Little Pumpkin Drawings.pdf

PDF 3 MB Posted

Attached to
Oahe - Little Pumpkin Bank Stabilization Federal contract opportunity
Solicitation number
W9128F21B0006
Issued by
Department of the Army Corps of Engineers Engineering District Omaha

View the file

Other files for this federal contract opportunity

Other files attached to Oahe - Little Pumpkin Bank Stabilization, newest first.
File Type Posted
Final W9128F21B0006 Little Pumpkin - Bid Abstract.pdf PDF
Little Pumpkin Site Visit Questions-Answers .pdf PDF
Signup Sheet 3.10.2021 - Little Pumpkin.pdf PDF
Little Pumpkin Specs.doc.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B

14P

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community

34 State Hwy 34

6th Av e

Dry Run RdDr y C ree k R d

Royal Ridge RdCo rra l R d

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus

DS, USDA, USGS, AEX,

Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community

Little Pumpkin Bank Stabilization Hughes County, South Dakota S. 1/2 of Sect 07, T110N, R078W

Pierre, SD

Project Location

Project Site

Project Location

Pierre, SD

A 24" gap w ill be left at the SE corner of the fenced in parking lot, for pedestrian entrance.

2:1 Slope

Notes:

Haul Road/Work Platform Section

Random Fill -1' Thick

20'

Graded to Drain ----------.t>

Distance from bank to be determined on site.

\__Geotextile Fabric

1. Random fill for building haul road/work platform shall be contractor furnished material.

No fill from cut area, bank, or toe trench will be allowed.

2. The exact loaction for the road and its distance from the bank shall be approved by the COR.

r

File details come from the government source that posted it. Updated .