LIFEBRIDGE_COMMUNITY_SVS_-_475_CLINTON_AVE_EXTERIOR_SECURITY_FENCE.pdf
PDF 335 KB Posted
- Solicitation number
- CGB038256
- Issued by
- Fairfield County, Connecticut
About this file
This is an Invitation to Bid (ITB) document issued by the City of Bridgeport, Connecticut Department of Public Purchases for security fence upgrades at LifeBridge Community Services Center located at 475 Clinton Avenue. The project involves procurement and installation of approximately 45 sections of commercial aluminum fencing in four-foot and six-foot heights with eight-foot wide panels, two walkway gates with security features, one electrified sliding gate at the driveway opening (minimum 21 feet long), and optional exit loop functionality in the existing driveway. All contractors must obtain necessary building permits and comply with state and local building codes. A mandatory preconstruction site visit is scheduled for Tuesday, May 6, 2025, at 10:30 am at 475 Clinton Avenue, with attendance required for all bidders to familiarize themselves with site conditions; an alternate date will be scheduled the following week for those unable to attend. Bid submissions are due Wednesday, June 4, 2025, by 2:00 pm via the City's OpenGov procurement portal or by hardcopy delivery to the Department of Public Purchases at 999 Broad Street, Bridgeport, Connecticut 06604, with submissions comprising one original, two copies, and one electronic copy via thumb drive. The project must be completed within 8 weeks of permit receipt, and bid pricing must remain valid for 120 days from the opening date.
Payment terms are Net 45 Days, and all services and materials are exempt from Connecticut state sales tax. A bid bond of 10 percent is required for bids of $50,000 or more, except for Minority Business Enterprise (MBE) certified firms, which must submit a bid bond for bids of $100,000 or more. The City actively encourages participation from MBE, Women Business Enterprises (WBE), and City-based businesses (CBB), with current certification documentation required at the time of submission to receive consideration. Contractors must demonstrate recent successful completion of similar projects with references, relevant municipal experience, and assigned staff with necessary professional skills and facilities. Contract award requirements include valid SAM, DUNS, Connecticut, and Federal Tax ID numbers prior to commencement of work. Contractors must provide certificates of insurance naming the City as additional insured with 30 days' notice for cancellation, adhere to OSHA safety standards, provide a one-year warranty on all work and materials, and comply with Davis-Bacon wage rates. The City reserves the right to reject any or all bids and to make awards based on factors beyond lowest price, including contractor qualifications, compliance capability, and overall project performance capacity. Questions may be submitted through the OpenGov portal with a cutoff date of May 16, 2025, at 5:00 pm, with answers posted by May 23, 2025.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION TO BID
CGB038256
LIFEBRIDGE COMMUNITY SVS - 475 CLINTON AVE
EXTERIOR SECURITY FENCE
CITY OF BRIDGEPORT
DEPARTMENT OF PUBLIC PURCHASES
999 BROAD STREET
BRIDGEPORT CT 06604
Submission Deadline:
Wednesday, June 4, 2025 by 2:00 pm
Table Of Contents
1. Introduction
2. Bid Information
3. Statement of Work
4. Pricing
5. Submission Deadlines
6. Terms and Conditions
7. Vendor Questionnaire
Attachments:
A - Exhibit_A-_Scope_of_Work
B - Wage Rates Life Bridge
C - 475 Clinton Ave. Map property line
D - 7 DEMO_Construction Contract_CDBG Program 12.15.2021
1. Introduction
The City of Bridgeport seeks bids for LIFEBRIDGE COMMUNITY SVS - 475 CLINTON
AVE EXTERIOR SECURITY FENCE.
The requirements of this bid are outlined in greater detail under Bid Information Section.
The selected awardee must meet all municipal, State and Federal practices and requirements.
Please note the City of Bridgeport encourages Minority business enterprises (MBE), Women business enterprises (WBE) and City-based businesses (CBB) to submit proposals. MBE, WBE or CBB State and/or City certification(s) showing the vendor’s current M/WBE and/or CBB status must be included as part of the proposal package at the time of submission for such status to be considered. For details, please see City Ordinance 3.12.130D
1.1. City Background
Bridgeport, the most populous city in Connecticut and the fifth-most populous in New England, is situated in eastern Fairfield County at the mouth of the Pequonnock River on Long Island
Sound. With a population of 148,654 in 2020, it is 60 miles from Manhattan and 40 miles from
The Bronx, forming part of the New York metropolitan area. The city borders Trumbull to the north, Fairfield to the west, and Stratford to the east. Bridgeport is a significant part of the
Greater Bridgeport Planning Region and the Bridgeport-Stamford-Norwalk-Danbury metropolitan statistical area, the second largest in Connecticut.
Since the early 21st century, Bridgeport has seen extensive redevelopment in its downtown and other neighborhoods. Bridgeport is home to several educational institutions, including the
University of Bridgeport, Housatonic Community College, Paier College, and part of Sacred
Heart University, as well as the state's only zoo, Connecticut's Beardsley Zoo. The city is also nicknamed "Park City" for its 35 public parks, covering 1,300 acres, including two large parks.
Despite not being headquartered in the city, over a dozen Fortune 500 companies are based in the metropolitan area shared with Stamford.
Bridgeport is a culturally vibrant city with three museums, numerous parks, and significant venues like Seaside Park, the Total Mortgage Arena, and the Hartford HealthCare Amphitheater.
The Barnum Museum and Connecticut's Beardsley Zoo are notable attractions, enhancing the city's cultural and recreational appeal. Recognized for its diversity, Bridgeport is consistently ranked among the 25 most ethnically and culturally diverse cities in the United States.
