List_of_Subcontractors_and_Amount.pdf
PDF 59 KB Posted
- Attached to
- Lakemont Center Drainage Improvements
- Solicitation number
- ITB-25-051
- Issued by
- Jefferson County, Weston CDP, Colorado
About this file
This is a Subcontractor List Form required for the City of Wheat Ridge, Colorado's Lakemont Center Drainage Improvements project (ITB-25-051). The project encompasses removal and replacement of approximately 13 linear feet of 12-inch HDPE pipe, installation of a 48-inch diameter manhole, bypass pumping and dewatering services, cleaning and camera inspection of 4-inch, 8-inch, and 12-inch HDPE storm pipes, minor landscaping, asphalt and sidewalk replacement, curb and gutter work, concrete rundowns, sidewalk chases, and erosion control measures. Bid alternates are available for single spot pipe repairs and cured-in-place pipe lining. A mandatory pre-bid meeting is scheduled for November 4, 2025, at 2:00 pm, with bids due on November 20, 2025, at 2:00 pm Mountain Time. Project completion is required within 30 calendar days from the Notice to Proceed.
The contractor's organization must perform at least 50% of the total contract cost, with any subcontractors listed on this form along with their work type and percentage of work allocation. Submission of a completed subcontractor list is mandatory; bidders with no subcontractors must state "None." The project is subject to the Keep Jobs in Colorado Act, requiring at least 80% of labor to be performed by Colorado workers. Bidders must submit a 5% bid bond and comply with federal and state regulations, including non-discrimination requirements and disadvantaged business enterprise provisions. The contract will be awarded to the lowest responsive and responsible bidder, with the city retaining 5% of the contract value until final completion. Funding is provided through the City of Wheat Ridge's Capital Improvement Program and will follow Colorado Department of Transportation Standard Specifications for Road and Bridge Construction, 2021 Edition.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LIST OF SUBCONTRACTORS AND AMOUNT
ITB-YR-NUM-Name Important: This form must be submitted and completed. If you are not using sub-contractors, state “None”. Failure to submit a completed form will result in a non-responsive bid.
Contractor’s organization shall perform work amounting to 50% or more of the total contract cost.
COMPANY SUBMITTING BID
NAME TYPE OF WORK AMOUNT % OF WORK
File details come from the government source that posted it. Updated .