.2.10 Thanksgiving Day

1.4.2.11 Christmas Day: December 25th

1.4.5 Access and General Protection/Security Policy and Procedures. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, Headquarters Air Force (HAF) and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

1.4.5.1 For Contractors Requiring Common Access Card (CAC). For installation(s)/location(s) cited in the contract, contractors shall ensure Common Access Cards (CACs) are obtained by all contract or subcontract personnel who meet one or both of the following criteria:

(a) Require logical access to Department of Defense computer networks and systems in either:

(i) the unclassified environment; or

(ii) the classified environment where authorized by governing security directives.

(b) Perform work, which requires the use of a CAC for installation entry control or physical access to facilities and buildings.

(c) While visiting or performing work on installation(s)/location(s), contractor personnel shall wear or prominently display the CAC as required by the Governing local policy.

Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated Tier 1 (T1) or higher investigation IAW DoDI 5200.46. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial/interim CAC may be issued based on a successfully scheduled T1 with the Office of Personnel Management and a favorable completion of an FBI fingerprint check.

1.4.5.1.1 Homeland Security Presidential Directive (HSPD)-12 Background Investigation Requirements: The contractor shall ensure that all contractor and subcontractor personnel whose duties require CAC card issuance obtain them, and shall process all CAC card applications. The contractor shall ensure that all employees requiring a T1 be vetted by the cognizant security activity Chief, Information Protection (CIP) to ensure a proper investigation is on record. The CIP will process the T1 if needed. The contractor shall ensure immediate compliance with all instructions regarding background investigation processing, including those provided verbally, by e-mail or via a Government system. The contractor is cautioned that the entire process from submittal of the investigation may take multiple weeks and shall factor this lead time into its hiring/placement process. The contractor shall make all reasonable efforts to ensure that contractor employees meet CAC eligibility standards upon assignment to the contract and shall be held responsible for delays, failure to meet performance requirements or decreases in efficiency in accordance with the applicable inspection clause.

1.4.5.1.2 Contractors and their personnel shall use the following procedures to obtain CACs:

(a) Contractors shall provide a listing of personnel who require a CAC to the contracting officer. The Government will provide the contractor instruction on how to complete the Contractor Verification System (CVS) application and then notify the contractor when approved.

1.4.5.1.3 Contractor personnel shall obtain a Contractor CAC from the nearest Real Time Automated Personnel Identification Documentation System (RAPIDS) Issuing Facility (Security Forces Pass and Identification Office). At the RAPIDS station, the RAPIDS Verification Officer will verify the contractor employee by Social Security Number (SSN) and two forms of identification. Identity source documents must come from the list of acceptable documents included in Form I-9, OMB No. 1615-0047, "Employment Eligibility Verification". Consistent with applicable law, at least one document from the Form I-9 list shall be a valid (unexpired) State or Federal Government-issued picture ID. The Identity documents will be inspected for authenticity and scanned and stored in the DEERS upon issuance of an ID. The photo ID requirement cannot be waived, consistent with applicable statutory requirements. The Verification Officer will capture primary and alternate fingerprints, picture, and updates to DEERS, and will then issue a CAC. Issued CACs will be valid for no longer than three years, or until the individual's contract end date (inclusive of any options), whichever is earlier.

1.4.5.1.4 During the performance period of the contract, the contractor shall:

1. Within 7 working days of any changes to the listing of the contract personnel authorized a CAC, provide an updated listing to the contracting officer who will provide the updated listing to the authorizing Government official;

2. Return CACs in accordance with local policy/directives within 7 working days of a change in status for contractor personnel who no longer require logical or physical access;

3. Return CACs in accordance with local policy/directives within 7 working days following a CACs expiration date; and

4. Report lost or stolen CACs in accordance with local policy/directives.

1.4.5.1.5 Within 7 working days following completion/termination of the contract, the contractor shall return all CACs issued to their personnel to the issuing office or the location specified by local policy/directives. A receipt for each returned card shall be provided to the TA/COR.

