Exhibit_A-_Scope_of_Work.pdf
PDF 67 KB Posted
- Solicitation number
- CGB038256
- Issued by
- Fairfield County, Connecticut
About this file
This Scope of Work document is for the LifeBridge Community Services Center's building upgrades and security fence project in Bridgeport, Connecticut. The project involves purchasing and installing approximately 45 sections of commercial aluminum fencing, including four-foot and six-foot high sections with eight-foot wide panels. The contractor will also install two walkway gates with security features, one electrified sliding gate at the driveway opening (minimum 21 feet long), and an exit loop in the existing driveway. Additional options include installing a keypad, remote control, or both for the driveway gate. The new fencing will be black and match the existing fence style along Clinton and Fairfield Avenues, with existing metal and wood fences to remain untouched.
The project requires the selected contractor to obtain all necessary building permits, follow state and local building codes, and maintain required insurance certificates. All work must adhere to OSHA safety standards and be completed professionally, with the worksite kept clean daily. The contractor will provide a one-year warranty on all work, equipment, materials, and labor. A mandatory preconstruction meeting will be held before work begins, and all bids will be based on Davis-Bacon wage rates. The contractor is prohibited from negotiating directly with homeowners and must route any contract changes through the Housing Community Development office.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| LIFEBRIDGE_COMMUNITY_SVS_-_475_CLINTON_AVE_EXTERIOR_SECURITY_FENCE.pdf | ||
| 7_DEMO_Construction_Contract_CDBG_Program_12.15.2021.pdf | ||
| 6_Timeline_and_Budget_Copy.docx | DOCX document | |
| NO_CONFLICTS_FORM_10-2018_and_02-2025.pdf | ||
| 475_Clinton_Ave._Map_property_line.pdf | ||
| Wage_Rates_Life_Bridge.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Life Bridge Community Services, Center.
475 Clinton Avenue
Building Upgrades
Security Fence
Scope of Work
PY48
Exterior Fence
1. All contractors will assess the entire exterior of the building areas during the walk-through. The selected contractor will have stamped drawing/print or whatever is necessary for the Building Department approval. The selected contractor must receive a permit before the job commences. Contractor will ensure all newly installed fencing, gates, posts, spring, panic bar, and latches for self-closing etc.
are plumb and level.
2. The contractor will purchase and install roughly 45 sections of commercial aluminum fencing four (4’) foot high by eight (8’) foot wide in one area and six (6’) foot high by eight (8’) foot wide in other areas along with all necessary post, caps, wiring, cement etc.
3. The existing eight (8) foot high metal black fence and gate on Clinton & Fairfield Avenues will remain and not to be touched.
4. The existing wood fence on the property line will remain and not to be touched.
5. The contractor will match the existing fence style that currently exist along Clinton & Fairfield Avenue eight (8’) foot fence.
6. Note: Contractor will follow the cities map provided with the bid package showing the property and property lines highlighted areas for the four (4’) foot & six (6’) foot fence along with all gates and hardware for the new fence installation.
7. The fence color that will be installed is black.
8. The contractor will purchase and install all necessary entry & exit walkway gates with security latches, springs, locks etc. for this project. A total of two (2) walkway gates will be installed with a minimum of three (3) feet wide on this project.
9. The contractor will purchase and install one (1) electrified elongated sliding gate with a minimum length of twenty-one (21) foot at the existing driveway opening for entry and exit.
10. The contractor will install an exit loop in the existing driveway for hand free exiting.
Contractors will do all necessary blacktop/concrete patching and finishing on this project.
11. The contractor will purchase and install a keypad for opening the newly installed driveway gate. (Alternate 1).
12. The contractor will purchase and install a remote control for opening the newly installed driveway gate (Alternate 2).
13. The contractor will purchase and install a keypad and remote control for opening the newly installed driveway gate. (Alternate 3).
14. All newly installed fences and gates system will match the existing style that’s on Clinton & Fairfield Avenues.
15. The owner will grant access to the basement area for power source (electrical room)
• Contractor will warranty all work, equipment, materials, and labor for a period of one (1) year.
• Contractor SHALL NOT negotiate directly with homeowners for any changes to this contract. Any changes will be brought to the attention of the Office of The Housing Community Development office.
• Contractor will secure all necessary permits and follow all current State and local building codes for the duration of this project. Contractor will have and maintain all necessary certificates of insurance for the duration of this project. All work will be done in a professional manner throughout the duration of this project. All waste must be discarded in a legal manner.
• Contractor will keep the worksite clean daily (Construction or Working Area) until the construction is complete. Contractor will adhere to all OSHA safety standards while working on the site.
• Contractor cannot deviate from the specs without permission from construction manager.
• Contractor will fill in each line item. Not filling each line could result in not being awarded this contract.
• There will be a mandatory preconstruction meeting with the owners, contractor, and construction manager before any work begins.
All bids will be based on Davis & Bacon wadges.
Contractor will keep the worksite clean daily (Construction or Working Area) until the construction is complete. Contractor will adhere to all OSHA safety standards while working on the site.