Little Pumpkin Drawings.pdf
PDF 3 MB Posted
- Attached to
- Oahe - Little Pumpkin Bank Stabilization Federal contract opportunity
- Solicitation number
- W9128F21B0006
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Final W9128F21B0006 Little Pumpkin - Bid Abstract.pdf | ||
| Little Pumpkin Site Visit Questions-Answers .pdf | ||
| Signup Sheet 3.10.2021 - Little Pumpkin.pdf | ||
| Little Pumpkin Specs.doc.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B
14P
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community
34 State Hwy 34
6th Av e
Dry Run RdDr y C ree k R d
Royal Ridge RdCo rra l R d
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus
DS, USDA, USGS, AEX,
Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community
Little Pumpkin Bank Stabilization Hughes County, South Dakota S. 1/2 of Sect 07, T110N, R078W
Pierre, SD
Project Location
Project Site
Project Location
Pierre, SD
A 24" gap w ill be left at the SE corner of the fenced in parking lot, for pedestrian entrance.
2:1 Slope
Notes:
Haul Road/Work Platform Section
Random Fill -1' Thick
20'
Graded to Drain ----------.t>
Distance from bank to be determined on site.
\__Geotextile Fabric
1. Random fill for building haul road/work platform shall be contractor furnished material.
No fill from cut area, bank, or toe trench will be allowed.
2. The exact loaction for the road and its distance from the bank shall be approved by the COR.
r