LMIR BPA Call 12363N26Q0014_2026 RGNF Reforestation.pdf
PDF 489 KB Posted
- Attached to
- Rio Grande National Forest Tree Planting - Land Management Integrated Resources (LMIR) BPA Call
- Solicitation number
- 12363N26Q0014
- Issued by
-
Department of Agriculture Forest Service
About this file
Land Management Integrated Resources BPA Call – 2026 Rio Grande Reforestation
This is a Request for Quote (RFQ) call order issued under a Blanket Purchase Agreement (BPA) by the U.S. Department of Agriculture Forest Service for tree planting services on the Rio Grande National Forest in Colorado. The call order was issued on March 26, 2026, with a response due date of April 9, 2026. This is a single-award call order set aside for small businesses, and quotes must be received from current BPA Award Holders only. The contract is payable on a per-seedling basis.
The scope of work requires hand planting approximately 28,600 containerized Engelmann spruce and Douglas-fir seedlings (1-0 plugs, cell size 112) across multiple units covering approximately 129 acres on sites burned by wildfire in 2013. Work must commence no later than September 23, 2026 (desired start date September 21, 2026) and be completed by September 30, 2026 to coincide with monsoon moisture patterns. Seedlings will be planted at 14-foot by 14-foot average spacing using hoedad (planting hoe) technique with 8-inch by 8-inch microsite scalping to bare mineral soil and natural microsite shading. The contractor must provide all labor, equipment, supervision, an on-site representative, a dedicated planting inspector, transportation, and incidentals. Three line items are priced separately: Item 1 covers base planting of 28,600 trees (NAICS 115310); Item 2 covers walk-in access surcharge for Unit 6 (1,500 trees at 0.33 miles); and Item 3 covers walk-in access surcharge for Unit 17 (5,700 trees at 0.25 miles). A post-award conference is required within 10 days of award, to be held virtually followed by an on-site meeting on the first day of work. Evaluation criteria emphasize technical capability and relevant tree planting experience, with past performance weighted significantly, followed by lowest price among acceptable quotes.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Land Management Integrated Resources BPA Call
Revised 04-02-2025 Page 1 of 10
Issue Date: 3/26/2026 Due Date/Time: 4/9/2026
Contractor:
BPA No. 12363N2__A4_____ Project Name 2026 Rio Grande Reforestation
BPA RFQ or Call No. 12363N26Q0014 Location Rio Grande National Forest (Colorado)
Set-Aside Small Business__x__ Unrestricted_____ This will only be sent out to the current BPA Award Holders as of Issue Date.
Contractor: Confirm business size by NAICS code below: Small___ Large___ Initial:______ NAICS Code Exception if Applicable:
Award Information
___X___This is a single award call order. Contractor must provide pricing for all items listed under Box 20.
______This is a multi-award call order. Contractor needs to only provide pricing for all items listed under the specific award(s) they are interested in.
Contractor:
UEI:
Email:
Issuing and Billing Office:
19.
ITEM
NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
NAICS
Code (per Scope of Work)
21.
ESTIMATED
QUANTITY
22.
UNIT OF
MEASURE
23.
UNIT PRICE
24.
AMOUNT
Plant containerized conifer tree seedlings, Microsite scalping (8 inches by 8 inches), and Microsite shading with natural shade (all seedlings/all units) 115310 28,600 Tree $ $
Walk-in access to Unit 6, 0.33 miles (additional cost per seedling for this unit; base pricing captured in line item
1) 115310 1,500 Tree $ $
Walk-in access to Unit 17, 0.25 miles (additional cost per seedling for this unit; base pricing captured in line item 1) 115310 5,700 Tree $ $
Remarks: All clauses and provisions in the base BPA award are applicable to call orders, however clauses and/or provisions in BPA Call Orders take precedence. See Attachments for additional terms and conditions. The Period of Performance for this Call Order is from the Date of Award through 09/30/2026. Specific item due dates or deliverable due dates are mandatory, not arbitrary, and must be met accordingly, regardless of the final period of performance date.
Total Price:
Contractor: (Name, Signature, and Date)
Date:
Requested By: (Name and Signature)
Revised 04-02-2025 Page 2 of 10
Michael Tooley, Forest Silviculturist /s/ Michael Tooley
COR: Rachael Sanchez; Rachael.sanchez@usda.gov Ordered By: (Name and Signature)
Contracting Officer
1. DESCRIPTION/STATEMENT OF WORK
Hand plant Engelmann spruce and Douglas-fir containerized seedlings on sites that were burned by wildfire in 2013. Seedlings will be planted on an average spacing of 14 foot by 14 foot and will utilize natural microsite shading. Microsite preparation will include scalping the ground to bare mineral soil prior to planting.
