Lely_Golf_Estates_MSTU_Decorative_Signs_Replacement_Project.pdf
PDF 288 KB Posted
- Solicitation number
- QQ-2027-142
- Issued by
- Collier County, Florida
About this file
Summary
This is a Quick Quote document issued by Collier County, Florida, through its Transportation Management Services Division, for the Lely Golf Estates MSTU Decorative Signs Replacement Project. The project involves replacing a total of 61 existing decorative street signs, directional paddles, roadway speed signs, and informational signs within the Lely Golf Estates Municipal Services Taxing Unit (MSTU) in accordance with current Florida Department of Transportation (FDOT) specifications. The scope of work includes removal of all existing signposts and blades, installation of 61 new decorative signposts and signs on a one-for-one basis, verification of FDOT compliance for mounting height, concrete footers, lateral offset, visibility, retroreflective sheeting, sign orientation, and sign dimensions, and provision of updated documentation and installation records for asset inventory. A non-mandatory pre-bid meeting is scheduled for November 5, 2026, at 9:00 a.m. at Literacy Collier Plaza in Naples, Florida. The question submission deadline is November 13, 2026, at 12:00 p.m., and all quotation responses must be submitted online through the Collier County Procurement Services Division Online Bidding System no later than November 18, 2026, at 3:00 p.m. The contract term is intended for a one-time purchase, with prices remaining firm for the duration of the resultant purchase order, and a one-year warranty covering parts and labor is required from final payment.
Award will be made to the responsive vendor submitting the lowest quote. The pricing proposal is structured as 14 line items on a lump-sum (LS) basis for various custom street sign configurations, each including specific quantities per FDOT specifications. Bidders must comply with comprehensive insurance requirements, including workers' compensation, employer's liability of $1,000,000, commercial general liability of $1,000,000 per occurrence and $2,000,000 aggregate, automobile liability of $1,000,000, and must name Collier County as an additional insured. Contractors are required to maintain MOT (Maintenance of Traffic) certification if applicable and perform work Monday through Friday, 8:00 a.m. to 5:00 p.m., with weekend work only by PM approval. Submission requirements include proof of Florida business status from the Division of Corporations (SunBiz), E-Verify enrollment documentation, a W-9 form, and any required licenses. All goods are FOB destination, with risk of loss transferring to the County upon delivery. No county purchase order terms and conditions exceptions or vendor-provided contracts will be accepted, and surcharges are not permitted.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PO_Terms_and_Conditions.pdf | ||
| Quick_Quotes_Instructions_Version_1_.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For more information, please visit our County’s e-Procurement Portal, located at https://procurement.opengov.com/portal/collier-county-fl
COLLIER COUNTY
QUICK QUOTE
FOR
LELY GOLF ESTATES MSTU DECORATIVE SIGNS
REPLACEMENT PROJECT
Jeffrey Felger, Project Manager II
Procurement Services Division
2885 S Horseshoe DR,Naples, FL, 34104 jeffrey.felger@collier.gov
(239) 227-4011
Quick Quote Title: Lely Golf Estates MSTU Decorative Signs Replacement Project
Table Of Contents
1. QUICK QUOTE
2. INTRODUCTION
3. TERM
4. AWARD CRITERIA
5. SPECIFICATIONS/SCOPE OF WORK
6. INSURANCE REQUIREMENTS
7. PRICING PROPOSAL
8. VENDOR QUESTIONNAIRE
Attachments:
A - PO Terms and Conditions
B - Quick Quotes Instructions Version 1
1. QUICK QUOTE
Lely Golf Estates MSTU Decorative Signs Replacement Project
Release Project Date: October 29, 2026
Pre-Bid Meeting (Non-Mandatory): November 5, 2026, 9:00am
Literacy Collier Plaza 8833 Tamiami Trail
E, Naples FLORIDA 34113
Question Submission Deadline: November 13, 2026, 12:00pm
Response Submission Deadline: November 18, 2026, 3:00pm
All quotes shall be submitted online via the Collier County Procurement Services Division Online
Bidding System: https://procurement.opengov.com/portal/collier-county-fl no later than the date and time specified above. We will not accept any quotation responses later than the noted time and date.