1.4.5.1.5.1 Failure to comply with these requirements may result in withholding of final payment.

1.4.5.2 Antiterrorism Awareness Level I Training (AT Level I). All contractor employees, to include subcontractor employees, requiring access to US Government installations, facilities and controlled access areas shall complete AT Level I training within 15 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. AT Level I may be accomplished by a Level I qualified instructor; completing the Force Protection computer-based training (CBT) course on the Advanced Distributed Learning System (ADLS) or Joint Knowledge Online at http://jko.jten.mil. Tracking for each contractor or subcontractor employee is the responsibility of the COR or unit AT Representative. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee to the COR within 15 calendar days after completion of training by each employee or subcontractor personnel.

1.4.5.3 Reserved.

1.4.5.4 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.

1.4.5.5 My Learning. All contractor employees and associated sub-contractor employees assigned to work on a Government site and/or requiring access to a DoD network will be required to register with My Learning at commencement of services in order to complete the necessary training required of them initially and annually for the duration of the contract (i.e., DoD IAA CyberAwareness, Protecting Sensitive Information, Force Protection, etc.) My Learning website: https://lms-jets.cce.af.mil/moodle/my/

1.4.5.6 Requirement for OPSEC Training. In accordance with AFI 10-701, Operations Security, OPSEC PMs/Signature Managers/Coordinators will provide OPSEC training or training materials to contract employees within 30 days of employees’ initial assignment to the contract and prior to having access to any critical information (CI) and annually thereafter. General organizational orientations may need to be supplemented by duty-related orientations in the work center targeted toward specific critical information and vulnerabilities associated with the work. Initial training (OPSE 1301 - OPSEC Fundamentals) is located on the ADLS website and refresher OPSEC training is conducted annually (at Commander's Call). The contractor shall submit certificates of completion for each contractor employee to the COR within 15 calendar days after completion of training.

1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.

1.4.8 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO. The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR, to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor. The Government Communication Services Officer (CSO) and Technical Representative shall be identified at time of contract award.

1.4.10 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. The contractor’s status as a “contractor” shall be predominantly displayed in all correspondence types (to include signature blocks on e-mail) and dealings with Government or non-Government entities. Contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed.

1.4.10.1 The contractor shall retrieve all identification media from its employees who depart employment for any reason. The contractor shall return all identification media (i.e., badges and CACs) to the KO within 14 days of an employee’s departure.

1.4.11 Combating Trafficking in Persons: The United States Government has adopted a zero tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR 22.17.

1.4.13 Data Rights The Government has unlimited rights to all documents/materials produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the KO. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.4.14 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.

2.0 Definitions and Acronyms:

2.1 Definitions:

2.1.1 Call Setup Success Rate (CSSR): (As defined by the international Telecommunication Union) The fractionalized amount of calls that make a successful connection to a dialed number, this is divided by the total number of calls placed.

2.1.2 Circuit Termination: Circuit termination at the Government installation includes the Main Distribution Frame (MDF) for analog signals, metallic cable pairs, Digital Signal Cross-Connect (DSX)-1 patch, cross connect panel(s) for T-1 and/or T-3 circuits, fiber optic patch and cross connect panels for optical interface equipment such as the optical carrier or SONET or MPLS systems, optical multiplexer equipment, and may extend to Cat 3/5/6 RJ-45 jack fields if directed by the Government POC to ensure adequate hand off of the circuit to the Government. Other wall-mounted, punch-down, terminal blocks are used for isolation and termination of Contractor metallic facilities.

2.1.3 Commercial Subscriber Lines (SCL): A CSL is defined by Government standards as a voice grade subscriber line serving directly from the Contractor’s central office switch to customer’s location.

2.1.4 Communications Focal Point (CFP): A 24/7 Focal Point located on an Air Force Facility that provides one stop notification services and provides reporting and tracking of communications outages to Government users of the communication systems.