2. Bid Information
The Invitation to Bid (ITB) is to obtain pricing information for LIFEBRIDGE COMMUNITY
SVS - 475 CLINTON AVE EXTERIOR SECURITY FENCE.
Any brand or trade names used by the City of Bridgeport in bid specifications are for the purpose of describing and establishing the standard of quality, performance and characteristics desired and are not intended to limit or restrict competition. Bidders may submit bids for equivalent products to those designated except where “No Substitutes” are indicated on the attached “price” list. Bidders must clearly identify all proposed substitutions, brand and/or unit of measure must be declared (with line item # referenced) on a separate sheet in the procurement portal, OpenGov. All of Brand substitutions shall be subject to purchaser’s approval. The City of
Bridgeport reserves the right to reject any bid when the product information submitted with the bid is incomplete.
Mandatory Walk-Thru Tuesday, May 6, 2025 @ 10:30 am All bidders are required to participate in the scheduled site visit of the property located at – 475 Clinton Ave., Bridgeport, CT for a tour of the areas and to make themselves familiar with the conditions at the site and to determine the scope of the job, as no allowances will be made for errors in judgment or omissions. It will be the responsibility of the Contractor to be sufficiently familiar with the site.
If you are unable to attend this scheduled meeting, please contact Ann Binkley at Ann.Binkley@Bridgeportct.gov by Monday, May 5, 2025 and 1 alternate date will be scheduled for the following week.
Bid price submitted shall be firm fixed and valid through one year.
For general information please contact Ann Binkley for any technical questions ann.binkley@bridgeportct.gov. All inquiries regarding this bid must be presented in writing and may be posted directly on the procurement portal, OpenGov. The cut-off date for questions and answers is 5:00pm on [Day, Month, Date, Year].
No work or deliveries shall be performed under the contract award until the purchase order has been issued by the purchasing department.
3. Statement of Work
3.1. Project Description
Please see Exhibit A- Scope of Work for complete project description.
3.2. Qualification Expectations
Eligible respondents must be able to demonstrate the following:
3.2.1 Demonstrated experience with projects like this project. To be qualified, the proposed project awardee for this project must have recently and successfully completed recent projects with similar scope and complexity and shall provide references for those projects.
3.2.2 Demonstrated experience with municipalities like the City of Bridgeport. Any additional information which demonstrates the respondent’s ability to perform the required work not already mentioned herein, must be provided.
3.2.3 Assigned Staff and office support must have the necessary experience, organization, and professional skills and facilities to successfully perform the required services described in the scope of work in this RFP. Description of the firm’s composition with identification of roles of all anticipated employees and/or subcontractors, if any. Resumes of key personnel are required for all key personnel.
mailto:Ann.Binkley@Bridgeportct.gov
3.2.4 No pending criminal litigation or criminal charges against the firm, Principal
Owners, Partners, Corporate Officers, or management Personnel.
3.3. Schedule, Timeline, and Milestone Tracking
The project must be completed within 8 weeks upon receipt of permit unless otherwise confirmed with the Construction Manager.
3.4. Pricing
All pricing must be valid for no less than one hundred and twenty (120) days from the opening date. Services and materials for this project are exempt from State of Connecticut sales tax.
3.5. Payment Terms
Payment terms are Net 45 Days.
4. Pricing
Line Item Description Quantity Unit of
Measure Unit Cost Total
1 Materials 1 each
2 Labor 1 each
TOTAL
ALTERNATES (SCOPE OF WORK 11, 12, & 13)
Line Item Description Quantity Unit of
Measure Unit Cost Total
1 Keypad Opening 1 each
2 Remote Control Opening 1 each
3 Keypad Opening & Remote Control
Opening 1 each
TOTAL
5. Submission Deadlines
5.1. Contacting the City of Bridgeport
The exclusive means by which all prospective respondents may obtain ITB packages, direct inquires, request and receive addenda and supplemental information, and submit proposals shall be through the City of Bridgeport’s bidding platform.
The City of Bridgeport has made it possible for vendors to view our solicitations, download bid packages and ask questions, free of charge.
Instructions to do so are as follows:
1. Go to the procurement portal, OpenGov
2. Click on any bid you see. It will take you that bid’s page.
3. On the right-hand side of the page, click on Register now for free!
4. After you register, you'll be able to view/download or ask questions on any bid you have interest in.
If you have any trouble registering on the procurement portal, please email OpenGov at procurement-support@opengov.com
Addenda Notification: Respondents are required to register on the procurement portal, OpenGov. Once the respondent has completed registration, they will receive addenda notifications in their email. Ultimately, it is the sole responsibility of each respondent to periodically check the site for any addenda.
General Information: All inquiries regarding this bid must be presented in writing and may be posted directly on the procurement portal, OpenGov. Questions must be posted and cut-off date for questions is May 16, 2035 at 5pm and answers will be posted no later than 5:00pm on
5/23/25.
5.2. Submission Instructions
Submissions are encouraged to be made electronically through the OpenGov site at https://procurement.opengov.com/portal/bridgeportct no later than 2:00 pm on Wednesday, June
4, 2025.
Submissions may also be made as follows:
ONE (1) ORIGINAL, TWO (2) COPIES AND ONE (1) ELECTRONIC VIA THUMBDRIVE
MUST BE SUBMITTED.