2. SPECIFICATIONS:
Planting will begin no later than September 23, 2026 in order to coincide with monsoon moisture patterns.
The desired start date is 9/21/2026. Plant approximately 129 acres with Engelmann spruce and Douglas-fir container stock (1-0 plugs), cell size 112. The planting will be accomplished utilizing a hoedad (planting hoe) technique, on a 14 foot x 14 foot average spacing (see Detailed Information Chart).
Microsite shading using natural stationary and moveable shade (if available within a 10-foot radius) will be required, as well as 8”x8” clearing and scalping for site preparation. The total trees to be planted are approximately 28,600 seedlings.
The Contractor shall furnish all labor, equipment, supervision, a planting inspector, workman’s compensation, unemployment insurance, transportation, supplies (expect those designated as Government-furnished) and incidentals, to perform all work necessary to plant seedlings in the area specified. The contract includes tree transportation from cooler to site, handling, planting, and micro-siting. All aspects of the work program shall be performed in an organized, systematic manner to assure services shall be performed over the entire unit. See chart on next page.
Revised 04-02-2025 Page 3 of 10
Detailed Information Chart
Detailed Information Chart Specifications
Area Name Number of Seedlings
Average Spacing/ Minimum Spacing (feet)
Walk In Distance (miles)
Estimated Seedlings/acre
On-Site Minimum Shade Requirements (inches)*
MIN
Clearing/ Scalping (inches)
Table Mtn Units 4,5,16 3,000 14’ x 14’/
7’ <600 feet 222
8” width, 8” height;
mandatory shading where available
8”x8”
Table Mtn Units 10-15 18,400 14’ x 14’/
7’ N/A 222
8” width, 8” height;
mandatory shading where available
8”x8”
Table Mtn Unit 6 1,500 14’ x 14’/
7’ 0.33 miles 222
8” width, 8” height;
mandatory shading where available
8”x8”
Table Mtn Unit 17 5,700 14’ x 14’/
7’ 0.25 miles 222
8” width, 8” height;
mandatory shading where available
8”x8”
Approximate Total Acres**: 129 *Stationary material first; transportable shade meeting requirements second; plant in the open last. See Attachment 3- Supplemental Contract Information, Section 4.7.3, Item 2.
**Note: this call order is payable on a per-seedling basis; acres have no bearing on the rate of payment and are included here as cursory information only.
Area Name Unit
Planting Method
Planting Stock*
Lot numbers by unit Species Plug
Size
Acceptable Established Tree
Planting distance from live conifer & aspen
Unit Flagging/ Tag Color
Distance from Delivery Point to Access Point (mi)
Table Mtn 4 Hoedad C ES-09-245-110-18-
ES 112 All conifers;
Aspen ≥4’ tall
Outside of dripline only
Orange or Pink
<600 feet
Table Mtn 5 Hoedad C ES-09-245-110-18-
ES 112 All conifers;
Aspen ≥4’ tall
Outside of dripline only
Orange or Pink
<600 feet
Table Mtn 6 Hoedad C ES-09-245-110-18-
ES 112 All conifers;
Aspen ≥4’ tall
Outside of dripline only
Orange or Pink
0.33 miles
Table Mtn 10 Hoedad C ES-09-245-110-18-
ES 112 All conifers;
Aspen ≥4’ tall
Outside of dripline only
Orange or Pink
Table Mtn 11 Hoedad C ES-09-245-110-18-
ES 112 All conifers;
Aspen ≥4’ tall
Outside of dripline only
Orange or Pink
Table Mtn 12 Hoedad C ES-09-245-110-18-
ES 112 All conifers;
Aspen ≥4’ tall
Outside of dripline only
Orange or Pink
Table Mtn 13 Hoedad C DF-09-513-098-03 DF 112 All conifers;
Aspen ≥4’ tall
Outside of dripline only
Orange or Pink
Table Mtn 14 Hoedad C DF-13-247-084-03 DF 112 All conifers;
Aspen ≥4’ tall
Outside of dripline only
Orange or Pink
Table Mtn 15 Hoedad C ES-09-245-110-18-
ES 112 All conifers;
Aspen ≥4’ tall
Outside of dripline only
Orange or Pink
Table Mtn 16 Hoedad C ES-09-245-110-18-
ES 112 All conifers;
Aspen ≥4’ tall
Outside of dripline only
Orange or Pink
<600 feet
Table Mtn 17 Hoedad C ES-09-245-110-18-
ES 112 All conifers;
Aspen ≥4’ tall
Outside of dripline only
Orange or Pink
0.25 miles
*For planting stock: B = Bareroot, C = Container, P2 = Plug + 2s
Revised 04-02-2025 Page 4 of 10
Description of Units Area Name Unit
Acres (Approx.)