2.1.5 Competitive Local Exchange Carrier (CLEC): A telephone company that competes with the already established local telephone business by providing its own network and switching.

2.1.6 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

2.1.7 Customer Premise Equipment (CPE): Customer-premises equipment or customer-provided equipment (CPE) is any equipment located at a subscriber's premises and connected with a carrier's telecommunication network at the contractually established demarcation point. The demarcation point contractually separates the customer equipment from the equipment located in either the distribution infrastructure or central office of the communications service provider. Vendor installed CPE devices are fully vendor owned, maintained, and monitored by the Vendor’s management platform. CPE equipment can be powered from the customer source electrical system, but a sufficient emergency power source must be available during periods of customer power interruption for any services contractually requiring a high level of reliability.

2.1.8 Defective Service: A service output that does not meet the standard of performance associated with the PWS.

2.1.9 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.

2.1.10 Dropped Call Rate (DCR): (As defined by International Telecommunication Union). The fractionalized amount of calls that experience a lost connection after a successful initial call establishment.

2.1.11 DS-1: A DS level and framing specification for synchronous digital streams, over circuits in the North American digital transmission hierarchy, at the DS1 transmission rate of 1,544,000 bits per second. DS1 is commonly used to multiplex 24 DS0 channels. Each DS0 channel, originally a digitized voice-grade telephone signal, carries 8000 bytes per second (64,000 bits per second). A DS1 frame includes one byte from each of the 24 DS0 channels and adds one framing bit, making a total of 193 bits per frame at 8000 frames per second. The result is 193*8000 = 1,544,000 bits per second.

2.1.12: Edge Boundary Controller (EBC): The Edge Boundary Controller is a Customer Provided Network Node device that provides firewall, intrusion detection, routing, QoS, and packet equalization between the Vendors IP Wide Area Network and the interior customer IP network. The EBC will provide the logical demarcation point between IP SIP delivered services when applicable and will physically interface to the vendor’s CPE Gateway Router device.

2.1.13 Flat Rate: A non-fluctuating monthly rate for telephone service in which an unlimited number of local calls can be made without further charge the extent of the contract. The monthly rate is established in the contract.

2.1.14 Government Emergency Telecommunications Service (GETS): GETS is a White House-directed emergency phone service provided by the National Communications System (NCS) in the Cyber Security & Communications Division, National Protection and Programs of the Department of Homeland Security. GETS supports Federal, State, local, and tribal Government, industry, and non-Governmental organization (NGO) personnel in performing their National Security and Emergency Preparedness (NS/EP) missions. GETS provides emergency access and priority processing in the local and long distance segments of the Public Switched Telephone Network (PSTN). It is used in an emergency or crisis situation when the PSTN is congested and the probability of completing a call over normal or other alternate telecommunication means has significantly decreased. The servicing LEC must have NPA (710) in the switch to allow access to the GETS line assigned to a specific site. Dialing 0/1+710-NXX-XXXX provides access to an emergency service for authorized users. The 710 NPA provides access to a tariffed service of the GETS interexchange carriers (AT&T, MCI WorldCom, and Sprint) and the call is billed to the U.S. Government. Web link: http://gets.ncs.gov/

2.1.15 Incumbent Local Exchange Carrier (ILEC): The dominant phone carrier within a geographic area as determined by the FCC Section 252 of the Telecommunications Act of 1996 provided local exchange service to specific area.

2.1.16 Interconnection Agreement: A business contract between telecommunication organizations for interconnecting their networks and exchanging telecommunication traffic. These agreements are present in both public switched telephone networks and the Internet.

2.1.17 Intra LATA: Local toll service (also called intra-LATA, local long distance, or regional toll service) provides calling within a geographic area known as a Local Access and Transport Area (LATA). Per-minute toll charges usually apply to these calls.

