The provided file is a comprehensive set of engineering and design plans for the Ralph Brennan Water Treatment Plant Lime Sludge Handling Improvements Project for the City of Daytona Beach, Florida. The project involves a series of civil, structural, and electrical improvements to the existing water treatment facility, specifically focusing on upgrading the lime sludge handling infrastructure. The plans include detailed drawings for sludge drying beds, a dewatered lime sludge building, site grading and paving, mechanical systems, and electrical installations. The project appears to be designed to enhance the plant's sludge management capabilities, with specific attention to improving efficiency and infrastructure resilience.

The design documents indicate a multi-phase approach to the improvements, with careful consideration of site conditions, drainage, and operational requirements. The plans show four sludge drying beds, a new dewatered lime sludge building, and associated mechanical and electrical systems. The structural designs incorporate reinforced concrete foundations, pre-engineered metal building components, and specialized infrastructure like ground rings and lightning protection systems. The electrical plans detail lighting, grounding, and power distribution strategies, with provisions for future expandability and system integration. While the documents do not specify exact budgetary figures, they represent a substantial municipal infrastructure investment aimed at modernizing and improving the City of Daytona Beach's water treatment plant capabilities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T

CA

NO

I

TC

ET

ORP

YTILITU

DNUORGRE

D

NU

E

HT

OT

MR

OF

NOC

TSUMNOITCURTSNOC

LL

A

N

CITY OF DAYTONA BEACH

LOCATION PLAN

RALPH BRENNAN WTP

LIME SLUDGE HANDLING IMPROVEMENTS

HAZEN CONTRACT NO. 44263-006

100% SUBMITTAL

APRIL 2025

NOT TO SCALE

HAZEN AND SAWYER

2420 SOUTH LAKEMONT AVENUE, SUITE 325

ORLANDO, FLORIDA 32814

CITY MANAGER:

UTILITIES DIRECTOR:

PROJECT MANAGER:

DERIC C. FEACHER

SHANNON PONITZ

FRANK O'KEEFE

DAYTONA BEACH, FL

PROJECT LOCATION

LP

G

A Bl vd

Hwy 95

DRAWING LIST

GENERAL

DWG NO.

G-00-01

SHEET TITLE

COVER SHEET AND LIST OF DRAWINGS

G-00-02 ABBREVIATIONS, SYMBOLS, AND LEGEND

CIVIL

C-00-01 GENERAL AND SWPP NOTES

C-01-00 OVERALL PLAN

MECHANICAL

M-10-01 SLUDGE PUMPS PLANS AND SECTION

M-20-01 SLUDGE DRYING BEDS PLAN

STRUCTURAL

S-00-01 NOTES, ABBREVIATIONS & SYMBOLS

S-20-01 SLUDGE DRYING BEDS FOUNDATION PLAN AND SECTION

ELECTRICAL

E-00-01 LEGEND AND SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES

S-20-02 SLUDGE DRYING BEDS DETAILS

3651 LPGA BLVD, DAYTONA BEACH, FL 32124

H w y 95

W In ternational S peedway B lvd

SR-9

SR

-6

S-30-01 POLE BARN FOUNDATION PLAN

S-30-02 POLE BARN SECTIONS

E-02-01 SITE PLAN

E-30-01 POLE BARN LIGHTING PLAN

M-30-01 DEWATERED LIME SLUDGE BUILDING

M-20-02 SLUDGE DRYING BEDS SECTIONS AND DETAILS

C-01-01 EXISTING SITE PLAN AND STAGING AREA

C-01-02 DEMOLITION PLAN

C-02-01 YARD PIPING PLAN

C-03-01 PAVING AND GRADING PLAN

C-03-02 PAVING AND GRADING SECTIONS

C-04-01 EROSION CONTROL PLAN

C-99-01 DETAILS SHEET - 1

C-99-02 DETAILS SHEET - 2

M-99-01 STANDARD DETALS - SHEET 1

S-30-03 POLE BARN ELEVATIONS

S-99-01 STANDARD STRUCTURAL DETAILS

S-99-02 STANDARD STRUCTURAL DETAILS

E-99-01 ELECTRICAL DETAILS

DESIGNED BY:

IF THIS BAR DOES NOT

MEASURE 1" THEN DRAWING

IS NOT TO FULL SCALE

DATE:

HAZEN NO.:

CONTRACT NO.:

DRAWING

NUMBER:

PROJECT

ENGINEER:

DRAWN BY:

CHECKED BY:

REV ISSUED FOR DATE BY

HAZEN AND SAWYER

2420 SOUTH LAKEMONT AVE., SUITE 325

ORLANDO, FLORIDA 32814

CITY OF DAYTONA BEACH

DAYTONA, FLORIDA

RALPH BRENNAN

WATER TREATMENT PLANT

LIME SLUDGE HANDLING IMPROVEMENTS

D. BIEBER

0 1/2" 1"

APRIL 2025

44263-006

Au to de sk

D oc s:

//4

-0

_R al ph B re nn an W

TP

Im pr ov em en ts /4

-0

-G

EN

.rv t

3/

/2

4:

:0

PM

G-00-02

J. CURTIS

W. MARSHALL

T. MORGAN

GENERAL

ABBREVIATIONS, SYMBOLS AND LEGEND

ABBREVIATIONS

AB ANCHOR BOLT

AC ALTERNATING CURRENT/

ASBESTOS CEMENT

ACT ACOUSTIC TILE

AD AREA DRAIN

ADDL ADDITIONAL

ADJ ADJUSTABLE

AFF ABOVE FINISHED FLOOR

AGGR AGGREGATE

AL ALUMINUM

ALLOW ALLOWANCE/ALLOWABLE

ALT ALTERNATE

APPROX APPROXIMATE

ARCH ARCHITECTURAL

ASB ASBESTOS

ASPH ASPHALT

AT ASPHALT TILE

B BORING

BD BOARD

BFE BOTTOM OF FITTING ELEV

BITUM BITUMINOUS

BL BASE LINE/ BUILDING LINE

BLDG BUILDING

BLK BLOCK

BM BENCH MARK

BOC BACK OF CURB

BOT BOTTOM

BRG BEARING

BRK BRICK

BRZ BRONZE

BSMT BASEMENT

BT BOLT

BUR BUILT-UP ROOFING

BV BALL VALVE

C CLOSET/CARPET/CHANNEL

CAB CABINET

CB CATCH BASIN

C/C CENTER TO CENTER

CE CONSTRUCTION EASEMENT

CEM CEMENT

CER CERAMIC

CF CUBIC FEET

CFM CUBIC FEET PER MINUTE

CI CAST IRON/ CUBIC INCHES

CIP CAST IRON PIPE

CL CENTER LINE/CHLORINE

CLG CEILING

CLKG CAULKING

CLR CLEAR

CMP CORRUGATED METAL PIPE

CMU CONCRETE MASONRY UNIT

CO CLEANOUT

COL COLUMN

CONC CONCRETE

CONST CONSTRUCTION

CONT CONTINUOUS

CONTR CONTRACTOR

CORP CORPORATION

CORR CORRIDOR

CP CONCRETE PLANK

CRS COURSE

CT CERAMIC TILE

CTJ CONTROL JOINT

CU COPPER

CV CHECK VALVE

CW COLD WATER

CY CUBIC YARD

DC DIRECT CURRENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA (Ø) DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DIP DUCTILE IRON PIPE