Average Slope (%)
Min-Max Elevations
Method & Year of Site Preparation
Remarks
Table Mtn 4 1.2 25% 11,040-11,080 feet
ASL
Wildfire- 2013 Groundcover is sedge, grass, and grouse whortleberry.
Table Mtn 5 9.8 25% 11,120-11-240 feet
ASL
Wildfire- 2013 Groundcover is sedge and grass. Unit is moderately rocky.
Table Mtn 6 6.7 25% 11,160-11,320 feet
ASL
Wildfire- 2013 Groundcover is sedge and grouse whortleberry.
Deadfall within the unit is moderate to heavy.
Table Mtn 10 22 25% 10,360-10,760 feet
ASL
Wildfire- 2013 Groundcover is grouse whortleberry, sedge, and grass. Unit is moderately rocky.
Table Mtn 11 11.3 15% 10,560-10,760 feet
ASL
Wildfire- 2013 Groundcover is sedge and grass. Unit is moderately rocky.
Table Mtn 12 28.1 20% 10,600-10,880 feet
ASL
Wildfire- 2013 Groundcover is sedge, and grass.
Table Mtn 13 7.1 20% 10,480-10,560 feet
ASL
Wildfire- 2013 Groundcover is sedge and grass.
Table Mtn 14 5.1 20% 10,440-10,560 feet
ASL
Wildfire- 2013 Groundcover is sedge and grass.
Table Mtn 15 9.6 25% 11,120-11,280 feet
ASL
Wildfire- 2013 Groundcover is sedge and grass.
Table Mtn 16 2.6 40% 10,960-11,080 feet
ASL
Wildfire- 2013 Groundcover is sedge and grass. Unit is moderately rocky.
Table Mtn 17 25.9 25% 10,720-11,000 feet
ASL
Wildfire- 2013 Groundcover is sedge and grass. Unit is moderately rocky.
Additional Information:
Off-road vehicles: Off-road vehicle use by the contractor, including ATV’s and UTV’s, is not allowed for this Call Order. The government may utilize UTV’s as necessary for contract management. The contractor will be required to transport seedlings by hand from the delivery points to the planting units as necessary.
Use of natural shade is required for planting spot selection. See Attachment 3- Supplemental Contract Information, Section 4.7.2 and Section 4.7.3, Item 2. The minimum spacing specification listed in the Detail Information Chart above is permitted to capture all available microsite shading.
Camping: Camping is permitted and suitable locations are present within 2 miles of the planting area.
Typical Weather Conditions/Access Constraints: Cold to warm temperatures, with afternoon thunderstorms likely. Planting areas are adjacent to or near four-wheel drive road access.
2.1 Key Personnel and Required Qualifications or Certifications
See Attachment 3- Supplemental Contract Information, Section 4.18. This call order requires an on-site representative and a dedicated inspector, both of whom shall be conversant in the English language.
2.2 Government Property FAR 52.245-1 GOVERNMENT PROPERTY (SEP 2021)
See Attachment 3- Supplemental Contract Information, Section 3.0.
Revised 04-02-2025 Page 5 of 10
3. PROJECT LOCATION AND DESCRIPTION
The 2026 Rio Grande tree plant will take place in one location on the Divide Ranger District of the Rio Grande National Forest, located in Mineral County in south-central Colorado. Project area location is depicted on the vicinity and plant area maps. The planting area is located within T.39 N., R.1 E., sections 24,25,26,36 and T.39., R.2 E., sections 30,31; New Mexico Principle Meridian.
The Table Mountain planting units are located west-southwest of the community of South Fork. They can be accessed from Colorado State Highway 160, using National Forest System Road 410 (Big Meadows Road). See Attachment 1 for maps.
4. INSPECTION AND ACCEPTANCE:
The Performance Requirements Summary inspection and acceptance elements are described in the Attachment 2- Quality Assurance Surveillance Plan (QASP) and included as part of this contract.