2.1.18 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.19 Local Exchange Access and Service Areas: The local exchange access service areas shall include the areas/zones coverage as currently defined by the incumbent local service provider(s) and/or the State PUC for the Site and shall be applied under the scope of this contract and provide a list of these local exchange access service areas and any updates as they accrue. When the Contractor provides services to a Government installation, the LATA boundary shall not be limited or restricted to a Contractor’s service area. Connection to intra-LATA exchange areas and with inter-LATA exchange carriers is required. Access to the local exchange shall include Operator Assistance, and Directory Assistance.

2.1.20 Physical Security: Actions that prevent the loss or damage of Government property.

2.1.21 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.22 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.23 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.

2.1.24 Reliability: the probability that a system will not fail during a specified period of time.

2.1.25 Resilience: The ability of a system to recover to its normal operating form after a failure or an outage.

2.1.26 Session Initiation Protocol (SIP): (As defined by Internet Assigned Numbers Authority & Request for Comments) a communications protocol for signaling, call setup/teardown, and communication of telephone and Video Real-Time Systems over an IP Based Unified Communication System

2.1.27 Session Initiation Protocol (SIP) Trunking: SIP trunking is a Voice over Internet Protocol (VoIP) and streaming media service Based on the Session Initiation Protocol (SIP) by which Internet telephone service providers (ITSPs)

2.1.28 SIP Trunk: An IP Based virtual connector between Unified Communication Systems designed to transport high-density unicast & multicast telephone/video traffic channels

2.1.29 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.2 Acronyms:

AFAir Force
AFIAir Force Instruction
AT/OPSECAntiterrorism/Operational Security
BIBackground Investigation
BRIBasic Rate Interface
BTNBilling Telephone Number
CFPCommunications Focal Point
CLECCompetitive Local Exchange Carrier
CMContract Manager
CORContracting Officer Representative
CPECustomer Premise Equipment
CSACommunication Service Authorization
CSLCommercial Subscriber Lines
CSOCommunications Service Officer
CSSRCall Setup Success Rate
DCODial Central Office
DCRDropped Call Rate
DFARSDefense Federal Acquisition Regulation Supplement
DIDDirect in Dial
DoDDepartment of Defense
DPDial Pulse
DSNDefense Switching Network
DSXDigital Signal Cross-Connect
DTMFDual Tone Multi-Frequency
EBDEdge Boundary Controller
FARFederal Acquisition Regulation
FCCFederal Communications Commission
FDFull Duplex
FRFlat Rate
FXForeign Exchange
GETSGovernment Emergency Telecommunications Service
GFP/M/E/SGovernment Furnished Property/Material/Equipment/Services
GSGround Start
HDHalf Duplex
HSPDHomeland Security Presidential Directive
IAInformation Assurance
IAWIn Accordance With
ICIncoming
ILECIncumbent Local Exchange Carrier
ISInformation System(s)
ISDNIntegrated Services Digital Network
ITInformation Technology
KOContracting Officer
LATALocal Access Transport Area
LSLoop Start
MDFMain Distribution Frame
MFMulti-frequency
MRMeasured Rate
NCSNational Communications System
NGBNational Guard Bureau
NGONon-Governmental Organization
NLTNo Later Than
NS/EPNational Security and Emergency Preparedness
OCIOrganizational Conflict of Interest
OEMOriginal Equipment Manufacturer
OGOutgoing
PIIPersonally Identifiable Information
POCPoint of Contact
PRIPrimary Ratre Interface
PRSPerformance Requirements Summary
PSTNPublic Switched Telephone Network
PUCPublic Utility Commission
PWSPerformance Work Statement
QAQuality Assurance
QASPQuality Assurance Surveillance Plan
QCQuality Control
QCPQuality Control Program
RPLRestoration Priority List
SCRService Contract Reporting
SIPSession Initiation Protocol
SSServices Summary
SSNSocial Security Number
TETechnical Exhibit
TSTelecommunication Services
TSPTelecommunications Services Priority
WSWink Start

3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): NONE

3.1 Property: NONE

3.2 Materials: NONE

3.3 Equipment: NONE

3.4 Services: NONE

3.5 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount. The Government will provide sufficient environmental controls to maintain humidity and temperature within the Contractor’s equipment operating specifications. In addition, the Government will provide primary and emergency conditioned power sources to operate the Contractor’s equipment within manufacturer’s specifications.