Sealed submissions must be received and time-stamped by the Department of Public Purchases prior to RFQ closing time. No submission received after closing time will be considered. The opening will be in the City of Bridgeport Department of Public Purchases’ Conference Room. To ensure proper handling and avoid misdirected delivery, please mark your BID envelope as follows:
https://procurement.opengov.com/portal/bridgeportct
CGB038256 — BUILDING RENOVATIONS - LIFEBRIDGE COMMUNITY SVS 475
CLINTON AVENUE
Submissions to:
Ann Binkley City of Bridgeport Department of Public Purchases 2nd floor, 999 Broad Street Bridgeport, CT 06604
BID submissions are due:
Wednesday, June 4, 2025, at 2:00 pm Eastern Standard Time (EST)
All firms are obligated to become familiar with such questions and answers and to submit or revise their proposals accordingly. The City of Bridgeport assumes no responsibility for a firm’s failure to read questions or answers and to revise their responses accordingly.
Late Submissions: City will not assume responsibility if a submission is misdirected, or its delivery is delayed. It shall be the sole responsibility of the submitter to pay for any type of delivery service charge, and to see that the Office of the Purchasing Agent receives his/her submission on time. The clock used shall be the Purchasing Agent’s official date and time stamp clock. The City does not assume financial responsibility for late deliveries by the U.S. Postal
System or any other delivery service.
5.3. Compliance
Certificates of Insurance: Certificates of insurance will be required from the awarded contractor prior to the commencement of any work and shall be furnished to the Department of
Public Purchases, Margaret E. Morton Government Center, Second Floor, 999 Broad Street, Bridgeport, Connecticut 06604 and must be shown to the City of Bridgeport as an additional insured with thirty (30) days’ notice for cancellation or non-renewal of policy. A copy of the endorsement insurance will also be required for this project.
No Conflicts| Disclosure: the awarded contractor must accurately complete and submit the No
Conflicts/Disclosure Form when it receives a Notice of Intent to Award. Failure to submit the No
Conflicts within three (3) business days of receipt of the Notice of Intent may result in the loss of the award.
Non-Collusion Affidavit: all bidders must accurately complete and submit non-collusion affidavits with all bids or bids will be considered non-responsive.
Addendums: all bidders shall check the procurement portal regularly to see if any addendums are issued.
Contract Award Requirements: the contract award will require that the successful will require that the successful vendor have a valid SAM, DUNS, CT, and Federal Tax ID numbers prior to commencing work.
Late Submissions: The City of Bridgeport will not assume responsibility if a submission is misdirected, or its delivery is delayed. The city will not accept late submission. It shall be the sole responsibility of the submitter to pay for any type of delivery service charge, and to see that the Office of the Purchasing Agent receives his/her submission on time. The clock used shall be the Purchasing Agent’s official date and time stamp clock. The City does not assume financial responsibility for late deliveries by the U.S. Postal System or any other delivery service.
Expenses: The City shall not be responsible for and/or shall not pay any costs associated with the preparation, submission, or presentation of any submission, or costs incurred by the responding firms during the interview and negotiations phase of the solicitation process
Information and Materials: Any information or materials submitted to this ITB shall become the property of the City of Bridgeport and will not be returned. All submitted materials will be available for public review.
Dates: Please keep in mind dates are estimates only and are subject to change.
5.4. Reservation of Rights
This solicitation is for an “Invitation to Bid (ITB) only”. This invitation to bid is not to be construed as a specific proposal or an offer to buy any products or services. Notwithstanding anything else herein to the contrary, the City expressly reserves all rights in its sole discretion and in the best interests of the City at any time prior to the selection of a preferred respondent and purchase order:
Bid Rejection: The City of Bridgeport reserves the right to reject any and all bids in whole or in part or to accept any bid, in its sole discretion if doing so deemed to be in the best interest of the
City of Bridgeport. This includes the right to reject any or all bids or to decline to make an award. Further, the City of Bridgeport reserves the right to make an award to more than one bidder or make awards not based solely on low bid when time is of the essence.
MSDS: The City of Bridgeport may request MSDS (Material Safety Data Sheets) or additional product information and literature or samples on any brands or products proposed as equivalents to those listed herein prior to award or to be included with shipment.
Tax Delinquency: The City of Bridgeport reserves the right to ensure bidders are not delinquent on any City real estate and personal property taxes, ate the time of bid opening.
Purchase Order - Contract Award: The City of Bridgeport reserves the right to award a purchase order to the responsible bidder whose bid, conforming to the solicitation, will be most advantageous to the City of Bridgeport in terms of cost. Other factors such as lead time, equipment, availability and other factors specified in this solicitation may be considered.
Bid Dates: The City of Bridgeport reserves the right to modify any dates other terms of the ITB upon posting notice.
Liability: the City of Bridgeport is not liable to any Respondent for damages of any type, however arising.
5.5. Additional Bid Requirements
Title: vendors are prohibited from assigning, transferring, conveying, subletting, or otherwise disposing of the ultimate contract award or its rights, title or interest therein or its power to execute such agreement to any other person, company or corporation without the prior consent and approval in writing by the City.
Taxes: bidders should not include any taxes in their quotation for which the city is not liable. The City of Bridgeport will issue tax-exempt certificates covering the work upon request.
Minority and Buy Local: The City of Bridgeport Minority and Buy Local Program Ord.
3.12.130 E, may be applicable to this project.
Minority Business Enterprise (MBE) and, or as a City Based Business (CBB): In conjunction with this invitation, certifications of the vendors current MBE and, or CBB status must be included as part of the bid package at the time of the bid submission. Consistent with the terms of City Ordinance 3.12.130 no submission either MBE or CBB certification will be accepted when such certifications(s) is, are not submitted as part of the bid package at the time of bid submission. For MBE | CBB certification information, please contact Mr. Jason
Chandersingh, Special Project Coordinator, Small & Minority Business Resource Center at (203)
576-7110, jason.chandersingh@bridgeportct.gov
6. Terms and Conditions
6.1. Terms and Conditions
All City of Bridgeport contracture terms, conditions, and requirements apply.
6.2. Payment Terms
Detail the payment schedule and any conditions for payment.