4.1 FAR 52.246-4: INSPECTION OF SERVICES--FIXED-PRICE (AUG 1996)
a. Definition. “Services”, as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.
b. The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.
c. The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.
d. If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.
e. If any of the services do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by reperformance, the Government may—
1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and
2) Reduce the contract price to reflect the reduced value of the services performed.
f. If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may—
1) By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service; or
2) Terminate the contract for default.
Revised 04-02-2025 Page 6 of 10
4.2 CONTRACTOR INSPECTION PROCEDURES
(A) General Instructions
1) The Contractor shall conduct inspections of planting units and record the results using procedures described herein. Inspections shall be maintained concurrent with contract work. Completed inspection forms shall be made available to the Government within 24 hours of completion of each planting unit and will remain part of the permanent contract file.
2) By submission of inspection forms to the Government, the Contractor is considered to be certifying that the unit is satisfactorily completed and that the inspection forms reflect the work accomplished.
3) The Contractor shall submit legible inspection forms. Illegible and incomplete forms shall be returned to the Contractor for correction and re-submission.
4) In the event the Contractor falsifies inspection results, as determined by the Contracting Officer, the Government may declare the Contractor to be in default of the contract. Additionally, the Government may refer such falsifications to the US Attorney’s Office for possible prosecution pursuant to 18 U.S.C. 1001 (Falsification of Government Documents) or 18 U.S.C. 287 (Fraud).
4.3 GOVERNMENT INSPECTION PROCEDURES – COMPLIANCE INSPECTION:
See Attachment 2 (QASP) for detailed government inspection procedures and payment calculations.
5. COMMENCEMENT PROSECUTION, AND COMPLETION OF WORK
The Contractor shall be required to (a) commence work under this contract within 7 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 9/30/2026.
6. POST AWARD CONFERENCE
A post award conference with the successful offeror is required. It will be scheduled within 10 days after the date of contract award. The conference will be held at virtually, followed by an on-site conference the first day of work.
7. EVALUATION CRITERIA:
Contractor must send a technical capability statement briefly explaining:
How they intend to complete this contract as far as time frame, personnel, and deliverables as well as explaining experience in tree planting work. Include relevant past performance information.
The Government will consider the relevance of past performance information obtained in relation to the scope of this procurement with respect to both similar efforts, and the length, scope, number, complexity, and diversity of contracts completed by the firm. Past performance, either positive or negative, which is considered by the Government to be more closely related to the scope of this effort will be given additional weight in the evaluation process.
Government evaluators may avail themselves of various federal, state, and local past performance databases. The Government may research offeror performance on any federal, state, local, and commercial contract performance of the offeror that is known to the Government, but not included on the submitted performance information.
Additionally, the personal experience and evaluator knowledge of offeror performance may be utilized.
Quotes will be evaluated in two steps:
Revised 04-02-2025 Page 7 of 10
• Step 1: Quotes will be reviewed initially under a Pass/Fail evaluation to determine if the Technical Capability meets requirements of the call order. Quotes must be signed. Those that do not meet the requirements will be marked unresponsive. Acceptable quotes will then be evaluated under Step 2.
• Step 2: Lowest Price with an acceptable quote will receive the award
8. LIST OF ATTACHMENTS
The following attachments are made a part of this solicitation and any resultant contract.
Title Pages ATT 1- Vicinity and Planting Area Maps 2 ATT 2- Quality Assurance Surveillance Plan 20 ATT 3- Supplemental Contract Information 14 ATT 4- Wage Determination 14 FAR Class Deviations and Updates (at end of this document)
Revised 04-02-2025 Page 8 of 10
March 2025 Class Deviation
This Call Order incorporates two FAR class deviations to ensure compliance with Executive Orders 14148, 14173, 14168, and 14208, issued since January 20, 2025. It also removes references to AGAR clauses and provisions that have been rescinded. These updates reflect recent policy changes and remove outdated requirements, as detailed below.
The following FAR provisions and clauses are hereby removed in their entirety from the LMIR BPA:
• 52.222-21 Prohibition of Segregated Facilities
• 52.222-26 Equal Opportunity
• 52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026/1
1/This provision was removed to comply with the Executive Order 14236 titled "Additional Rescissions of Harmful Executive Orders and Actions," dated March 14, 2025.