4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E): NONE

4.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.

5.0 Requirements: The Contractor shall provide and install transmission equipment and cables for local exchange access and transport service circuits to the Government-provided floor space at the Government demarcation location(s) identified in bullet 5.1.1. The Contractor shall connect to Government-provided power connection points and termination frames. The Contractor shall coordinate with the Government Point of Contact (POC) (primary and alternate names, emails, and telephone numbers shall be provided by the Government No Later Than (NLT) five days after contract award) prior to any installation. The Government does not authorize aerial cable

5.1 The contractor shall provide the following Government line of local commercial communications services for Kingsley Field ANGB, OR at cutover. Innovative technical solutions are encouraged but must be compatible with the current requirement that is listed in the remainder of this Appendix. The quantity of these initial service requirements will be incorporated into the Pricing Schedule. The installation service requirement will be identified here and in the Pricing Schedule.

5.1.1 The Government telephone switching system is a Virtualized Machine (VM). The software is CM7.0, and where the switching system is located in Building 210, Gentile Street, Klamath Fall, OR 97603.

5.1.2 Installation and Cutover: Cutover for this site is 30 days. A cutover plan shall be submitted to the Government with their proposal and a final plan shall be provided NLT five days after contract award. In the event that the award is made to the incumbent contractor, no installation/cutover plans are required and this PWS section shall not apply. In the event the award is made to a non-incumbent contractor, the incoming Contractor shall develop an installation and cutover plan for submittal to the Government with their technical proposal. This plan shall include installation of the initial required services for cutover of local CSA requirements, along with the recommended time frame to complete the cutover process. The Contractor shall coordinate deviations from the proposed installation plan with the Government POC prior to any work commencing in the affected area. The Contractor shall ensure that all circuits, equipment, and service provided by the incumbent, under the prior contract, are disconnected/discontinued upon successful cutover. At this point, the Contractor shall inform the Government POC that the incumbent’s equipment is no longer needed and may be removed by the incumbent. Any omissions or discrepancies in the installation/cutover plans do not relieve the Contractor of its responsibility to install, cutover, and perform all services identified in this requirement. It is the Contractor’s responsibility to resolve any issues associated with these efforts within a time agreed upon by the Government POC and the contractor.

5.1.2.1 Installation Plan: The Installation Plan shall contain, at a minimum, the following site-specific information:

a. Description of new equipment to be installed (include any site support required to support this installation);

b. Detailed location of equipment to be installed;

c. Floor Plan Layout; and

d. Installation schedule.

5.1.2.2 Cutover Plan: The Cutover Plan shall, at a minimum, contain the following site specific information:

a. Conditions/Support required being in place prior to the start of cutover;

b. A detailed listing of actions/events that must occur for successful cutover.

c. A listing of the awarded Contractor responsibilities;

d. A listing of Government responsibilities;

e. A dialing test plan to ensure ported numbers work correctly; and

f. A dialing test to access the GETS.

5.1.3 Personnel: The Contractor is solely responsible for ensuring sufficient personnel are assigned to this requirement. Appropriate personnel shall possess the qualifications and certifications to perform the requirements listed herein. These qualifications and certifications shall include those required by the Original Equipment Manufacturer (OEM) to maintain, install, and/or operate the equipment covered by this contract.

5.1.4 The Contractor shall be responsible for safeguarding all Government property provided for its use. The Contractor shall secure Government facilities, property, and materials before leaving a facility. The Contractor shall safeguard the Government furnished facilities and material contained therein.