DISCH DISCHARGE

DIST DISTRIBUTION

DJ DOUBLE JOINT

DL DEAD LOAD

DN DOWN

DOZ DOZEN

DR DRAIN PIPE

DWG DRAWING

DWL DOWEL

E EAST/ EASEMENT

EA EACH

ECC ECCENTRIC

EF EACH FACE

EFF EFFLUENT

EIP EXIST IRON PIPE

EL ELEVATION

ELEC ELECTRIC/ ELECTRICAL

ELL ELBOW

ENGR ENGINEER

ENT ENTRANCE

EOG EDGE OF GRAVEL

EOP EDGE OF PAVEMENT

EQ EQUAL

EQPT EQUIPMENT

EW EACH WAY

EX EXISTING

EXC EXCAVATE

EXH EXHAUST

EXP EXPANSION

EXT EXTERIOR

FAB FABRICATE

F&C FRAME AND COVER

F&G FRAME AND GRATE

FC FLUSHING CONNECTION

FD FLOOR DRAIN

FDN FOUNDATION

FE FIRE EXTINGUISHER

FF FINISHED FLOOR

FH FIRE HYDRANT

FIN FINISH

FIX FIXTURE

FL FLASHING/ FLOOR

FLEX FLEXIBLE

FLG FLANGE

FLUOR FLUORESCENT

FLXC FLEXIBLE CONNECTION

FM FORCE MAIN

FP FINISHED PRODUCT

FPRF FIREPROOF

FRP FIBERGLASS REINFORCED

POLYESTER LAMINATE

FT FEET

FTG FOOTING/ FITTING

FURR FURRING/ FURRED

G GAS/ GAS LINE

GA GAUGE

GAL GALLON

GALV GALVANIZED

GC GENERAL CONTRACTOR

GEN GENERATOR

GI GALVANIZED IRON

GL GLASS

GPM GALLONS PER MINUTE

GR GRADE

GV GATE VALVE

GW GUY WIRE

GWB GYPSUM WALL BOARD

GWF GLAZED WALL FINISH

GYP GYPSUM

H HEIGHT

HDW HARDWARE

HEX HEXAGONAL

HM HOLLOW METAL

HORZ HORIZONTAL

HP HORSEPOWER

HPT HIGH POINT

HSS HOLLOW STRUCTURAL SECTION

HTR HEATER

HVAC HEATING, VENTILATION AND

AIR CONDITIONING

HW HOT WATER

HWL HIGH WATER LEVEL

HWY HIGHWAY

HYD HYDRAULIC

I IRON

ID INSIDE DIAMETER

IF INSIDE FACE

IN INCH

INCL INCLUDED

INF INFLUENT

INS INSULATION

INT INTERIOR

INV INVERT

J JOIST

JB JUNCTION BOX

JCT JUNCTION

JT JOINT

L LENGTH/ ANGLE

LA LINE AHEAD

LAB LABORATORY

LAM LAMINATED

LAT LAVATORY

LB POUND/ LINE BACK

LF LINEAR FEET

LG LONG

LL LIVE LOAD

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LP LIGHT POLE

LPT LOW POINT

LT LIGHT

LTG LIGHTING

LVR LOUVER

LWL LOW WATER LEVEL

MAINT MAINTENANCE

MATL MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MEMB MEMBRANE

MET METAL

MFR MANUFACTURER

MG MILLION GALLONS

MGD MILLION GALLONS PER DAY

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MJ MECHANICAL JOINT

MLDG MOLDING

MO MASONRY OPENING

MOD MODIFY/ MODIFIED

MON MONUMENT

MOT MOTOR

MTE MATCH TO EXISTING

MTD MOUNTED

MTG MOUNTING

MULT MULTIPLE

N NORTH

NA NOT APPLICABLE

NF NEAR FACE

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NPW NON POTABLE WATER

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OF OUTSIDE FACE

OFF OFFICE

OPER OPERATOR

OPNG OPENING

OPP OPPOSITE

ORIG ORIGINAL

OT OPEN TRUSS

OVHD OVERHEAD

PAR PARALLEL

PC POINT OF CURVE/ PIECE

PCC POINT OF COMPOUND CURVE

PCF POUNDS PER CUBIC FOOT

PE LINING POLYETHYLENE LINING

PERF PERFORATED

PERP PERPENDICULAR

PI POINT OF INTERSECTION

PL PROPERTY LINE/ PLATE

PNL PANEL

PP POWER POLE

PREFAB PREFABRICATED

PRV PRESSURE RELIEF VALVE

PS PUMPING STATION

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT POINT OF TANGENT/ POINT

PTN PARTITION

PV PLUG VALVE

PVC POLYVINYL CHLORIDE

PVMT PAVEMENT

PW POTABLE WATER

QTY QUANTITY

R RADIUS/ RISER

RCP REINFORCED CONCRETE PIPE

RD ROAD/ ROOF DRAIN

RECIR RECIRCULATION

RECP RECEPTACLE

RECT RECTANGULAR

RED REDUCER

REF REFERENCE

REG REGISTER

REINF REINFORCING

REM REMOVE

REQD REQUIRED

REST RESTRAINED

REV REVISE

RF ROOF

RFG ROOFING

RJ RESTRAINED JOINT

RM ROOM

RND ROUND

RO ROUGH OPENING

RPM REVOLUTIONS PER MINUTE

RR RAILROAD

RT RIGHT

RTU REMOTE TERMINAL UNIT

RW RAW WATER

R/W RIGHT OF WAY

S SOUTH

SAN SANITARY

SBL SURVEY BASELINE

SCH SCHEDULE

SD STORM/SITE DRAIN

SECT SECTION

SERV SERVICE

SEW SEWER

SF SQUARE FEET

SLG SLUDGE

SHT SHEET

SI SQUARE INCH

SIM SIMILAR

SJ STEEL JOIST

SPEC SPECIFICATION

SQ SQUARE

SS SANITARY SEWER

SST STAINLESS STEEL

ST STREET

STA STATION

STD STANDARD

STG STORAGE

STIR STIRRUP

STL STEEL

STR STRUCTURAL

SUB SUBSTITUTE

SUP SUPPLY

SUPT SUPERINTENDENT

SUR SURFACE

SUSP SUSPENDED

SW SWITCH

SWBD SWITCHBOARD

SWD SIDE WATER DEPTH

SYM SYMMETRICAL

T TREAD

T&B TOP AND BOTTOM

T&G TONGUE AND GROOVE

TAN TANGENT

TBM TEMPORARY BENCH MARK

TC TOP OF CURB

TDH TOTAL DYNAMIC HEAD

TECH TECHNICAL

TEL TELEPHONE

TEMP TEMPERATURE

TER TERRAZZO

THERMO THERMOSTAT

THK THICK

THRU THROUGH

TOD TOP OF DECK

TOF TOP OF FOOTING

TOM TOP OF MASONRY/ MANHOLE

TOP TOP OF PARAPET

TOS TOP OF SLAB

TOW TOP OF WALL

TOL TOLERANCE

TPS TWISTED PAIR SHIELDED

TRANS TRANSFORMER

TYP TYPICAL

UG UNDERGROUND

UH UNIT HEATER

UNFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

AB ANCHOR BOLT

UR URINAL

UTIL UTILITY

VAC VACUUM

VAT VINYL ASBESTOS TILE

VCP VITRIFIED CLAY PIPE

VEL VELOCITY

VENT VENTILATING/ VENTILATION

VERT VERTICAL

VOL VOLUME

VP VENT PIPE

VWC VINYL WALL COVERING

W WEST/ WIDTH

W/ WITH

WC WATER CLOSET

WF WIDE FLANGE

WH WALL HYDRANT

WI WROUGHT IRON

WL WATER LEVEL

W/L WATER LINE

WO WINDOW OPENING

W/O WITHOUT

WP WATERPROOF

WPFG WATER PROOFING

WPT WALL PENETRATING TYPE

WSE WATER SURFACE ELEVATION

WSP WEATHERSTRIP

WT WEIGHT

WV WATER VALVE

WWF WELDED WIRE FABRIC

YD YARD

YR YEAR

SECTION AND DETAIL KEYING

LEGEND

LINETYPES

PROPOSED ITEMS

EXISTING ITEMS

HIDDEN ITEMS

DEMOLITION ITEMS

CENTER LINE

MATCH LINE

GATE VALVE

BALL CHECK VALVE

MECHANICAL COUPLING

WELDED JOINT

WALL PENETRATION

FLANGED JOINT

MECHANICAL PUSH-ON OR

RESTRAINED JOINT

HARNESSED FLANGED

COUPLING ADAPTER

SLEEVE TYPE COUPLING

HARNESSED SLEEVE

TYPE COUPLING

HARNESSED FLEXIBLE

COUPLING

SYMBOLS

HOSE BIB

BUTTERFLY VALVE

PLUG VALVE

SWING CHECK VALVE

GLOBE VALVE

PINCH VALVE

BALL VALVE

DIAPHRAGM VALVE

YARD HYDRANT

FIRE HYDRANT

QUICK DISCONNECT

FITTING

SOIL BORING

MATERIALS

GRADE OR EARTH

SAND

GRAVEL

CONCRETE

CONCRETE PAVEMENT

PROPOSED TRENCH DRAIN

BRICK

WOOD BLOCKING

GLASS

CHECKERED PLATE

GRATING

WATER SURFACE

INSULATION

STEEL

ROCK

FLUSHING CONNECTION

SLIDE GATE/STOP GATE

SLUICE GATE

AREA TO BE FILLED AND SODDED

A A6

DRAWING WHERE SECTION IS SHOWN

DRAWINGS ARE CROSS REFERENCED IN THE FOLLOWING METHOD:

SECTION CUT ON DRAWING IS IDENTIFIED AS FOLLOWS:

REFERENCED ITEM

REFERENCED ITEM

AND ARE SHOWN ON THE CONTRACT DRAWINGS BY ONE OF TWO METHODS:

STANDARD DETAILS ARE REFERENCED BY A UNIQUE SEVEN DIGIT NUMBER

ARE IDENTIFIED BY A SQUARE WITH A NUMBER IN THE UPPER HALF.

DETAILS ARE CROSS REFERENCED IN A SIMILAR MANNER, EXCEPT DETAILS

SECTION SHOWN ON DRAWING IS IDENTIFIED AS FOLLOWS:

SEE M-40-0100

OR:

SECTION LETTER

M-40-0100

SECTION A

M-XX-02SCALE

DRAWING WHERE SECTION WAS TAKEN

SECTION LETTER

M-99-XX

M-99-XX

DETAIL

SCALE

DRAWING WHERE DETAIL IS SHOWN

DETAIL NUMBER

DRAWING WHERE DETAIL IS LOCATED

DETAIL NUMBER

1 100% SUBMITTAL 03/25 DB

GRASS

METAL

FRAME

SHED

TANK

METAL

FRAME

SHED

E

E

E

W

W

W

SD

E

E

E

F

W W

SLUDGE

PUMPS

METAL

FRAME

SHED

SLUDGE DRYING

BED 1

SLUDGE DRYING

BED 2

SLUDGE DRYING

BED 3

SLUDGE DRYING

BED 4

DEWATERED

LIME SLUDGE

BUILDING

EXISTING ROAD

SCALE: 1" = 30'

PLAN

PL

O

T D

AT

E:

/1

6/

:4

AM

B Y:

K R

O M

ER

O

Fi le

: C :\U

SE

R

S\

KR

O M

ER

O

\D C

\A C

C D

O C

S\ H

AZ

EN

A N

D S

AW

YE

R \4

-0

_R

AL

PH

B

R

EN

N

AN

W

TP

IM

PR

O

VE

M

EN

TS

\P

R O

JE

C

T

FI

LE

S\

_D

ES

IG

N \0

1- H

AZ

EN

\0 1-

C

IV

IL

\4

-0

-C -0

1-

S av ed b y C

M O

SC

H

IL

LO

S av e da te : 3

/2 1/

:0

AM

44263-006

X

APRIL 2025D. BIEBER

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECT

ENGINEER:

REV ISSUED FOR DATE BY

0 1"1/2"

CONTRACT NO.:

HAZEN NO.:

DATE:

DRAWING

NUMBER:

RALPH BRENNAN

WATER TREATMENT PLANT

LIME SLUDGE HANDLING IMPROVEMENTS

CITY OF DAYTONA BEACH

DAYTONA, FLORIDA

HAZEN AND SAWYER

2420 SOUTH LAKEMONT AVE., SUITE 325

ORLANDO, FLORIDA 32814IF THIS BAR DOES NOT

MEASURE 1" THEN DRAWING

IS NOT TO FULL SCALE

H&S ENGINEERING AND ARCHITECTURE

4011 WESTCHASE BLVD, SUITE 500

RALEIGH, NC 27607

REGISTRATION NUMBER 54078

1 100% SUBMITTAL 03/25 DB

D. BANNETT

K. ROMERO

C-01-00

CIVIL

OVERALL PLANW. MARSHALL

CONCRETE SLAB

CATCH BASIN

TOP 28.41'

BOTTOM=24.96'

CATCH BASIN

TOP 29.80'

TOP OF MUD=27.63'

BOTTOM=27.05'

CATCH BASIN

TOP 28.87'

BOTTOM=26.65'

CATCH BASIN

TOP 28.55'

BOTTOM=25.53'

STORM MANHOLE

TOP=30.03

N INV=25.40' (UNK)

BOTTOM=22.70'

CATCH BASIN

TOP=28.10'

TOP OF DIRT=25.93'

S INV=25.68' (UNK)

BOTTOM=25.35'

GRASS

GRASS

DIRT

EMBANKMENT

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

CONCRETE PAVERS

CONCRETE

WALK

BURIED

SLUDGE

LINE

BURIED

INF LINE

BURIED

EFF LINE

METAL

FRAME

SHED

TANK

ABOVE GROUND TANK

(CLOSED)

ABOVE GROUND TANK

TANK

CONCRETE WALK

EDGE OF ASPHALT

PAVEMENT

EDGE OF

ASPHALT

PAVEMENT

EDGE OF ASPHALT

PAVEMENT

CONCRETE

PAVEMENT

CONCRETE

PAVEMENT

ASPHALT

SPEED TABLE

SERVICE

CABINET

UG

E

FOCFOC

FOCFOCFOC

UGE UGE

UGE

UGE

UGE

UGE

U G

E U

G E

U G

E U

G E

U G

E

FO

C

FO

C

FO

C

FO

C

FO

C

FO

C

FO

C

FO

C

U G

E U

G E

UGT UGT UGT

FM

FM

FM

FM

FM

FOC

FOC

FOC

UGT

U G

T U

G T

U G

T

FOC

U G

E U

G E

U G

E

W W

W W

W W

FO

C

FO

C

FO

C

FO

C

FO

C

FO

C

FO

C

FO

C

W

U G

E

FM

FM

FM

FM

FM

W

UGE UGE

W

SITE BENCHMARK T11

SET 5/8" IRON ROD & CAP

"ECHO UES TP LB 8184"

ELEVATION = 29.45'

SITE BENCHMARK T3

SET NAIL & DISC

"ECHO UES TP LB 8184"

ELEVATION = 30.12'

METAL

FRAME

SHED

SITE BENCHMARK T10

SET 5/8" IRON ROD & CAP

"ECHO UES TP LB 8184"

ELEVATION = 30.02'

UNKNOWN

BURIED UTILITY

UNKNOWN

BURIED UTILITY

UNKNOWN

BURIED UTILITY

E

E

POLE E

W

W

BACKFLOW

VALVE

W

SD

OVERHEAD

BUILDING

NON-POTABLE

WATER

E

SERVICE

CABINET

E

E

F

W W

BACKFLOW

VALVE

SLUDGE

THICKENER

SLUDGE

PUMPS

MECHANICAL

FILTER

BUILDING

LIME

BUILDING

CO2

STORAGE

GROUND

STORAGE

TANK

CO2

STORAGE

CONCRETE SLAB

CONCRETE

SLAB

THICKENING SLUDGE

PUMP STATION

RAISED

WALK

SLUDGE

THICKENER

METAL

FRAME

SHED

NOTES:

1. THE MAIN ACCESS ROAD IS A COMMON ROAD FOR

THE OWNER, OWNER'S REPRESENTATIVES,

VENDOR SUPPLIERS, VISITORS AND SAFETY

VEHICLES; THE CONTRACTOR SHALL MAINTAIN

ACCESS THROUGH MAIN ENTRY GATE AT ALL

TIMES.

2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR

THE SECURITY OF ITS EQUIPMENT AND FACILITIES.

3. REFERENCE PROJECT SPECIFICATIONS FOR

CONSTRUCTION SEQUENCE REQUIREMENTS AND

RESTRICTIONS.

4. REFERENCE PROJECT SPECIFICATIONS FOR

REQUIREMENTS FOR TEMPORARY UTILITIES AND

SERVICES DURING CONSTRUCTION.

5. THE CONTRACTOR SHALL AVOID ELECTRICAL

VAULTS TO PREVENT EQUIPMENT DAMAGE.