The following FAR clauses now include deviations to align with recent Executive Orders:
• 52.212-3 Offeror Representations and Certifications—Commercial Products and Commercial Services
(MAY 2024) (DEVIATION FEB 2025)
• 52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders— Commercial Products and Commercial Services (JAN 2025) (DEVIATION FEB 2025)
• 52.223-1 Biobased Product Certification (MAY 2024) (DEVIATION FEB 2025)
• 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts (MAY 2024)
(DEVIATION FEB 2025)
Ther following references to AGAR Clauses and provisions are hereby removed to comply with AGAR Rule 2024-22463 (89 FR 81014):
• AGAR 452.211-74 Period of Performance (FEB 1988)/2
• AGAR 452.215-73 Post Award Conference (NOV 1996) /2
• AGAR 452.219-70 Size Standard and NAICS Code Information (SEP 2001) /2
• AGAR 452.236-72 Use of Premises (NOV 1996) /2
• AGAR 452.236-77 Emergency Response (NOV 1996)
• AGAR 452.236-78 Fire Suppression and Liability (MAY 2014)
• AGAR 452.237-74 Key Personnel (FEB 1988) /2
2/AGAR clauses and provisions that were included in full text have been retained, with only the AGAR reference removed.
The following AGAR clauses is hereby included:
• AGAR 452.236-70 Emergency Response, Fire Suppression and Liability (NOV 2024)
All call orders will incorporate these changes by reference at award.
Disclaimer: System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services.
Contracting officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove
Revised 04-02-2025 Page 9 of 10 these representations in SAM.
In advancement of Section 2 of Executive Order 14208, the removal of requirements related to Executive Order 14057 eliminates all non-statutory sustainability requirements or preferences in purchases of food service wares, including paper straws. In addition to removing requirements related to Executive Order 14057, the attachment also reflects recent updates to Code of Federal Regulation citations for the U.S.
Department of Agriculture’s BioPreferred® Program, a statutory purchasing preference program.
These class deviations will remain in effect until rescinded or incorporated into the FAR.
Revised 04-02-2025 Page 10 of 10
As prescribed in AGAR 433.104-4 (a)(5)(ii), the following Notice for Filing Agency Protests shall be included in every solicitation.
NOTICE FOR FILING AGENCY PROTESTS
United States Department of Agriculture (USDA) Ombudsman Program
The USDA is committed to issuing solicitations and awarding contracts in a fair and prompt manner. The Ombudsman Program for Agency Protests (OPAP) was established to address protest issues within the agency, providing an alternative to costly and time-consuming litigation. Operating independently, OPAP offers relief comparable to that granted by the Government Accountability Office (GAO). Interested parties are encouraged to resolve concerns through USDA’s internal Alternative Dispute Resolution (ADR) process before pursuing external forums such as the GAO. Concerns may be addressed informally or through a formal agency protest filed with either the Contracting Officer or the Ombudsman.
Informal Forum with the Ombudsman
1. Initial Point of Contact: Interested parties who believe a specific USDA procurement is unfair or otherwise defective should first direct their concerns to the applicable Contracting Officer.
2. Escalation: If the Contracting Officer is unable to address their concerns, interested parties are encouraged to contact the USDA Ombudsman for Agency Protests. Under this informal process, the agency is not required to suspend contract award performance. Utilization of the informal forum does not suspend any time requirement for filing a formal protest with the agency or other forums.
3. Required Information: To ensure a timely response, interested parties should provide the following information to the Ombudsman: solicitation/contract number, contracting office, Contracting Officer, and solicitation closing date (if applicable).
Formal Agency Protest with the Ombudsman
1. Effort to Resolve: Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the Contracting Officer through open and frank discussions.
2. Independent Review: If the protester’s concerns remain unresolved, an Independent Review is available by the Ombudsman. The protester may file a formal agency protest with either the Contracting Officer or, alternatively, with the Ombudsman under the OPAP program. Contract awards or performance will be suspended during the protest period unless justified in writing for urgent and compelling reasons or determined in writing to be in the best interest of the Government.
3. Resolution Timeline: The agency’s goal is to resolve protests within 35 calendar days from the date of filing.
4. Required Information: Protests shall include the information set forth in FAR 33.104(a)(3).
Failure to submit the required information may result in a delay or dismissal of the protest.
5. Timeliness: Protests must be filed within the timeframes specified in FAR 33.104.
6. Submission: Formal protests under the OPAP program should be submitted electronically to SPE.inquiry@usda.gov and the Contracting Officer.
Election of Forum. By initiating a protest with the USDA, the protester agrees not to pursue the same matter with the Government Accountability Office (GAO) or any other external forum while the agency protest is pending. If a protest is filed externally, the agency protest will be dismissed.
Page last modified on October 15, 2025 mailto:SPE.inquiry@usda.gov