6.3. Warranty and Support
Specify any warranty and support requirements.
6.4. Openness of Procurement Process
Written responses, other discussions, correspondence, and all other pertinent records shall be handled as public records in compliance with State and Federal open records statutes and regulations.
6.5. Errors and Omissions
mailto:jason.chandersingh@bridgeportct.gov
Once a response is submitted, the City of Bridgeport may consider requests by any contractor to correct errors or omissions but shall retain sole discretionary authority to determine the outcome of such a request.
6.6. Collusion
By offering a response to this ITB the supplier certifies that no attempt has been made or will be made by the consultant to induce any other person or firm to submit or not to submit a proposal for the purpose of restricting competition. All persons interested in this project, principal or principals being named therein, and no other person have an interest in this project or in the
Agreement which they may participate in. No person or agency has been employed or retained to solicit or secure this Agreement upon an agreement or understanding for a commission, percentage, brokerage, or contingent fee, excepting legitimate employees or established commercial agencies maintained by the consultant for the purpose of doing business. All firms interested in this project (including the firm's employees, representatives, agents, lobbyists attorneys and subconsultants) will refrain, under penalty of disqualification, from direct or indirect contact for the purpose of influencing the selection or creating bias in the selection process with any person who may play a part in the selection process, including the evaluation panel and other administrative staff. The policy is intended to create a level playing field for all potential firms; assure that contract decisions are made in public and to protect the integrity of the selection process.
6.7. Suspension and Debarment
The City will not participate in contracts with parties that have been debarred, suspended or excluded from Federal assistance programs per 2 CFR part 180 and part 1532 and 40 CFR part
31.35. Further, the respondent is required to verify that the respondent, or its principals, as defined at 49 CFR 19.995, or affiliates, as defined at 49 CFR 29.905, are excluded or disqualified as defined at 49 CFR 29.40 and 29.945
The respondent is required to comply with 49 CFR 29, Subpart C and must include the requirement to comply with 49 CFR 29, Subpart C in any lower-tier covered transaction it participates in.
By signing and submitting its bid or proposal, the respondent or proposer certifies as follows:
The certification in this clause is a material representation of fact relied upon by the City if it is later determined that the respondent or proposer knowingly rendered an erroneous certification, in addition to remedies available to the City the Federal Government may pursue available remedies, including but not limited to suspension and/or debarment. The respondent or proposer agrees to comply with the requirements of 49 CFR 29, Subpart C while this offer is valid and throughout the period of any contract that may arise from this offer. The respondent or proposer further agrees to include a provision requiring such compliance in its lower-tier covered transactions.
7. Vendor Questionnaire
1. Federal I.D. Number or Social Security Number:*
*Response required
2. Confirmation*
Pursuant to and in compliance with your Invitation To Bid relating thereto, the submitter states that he has examined the Contract Documents and the site of the work, and that he understands the purport and magnitude of the work intended, and the undersigned hereby offers to furnish all plant, materials, supplies, equipment, labor, and other facilities and things necessary or proper for or incidental to, the proper construction of the work, and to construct the said work in strict accordance with the Contract Documents and such detailed directions, plans, and drawings as may be furnished from time to time during the progress of construction by the Engineer at the following unit and lump sum prices which prices include all incidental work, viz.
☐ Please confirm
*Response required
3. Contractor's License Number*
*Response required
4. BID BOND: *
Bidder must Include with the submitted bid, a CURRENT CERTIFED ten (10%) percent bid bond or a certified check made payable to the City of Bridgeport with their bid submission if the bid is $50,000.00 or more, except for bids from MBE’s, for which a bid bond is required on bids that are $100,000 or more. Bid bonds must reference the current project. Certification showing the vendor’s current MBE status must be included as part of the submission package at the time of submission for such status to be considered.
*Response required
5. Contractor's Certification of Surety*
Please download the below documents, complete, and upload.
• Contractor's_Certification_...
*Response required
6. Contractor's Designation of Compliance Officer*
Please download the below documents, complete, and upload.
• Contractor's_Designation_of...
*Response required
7. Contractor's Good Standing Certification*
Please download the below documents, complete, and upload.
• Contractor's_Good_Standing_...