SCALE: 1" = 20'

PLAN

PL

O

T D

AT

E:

/1

6/

:4

K R

O M

ER

O

Fi le

: C :\U

SE

R

S\

KR

O M

ER

O

\D C

\A C

C D

O C

S\ H

AZ

EN

A N

D S

AW

YE

R \4

-0

_R

AL

PH

B

R

EN

N

AN

W

TP

IM

PR

O

VE

M

EN

TS

\P

R O

JE

C

T

FI

LE

S\

_D

ES

IG

N \0

1- H

AZ

EN

\0 1-

C

IV

IL

\4

-0

-C -0

1-

S av ed b y C

M O

SC

H

IL

LO

S av e da te : 3

/2 1/

:5

AM

44263-006

X

APRIL 2025D. BIEBER

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECT

ENGINEER:

REV ISSUED FOR DATE BY

0 1"1/2"

CONTRACT NO.:

HAZEN NO.:

DATE:

DRAWING

NUMBER:

RALPH BRENNAN

WATER TREATMENT PLANT

LIME SLUDGE HANDLING IMPROVEMENTS

CITY OF DAYTONA BEACH

DAYTONA, FLORIDA

HAZEN AND SAWYER

2420 SOUTH LAKEMONT AVE., SUITE 325

ORLANDO, FLORIDA 32814IF THIS BAR DOES NOT

MEASURE 1" THEN DRAWING

IS NOT TO FULL SCALE

1 100% SUBMITTAL 03/25 DB

D. BANNETT

K. ROMERO

C-01-01

CIVIL

EXISTING SITE PLAN

AND STAGING AREAW. MARSHALL

LEGEND

STAGING AREA

CONTRACTOR TRAFFIC FLOW

TOP 28.41'

BOTTOM=24.96'

CATCH BASIN

TOP 29.80'

TOP OF MUD=27.63'

BOTTOM=27.05'

CATCH BASIN

TOP 28.87'

BOTTOM=26.65'

CATCH BASIN

TOP 28.55'

BOTTOM=25.53'

STORM MANHOLE

TOP=30.03

N INV=25.40' (UNK)

BOTTOM=22.70'

CATCH BASIN

TOP=28.10'

TOP OF DIRT=25.93'

S INV=25.68' (UNK)

BOTTOM=25.35'

GRASS

GRASS

DIRT

EMBANKMENT

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

CONCRETE PAVERS

CONCRETE

WALK

BURIED

SLUDGE

LINE

BURIED

INF LINE

BURIED

EFF LINE

METAL

FRAME

SHED

TANK

ABOVE GROUND TANK

(CLOSED)

ABOVE GROUND TANK

(CLOSED)

TANK

CONCRETE WALK

EDGE OF ASPHALT

PAVEMENT

EDGE OF

ASPHALT

PAVEMENT

EDGE OF ASPHALT

PAVEMENT

CONCRETE

PAVEMENT

CONCRETE

PAVEMENT

ASPHALT

SPEED TABLE

SERVICE

CABINET

UG

E

FOCFOC

FOCFOCFOC

UGE UGE

UGE

UGE

UGE

UGE

U G

E U

G E

U G

E U

G E

U G

E

FO

C

FO

C

FO

C

FO

C

FO

C

FO

C

FO

C

FO

C

U G

E U

G E

UGT UGT UGT

FM

FM

FM

FM

FM

FOC

FOC

FOC

UGT

U G

T U

G T

U G

T

FOC

U G

E U

G E

U G

E

W W

W W

W W

FO

C

FO

C

FO

C

FO

C

FO

C

FO

C

FO

C

FO

C

W

U G

E

FM

FM

FM

FM

FM

W

UGE UGE

W

SITE BENCHMARK T11

SET 5/8" IRON ROD & CAP

"ECHO UES TP LB 8184"

ELEVATION = 29.45'

SITE BENCHMARK T3

SET NAIL & DISC

"ECHO UES TP LB 8184"

ELEVATION = 30.12'

METAL

FRAME

SHED

SITE BENCHMARK T10

SET 5/8" IRON ROD & CAP

"ECHO UES TP LB 8184"

ELEVATION = 30.02'

UNKNOWN

BURIED UTILITY

UNKNOWN

BURIED UTILITY

UNKNOWN

BURIED UTILITY

E

E

POLE E

W

W

BACKFLOW

VALVE

W

SD

OVERHEAD

BUILDING

NON-POTABLE

WATER

E

SERVICE

CABINET

E

E

F

W W

BACKFLOW

VALVE

SLUDGE

THICKENER

SLUDGE

PUMPS

MECHANICAL

FILTER

BUILDING

LIME

BUILDING

CO2

STORAGE

GROUND

STORAGE

TANK

CO2

STORAGE

CONCRETE SLAB

CONCRETE

SLAB

THICKENING SLUDGE

PUMP STATION

RAISED

WALK

SLUDGE

THICKENER

METAL

FRAME

SHED

CLEARING AND GRUBBING AREA.

SEE NOTE 4.

SEE M-10-01 FOR

DEMO PLAN

REMOVE TREES AND SHRUBS

CONTRACTOR TO

RELOCATE BENCHMARK

PRIOR TO COMMENCING

CONSTRUCTION

SEE NOTE 6

SEE E-02 FOR

ELECTRICAL LINE

COORDINATION

NOTES:

1. NOT ALL UNDERGROUND UTILITIES ARE SHOWN

FOR CLARITY.

2. IRRIGATION PIPING NOT SHOWN. IRRIGATION

SYSTEM SUBCONTRACTOR SHALL ISOLATE THE

IRRIGATION SYSTEM TO WORK AREAS. WHEN

NEEDED THE IRRIGATION SYSTEM

SUBCONTRACTOR SHALL ADD ISOLATION VALVES

TO PREVENT IMPACT TO AREAS NOT ASSOCIATED

WITH THE WORK. UPON COMPLETION OF THE

WORK, CONTRACTOR SHALL COORDINATE WITH

SUBCONTRACTOR FOR THE INSTALLATION OF A

NEW IRRIGATION SYSTEM WITHIN THE WORK

AREAS IMPACTED BY THE CONSTRUCTION

ACTIVITIES.

3. DEMOLITION WORK SHALL BE PERFORMED IN

COORDINATION WITH THE SEQUENCE OF

CONSTRUCTION AND CONSTRUCTION

CONSTRAINTS ESTABLISHED IN THE

SPECIFICATIONS. COORDINATE WITH OWNER IF

SERVICE INTERRUPTIONS ARE REQUIRED.

4. FOR CLEARING AND GRUBBING AREA, REMOVE 6"

TOPSOIL AND THEN EXCAVATE DOWN TO THE

PROPOSED DESIGN ELEVATIONS SHOWN ON THE

PAVING AND GRADING PLAN.

5. OWNER WILL RELOCATE SHEDS PRIOR TO

DEMOLITION.

6. CONTRACTOR SHALL FIELD LOCATE 2" AND

PROTECT WATER LINE BETWEEN THICKENERS. NEW

WATER LINE INSTALLATION PLAN SHOWN ON C-02-01

7. EXISTING LIME SLUDGE DRYING AREA: THE

CONTRACTOR SHALL PILE UP THE DISCARDED

CONTENTS AND COORDINATE WITH THE CITY TO

DISPOSE OF THE MATERIALS IN A DESIGNATED

AREA.

SCALE: 1" = 20'

PLAN

PL

O

T D

AT

E:

/1

6/

:4

K R

O M

ER

O

Fi le

: C :\U

SE

R

S\

KR

O M

ER

O

\D C

\A C

C D

O C

S\ H

AZ

EN

A N

D S

AW

YE

R \4

-0

_R

AL

PH

B

R

EN

N

AN

W

TP

IM

PR

O

VE

M

EN

TS

\P

R O

JE

C

T

FI

LE

S\

_D

ES

IG

N \0

1- H

AZ

EN

\0 1-

C

IV

IL

\4

-0

-C -0

1-

S av ed b y C

M O

SC

H

IL

LO

S av e da te : 3

/2 1/

:4

AM

44263-006

X

APRIL 2025D. BIEBER

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECT

ENGINEER:

REV ISSUED FOR DATE BY

0 1"1/2"

CONTRACT NO.:

HAZEN NO.:

DATE:

DRAWING

NUMBER:

RALPH BRENNAN

WATER TREATMENT PLANT

LIME SLUDGE HANDLING IMPROVEMENTS

CITY OF DAYTONA BEACH

DAYTONA, FLORIDA

HAZEN AND SAWYER

2420 SOUTH LAKEMONT AVE., SUITE 325

ORLANDO, FLORIDA 32814IF THIS BAR DOES NOT

MEASURE 1" THEN DRAWING

IS NOT TO FULL SCALE

1 100% SUBMITTAL 03/25 DB

D. BANNETT

K. ROMERO

C-01-02

CIVIL

DEMOLITION PLANW. MARSHALL

LEGEND

LIMITS OF DEMOLITION

CLEARING AND

GRUBBING LIMITS

SEE NOTE 5

SEE NOTE 5

TOP 28.41'

BOTTOM=24.96'

CATCH BASIN

TOP 29.80'

TOP OF MUD=27.63'

BOTTOM=27.05'

CATCH BASIN

TOP 28.87'

BOTTOM=26.65'

CATCH BASIN

TOP 28.55'

BOTTOM=25.53'

STORM MANHOLE

TOP=30.03

N INV=25.40' (UNK)

BOTTOM=22.70'

CATCH BASIN

TOP=28.10'

TOP OF DIRT=25.93'

S INV=25.68' (UNK)

BOTTOM=25.35'

GRASS

GRASS

DIRT

EMBANKMENT

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

CONCRETE PAVERS

CONCRETE

WALK

BURIED

SLUDGE

LINE

BURIED

INF LINE

BURIED

EFF LINE

ABOVE GROUND TANK

(CLOSED)

ABOVE GROUND TANK

TANK

CONCRETE WALK

EDGE OF ASPHALT

PAVEMENT

EDGE OF

ASPHALT

PAVEMENT

EDGE OF ASPHALT

PAVEMENT

CONCRETE

PAVEMENT

CONCRETE

PAVEMENT

ASPHALT

SPEED TABLE

SERVICE

CABINET

UG

E

FOCFOC

FOCFOCFOC

UGE UGE

UGE

UGE

UGE

UGE

U G

E U

G E

U G

E U

G E

U G

E

FO

C

FO

C

FO

C

FO

C

FO

C

FO

C

FO

C

FO

C

U G

E U

G E

UGT UGT UGT

FM

FM

FM

FM

FM

FOC

FOC

FOC

UGT

U G

T U

G T

U G

T

FOC

U G

E U

G E

U G

E

W W

W W

W W

FO

C

FO

C

FO

C

FO

C

FO

C

FO

C

FO

C

FO

C

W

U G

E

FM

FM

FM

FM

FM

W

UGE UGE

W

SITE BENCHMARK T11

SET 5/8" IRON ROD & CAP

"ECHO UES TP LB 8184"

ELEVATION = 29.45'

SITE BENCHMARK T3

SET NAIL & DISC

"ECHO UES TP LB 8184"

ELEVATION = 30.12'

SITE BENCHMARK T10

SET 5/8" IRON ROD & CAP

"ECHO UES TP LB 8184"

ELEVATION = 30.02'

UNKNOWN

BURIED UTILITY

UNKNOWN

BURIED UTILITY

UNKNOWN

BURIED UTILITY

E

E

POLE E

W

W

BACKFLOW

VALVE

W

SD

OVERHEAD

BUILDING

NON-POTABLE

WATER

E

SERVICE

CABINET

E

E

F

W W

BACKFLOW

VALVE

SLUDGE

THICKENER

SLUDGE

PUMPS

MECHANICAL

FILTER

BUILDING

LIME

BUILDING

CO2

STORAGE

GROUND

STORAGE

TANK

CO2

STORAGE

CONCRETE SLAB

CONCRETE

SLAB

THICKENING SLUDGE

PUMP STATION

RAISED

WALK

SLUDGE

THICKENER

SLUDGE DRYING

BED 1

SLUDGE DRYING

BED 2

SLUDGE DRYING

BED 3

SLUDGE DRYING

BED 4

DEWATERED

LIME SLUDGE

BUILDING

15 16

FITTINGS TABLE

POINT #

DESCRIPTION

PIPE CONNECTION

8" PVC MJ 90° BEND

8" PVC MJ 90° BEND

8" PVC MJ TEE

4" PVC MJ 90° BEND ROLLED

4" PVC MJ 90° BEND ROLLED

4" SLG

4" DR

8" PVC MJ TEE

8" PVC MJ 90° BEND

8" x 4" PVC MJ RED

4" DI MJ 90° BEND

2'' TAP

2'' PVC 45 BEND

2'' PVC 45 BEND

2'' PVC TEE

NORTHING

1761043.61

1761080.36

1761080.36

1761053.56

1760981.06

1760974.99

1760975.05

1760975.11

1760906.56

1760885.56

1760885.56

1760885.44

1761025.40

1761025.40

1761033.09

1761033.09

EASTING

619256.29

619256.33

619320.28

619320.32

619323.49

619323.49

619320.32

619320.32

619320.32

619320.32

619322.41

619369.71

619269.80

619279.84

619287.52

619331.49

ELEVATION

INV. 21.22

INV. 21.59

INV. 22.23

INV. 22.49

CL 26.80

CL 27.83

CL 27.83

INV. 23.29

INV. 23.96

INV. 24.17

INV. 24.18

INV. 24.77

INV. 0.00

INV. 0.00

INV. 0.00

INV. 0.00

NOTES:

1. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS

PRIOR TO BEGINNING ANY WORK. UNDERGROUND

UTILITY INFORMATION IS PROVIDED FOR

REFERENCE ONLY. CONTRACTORS SHALL BE FULLY

RESPONSIBLE FOR PERFORMING UTILITY LOCATES

WITHIN WORK AREAS. CONTRACTOR SHALL HAND

EXCAVATE THE AREAS OF WORK TO CONFIRM

UNDERGROUND UTILITY SIZES PRIOR TO ORDERING

MATERIALS. CONTRACTORS SHALL NOTIFY THE

ENGINEER OF ANY DISCREPANCIES.