5.1.5 Baseline Specifications

Direct-Inward-Dialing (DID) Directory Numbers

NPA-NXX-XXXX
DID Directory Numbers
(541)880-0600-0999
400
(541)880-2440-2539
100
(541)885-6100-6699
600
Total Number of DIDs Required
1100

Local Exchange Access Analog Trunks

Circuit ID

Qty & Type
IC Channel Signaling:

Supervision, Addressing, Start OG Channel Signaling:

Supervision, Addressing, Start Demarcation

541-883-8679-236
6, 2-wire

(2-way)

Loop Start Signaling, Loop, DTMF
Loop Start Signaling, Loop, DTMF
Bldg 210, Gentile Street, Klamath Fall OR 97603

Local Exchange Digital (ISDN Primary Rate Interface (PRI)) Trunks

ISDN PRI Circuit ID
D-Channel
IC

B-Channel Qty & Signaling:

(PRI Q.931)

OG

B-Channel Qty & Signaling:

(PRI Q.931)

2-Way Channel B-Channel Qty & Signaling

(PRI Q.931):

Demarcation

PRI #1

102T1ZF1ZFKLFLORDR

HAAKLFLOR54DC1

46
Bldg 210, Gentile Street, Klamath Fall OR 97603

5.1.6 E911 Compatibility: The Contractor shall provide configuration diagrams to show access to 911/E911 services, where available, through the local city or county emergency services organization.

5.1.7 Government Emergency Telecommunications Service: Government Emergency Telecommunications Service (GETS) will be used in an emergency or crisis situation when the Public Switched Telephone Network (PSTN) is congested and the probability of completing a call over normal telecommunication means has significantly decreased. The Contractor must have NPA (710) in the switch to allow access to the GETS line assigned to a specific site. Authorized users are provided access to an emergency service by dialing 0/1+710-NXX-XXXX. The 710 NPA provides access to a tariffed service of the GETS interexchange carriers and the call is billed to the United States Government. The Contractor shall not provide 10-10 dial around for this CSA.

5.1.8 Outages

5.1.8.1 Scheduled Outage: The Contractor shall notify the Government POC of any scheduled outage that will affect any telecommunication service. The Contractor shall inform the Government POC NLT 5 business days prior to the scheduled outage. The Contractor shall provide a detailed explanation for the outage to include the amount of downtime and end users affected. The Contractor shall notify the Government POC via email of the need for any scheduled service outages. Such outages shall be scheduled to minimize inconvenience to users. The Government POC must release all affected equipment and circuits prior to any service disruption. The Contractor shall follow procedures identified below for outages.

5.1.8.2 Scheduled Outage Procedures: The Contractor shall follow procedures identified below for scheduled outages. In all cases, notification shall include:

a. Reason for interruption;

b. Duration;

c. Start and stop times;

d. Affected equipment, lines, and buildings; and

e. Restoration action (what service was impacted and how service was restored)

5.1.8.3 Unscheduled Outages: If multiple facilities, areas, primary trunks, or cables/fibers are impacted, the Communications Focal Point (CFP) and Government POC shall assign the category of the outage and establish the repair priority. The Contractor shall notify the CFP and Government POC verbally of problem(s) and follow-up with documentation via email within time specified for each outage type.

5.1.8.4 Unscheduled Outage Procedures: The Contractor shall follow procedures identified below for unscheduled outages. In all cases, notification shall include:

a. Reason for interruption;

b. Affected equipment, lines, and buildings; and

c. Restoration action (what service was impacted and how service was restored)

5.1.8.5 Outage Priority, Restoration of Service, and Maintenance: The Contractor shall respond and restore service outages. From the time of receipt of the notification, the Contractor shall respond and coordinate with the Government POC within the time limits indicated below. For mission-essential functions, the Government POC shall identify and prioritize the essential contractor services. The Contractor shall prioritize and perform restorations IAW the Telecommunications Services Priority (TSP) and Restoration Priority List (RPL), which are provided by the Government POC. In the event that the Contractor anticipates not being able to perform any of the essential contractor services (i.e. beyond the Contractor’s control) IAW the TSP and RPL during a crisis situation, the Contractor shall notify the Government POC as expeditiously as possible and use its best efforts to cooperate with the Government in the Government’s efforts to maintain the continuity of operations. If the Government POC determines that the outage restoration time frames cannot be met for other non-mission essential functions, the Government POC can declare any outage restoration priority level as high to medium to low if the outage significantly affects the mission of the Government.