*Response required https://government-project.s3.us-west-2.amazonaws.com/115403/e5aa1a6f-6b99-4f8f-af4f-c380ae23d501_Contractor%27s_Certification_of_Surety.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4B74YQGMJ%2F20250428%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250428T172238Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEOH%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJGMEQCIDa3Cxb7YOTpVoQdIG1LdgfFF9LKw5JovusgUvql8BCCAiA%2BtZZj7rBY1uAo6qmFgGS341JbLVr8stNJwtW3DFCqOSqDBQh6EAIaDDg5MjM2NDY4NzY3MiIMotbiGPCm80sS%2FLP1KuAEZJt41MCd8xnpnw3G4pNRE55JIP6oCF2bnUp2oVDAMahEP7Vliuq4mrdjZpWDWf2QXWwC4sw%2BKJaqCfqedxAhQlIS3Tw1jYyTp20pHAsBxvwcbOnoug%2F1jBGJ8SuvDP0FSV9li2MnQ7O6OJR8UvSCvN4HzyO7mAbou3n8lTrJMKnEqqPHXiOwTTUYcbWrU4B%2FVJFBi%2Fvqo3ZZw%2Bk7LfDMgNaHPDuMvQwTWkDXGrbAWbb%2FnifQpHjvKSgjoqoRgzc2FvQ0NHSJhteIdJWUk1k8MXmR%2Fjix717klZspQzOu3kWR%2BtWhN8g6A1y2PV3p813fL78Ijk%2BFDPrp2Q8CZly4HT6gMKJjuYVtiqW3emn%2FqZQqhkCXAB3%2FxHs2Pg1fYDcS3a3wbZduRMxi3OuoyQHw4Z3YphZr65jI6sBS1Cidm%2FwYo6t%2BzfWyix5A1oKseG4CygOUQQSyoPMjGfzB7AKJtL%2BQRuiZ36vQznFfajPnQvDfIFm0TXNExuA0VR%2BG0UOHL5NlhExLHpMAWTbHXUWiL9ANBZzejM8%2FFtMH6Sx50Q7XX6SaV25Byql%2FDnYBfFkiaMLnqcsJPzLJMQoaR2JrkU3BzzOoTT2qfg7W7lmsbscbSsJZBmTOUl80P%2BO7Cgk1zKgNFOmCendnYyOzpa%2F54cupJMctPMk4XlNUG%2BmPCmwOCQBkL8hnMOmlrkvMTWIxMVA99EA%2Fhn2%2Fw7jBFZ9iWGuL77IozT7N1p6F8HojK86Jgk29qDpWMKgSTC0imxbkKD1%2BtG0Ivv9VmlHBn3kWmZA42sykaQeBSo2UzTq3orgw2Ny%2BwAY6nAF6PK4Qqi8qxzYb60nWuyHabHyANwgyFssutvkPF42LK%2B2WSfb2nBjYRxmygnTL5vNavgz%2FQDpqaAvWuqeMKPmQcPHK0KbAXmdQPv9L834BerYvza8UVzJyaGtMrZxcBDP6ILPpbNWjVohg0V1sZ9yOrI8mvXfpWedPQoOmccx8adaFAb%2B80OtbPesBf7yT3X2iFMdNpoiOSyeB1Sk%3D&X-Amz-Signature=12409ed56ea1564986b4497e8db2716ee9fc164c4a9a571299caa6b88701e319&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Contractor%27s_Certification_of_Surety.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/115403/75efbd30-4945-4f69-a730-84ce2633da7b_Contractor%27s_Designation_of_Compliance_Officer.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4B74YQGMJ%2F20250428%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250428T172238Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEOH%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJGMEQCIDa3Cxb7YOTpVoQdIG1LdgfFF9LKw5JovusgUvql8BCCAiA%2BtZZj7rBY1uAo6qmFgGS341JbLVr8stNJwtW3DFCqOSqDBQh6EAIaDDg5MjM2NDY4NzY3MiIMotbiGPCm80sS%2FLP1KuAEZJt41MCd8xnpnw3G4pNRE55JIP6oCF2bnUp2oVDAMahEP7Vliuq4mrdjZpWDWf2QXWwC4sw%2BKJaqCfqedxAhQlIS3Tw1jYyTp20pHAsBxvwcbOnoug%2F1jBGJ8SuvDP0FSV9li2MnQ7O6OJR8UvSCvN4HzyO7mAbou3n8lTrJMKnEqqPHXiOwTTUYcbWrU4B%2FVJFBi%2Fvqo3ZZw%2Bk7LfDMgNaHPDuMvQwTWkDXGrbAWbb%2FnifQpHjvKSgjoqoRgzc2FvQ0NHSJhteIdJWUk1k8MXmR%2Fjix717klZspQzOu3kWR%2BtWhN8g6A1y2PV3p813fL78Ijk%2BFDPrp2Q8CZly4HT6gMKJjuYVtiqW3emn%2FqZQqhkCXAB3%2FxHs2Pg1fYDcS3a3wbZduRMxi3OuoyQHw4Z3YphZr65jI6sBS1Cidm%2FwYo6t%2BzfWyix5A1oKseG4CygOUQQSyoPMjGfzB7AKJtL%2BQRuiZ36vQznFfajPnQvDfIFm0TXNExuA0VR%2BG0UOHL5NlhExLHpMAWTbHXUWiL9ANBZzejM8%2FFtMH6Sx50Q7XX6SaV25Byql%2FDnYBfFkiaMLnqcsJPzLJMQoaR2JrkU3BzzOoTT2qfg7W7lmsbscbSsJZBmTOUl80P%2BO7Cgk1zKgNFOmCendnYyOzpa%2F54cupJMctPMk4XlNUG%2BmPCmwOCQBkL8hnMOmlrkvMTWIxMVA99EA%2Fhn2%2Fw7jBFZ9iWGuL77IozT7N1p6F8HojK86Jgk29qDpWMKgSTC0imxbkKD1%2BtG0Ivv9VmlHBn3kWmZA42sykaQeBSo2UzTq3orgw2Ny%2BwAY6nAF6PK4Qqi8qxzYb60nWuyHabHyANwgyFssutvkPF42LK%2B2WSfb2nBjYRxmygnTL5vNavgz%2FQDpqaAvWuqeMKPmQcPHK0KbAXmdQPv9L834BerYvza8UVzJyaGtMrZxcBDP6ILPpbNWjVohg0V1sZ9yOrI8mvXfpWedPQoOmccx8adaFAb%2B80OtbPesBf7yT3X2iFMdNpoiOSyeB1Sk%3D&X-Amz-Signature=66701c77548970261a8703cc14fa8176b2313ca4c80b552cfb8463ae7867cba8&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Contractor%27s_Designation_of_Compliance_Officer.