2. CONTRACTOR SHALL INSTALL A BI-DIRECTIONAL

CLEANOUT AT CENTER OF FITTING 8. SEE SHEET

C-99-02 FOR STANDARD DETAIL.

3. CONTRACTOR SHALL INSTALL A ONE-WAY

CLEANOUT AT FITTING 3 AND FITTING 10. SEE

SHEET C-99-02.

4. CONTRACTOR SHALL CORE FRILL THE EXISTING

THICKENING SLUDGE WETWELL AND INSTALL A

COMPRESSIBLE TYPE LINK SEAL AND GROUT AS

REQUIRED TO MAKE THE NEW CONNECTION.

SCALE: 1" = 20'

PLAN

PL

O

T D

AT

E:

/1

6/

:4

K R

O M

ER

O

Fi le

: C :\U

SE

R

S\

KR

O M

ER

O

\D C

\A C

C D

O C

S\ H

AZ

EN

A N

D S

AW

YE

R \4

-0

_R

AL

PH

B

R

EN

N

AN

W

TP

IM

PR

O

VE

M

EN

TS

\P

R O

JE

C

T

FI

LE

S\

_D

ES

IG

N \0

1- H

AZ

EN

\0 1-

C

IV

IL

\4

-0

-C -0

2-

S av ed b y

KR

O M

ER

O

S av e da te : 4

/1 6/

:3

AM

44263-006

X

APRIL 2025D. BIEBER

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECT

ENGINEER:

REV ISSUED FOR DATE BY

0 1"1/2"

CONTRACT NO.:

HAZEN NO.:

DATE:

DRAWING

NUMBER:

RALPH BRENNAN

WATER TREATMENT PLANT

LIME SLUDGE HANDLING IMPROVEMENTS

CITY OF DAYTONA BEACH

DAYTONA, FLORIDA

HAZEN AND SAWYER

2420 SOUTH LAKEMONT AVE., SUITE 325

ORLANDO, FLORIDA 32814IF THIS BAR DOES NOT

MEASURE 1" THEN DRAWING

IS NOT TO FULL SCALE

1 100% SUBMITTAL 03/25 DB

T. MORGAN

K. ROMERO

C-02-01

CIVIL

YARD PIPING PLANW. MARSHALL

8" PVC DR (TYP)

CONNECT TO 4" SLG

SEE M-10-01 FOR CONTINUATION

4" PVC SLG

SEE NOTE 2

SEE NOTE 3

SEE SHEET M-10-01

4" PVC DR (TYP)

2'' PV

CONNECT TO EXISTING WATER

2" PVC WATER

HOSE BIBB CONNECTION,

TYP OF 2. SEE C-33-0640

SEE NOTE 4

TOP 28.41'

BOTTOM=24.96'

CATCH BASIN

TOP 29.80'

TOP OF MUD=27.63'

BOTTOM=27.05'

CATCH BASIN

TOP 28.87'

BOTTOM=26.65'

CATCH BASIN

TOP 28.55'

BOTTOM=25.53'

STORM MANHOLE

TOP=30.03

N INV=25.40' (UNK)

BOTTOM=22.70'

CATCH BASIN

TOP=28.10'

TOP OF DIRT=25.93'

S INV=25.68' (UNK)

BOTTOM=25.35'

GRASS

GRASS

DIRT

EMBANKMENT

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

CONCRETE PAVERS

CONCRETE

WALK

ABOVE GROUND TANK

(CLOSED)

ABOVE GROUND TANK

TANK

CONCRETE WALK

EDGE OF ASPHALT

PAVEMENT

EDGE OF

ASPHALT

PAVEMENT

EDGE OF ASPHALT

PAVEMENT

CONCRETE

PAVEMENT

CONCRETE

PAVEMENT

ASPHALT

SPEED TABLE

SERVICE

CABINET

UG

E

FOCFOC

FOCFOCFOC

UGE UGE

UGE

UGE

UGE

UGE

U G

E U

G E

U G

E U

G E

U G

E

FO

C

FO

C

FO

C

FO

C

FO

C

FO

C

FO

C

FO

C

U G

E U

G E

FOC

FOC

FOC

FOC

U G

E U

G E

U G

E

FO

C

FO

C

FO

C

FO

C

FO

C

FO

C

FO

C

FO

C

U G

E

UGE UGE

SITE BENCHMARK T11

SET 5/8" IRON ROD & CAP

"ECHO UES TP LB 8184"

ELEVATION = 29.45'

SITE BENCHMARK T3

SET NAIL & DISC

"ECHO UES TP LB 8184"

ELEVATION = 30.12'

SITE BENCHMARK T10

SET 5/8" IRON ROD & CAP

"ECHO UES TP LB 8184"

ELEVATION = 30.02'

E

E

POLE E

W

W

BACKFLOW

VALVE

W

SD

OVERHEAD

BUILDING

E

SERVICE

CABINET

E

E

F

W W

BACKFLOW

VALVE

SLUDGE

THICKENER

SLUDGE

PUMPS

MECHANICAL

FILTER

BUILDING

LIME

BUILDING

CO2

STORAGE

GROUND

STORAGE

TANK

CO2

STORAGE

CONCRETE SLAB

CONCRETE

SLAB

THICKENING SLUDGE

PUMP STATION

RAISED

WALK

SLUDGE

THICKENER

SLUDGE DRYING

BED 1

SLUDGE DRYING

BED 2

SLUDGE DRYING

BED 3

SLUDGE DRYING

BED 4

DEWATERED

LIME SLUDGE

BUILDING

8'

6'

6'

3 4

11 12

15 16

27.00 32.00 (TOP) 27.00 32.00 (TOP)32.09 (TOP)

32.00 (TOP)

27.00 (EOP)

29.80 (EOP)

30.50 (EOP)

29.80 (EOP)

32.00 (TOP)

32.00 (T

OP)

32.00 (TOP)

30.50 (EOP)

30.50 (EOP)

29.80 (EOP)29.80 (EOP)

28.20

28.50

29 30

30 3030 31 3132 32

282930

25'

STAKING TABLE

POINT #

NORTHING

1761057.56

1761057.56

1760982.56

1760982.56

1760902.56

1760902.56

1760882.64

1760882.64

1760848.30

1760848.30

1760918.17

1760917.96

1760902.73

1760909.62

1760892.40

1760892.40

EASTING

619338.61

619398.61

619334.61

619398.61

619333.61

619398.61

619329.99

619373.15

619329.99

619373.15

619276.22

619293.21

619284.20

619297.52

619286.71

619301.71

SCALE: 1" = 20'

PLAN

PL

O

T D

AT

E:

/1

6/

:4

K R

O M

ER

O

Fi le

: C :\U

SE

R

S\

KR

O M

ER

O

\D C

\A C

C D

O C

S\ H

AZ

EN

A N

D S

AW

YE

R \4

-0

_R

AL

PH

B

R

EN

N

AN

W

TP

IM

PR

O

VE

M

EN

TS

\P

R O

JE

C

T

FI

LE

S\

_D

ES

IG

N \0

1- H

AZ

EN

\0 1-

C

IV

IL

\4

-0

-C -0

3-

S av ed b y C

M O

SC

H

IL

LO

S av e da te : 3

/2 1/

:5

AM

44263-006

X

APRIL 2025D. BIEBER

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECT

ENGINEER:

REV ISSUED FOR DATE BY

0 1"1/2"

CONTRACT NO.:

HAZEN NO.:

DATE:

DRAWING

NUMBER:

RALPH BRENNAN

WATER TREATMENT PLANT

LIME SLUDGE HANDLING IMPROVEMENTS

CITY OF DAYTONA BEACH

DAYTONA, FLORIDA

HAZEN AND SAWYER

2420 SOUTH LAKEMONT AVE., SUITE 325

ORLANDO, FLORIDA 32814IF THIS BAR DOES NOT

MEASURE 1" THEN DRAWING

IS NOT TO FULL SCALE

1 100% SUBMITTAL 03/25 DB

D. BANNETT

K. ROMERO

C-03-01

CIVIL

PAVING AND GRADING PLANW. MARSHALL

C C

C -0

3-

AA

C-03-02

BB

C-03-02

D D

C -0

3-

15' PROPOSED STABILIZED ROAD

CONSTRUCTION OF 12" SUBGRADE (LBR 40)

COMPACTED TO 98% PER ASSHTO T180

CONCRETE

PROPOSED STABILIZED ROAD

CONSTRUCTION ENTRANCE AND

WASHDOWN

CONTOUR

LEGEND

F.F. = 30.50

CONCRETE SLAB

SEE STRUCTURAL

PLANS FOR

REINFORCEMENT

SL

O

PE

.0

SL

O

PE

.0

SL

O

PE

.0

SL

O

PE

.0

CONCRETE LANDING

SEE STRUCTURAL PLANS

FOR REINFORCEMENT (TYP)

ELEVATED CONCRETE WALKWAY

SEE STRUCTURAL PLANS

FOR REINFORCEMENT

EE

C

-03-02

(TOS) (TOS)

EOP = EDGE OF PAVEMENT

TOS = TOP OF PARAPET

TOS = TOP OF SIDEWALK

MTE = MATCH EXISTING

SCALE: 1" = 5'

PLAN

PL

O

T D

AT

E:

/1

6/

:4

K R

O M

ER

O

Fi le

: C :\U

SE

R

S\

KR

O M

ER

O

\D C

\A C

C D

O C

S\ H

AZ

EN

A N

D S

AW

YE

R \4

-0

_R

AL

PH

B

R

EN

N

AN

W

TP

IM

PR

O

VE

M

EN

TS

\P

R O

JE

C

T

FI

LE

S\

_D

ES

IG

N \0

1- H

AZ

EN

\0 1-

C

IV

IL

\4

-0

-C -0

3-

S av ed b y C

M O

SC

H

IL

LO

S av e da te : 3

/2 1/

:5

AM

44263-006

X

APRIL 2025D. BIEBER

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECT

ENGINEER:

REV ISSUED FOR DATE BY

0 1"1/2"

CONTRACT NO.:

HAZEN NO.:

DATE:

DRAWING

NUMBER:

RALPH BRENNAN

WATER TREATMENT PLANT

LIME SLUDGE HANDLING IMPROVEMENTS

CITY OF DAYTONA BEACH

DAYTONA, FLORIDA

HAZEN AND SAWYER

2420 SOUTH LAKEMONT AVE., SUITE 325

ORLANDO, FLORIDA 32814IF THIS BAR DOES NOT

MEASURE 1" THEN DRAWING

IS NOT TO FULL SCALE

1 100% SUBMITTAL 03/25 DB

D. BANNETT

K. ROMERO

C-03-02

CIVIL

PAVING AND GRADING SECTIONSW. MARSHALL

DRYING BED

EL 32.00 TOP

EL 27.00 TO 30.50

1'

6'

SOD

MATCH TO

EXISTING

OVER 5'

EXISTING

GROUND

12" SUBGRADE (LBR 40)