5.1.8.5.1 Catastrophic Outage: A catastrophic outage demands immediate attention, such as a total loss of service, loss of network control, and loss of call processing capability to 95% or more of equipped lines and/or trunks. The Government POC can declare any outage as a catastrophic outage if the outage significantly affects the mission of the Government. A catastrophic outage is normally a sudden and widespread disaster stemming from the result of a man made or natural disaster in which property and site network infrastructure are completely destroyed. Restore service time will be determined from the time the Contractor responds to the Government’s notification IAW the local TSP and RPL requirements. The Contractor must advise the Government POC of their restoration procedures for the base in a catastrophic situation. The Contractor shall respond to the outage NLT one hour of receipt of notification by the Government POC and advise the Government POC of its restoration procedures for a catastrophic situation. The Contractor shall provide the Government POC with updates NLT every four hours on the status of restoration actions.

5.1.8.5.2 Emergency Outage: An emergency outage demands rapid action. The Government POC can declare any outage as an emergency outage if an outage significantly affects the mission of the Government. Emergency is defined by the Government as any outage that severely hampers the Air Force mission and can be restored within the restoration parameters. The Contractor shall respond to the outage NLT one hour of receipt of notification by the Government POC. The Contractor shall restore service NLT eight hours from the time the Contractor responds to the Government notification.

5.1.8.5.3 Serious Outage: A serious outage demands timely action, as such as degraded service or a fault condition that makes the system perform at a level less than that for which it is designed; condition discovered in automatic routing which has not shown in the operation of the equipment but requires attention. The Government POC can declare any outage as a serious outage if an outage significantly affects the mission of the Government. The Contractor shall respond to the outage NLT one hour of receipt of notification by the Government POC. The Contractor shall restore service NLT 24 hours from the time the Contractor responds to the Government notification.

5.1.8.5.4 Routine Outage: A routine outage minimally disrupts service to property, equipment, and site infrastructure. The Government POC can declare any outage as a routine outage if an outage does not seriously affect the mission but does hamper day-to-day operation of the Government installation. The Contractor shall respond to the outage NLT one hour of receipt of notification by the Government POC. The Contractor shall restore service NLT two calendar days from the time the Contractor responds to the Government’s notification.

6.0 Applicable Publications: Publications applicable to this PWS are listed below:

Publication (Chapter/Page)

Date of Publication
Mandatory or Advisory
Website
Federal Acquisition Regulation
Effective Date: 17 Jan 2025

https://www.acquisition.gov/?q=browsefar

Defense Federal Acquisition Regulation Supplement
Effective Date: 17 Jan 2025

http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html or https://www.acquisition.gov/dfars

DoDM 1000.13-M-V1 DoD Identification (ID) Cards (Enclosure 2, paragraph 3.b) 23 Jan 2014 (Change 1: 28 Jul /2020) http://www.esd.whs.mil/Directives/issuances/dodm

Federal Information Processing Standards (FIPS) Publication 201-2 Personal Identity Verification (PIV) of Federal Employees and Contractors (paragraph 9) August 2013 http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf

DoDM 5200.2 Procedures for the DoD Personnel Security Program (PSP)
03 Apr 2017

https://www.esd.whs.mil/Directives/issuances/dodm/

Homeland Security Presidential Directive (HSPD)-12 Policy for a Common Identification Standard for Federal Employees and Contractors 27 Aug 2004 https://www.dhs.gov/homeland-security-presidential-directive-12