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/115403/8d9bf061-767f-4716-a5fe-0d8d8ec81783_Contractor%27s_Good_Standing_Certification.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4B74YQGMJ%2F20250428%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250428T172238Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEOH%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJGMEQCIDa3Cxb7YOTpVoQdIG1LdgfFF9LKw5JovusgUvql8BCCAiA%2BtZZj7rBY1uAo6qmFgGS341JbLVr8stNJwtW3DFCqOSqDBQh6EAIaDDg5MjM2NDY4NzY3MiIMotbiGPCm80sS%2FLP1KuAEZJt41MCd8xnpnw3G4pNRE55JIP6oCF2bnUp2oVDAMahEP7Vliuq4mrdjZpWDWf2QXWwC4sw%2BKJaqCfqedxAhQlIS3Tw1jYyTp20pHAsBxvwcbOnoug%2F1jBGJ8SuvDP0FSV9li2MnQ7O6OJR8UvSCvN4HzyO7mAbou3n8lTrJMKnEqqPHXiOwTTUYcbWrU4B%2FVJFBi%2Fvqo3ZZw%2Bk7LfDMgNaHPDuMvQwTWkDXGrbAWbb%2FnifQpHjvKSgjoqoRgzc2FvQ0NHSJhteIdJWUk1k8MXmR%2Fjix717klZspQzOu3kWR%2BtWhN8g6A1y2PV3p813fL78Ijk%2BFDPrp2Q8CZly4HT6gMKJjuYVtiqW3emn%2FqZQqhkCXAB3%2FxHs2Pg1fYDcS3a3wbZduRMxi3OuoyQHw4Z3YphZr65jI6sBS1Cidm%2FwYo6t%2BzfWyix5A1oKseG4CygOUQQSyoPMjGfzB7AKJtL%2BQRuiZ36vQznFfajPnQvDfIFm0TXNExuA0VR%2BG0UOHL5NlhExLHpMAWTbHXUWiL9ANBZzejM8%2FFtMH6Sx50Q7XX6SaV25Byql%2FDnYBfFkiaMLnqcsJPzLJMQoaR2JrkU3BzzOoTT2qfg7W7lmsbscbSsJZBmTOUl80P%2BO7Cgk1zKgNFOmCendnYyOzpa%2F54cupJMctPMk4XlNUG%2BmPCmwOCQBkL8hnMOmlrkvMTWIxMVA99EA%2Fhn2%2Fw7jBFZ9iWGuL77IozT7N1p6F8HojK86Jgk29qDpWMKgSTC0imxbkKD1%2BtG0Ivv9VmlHBn3kWmZA42sykaQeBSo2UzTq3orgw2Ny%2BwAY6nAF6PK4Qqi8qxzYb60nWuyHabHyANwgyFssutvkPF42LK%2B2WSfb2nBjYRxmygnTL5vNavgz%2FQDpqaAvWuqeMKPmQcPHK0KbAXmdQPv9L834BerYvza8UVzJyaGtMrZxcBDP6ILPpbNWjVohg0V1sZ9yOrI8mvXfpWedPQoOmccx8adaFAb%2B80OtbPesBf7yT3X2iFMdNpoiOSyeB1Sk%3D&X-Amz-Signature=793e51ad05aaf541698ef5e0599109ed4d20b4f3dfa1bbac1cb29fd73aca4262&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Contractor%27s_Good_Standing_Certification.pdf%22&x-id=GetObject
8. Contractor's MWBE Utilization Form*
Please download the below documents, complete, and upload.
• Contractor's_MWBE_Utilizati...
*Response required
9. Mandatory Good Faith Efforts *
Please download the below documents, complete, and upload.
• MANDATORY_GOOD_FAITH_EFFORT...
*Response required
10. Equal Opportunity Policy Statement*
Please download the below documents, complete, and upload.
• Equal_Opportunity_Policy_St...
*Response required
11. No Conflicts-Disclosure Form*
Please download the below documents, complete, and upload.
• No_Conflicts-Disclosure_For...
*Response required https://government-project.s3.us-west-2.amazonaws.com/115403/a2e401a8-0a6b-4dee-8b6c-a19d3aab26eb_Contractor%27s_MWBE_Utilization_Form.