COMPACTED TO 98% DENSITY

PER AASHTO T-180

12" THICK CONCRETE DRYING BED

REFER TO STRUCTURAL

PLANS FOR REINFORCEMENT

SECTION AA

1" = 5'

EL 27.00 to 30.50

EL 32.00 TOP

EL 27.00

EL 28.00

EL 28.00

6' 4' 4'

2'

FLAT

8'

CONCRETE RAMP

SEE STRUCTURAL

PLAN FOR

REINFORCEMENT

6'

SOD

6'

SOD

MATCH TO

EXISTING

OVER 5'

EXISTING

GROUND

12" SUBGRADE (LBR 40)

COMPACTED TO 98% DENSITY

PER AASHTO T-180

12" THICK CONCRETE DRYING BED

REFER TO STRUCTURAL

PLANS FOR REINFORCEMENT

12" THICK CONCRETE DRYING BED

REFER TO STRUCTURAL

PLANS FOR REINFORCEMENT

14'

VA:1 SLOPEVA:1 SLOPE

CL SWALE SLOPE TO DRAIN

CL SWALE

8'

CONCRETE RAMP

SEE STRUCTURAL

PLAN FOR

REINFORCEMEN

SECTION BB

1" = 5'

SECTION CC

1" = 5'

SECTION DD

1" = 5'

12" SUBGRADE (LBR 40)

COMPACTED TO 98% DENSITY

PER AASHTO T-180

12" SUBGRADE (LBR 40)

COMPACTED TO 98% DENSITY

PER AASHTO T-180

12" THICK CONCRETE DRYING BED

REFER TO STRUCTURAL

PLANS FOR REINFORCEMENT

VA:1 SLOPE

LIMITS OF FILL

HAND COMPACT

AGAINST STRUCTURE

TOE OF SLOPE

SEE PLANS FOR

ELEVATION

LIMITS OF CUT

1'

DEWATERED

LIME SLUDGE

BUILDING

F.F. = 30.50

EXISTING GROUND

LIMITS OF WELL

COMPACTED FILL

LIMITS OF CUT

EL 30.50 2' SLOPE @ 5.0% SLOPE @ 5.0% 2'

6" 6"

VARIES

SEE PLANS

MATCH TO

EXISTING

EL VARIES 28.00 TO 29.00

LIMITS OF CUT

EL 30.50

SLOPE @ 5.0%SLOPE @ 5.0%

EL 27.00

ALUM GUARDRAIL, TYP

SEE STRUCTURAL PLANS FOR DETAIL

4" GV, TYP

FLG BEND 90, TYP

4" DI SLG

CL 32.70

SECTION EE

1" = 5'

EL 32.00 TOP

ADJUSTABLE SADDLE, TYP

M-40-0304

12" SUBGRADE (LBR 40)

COMPACTED TO 98% DENSITY

PER AASHTO T-180

8" PVC DR

SEE M-20-02 FOR DETAIL

8" PVC DR

SEE M-20-02 FOR DETAIL

SOD

9'

VA:1

SOD

SPEED BUMP

SEE S-20-02 FOR DETAIL

SPEED BUMP

SEE S-20-02 FOR DETAIL

LIMITS OF FILL

HAND COMPACT

AGAINST STRUCTURE

CL SWALE

VARIES

SEE PLANS

12" THICK CONCRETE DRYING BED

REFER TO STRUCTURAL PLANS

FOR REINFORCEMENT

24.38'

SLUDGE PUMP PAD

20.27'

8" THICK PAD 8" THICK PAD

8" THICK PAD

TOP 28.41'

BOTTOM=24.96'

CATCH BASIN

TOP 29.80'

TOP OF MUD=27.63'

BOTTOM=27.05'

CATCH BASIN

TOP 28.87'

BOTTOM=26.65'

CATCH BASIN

TOP 28.55'

BOTTOM=25.53'

STORM MANHOLE

TOP=30.03

N INV=25.40' (UNK)

BOTTOM=22.70'

CATCH BASIN

TOP=28.10'

TOP OF DIRT=25.93'

S INV=25.68' (UNK)

BOTTOM=25.35'

GRASS

GRASS

DIRT

EMBANKMENT

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

GRASS

CONCRETE PAVERS

CONCRETE

WALK

BURIED

SLUDGE

LINE

BURIED

INF LINE

BURIED

EFF LINE

ABOVE GROUND TANK

(CLOSED)

ABOVE GROUND TANK

TANK

CONCRETE WALK

EDGE OF ASPHALT

PAVEMENT

EDGE OF

ASPHALT

PAVEMENT

EDGE OF ASPHALT

PAVEMENT

CONCRETE

PAVEMENT

CONCRETE

PAVEMENT

ASPHALT

SPEED TABLE

SERVICE

CABINET

UG

E

FOCFOC

FOCFOCFOC

UGE UGE

UGE

UGE

UGE

UGE

U G

E U

G E

U G

E U

G E

U G

E

FO

C

FO

C

FO

C

FO

C

FO

C

FO

C

FO

C

FO

C

U G

E U

G E

UGT UGT UGT

FM

FM

FM

FM

FM

FOC

FOC

FOC

UGT

U G

T U

G T

U G

T

FOC

U G

E U

G E

U G

E

W W

W W

W W

FO

C

FO

C

FO

C

FO

C

FO

C

FO

C

FO

C

FO

C

W

U G

E

FM

FM

FM

FM

FM

W

UGE UGE

W

SITE BENCHMARK T11

SET 5/8" IRON ROD & CAP

"ECHO UES TP LB 8184"

ELEVATION = 29.45'

SITE BENCHMARK T3

SET NAIL & DISC

"ECHO UES TP LB 8184"

ELEVATION = 30.12'

SITE BENCHMARK T10

SET 5/8" IRON ROD & CAP

"ECHO UES TP LB 8184"

ELEVATION = 30.02'

UNKNOWN

BURIED UTILITY

UNKNOWN

BURIED UTILITY

UNKNOWN

BURIED UTILITY

E

E

POLE E

W

W

BACKFLOW

VALVE

W

SD

OVERHEAD

BUILDING

NON-POTABLE

WATER

E

SERVICE

CABINET

E

E

F

W W

BACKFLOW

VALVE

SLUDGE

THICKENER

SLUDGE

PUMPS

MECHANICAL

FILTER

BUILDING

LIME

BUILDING

CO2

STORAGE

GROUND

STORAGE

TANK

CO2

STORAGE

CONCRETE SLAB

CONCRETE

SLAB

THICKENING SLUDGE

PUMP STATION

RAISED

WALK

SLUDGE

THICKENER

SF

SF SF SF SF

SF

SF

SF

SF

SF

SF

SFSFSF

SF

SF

SF

SF

SF

SLUDGE DRYING

BED 1

SLUDGE DRYING

BED 2

SLUDGE DRYING

BED 3

SLUDGE DRYING

BED 4

DEWATERED

LIME SLUDGE

BUILDING

PL

O

T D

AT

E:

/1

6/

:4

K R

O M

ER

O

Fi le

: C :\U

SE

R

S\

KR

O M

ER

O

\D C

\A C

C D

O C

S\ H

AZ

EN

A N

D S

AW

YE

R \4

-0

_R

AL

PH

B

R

EN

N

AN

W

TP

IM

PR

O

VE

M

EN

TS

\P

R O

JE

C

T

FI

LE

S\

_D

ES

IG

N \0

1- H

AZ

EN

\0 1-

C

IV

IL

\4

-0

-C -0

4-

S av ed b y C

M O

SC

H

IL

LO

S av e da te : 3

/2 1/

:5

AM

44263-006

X

APRIL 2025D. BIEBER

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECT

ENGINEER:

REV ISSUED FOR DATE BY

0 1"1/2"

CONTRACT NO.:

HAZEN NO.:

DATE:

DRAWING

NUMBER:

RALPH BRENNAN

WATER TREATMENT PLANT

LIME SLUDGE HANDLING IMPROVEMENTS

CITY OF DAYTONA BEACH

DAYTONA, FLORIDA

HAZEN AND SAWYER

2420 SOUTH LAKEMONT AVE., SUITE 325

ORLANDO, FLORIDA 32814IF THIS BAR DOES NOT

MEASURE 1" THEN DRAWING

IS NOT TO FULL SCALE

1 100% SUBMITTAL 03/25 DB

D. BANNETT

K. ROMERO

C-04-01

CIVIL

EROSION CONTROL PLANW. MARSHALL

GRAVEL CONSTRUCTION

ENTRANCE AND WASH DOWN

CONSTRUCTION ENTRANCE

INLET PROTECTION

SILT FENCE

SCALE: 1" = 20'

PLAN

LEGEND

SF

TRENCH WIDTH

SEE NOTE 4

VA

RI

ES

(4

8" M

IN

. C

O

VE

R)

12" 12"PIPE

O.D.

6" MAX. LAYERS AT

4" MAX. LAYERS

95% COMPACTION

AT 95% COMPACTION

SEE NOTE 5

UNDISTURBED SOIL

EXCAVATION WIDTH

2'

(TYP)

NOTES:

1. WHERE SOIL CONDITIONS CANNOT BE MAINTAINED AS SHOWN ABOVE,

PROVIDE APPROVED METHOD OF CONSTRUCTION.

2. TRENCH SUPPORTS AND DEWATERING METHOD SHALL BE DETERMINED BY

THE CONTRACTOR AND BE CONSISTENT WITH APPLICABLE OSHA

REQUIREMENTS.

3. COMPACTION PERCENTAGES SHOWN REFER TO A.A.S.H.T.O. T-180. PROVIDE

COMPACTION TEST REPORTS TO CITY INSPECTOR.

4. MECHANICAL COMPACTION NOT ALLOWED BETWEEN SPRING LINE AND 12"

ABOVE THE TOPE OF PIPE ONCE PIPE IS INSTALLED.

5. INSTALL METALLIC TAPE AND UF #12 INSULATED SINGLE STRAND COPPER

WIRE OVER FULL LENGTH OF PIPE.

6. PROVIDE 6" OF TOPSOIL TO PROMOTE VEGETATION ESTABLISHMENT WHERE

TRENCH IS SITUATED OUTSIDE OF PAVED AREAS.

7. UPPER ONE FOOT BELOW BASE COURSE SHOULD BE COMPACT EACH LIFT TO A

MINIMUM DESNSITY OF 98 PERCENT OF THE MODIFIED PROCTOR MAXIMUM

DRY DENSITY.

"CLEAN" FINE SANDS WITH

6" THICK CLASS 12 EARTHFILL

(TOPSOIL, SEE NOTE 7)

WITHOUT PAVEMENT RESTORATION

#57 STONE

FULLY WRAPPED WITH A

GEOTEXTILE FILTER FABRIC SUCH

AS CONTECH C 31NW OR

EQUIVALENT

LESS THAN 5% SOIL FINES

PL

O

T D

AT

E:

/1

6/

:4

K R

O M

ER

O

Fi le

: C :\U

SE

R

S\

KR

O M

ER

O

\D C

\A C

C D

O C

S\ H

AZ

EN

A N

D S

AW

YE

R \4

-0

_R

AL

PH

B

R

EN

N

AN

W

TP

IM

PR

O

VE

M

EN

TS

\P

R O

JE

C

T

FI

LE

S\

_D

ES

IG

N \0

1- H

AZ

EN

\0 1-

C

IV

IL

\4

-0

-C -9

9-

S av ed b y C

M O

SC

H

IL

LO

S av e da te : 3

/2 1/

:5

AM

44263-006

X

APRIL 2025D. BIEBER

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECT

ENGINEER:

REV ISSUED FOR DATE BY

0 1"1/2"

CONTRACT NO.:

HAZEN NO.:

DATE:

DRAWING

NUMBER:

RALPH BRENNAN

WATER TREATMENT PLANT

LIME SLUDGE HANDLING IMPROVEMENTS

CITY OF DAYTONA BEACH

DAYTONA, FLORIDA

HAZEN AND SAWYER

2420 SOUTH LAKEMONT AVE., SUITE 325

ORLANDO, FLORIDA 32814IF THIS BAR DOES NOT

MEASURE 1" THEN DRAWING

IS NOT TO FULL SCALE

1 100% SUBMITTAL 03/25 DB

D. BANNETT

K. ROMERO

C-99-01

CIVIL

DETAILS - SHEET 1W. MARSHALL

STORM DRAINAGE

12" MIN.

FINISHED GRADE

36" OF COVER MIN.