DoDI 5400.11 Department of Defense Privacy and Civil Liberties Programs 29 Jan 2019 https://www.esd.whs.mil/Directives/issuances/dodi/

DoD 5400.11-R Department of Defense Privacy Program 14 May 2007 https://www.esd.whs.mil/Directives/issuances/dodm/

AFI 10-245

Antiterrorism 03/28/2013 (Certified current 03/30/2017) https://www.e-publishing.af.mil/Product-Index/#/?view=pubs&orgID=10141&catID=1&series=-1&modID=449&tabID=131

AFI 31-118

Security Forces Standards and Procedures 17 Aug 2020 afi31-118.pdf

AFPD 17-1

Information Dominance Governance and Management 11 Apr 2016 afpd_17-1.pdf

DAFMAN 17-1301

Computer Security (COMPUSEC) 08 Dec 2024

DAFMAN17-1301

AFI 10-701

Operations Security 24 Jul 2019 (Change 1:

09 Jun 2020) afi10-701.pdf

6.1 Applicable Forms: Forms applicable to the PWS are listed below:

Form
Date
Website

DD 1172-2

Application for Identification Card/DEERS Enrollment

Mar 2017
http://www.dtic.mil/whs/directives/forms/index.htm

I-9 Employment Eligibility Verification 10/21/2019 https://www.uscis.gov/sites/default/files/files/form/i-9.pdf

DD 441

Department of Defense Security Agreement Feb 2020 http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm

DD 250

Material Inspection and Receiving Report

Aug 2000
https://www.esd.whs.mil/Directives/forms/dd0001_0499/

TECHNICAL EXHIBIT 1

Performance Requirements Summary (PRS)

Performance Objective
Performance Standard
Acceptable Quality Levels (AQL)
Surveillance Method / By Whom

5.0 Services Requirement

Perform and provide local access at the designated circuit demarcation points identified
Continuous operation local phone service 24/7/365 with 99.999% reliability
Periodic Inspection / COR

5.1.8.2 Scheduled Outages Procedures

Inform the Government POC NLT 30 days in advance of scheduled outage providing a detailed explanation for the outage
Timely and accurate notification provided 99% of time
Random Monitoring / COR

5.1.8.4 Unscheduled Outages Procedures

Inform the Government POC NLT 5 days after an unscheduled outage providing a detailed explanation for the outage
Timely and accurate notification provided 99% of time
Random Monitoring / COR

5.1.8.5.1 Catastrophic outages

Responds and restores Catastrophic service outages IAW TSP and RPL, and/or the defined outage severity as coordinated with the Government POC
Timely and accurate notification provided 99% of the time
Random Monitoring / COR

5.1.8.5.2 Emergency outages

Respond and restore Emergency Priority service outages IAW TSP and RPL, and/or the defined outage severity as coordinated with the Government POC
Timely and accurate notification provided 95% of the time
Random Monitoring / COR

5.1.8.5.3 Serious outages

Respond and restore Serious Priority service outages IAW TSP and RPL, and/or the defined outage severity as coordinated with the Government POC
Timely and accurate notification provided 95% of the time

Random Monitoring / COR

5.1.8.5.4 Routine outages

Respond and restore Routine Priority service outages IAW TSP and RPL, and/or the defined outage severity as coordinated with the Government POC
Timely and accurate notification provided 95% of the time
Random Monitoring / COR

TECHNICAL EXHIBIT 2

Deliverables Schedule

PWS Reference / Deliverable Title
Frequency
Number of Copies
Medium/Format
Submit To
Cutover Plan
Initial plan shall be submitted with quote

Finalized plan no later than 5 days after contract award.

1
Electronic Submission
Initial plan to the local contracting office

Finalized plan to the COR

Installation Plan
Initial plan shall be submitted with quote

Returned no later than 14 days after contract award.

1
Electronic Submission
Initial plan to the local contracting office

Finalized plan to the COR

Ver. October 2022

File details come from the government source that posted it. Updated .