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4B74YQGMJ%2F20250428%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250428T172238Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEOH%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJGMEQCIDa3Cxb7YOTpVoQdIG1LdgfFF9LKw5JovusgUvql8BCCAiA%2BtZZj7rBY1uAo6qmFgGS341JbLVr8stNJwtW3DFCqOSqDBQh6EAIaDDg5MjM2NDY4NzY3MiIMotbiGPCm80sS%2FLP1KuAEZJt41MCd8xnpnw3G4pNRE55JIP6oCF2bnUp2oVDAMahEP7Vliuq4mrdjZpWDWf2QXWwC4sw%2BKJaqCfqedxAhQlIS3Tw1jYyTp20pHAsBxvwcbOnoug%2F1jBGJ8SuvDP0FSV9li2MnQ7O6OJR8UvSCvN4HzyO7mAbou3n8lTrJMKnEqqPHXiOwTTUYcbWrU4B%2FVJFBi%2Fvqo3ZZw%2Bk7LfDMgNaHPDuMvQwTWkDXGrbAWbb%2FnifQpHjvKSgjoqoRgzc2FvQ0NHSJhteIdJWUk1k8MXmR%2Fjix717klZspQzOu3kWR%2BtWhN8g6A1y2PV3p813fL78Ijk%2BFDPrp2Q8CZly4HT6gMKJjuYVtiqW3emn%2FqZQqhkCXAB3%2FxHs2Pg1fYDcS3a3wbZduRMxi3OuoyQHw4Z3YphZr65jI6sBS1Cidm%2FwYo6t%2BzfWyix5A1oKseG4CygOUQQSyoPMjGfzB7AKJtL%2BQRuiZ36vQznFfajPnQvDfIFm0TXNExuA0VR%2BG0UOHL5NlhExLHpMAWTbHXUWiL9ANBZzejM8%2FFtMH6Sx50Q7XX6SaV25Byql%2FDnYBfFkiaMLnqcsJPzLJMQoaR2JrkU3BzzOoTT2qfg7W7lmsbscbSsJZBmTOUl80P%2BO7Cgk1zKgNFOmCendnYyOzpa%2F54cupJMctPMk4XlNUG%2BmPCmwOCQBkL8hnMOmlrkvMTWIxMVA99EA%2Fhn2%2Fw7jBFZ9iWGuL77IozT7N1p6F8HojK86Jgk29qDpWMKgSTC0imxbkKD1%2BtG0Ivv9VmlHBn3kWmZA42sykaQeBSo2UzTq3orgw2Ny%2BwAY6nAF6PK4Qqi8qxzYb60nWuyHabHyANwgyFssutvkPF42LK%2B2WSfb2nBjYRxmygnTL5vNavgz%2FQDpqaAvWuqeMKPmQcPHK0KbAXmdQPv9L834BerYvza8UVzJyaGtMrZxcBDP6ILPpbNWjVohg0V1sZ9yOrI8mvXfpWedPQoOmccx8adaFAb%2B80OtbPesBf7yT3X2iFMdNpoiOSyeB1Sk%3D&X-Amz-Signature=208b339c44659631ea19e555471aeeafd986846158aeb0c6bff2679998891f47&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Contractor%27s_MWBE_Utilization_Form.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/160444/ed693d92-1cd5-4df0-8afe-01e41b2def4c_MANDATORY_GOOD_FAITH_EFFORTS.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4B74YQGMJ%2F20250428%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250428T172238Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEOH%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJGMEQCIDa3Cxb7YOTpVoQdIG1LdgfFF9LKw5JovusgUvql8BCCAiA%2BtZZj7rBY1uAo6qmFgGS341JbLVr8stNJwtW3DFCqOSqDBQh6EAIaDDg5MjM2NDY4NzY3MiIMotbiGPCm80sS%2FLP1KuAEZJt41MCd8xnpnw3G4pNRE55JIP6oCF2bnUp2oVDAMahEP7Vliuq4mrdjZpWDWf2QXWwC4sw%2BKJaqCfqedxAhQlIS3Tw1jYyTp20pHAsBxvwcbOnoug%2F1jBGJ8SuvDP0FSV9li2MnQ7O6OJR8UvSCvN4HzyO7mAbou3n8lTrJMKnEqqPHXiOwTTUYcbWrU4B%2FVJFBi%2Fvqo3ZZw%2Bk7LfDMgNaHPDuMvQwTWkDXGrbAWbb%2FnifQpHjvKSgjoqoRgzc2FvQ0NHSJhteIdJWUk1k8MXmR%2Fjix717klZspQzOu3kWR%2BtWhN8g6A1y2PV3p813fL78Ijk%2BFDPrp2Q8CZly4HT6gMKJjuYVtiqW3emn%2FqZQqhkCXAB3%2FxHs2Pg1fYDcS3a3wbZduRMxi3OuoyQHw4Z3YphZr65jI6sBS1Cidm%2FwYo6t%2BzfWyix5A1oKseG4CygOUQQSyoPMjGfzB7AKJtL%2BQRuiZ36vQznFfajPnQvDfIFm0TXNExuA0VR%2BG0UOHL5NlhExLHpMAWTbHXUWiL9ANBZzejM8%2FFtMH6Sx50Q7XX6SaV25Byql%2FDnYBfFkiaMLnqcsJPzLJMQoaR2JrkU3BzzOoTT2qfg7W7lmsbscbSsJZBmTOUl80P%2BO7Cgk1zKgNFOmCendnYyOzpa%2F54cupJMctPMk4XlNUG%2BmPCmwOCQBkL8hnMOmlrkvMTWIxMVA99EA%2Fhn2%2Fw7jBFZ9iWGuL77IozT7N1p6F8HojK86Jgk29qDpWMKgSTC0imxbkKD1%2BtG0Ivv9VmlHBn3kWmZA42sykaQeBSo2UzTq3orgw2Ny%2BwAY6nAF6PK4Qqi8qxzYb60nWuyHabHyANwgyFssutvkPF42LK%2B2WSfb2nBjYRxmygnTL5vNavgz%2FQDpqaAvWuqeMKPmQcPHK0KbAXmdQPv9L834BerYvza8UVzJyaGtMrZxcBDP6ILPpbNWjVohg0V1sZ9yOrI8mvXfpWedPQoOmccx8adaFAb%2B80OtbPesBf7yT3X2iFMdNpoiOSyeB1Sk%3D&X-Amz-Signature=0af5bf55ac73bb18043742b34588b38c930662e8ef0cf2a2761afb35b5ef23b7&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22MANDATORY_GOOD_FAITH_EFFORTS.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/115403/5b16fe76-119d-4555-9b91-564f8a193a43_Equal_Opportunity_Policy_Statement.