FOR ALL PIPE

PIPE OR SANITARY

SEWER MAIN

2. ADDITIONAL RESTRAINTS MAY BE REQUIRED FOR VERTICAL BENDS.

POTABLE WATER MAIN

( FULL LENGTH )

EXIST. PIPE

RESTRAINED JOINT

1 FULL LENGTH

(4 REQUIRED)

STORM WATER, REUSE

45° D.I.P. BENDS

M

IN

VARIES

TRANSITION GASKET

SOLID SLEEVE WITH

FINISHED GRADE

( FULL LENGTH )

EXIST. PIPE

" M

IN

. C

O

VE

R

OR SANITARY SEWER

RESTRAINED AS REQUIRED

BY MANUFACTURER.

3. LOWERING OF EXISTING WATER MAIN & FORCE MAIN BY DEFLECTION METHOD MAY BE ACCEPTABLE

4. LENGTH OF SECTION BASED ON MINIMUM LENGTH AS DETERMINED BY EBAA RESTRAINED JOINT MANUAL.

5. INSTALL RESTRAINED JOINTS, AS REQUIRED, FROM DEFLECTION POINT IN BOTH DIRECTIONS (20' MIN.).

TYPE 'B'

TYPE 'A'

IF EXISTING FIELD CONDITIONS PERMIT AND APPROVAL IS RECEIVED FROM CODB.

POTABLE WATER MAIN

1. TYPE "A" CROSSING SHALL BE THE PREFERRED CONFIGURATION. TYPE "B" MAY BE USED ONLY

UPON SPECIFIC APPROVAL.

Revision Date: 12/2020 File Name:

Scale:

Drawn By:

Checked By:

Drawing Date: 01/08

Pipe Crossing W-7

JMP

NTS

CRB

FY-21/22

1 FULL LENGTH OF PIPE

NOTES:

CROSS SECTIONAL VIEW

CROSS SECTIONAL VIEW

OF PIPE

6. ALL DEFLECTIONS SHALL BE DIP.

DETAIL 1

NTS -

DARLING OR EQUAL

C-33-0640

2" YARD (POST) HYDRANT AS

MANUFACTURED BY ZURN Z-1390,

JAY R. SMITH 5914, AMERICAN

2" AMERICAN NATIONAL

STRAIGHT THREAD

HOSE CONNECTION

HYDRANT

HOUSING

1/4 CU YD CRUSHED

STONE FOR HYDRANT

DRAINAGE

VALVE HOUSING

YARD HYDRANT

5"7"5"

6"

4' -6

CONC BASE

VALVE

VALVE BOX

C-33-0630

3' -0

" M

IN

IM

U

M

24" SQUARE

6"

VALVE BOX PAD,

SEE C-33-0631

VALVE SUPPORT

2'-0" x 2'-0"

SQUARE CONCRETE PAD

6" M

IN

2" 4"

VALVE BOX TOP SECTION

WITH COVER AL

L

AR

O U

N D

3/ 4"

C H

AM

FE

R

TYPICAL

PAVEMENT

SECTION

SEE NOTE ABOVE

C-33-0631

VALVE BOX PAD

CENTER SECTION

(LENGTH AS REQD)

NOTE:

EMBED INTO CONCRETE PAD, BRASS DISK

WITH VALVE DATA PER DETAIL C-33-0632

FINISHED

GRADE

SECTIONELEVATION

VE

R

TI

C

AL

SILT FLOW

POST OPTIONS:

SOFT WOOD 2 1/2" DIA.

SOFT WOOD 2" x 4" HARDWOOD 1 1/2" x1 1/2"

STEEL 1.33 LBS/FT

OPTIONAL

POST

POSITION

20°±

PRINCIPAL POST POSITION

(CANTED 20° TOWARD FLOW)

FILTER FABRIC

FILTER FABRIC (IN ACCORDANCE WITH

SECTION 985 FDOT SPECIFICATION)

6' MAX

8"

" M

IN

3' O

R M

O R

E

GROUND SURFACE

00 50 100 150 200 250 300 350 400

SPACING (In Feet)

CHART 1: SILT FENCE SPACING

WATER COURSE

SILT FLOW

SILT FENCE

STORMWATER

RUNOFF

SILT FENCE PROTECTION IN DITCHES

WITH INTERMITTENT FLOW

SILT FENCE PROTECTION AROUND

DITCH BOTTOM INLETSSILT FENCE

SILT FENCE APPLICATIONS

F

LO

W

POST POST

F

LO

W

PLACE THE POST OF ONE FENCE BEHIND

THE END POST OF THE OTHER FENCE AS SHOWN.

ROTATE BOTH POSTS AT LEAST 180 DEGREES IN

A CLOCKWISE DIRECTION TO CREATE A TIGHT

SEAL WITH THE FABRIC MATERIAL.

DRIVE BOTH POSTS INTO THE GROUND AND

BURY FLAP.

PLAN VIEW

JOINING TWO SILT FENCES

NOTES:

1. WHERE USED IN DITCHES, THE SPACING FOR TYPE III SILT FENCE SHALL BE IN ACCORDANCE

WITH CHART 1.

2. DO NOT CONSTRUCT SILT FENCE ACROSS PERMANENT FLOWING WATERCOURSES. SILT

FENCES ARE TO BE AT UPLAND LOCATIONS AND TURBIDITY BARRIERS USED AT PERMANENT

BODIES OF WATER.

3. WHERE USED AS SLOPE PROTECTION, SILT FENCE IS TO BE CONSTRUCTED ON 0%

LONGITUDINAL GRADE TO AVOID CHANNELIZING RUNOFF ALONG LENGTH OF FENCE.

TYPE III SILT FENCESL

O

PE

(I n

6" MAX. LAYERS AT

95% COMPACTION

"CLEAN" FINE SANDS WITH

6" THICK CLASS 12 EARTHFILL

(TOPSOIL, SEE NOTE 7)

LESS THAN 5% SOIL FINES

TYPE III SILT FENCE

45° BEND

45° BEND OR LATERAL

AS REQUIRED

3"

CLEAR

12", MIN

4 SIDES

NOTE:

ALL FITTINGS SHALL BE

RESTRAINED JOINT.

CLEANOUT RISER FOR PRESSURIZED LINES 4"-12"

#5@12 EW", TYP

C-33-0643

H20 RATED MANHOLE

RING AND COVER

FLANGE WITH TAPPED

BOLT HOLES

SQUARE CONCRETE PAD, TOP

OF PAD AND MANHOLE COVER

SHALL BE FLUSH WITH GRADE

OR PAVEMENTCOMPANION FLANGE WITH

2" THREADED HOLE AND

HEX HEAD PLUG

" M

IN

12" MIN #57 STONE

1" EXPANSION JOINT MATERIAL

PAVEMENT

3"

CLEAR

12", MIN

4 SIDES

#5@12 EW", TYP

H20 RATED MANHOLE

RING AND COVER

SQUARE CONCRETE PAD, TOP

OF PAD AND MANHOLE COVER

SHALL BE FLUSH WITH GRADE

OR PAVEMENT

" M

IN

12" MIN #57 STONE

1" EXPANSION JOINT MATERIAL

PAVEMENT

TWO-WAY

CLEANOUT TEE

CLEANOUT

BI-DIRECTIONAL CLEANOUT

PL

O

T D

AT

E:

/1

6/

0:

A M

K

R O

M

ER

O Fi le : C

:\U

SE

R S\

KR

O

M

ER

O \D

C \A

C C

D O

C S\

H

AZ

EN

A

N D

S

AW

YE

R

\4

-0

_R

AL

PH

B R

EN

N

AN

W

TP

IM

PR

O

VE

M

EN

TS

\P R

O

JE

C T

FI

LE

S\

_D

ES

IG

N

\0 1-

H

AZ

EN

\0

1- C

IV

IL

\4

-0

-C

-9 9-

S av ed b y

C M

O

SC

H

IL

LO

S av e da te

: 3 /2

1/

:5

AM

44263-006

X

APRIL 2025D. BIEBER

CHECKED BY:

DRAWN BY:

DESIGNED BY:

PROJECT

ENGINEER:

REV ISSUED FOR DATE BY

0 1"1/2"

CONTRACT NO.:

HAZEN NO.:

DATE:

DRAWING

NUMBER:

RALPH BRENNAN

WATER TREATMENT PLANT

LIME SLUDGE HANDLING IMPROVEMENTS

CITY OF DAYTONA BEACH

DAYTONA, FLORIDA

HAZEN AND SAWYER

2420 SOUTH LAKEMONT AVE., SUITE 325

ORLANDO, FLORIDA 32814IF THIS BAR DOES NOT

MEASURE 1" THEN DRAWING

IS NOT TO FULL SCALE

1 100% SUBMITTAL 03/25 DB

D. BANNETT

K. ROMERO

C-99-02

CIVIL

DETAILS - SHEET 2W. MARSHALL

DETAIL 2

NTS -

DETAIL 4

NTS -

DETAIL 3

NTS -

DETAIL 5

NTS -

4" PVC SLG SEE SHEET C-02-01

FOR CONTINUATION

M-10-01

A_______

NOTE:

1. BACKFILL WITH EXCAVATABLE

FLOWABLE FILL.

RESTRAINED MJ

SOLID SLEEVE

M-40-0700

, TYP

4" PV-FP

2'

6"

4" DI TEE, MJ

4" TRANSITION SLEVE, MJ

4" DI SLG

4" DI SLG

4" 4"

D I

PV

C

REMOVE 4" WYE FITTING, 4" 45°,

4" SPOOL PIECE AND END CAP.

SEE NOTE 1.

4" DI SLG

4" DI SLG

EL 30.33 SEE NOTE 1

4" PVC SLG

CL 27.83

DESIGNED BY:

IF THIS BAR DOES NOT

MEASURE 1" THEN DRAWING

IS NOT TO FULL SCALE

DATE:

HAZEN NO.:

CONTRACT NO.:

DRAWING

NUMBER:

PROJECT

ENGINEER:

DRAWN BY:

CHECKED BY:

X

REV ISSUED FOR DATE BY

HAZEN AND SAWYER

2420 SOUTH LAKEMONT AVE., SUITE 325

ORLANDO, FLORIDA 32814

CITY OF DAYTONA BEACH

DAYTONA, FLORIDA

RALPH BRENNAN

WATER TREATMENT PLANT

LIME SLUDGE HANDLING IMPROVEMENTS

D. BIEBER

0 1/2" 1"

APRIL 2025

44263-006

Au to de sk

D oc s:

//4

-0

_R al ph B re nn an W

TP

Im pr ov em en ts /4

-0

-S

PS

-M .rv t 3/

/2

2:

:1

PM

M-10-01

J. CURTIS

W. MARSHALL

T. MORGAN

MECHANICAL

SLUDGE PUMPS

PLANS AND SECTION

3/8" = 1'-0"

MODIFIED PLAN

N

3/8" = 1'-0"

DEMOLITION PLAN

SECTION

3/8" = 1'-0" M-10-01

A

1 100% SUBMITTAL 3/25 DB

M-20-02

A_______

M-20-02

A_______

M-20-02

C_______ M-20-02

C_______

4" DI SLG

4" DI SLG

4" PVC SLG, SEE CIVIL

FOR CONTINUATION

8" PVC DR @ 1% SLOPE.

SEE SHEET C-02-01 FOR CONTINUATION

M-20-02

B_______

M-20-02

B_______

8" PVC DR @ 1% SLOPE.

SEE CIVIL FOR CONTINUATION

4' - 0"

BAY NO. 2

BAY NO. 1

BAY NO. 4

BAY NO. 3

4' - 0"

, TYP

1.

NOTES:

CONTRACTOR SHALL LABEL EACH PIPE

ENTERING ITS RESPECTIVE BAY WITH "BAY NO.

X," WHERE X CORRESPONDS TO THE SPECIFIC

BAY NUMBER. EACH BAY PIPE SHALL HAVE A

UNIQUE MARKING. TYPCIAL FOR ALL BAYS.

SEE NOTE 1

4" GV-DI, TYP

RESTRAINED MJ

SOLID SLEEVE

M-40-0700

M

IN

1'

1' - 6"

4" DI CROSS

W/BLIND FLG, TYP

SEE NOTE 1

4" DI 90° BEND, FLG,

TYP

M-20-02

B_______

M-20-02

B_______

DESIGNED BY:

IF THIS BAR DOES NOT

MEASURE 1" THEN DRAWING

IS NOT TO FULL SCALE

DATE:

HAZEN NO.:

CONTRACT NO.:

DRAWING

NUMBER:

PROJECT

ENGINEER:

DRAWN BY:

CHECKED BY:

X

REV ISSUED FOR DATE BY

HAZEN AND SAWYER

2420 SOUTH LAKEMONT AVE., SUITE 325

ORLANDO, FLORIDA 32814

CITY OF DAYTONA BEACH

DAYTONA, FLORIDA

RALPH BRENNAN

WATER TREATMENT PLANT

LIME SLUDGE HANDLING IMPROVEMENTS

D. BIEBER

0 1/2" 1"

APRIL 2025

44263-006

Au to de sk

D oc s:

//4

-0

_R al ph B re nn an W

TP

Im pr ov em en ts /4

-0

-S D

B- M

.rv t

4/

/2

8:

:5

AM

M-20-01

J. CURTIS

W. MARSHALL

T. MORGAN

MECHANICAL

SLUDGE DRYING BED

PLAN

3/16" = 1'-0"

OVERALL PLAN

N

4" DI SLG

CL 32.70

GRADE EL 31.00GRADE EL 31.00

EL 32.00

4" PVC SLG

CL 27.00

M-99-01

VERTICAL PIPE

SWAY BRACE

TYP

ADJUSTABLE SADDLE

M-40-0304

31' - 6"

CONCRETE MOUNTED RAILING

S-99-02

DIPVC

4"4"

4" DI 45° BEND, MJ

TYP

4" DI 90° BEND, FLG

TYP

4" TANSITION SLEVE,

MJ

5' - 0"

1' - 6"

EL 27.00

EL 32.00

4" GV, TYP

ADJUSTABLE SADDLE

M-40-0304

, TYP

4" DI SLG

CL 32.70

4" DI 90° BEND, FLG

TYP

8" PVC DR @ 1% SLOPE.

SEE CIVIL FOR CONTINUATION

EL 32.00

APPROX GRADE 31.00

TYP

WALL PENETRATION

TYPE 10 (PIPE)

M-40-0110

RESTRAINED MJ

SOLID SLEEVE

M-40-0700

2'

1/

2"

8" DI 45° BEND, MJ, TYP

DESIGNED BY:

IF THIS BAR DOES NOT

MEASURE 1" THEN DRAWING

IS NOT TO FULL SCALE

DATE:

HAZEN NO.:

CONTRACT NO.:

DRAWING

NUMBER:

PROJECT

ENGINEER:

DRAWN BY:

CHECKED BY:

X

REV ISSUED FOR DATE BY

HAZEN AND SAWYER

2420 SOUTH LAKEMONT AVE., SUITE 325

ORLANDO, FLORIDA 32814

CITY OF DAYTONA BEACH

DAYTONA, FLORIDA

RALPH BRENNAN

WATER TREATMENT PLANT

LIME SLUDGE HANDLING IMPROVEMENTS

D. BIEBER

0 1/2" 1"

APRIL 2025

44263-006

Au to de sk

D oc s:

//4

-0

_R al ph B re nn an W

TP

Im pr ov em en ts /4

-0

-S D

B- M

.rv t

4/

/2

8:

:5

AM

M-20-02

J. CURTIS

W. MARSHALL

T. MORGAN

MECHANICAL

SLUDGE DRYING BED

SECTION AND DETAILS

SECTION

3/8" = 1'-0" M-20-01

A

SECTION

3/8" = 1'-0" M-20-01

CSECTION

3/8" = 1'-0" M-20-01

4" PVC DR @ 1% SLOPE.

SEE CIVIL FOR

CONTINUATION

M-30-01

A_______

M-30-01

A_______

2'x2' SUMP

4" PVC DR, CL 26.87

3'

0"

3' - 2"

5'

2"

EL 28.50

2'x2' SUMP

4" PVC DR @ 1% SLOPE.

SEE CIVIL FOR

CONTINUATION

WALL PENETRATION

TYPE 4 (PIPE)

M-40-0104

GROUT FILL

EL 26.50

4" PVC DR

INV 26.70

DESIGNED BY:

IF THIS BAR DOES NOT

MEASURE 1" THEN DRAWING

IS NOT TO FULL SCALE

DATE:

HAZEN NO.:

CONTRACT NO.:

DRAWING

NUMBER:

PROJECT

ENGINEER:

DRAWN BY:

CHECKED BY:

REV ISSUED FOR DATE BY

HAZEN AND SAWYER

2420 SOUTH LAKEMONT AVE., SUITE 325

ORLANDO, FLORIDA 32814

CITY OF DAYTONA BEACH

DAYTONA, FLORIDA

RALPH BRENNAN

WATER TREATMENT PLANT

LIME SLUDGE HANDLING IMPROVEMENTS

F. HOLMES

0 1/2" 1"

APRIL 2025

44263-006

Au to de sk

D oc s:

//4

-0

_R al ph B re nn an W

TP

Im pr ov em en ts /4

-0

-P

BN

-M .rv t 4/

/2

9:

:2

AM

M-30-01

J. CURTIS

W. MARSHALL

T. MORGAN

MECHANICAL

DEWATERED LIME SLUDGE BUILDING

PLAN AND SECTION

3/8" = 1'-0"

PLAN SECTION

3/4" = 1'-0" M-30-01

A

N

COMPRESSIBLE LINK TYPE SEAL,

TWO REQUIRED FOR WALL

THICKNESS GREATER THAN 10"

PIPE, 42" MAX, SEE NOTE 1

WALL PIPE WITH INTEGRAL

WATERSTOP (PExPE)

STAINLESS STEEL BOLTS

NEW CONCRETE WALL

M-40-0111

CORE DRILLED OPENING

EXISTING CONCRETE WALL

1.

2.

NOTE:

THE USE OF COMPRESSIBLE TYPE

LINK SEALS ON PIPES LARGER THAN

42" REQUIRES ENGINEER'S APPROVAL.

PRIOR TO INSTALLATION OF LINK

SEAL, BURN BACK REINFORCEMENT

STEEL 1/2" MIN BELOW SURFACE AND

FILL VOIDS CREATED WITH EPOXY

RESIN BINDER.

NON SHRINK GROUT

NON SHRINK GROUT

RESTRAINED MJ SOLID SLEEVE

M-40-0700

NOTE:

CONTRACTOR MAY USE EBAA IRON 3800

MEGA-COUPLING IN LIEU OF COMPONENTS SHOWN. ALL

RODS AND RESTRAINING HARDWARE SHALL BE PAINTED

WITH TWO COATS COAL TAR (MIN 26 DRY MIL

THICKNESS) TNEMEC 46-465 HI-BUILD OR EQUAL.

PLAIN END PIPE

WEDGE TYPE

RESTRAINING GLAND, TYP

MJ SOLID SLEEVE

ADJUSTABLE SADDLE FLANGE SUPPORT

M-40-0304

C

A

VARIES ACCORDING TO PIPE SIZE

(APPROX 4 1/2" TOTAL ADJUSTMENT)

ADJUSTABLE SADDLE WITH

SUPPORT PIPE, MSS TYPE 38,

SEE SCHEDULE B (MSS TYPE

37, AS REQD), TYP

CARRIER PIPE, SEE SCHEDULE B

CONCRETE ANCHORS (D)

(4 REQD EA SUPPORT -

SEE SCHEDULE B)

1" NON-SHRINK GROUT

FLANGE SUPPORT

WITH ADJUSTABLE

SUPPORT PIPE

C

A

B

VA

R

IE

S

B

VERTICAL PIPE SWAY BRACE

1. ALL SUPPORTS AND FASTENERS SHALL BE 316 STAINLESS STEEL

NOTE:

(TYP)3"

1/2" ⌀ CONC

ANCHOR (TYP)

12" ⌀ BOLTS WITH

LOCK WASHER (TYP)

WALL

BENT FB 3X8 x 1 1/2 x

LENGTH REQUIRED

TYP

45°

O D

/2 +1

PI

PE

O R

F

LA

N G

E

(TYP)1 1/2"

PIPE OD + 6"

SCHEDULE B

PIPE SIZE A B C

4-12

14-16

18-20

24-48

2 1/2

7 1/2

1 1/2

2 1/2

3 1/2

5/8

5/8

5/8

3/4

3/4

DIA

D

ADJUSTABLE SADDLE (DIM IN INCHES)

WALL PIPE WITH INTEGRAL

WATERSTOP. DRILL AND TAP

FOR STUD BOLTS.

NEW CONCRETE WALL

NON-SHRINK GROUT

EXISTING CONCRETE WALL

PIPE

RJxPE OR MJxPE, SEE PIPE

SCHEDULE IN SPECIFICATIONS

FOR CONNECTING PIPE

M-40-0104

6"

HYDROPHILIC WATERSTOP

CENTERED IN WALL, CONTINUOUS

AROUND PERIMETER OF OPENING

M-40-0110

9" FOR PIPES 24" DIA AND LARGER

6" FOR PIPES 20" DIA AND SMALLER

6"

PIPE

EXISTING CONCRETE WALL

NEW CONCRETE WALL

WALL PIPE WITH INTEGRAL

WATERSTOP (FLxPE)

NON-SHRINK GROUT

HYDROPHILIC WATERSTOP

CENTERED IN WALL, CONTINUOUS

AROUND PERIMETER OF OPENING

DESIGNED BY:

IF THIS BAR DOES NOT

MEASURE 1" THEN DRAWING

IS NOT TO FULL SCALE

DATE:

HAZEN NO.:

CONTRACT NO.:

DRAWING

NUMBER:

PROJECT

ENGINEER:

DRAWN BY:

CHECKED BY:

REV ISSUED FOR DATE BY

HAZEN AND SAWYER

2420 SOUTH LAKEMONT AVE., SUITE 325

ORLANDO, FLORIDA 32814

CITY OF DAYTONA BEACH

DAYTONA, FLORIDA

RALPH BRENNAN

WATER TREATMENT PLANT

LIME SLUDGE HANDLING IMPROVEMENTS

F. HOLMES

0 1/2" 1"

APRIL 2025

44263-006

Au to de sk

D oc s:

//4

-0

_R al ph B re nn an W

TP

Im pr ov em en ts /4

-0

-P

BN

-M .rv t 4/

/2

9:

:2

AM

M-99-01

J. CURTIS

W. MARSHALL

T. MORGAN

MECHANICAL

STANDARD DETAILS - SHEET 1

DETAIL

NTS

1. ALL STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION

WITH THE MECHANICAL, CIVIL, ARCHITECTURAL, ELECTRICAL, HVAC,

PLUMBING AND SHOP DRAWINGS AND SPECIFICATIONS.

2. THE CONTRACTOR SHALL REVIEW AND VERIFY DIMENSIONS SHOWN

IN ALL PLANS AND REVIEW ALL FIELD CONDITIONS THAT MAY AFFECT

THE WORK DEPICTED ON THE DRAWINGS. SHOULD DISCREPANCIES

APPEAR, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IN

WRITING TO OBTAIN ENGINEER'S CLARIFICATION BEFORE

COMMENCING WITH THE WORK.

3. FOR ALL ITEMS EMBEDDED IN OR PASSING THROUGH CONCRETE,

THE CONTRACTOR SHALL INITIALLY REFER TO MECHANICAL, HVAC,

AND PLUMBING DRAWINGS FOR TYPE, SIZE, LOCATION, AND SPECIAL

INSTALLATION REQUIREMENTS FOR THESE ITEMS.

4. THE CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO

PROTECT EXISTING STRUCTURES FROM DAMAGE WHEN WORKING

IN AND AROUND EXISTING STRUCTURES PERFORMING WORK SUCH

AS DEMOLITION, FOUNDATION EXCAVATIONS, AND OTHERS.

5. SIZE AND LOCATION OF EQUIPMENT PADS AND ANCHOR BOLTS

SHALL BE PER EQUIPMENT MANUFACTURER'S REQUIREMENTS.

6. ANY EQUIPMENT THAT MAY INDUCE VIBRATION TO THE STRUCTURE

SHALL BE ADEQUATELY ISOLATED FROM THE STRUCTURE.

7. ALL DETAILS AND SECTIONS SHOWN ON THE DRAWINGS ARE

INTENDED TO BE TYPICAL AND SHALL BE CONSTRUED TO APPLY TO

ANY SIMILAR SITUATION ELSEWHERE ON THE PROJECT, EXCEPT

WHERE A DIFFERENT DETAIL IS SHOWN.