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4B74YQGMJ%2F20250428%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250428T172238Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEOH%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJGMEQCIDa3Cxb7YOTpVoQdIG1LdgfFF9LKw5JovusgUvql8BCCAiA%2BtZZj7rBY1uAo6qmFgGS341JbLVr8stNJwtW3DFCqOSqDBQh6EAIaDDg5MjM2NDY4NzY3MiIMotbiGPCm80sS%2FLP1KuAEZJt41MCd8xnpnw3G4pNRE55JIP6oCF2bnUp2oVDAMahEP7Vliuq4mrdjZpWDWf2QXWwC4sw%2BKJaqCfqedxAhQlIS3Tw1jYyTp20pHAsBxvwcbOnoug%2F1jBGJ8SuvDP0FSV9li2MnQ7O6OJR8UvSCvN4HzyO7mAbou3n8lTrJMKnEqqPHXiOwTTUYcbWrU4B%2FVJFBi%2Fvqo3ZZw%2Bk7LfDMgNaHPDuMvQwTWkDXGrbAWbb%2FnifQpHjvKSgjoqoRgzc2FvQ0NHSJhteIdJWUk1k8MXmR%2Fjix717klZspQzOu3kWR%2BtWhN8g6A1y2PV3p813fL78Ijk%2BFDPrp2Q8CZly4HT6gMKJjuYVtiqW3emn%2FqZQqhkCXAB3%2FxHs2Pg1fYDcS3a3wbZduRMxi3OuoyQHw4Z3YphZr65jI6sBS1Cidm%2FwYo6t%2BzfWyix5A1oKseG4CygOUQQSyoPMjGfzB7AKJtL%2BQRuiZ36vQznFfajPnQvDfIFm0TXNExuA0VR%2BG0UOHL5NlhExLHpMAWTbHXUWiL9ANBZzejM8%2FFtMH6Sx50Q7XX6SaV25Byql%2FDnYBfFkiaMLnqcsJPzLJMQoaR2JrkU3BzzOoTT2qfg7W7lmsbscbSsJZBmTOUl80P%2BO7Cgk1zKgNFOmCendnYyOzpa%2F54cupJMctPMk4XlNUG%2BmPCmwOCQBkL8hnMOmlrkvMTWIxMVA99EA%2Fhn2%2Fw7jBFZ9iWGuL77IozT7N1p6F8HojK86Jgk29qDpWMKgSTC0imxbkKD1%2BtG0Ivv9VmlHBn3kWmZA42sykaQeBSo2UzTq3orgw2Ny%2BwAY6nAF6PK4Qqi8qxzYb60nWuyHabHyANwgyFssutvkPF42LK%2B2WSfb2nBjYRxmygnTL5vNavgz%2FQDpqaAvWuqeMKPmQcPHK0KbAXmdQPv9L834BerYvza8UVzJyaGtMrZxcBDP6ILPpbNWjVohg0V1sZ9yOrI8mvXfpWedPQoOmccx8adaFAb%2B80OtbPesBf7yT3X2iFMdNpoiOSyeB1Sk%3D&X-Amz-Signature=6d0b8efe133cac2e1ff012e1679b25bc64a085040008693aa25810b6769be3a4&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Equal_Opportunity_Policy_Statement.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/115403/71724e63-735a-4ba1-a382-4248a8a3ee90_No_Conflicts-Disclosure_Form.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4B74YQGMJ%2F20250428%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20250428T172238Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEOH%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJGMEQCIDa3Cxb7YOTpVoQdIG1LdgfFF9LKw5JovusgUvql8BCCAiA%2BtZZj7rBY1uAo6qmFgGS341JbLVr8stNJwtW3DFCqOSqDBQh6EAIaDDg5MjM2NDY4NzY3MiIMotbiGPCm80sS%2FLP1KuAEZJt41MCd8xnpnw3G4pNRE55JIP6oCF2bnUp2oVDAMahEP7Vliuq4mrdjZpWDWf2QXWwC4sw%2BKJaqCfqedxAhQlIS3Tw1jYyTp20pHAsBxvwcbOnoug%2F1jBGJ8SuvDP0FSV9li2MnQ7O6OJR8UvSCvN4HzyO7mAbou3n8lTrJMKnEqqPHXiOwTTUYcbWrU4B%2FVJFBi%2Fvqo3ZZw%2Bk7LfDMgNaHPDuMvQwTWkDXGrbAWbb%2FnifQpHjvKSgjoqoRgzc2FvQ0NHSJhteIdJWUk1k8MXmR%2Fjix717klZspQzOu3kWR%2BtWhN8g6A1y2PV3p813fL78Ijk%2BFDPrp2Q8CZly4HT6gMKJjuYVtiqW3emn%2FqZQqhkCXAB3%2FxHs2Pg1fYDcS3a3wbZduRMxi3OuoyQHw4Z3YphZr65jI6sBS1Cidm%2FwYo6t%2BzfWyix5A1oKseG4CygOUQQSyoPMjGfzB7AKJtL%2BQRuiZ36vQznFfajPnQvDfIFm0TXNExuA0VR%2BG0UOHL5NlhExLHpMAWTbHXUWiL9ANBZzejM8%2FFtMH6Sx50Q7XX6SaV25Byql%2FDnYBfFkiaMLnqcsJPzLJMQoaR2JrkU3BzzOoTT2qfg7W7lmsbscbSsJZBmTOUl80P%2BO7Cgk1zKgNFOmCendnYyOzpa%2F54cupJMctPMk4XlNUG%2BmPCmwOCQBkL8hnMOmlrkvMTWIxMVA99EA%2Fhn2%2Fw7jBFZ9iWGuL77IozT7N1p6F8HojK86Jgk29qDpWMKgSTC0imxbkKD1%2BtG0Ivv9VmlHBn3kWmZA42sykaQeBSo2UzTq3orgw2Ny%2BwAY6nAF6PK4Qqi8qxzYb60nWuyHabHyANwgyFssutvkPF42LK%2B2WSfb2nBjYRxmygnTL5vNavgz%2FQDpqaAvWuqeMKPmQcPHK0KbAXmdQPv9L834BerYvza8UVzJyaGtMrZxcBDP6ILPpbNWjVohg0V1sZ9yOrI8mvXfpWedPQoOmccx8adaFAb%2B80OtbPesBf7yT3X2iFMdNpoiOSyeB1Sk%3D&X-Amz-Signature=d433b228950f58e4e305d06a33fa48a3efa4937f3af20d9e608bec8315dd40da&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22No_Conflicts-Disclosure_Form.pdf%22&x-id=GetObject
File details come from the government source that posted it. Updated .