8. STANDARD DETAILS APPLY TO ALL SIMILAR SITUATIONS ON THE

PROJECT EXCEPT WHERE A DIFFERENT DETAIL IS SHOWN.

GENERAL CONDITIONS

BUILDING CODES AND REFERENCES:

1. 2023 FLORIDA BUILDING CODE (FBC), EIGHTH EDITION

2. REINFORCED CONCRETE:

WATER RETAINING ENVIRONMENTAL STRUCTURES: ACI 350-20

"CODE REQUIREMENTS FOR ENVIRONMENTAL ENGINEERING

CONCRETE STRUCTURES"

ALL OTHER STRUCTURES: ACI 318-19 "BUILDING CODE

REQUIREMENTS FOR STRUCTURAL CONCRETE"

3. MASONRY: TMS 402-13/ACI 530-13/ASCE 5-13 "BUILDING CODE

REQUIREMENTS FOR MASONRY STRUCTURES.

4. STRUCTURAL STEEL: AISC MANUAL OF STEEL CONSTRUCTION, 15TH

EDITION

5. ALUMINUM: ADM1-2020, ALUMINUM DESIGN MANUAL

6. LIVE LOADS:

-PROCESS RELATED STRUCTURES:

WALKWAYS, STAIRWAYS AND LANDINGS: 100 PSF

ELEVATED SLABS AT PROCESS AREAS: 200 PSF

SLABS ON GRADE 300 PSF

-BUILDINGS:

ROOF 20 PSF

STORAGE AREAS (HEAVY), ELECTRICAL ROOMS 300 PSF

STORAGE AREAS (LIGHT) 150 PSF

7. WIND DESIGN CRITERIA:

RISK CATEGORY III

ULTIMATE DESIGN WIND SPEED, V/ULT 148 MPH

NOMINAL DESIGN WIND SPEED, V/ASD 115 MPH

EXPOSURE CATEGORY C

ENCLOSURE CLASSIFICATION OPEN STRUCTURE

TORNADO WIND SPPED, VT 50 MPH

EFFECTIVE PLAN AREA, AE 12,450 SF

IS TORNADO WIND DESIGN EXEMPT YES, VT < 60 MPH

8. SNOW LOAD: N/A

9. SEISMIC DESIGN CRITERIA: N/A

DESIGN CRITERIA

FOUNDATION DESIGN:

1. ALLOWABLE BEARING PRESSURE FOR MAT SLAB AND FOOTINGS :

1,500 PSF

FOUNDATIONS

1. ALL MATERIALS AND METHODS OF CONSTRUCTION SHALL BE IN

ACCORDANCE WITH ACI 318 REQUIREMENTS.

2. ALL CONCRETE SHALL BE AIR-ENTRAINED WITH A MINIMUM OF 4,000

PSI COMPRESSIVE STRENGTH AT 28 DAYS UNLESS OTHERWISE NOTED.

3. WATER REDUCING AGENT SHALL BE IN ACCORDANCE WITH ASTM

C494.

4. ALL CONCRETE SURFACES EXPOSED TO AIR, UNLESS OTHERWISE

NOTED IN THE SPECIFICATIONS, SHALL BE TREATED WITH AN

APPROPRIATE CURING COMPOUND AS SOON AS FINISHING IS

COMPLETED OR FORMS ARE REMOVED.

5. ALL EXPOSED CORNERS SHALL HAVE A MINIMUM CHAMFER OF 3/4"

UNLESS OTHERWISE NOTED.

6. THE CONTRACTOR SHALL OBTAIN ENGINEER'S APPROVAL FOR THE

LOCATIONS OF CONSTRUCTION JOINTS THAT ARE NOT SHOWN ON THE

DRAWINGS.

CONCRETE (CAST-IN-PLACE)

1. REINFORCEMENT SHALL CONFORM TO ASTM A615, GRADE 60

REQUIREMENTS. WELDED WIRE FABRIC SHALL CONFORM TO ASTM

A1064 REQUIREMENTS. ALL ACCESSORIES SHALL BE IN

CONFORMANCE WITH ACI 315 REQUIREMENTS.

2. REINFORCING STEEL SHALL HAVE THE FOLLOWING CLEAR COVER

UNLESS OTHERWISE NOTED:

a. CONCRETE CAST AGAINST EARTH 3"

b. FORMED SURFACE IN CONTACT WITH SOIL, SEWAGE, WATER OR EXPOSED TO WEATHER 2"

3. LAP SPLICES SHALL BE AS SHOWN ON THE DRAWINGS. FOR LAP

SPLICES NOT SHOWN ON THE DRAWINGS, THE CONTRACTOR SHALL

OBTAIN ENGINEERS APPROVAL.

4. THE CONTRACTOR SHALL PREPARE PLACING DRAWINGS AND

SCHEDULES IN CONFORMANCE WITH ACI 315 REQUIREMENTS.

REINFORCING STEEL

1. ALUMINUM DESIGN, DETAILING, FABRICATION, AND ERECTION SHALL

CONFORM TO THE LATEST EDITION OF THE ALUMINUM DESIGN MANUAL.

2. ALUMINUM IN CONTACT WITH OR EMBEDDED IN CONCRETE OR

MASONRY SURFACES SHALL BE COATED WITH A HEAVY COATING OF

ALKALI RESISTANT BITUMINOUS PAINT.

3. ALL BOLTS USED IN CONNECTIONS WITH ALUMINUM MEMBERS SHALL

BE STAINLESS STEEL A316, UNLESS NOTED OTHERWISE.

4. ALL WELDING OF ALUMINUM STRUCTURES SHALL CONFORM TO

"STRUCTURAL WELDING CODE - ALUMINUM", AWS D1.2, LATEST EDITION.

ALUMINUM

1. FURNISH ALL LABOR, MATERIALS, EQUIPMENT AND INCIDENTALS

REQUIRED TO DESIGN, FABRICATE, DELIVER TO JOB SITE AND ERECT

THE PRE-ENGINEERED METAL BUILDING AS SHOWN ON THE CONTRACT

DOCUMENTS.

2. SUBMIT TO THE ENGINEER AS PROVIDED COMPLETE PLANS SHOWING

SUPERSTRUCTURE COLUMN LINES SET TO COORDINATE WITH

CONCRETE DIMENSIONS SHOWN. INDICATE ANCHOR BOLT SIZE AND

LOCATIONS AND FOUNDATION REACTIONS IN KIPS AT ALL COLUMNS.

FOUNDATION SIZE AND REINFORCEMENT FOR PRE-ENGINEERED

METAL BUILDING ARE PRELIMINARY AND ARE SUBJECT TO CHANGE

UNTIL FINAL REACTIONS ARE PROVIDED BY BUILDING MANUFACTURER

AND APPROVED BY THE ENGINEER OF RECORD.

3. SUBMIT LETTER AND CALCULATIONS SIGNED AND SEALED BY A

PROFESSIONAL ENGINEER REGISTERED IN THE STATE OF FLORIDA

CERTIFYING THAT THE STRUCTURAL FRAMING AND COVERING

PANELS PROPOSED MEET THE DESIGN CRITERIA.

4. PRIOR TO FOUNDATION CONSTRUCTION, PRE-ENGINEERED METAL

BUILDING SUBMITTAL MUST BE APPROVED. CONSTRUCTION DETAILS

MAY BE VARIED TO SUIT MANUFACTURER'S STANDARD DESIGN.

5. ALL BUILDING COLUMNS SHALL BE DESIGNED AS "PIN" CONNECTED.

COLUMN ENDS SHALL NOT TRANSFER MOMENTS TO FOUNDATION.

ANCHOR BOLTS SHALL BE DESIGNED BY THE BUILDING

MANUFACTURER AND FURNISHED BY THE CONTRACTOR.

6. SEE SPECIFICATION SECTION 13 34 19 "PRE-ENGINEERED METAL

BUILDING" FOR REQUIREMENT IN ADDITION TO THESE NOTES.

7. ALL PRIMARY STEEL SHALL BE HOT-DIPPED GALVANIZED.

PRE-ENGINEERED METAL BUILDINGS

& AND

@ AT

# NUMBER

ADDTL ADDITIONAL

AFF ABOVE FINISHED FLOOR

ALUM ALUMINUM

AEWS AUTOMATIC END WELDED STUD(S)

ALT ALTERNATE

APROX APPROXIMATE(LY)

BLD BUILDING

BM BEAM

BOT BOTTOM

CJ CONTROL JOINT

CL CENTER LINE

CLR CLEAR

CMU CONCRETE MASONRY UNIT

COL COLUMN

CONC CONCRETE

CONN CONNECTION

CONST JT CONSTRUCTION JOINT

CONT CONTINUOUS

DIA DIAMETER

DIM DIMENSION

DEG DEGREE(S)

DO DITTO

DWG DRAWING

DWL DOWEL(S)

(E) EXISTING

EA EACH

EF EACH FACE

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRICAL

EMBED EMBEDMENT

STRUCTURAL ABBREVIATIONS

EQ EQUAL

EW EACH WAY

EXIST EXISTING

EXP EXPANSION

FE FIRE EXTINGUISHER

FF FAR FACE, FINISHED FLOOR

FG FINISHED GRADE

FRP FIBER REINFORCED PLASTIC

FT FOOT

FTG FOOTING

FV FIELD VERIFY

GA GAGE

GALV GALVANIZED

HK HOOK

HORIZ HORIZONTAL

HSS HOLLOW STRUCTURAL SECTION

HP HIGH POINT

ID INSIDE DIAMETER

JT JOINT

LB(S) POUND(S)

LONG LONGITUDINAL

LP LOW POINT

MANUF MANUFACTURER

MATL MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MTL METAL

NO NUMBER

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OH OPPOSITE HAND

OPNG OPENING

PCS PIECES

PEMB PRE-ENGINEERED METAL BUILDING

PERP PERPENDICULAR

PL PLATE

PLF POUND PER LINEAR FOOT

PT PRESSURE TREATED

PROJ PROJECTION

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PVC POLYVINYL CHLORIDE

R RADIUS

REINF REINFORCING

REQD REQUIRED

RO ROUGH OPENING

SCHED SCHEDULE(D)

SIM SIMILAR

SJ SAWCUT JOINT

SMS SHEET METAL SCREW

SPECS SPECIFICATIONS

SQ SQUARE

SS STAINLESS STEEL

STD STANDARD

STL STEEL

T/ TOP OF

TB TIE BEAM

T&B TOP AND BOTTOM

THK THICK

THRU THROUGH

TOC TOP OF CONCRETE

TOS TOP OF STEEL

TYP TYPICAL

UNO UNLESS NOTED OTHERWISE

VERT VERTICAL

WT WEIGHT

WWF WELDED WIRE FABRIC

EARTH FILL

LEGEND

CONCRETE

UNDISTURBED EARTH EXISTING CONCRETE

COMPACTED GRANULAR FILL

DEMOLITION

GROUT OR SAND (AS NOTED)

STEEL

GRATING

PRECAST CONCRETE

1320 WILFRED DRIVE

ORLANDO, FL 32803

Ph: 407.219.4454 Wekiva Project No. 23-353

DESIGNED BY:

IF THIS BAR DOES NOT

MEASURE 1" THEN DRAWING

IS NOT TO FULL SCALE

DATE:

HAZEN NO.:

CONTRACT NO.:

DRAWING

NUMBER:

PROJECT

ENGINEER:

DRAWN BY:

CHECKED BY:

REV ISSUED FOR DATE BY

HAZEN AND SAWYER

2420 SOUTH LAKEMONT AVE., SUITE 325

ORLANDO, FLORIDA 32814

CITY OF DAYTONA BEACH

DAYTONA, FLORIDA

RALPH BRENNAN

WATER TREATMENT PLANT

LIME SLUDGE HANDLING IMPROVEMENTS

D. BIEBER

0 1/2" 1"

PRELIMINARY DRAWING

DO NOT USE FOR

CONSTRUCTION

APRIL 2025

44263-006

A u to d e s k D o c s /4

-0

R a lp h B re n n a n W

T P

I m p ro v e m e n ts /4

-0

-S D

B -S

.r v t

/9

/2

:1

:4

P M

S-00-01

J. MORRIS

W. MARSHALL

J. SOBCZAK

STRUCTURAL

GENERAL NOTES,

ABB…