2. INTRODUCTION
The Transportation Management Services Division (hereinafter, the “Division or Department”) has issued this informal competition Quick Quote (hereinafter, “QQ”) with the intent of obtaining quotes from interested vendors in accordance with the terms, conditions and specifications stated or attached. The vendor, at a minimum, must achieve the requirements of the Specifications or Scope of Work stated.
3. TERM
The purchase order term, if an award is made is intended to be for a one-time purchase.
Prices shall remain firm for the term of the resultant purchase order.
NO EXCEPTIONS TO THE COUNTY’S PURCHASE ORDER TERMS AND CONDITIONS NOR A
VENDOR PROVIDED CONTRACT WILL BE ACCEPTED.
Surcharges will not be accepted in conjunction with this purchase order, and such charges should be incorporated into the pricing structure.
All goods are FOB destination and must be suitably packed and prepared to secure the lowest transportation rates and to comply with all carrier regulations. Risk of loss of any goods sold hereunder shall transfer to the COUNTY at the time and place of delivery; provided that risk of loss prior to actual receipt of the goods by the COUNTY nonetheless remain with VENDOR.
4. AWARD CRITERIA
https://procurement.opengov.com/portal/collier-county-fl
For the purposes of determining the winning quote, the County will select the responsive vendor with the lowest quote.
5. SPECIFICATIONS/SCOPE OF WORK
5.1. Lely Golf Estates MSTU Decorative Signs Replacement Project
The Contractor shall replace a total of 61 existing decorative street signs, directional paddles, roadway speed signs & Informational Signs within the Lely Golf Estates MSTU. All replacement work must ensure that the newly installed signage meets current Florida Department of Transportation (FDOT) specifications for roadway signage.
Work to Be Performed:
• Remove all existing signposts, street name blades, directional paddles, and speed limit signs currently installed at designated locations within the MSTU.
• Install 61 new decorative signposts and signs, replacing each existing sign one-for-one.
• Signs and Directional Paddles, MPH, Speed Bump Ahead & Cart Path Ahead.
Verify each installation complies with all applicable FDOT standards, including:
• Required mounting height from ground to sign bottom
• Footers must be done in concrete to FDOT specifications.
• Proper lateral offset and setback distance from roadway edge
• Required visibility, readability, and clear-zone placement
• Acceptable retroreflective sheeting and nighttime visibility
• Correct sign orientation and angle of placement
• FDOT-compliant sign dimensions, lettering height, and layout where applicable
(https://www.fdot.gov/traffic/trafficservices/highway-signing)
• The bottom edge of the sign must be: ≥ 7 ft above the edge of the travel lane
• Set all new signposts securely with appropriate foundations or footings to ensure long-term structural stability.
• Ensure all sign blades and paddles are mounted level, oriented correctly, and tightened to manufacturer standards.
• Metal Square Posts & Signage will be saved for return to Traffic Operations.
• Dispose of all removed materials in accordance with Collier County guidelines.
• Perform a final inspection of all 61 installed signs to confirm compliance with FDOT specifications and MSTU requirements.
https://www.fdot.gov/traffic/trafficservices/highway-signing
• Provide updated documentation and installation records for MSTU asset inventory, confirming all 61 signs have been replaced successfully.
• Drive/Walk through with ROW Inspector after Installation Completed.
Contractor Responsibilities:
• Verify field conditions prior to installation.
• Pictures of verified work completed.
• All quick quotes will expire at the end of the fiscal year (9/30/2027).
• Maintain safe traffic operations (MOT Certification), if applicable during all work activities.
• Protect surrounding property, landscaping, and existing utilities (Locates If Needed).
All required licensing and permitting associated with this project.
• Warranty for one year from final payment including parts and labor.
Worked to be performed Monday – Friday (8am – 5pm). Weekend work can be performed with approval from
PM.
6. INSURANCE REQUIREMENTS
A. Bidder shall at its own expense, carry and maintain insurance coverage from responsible companies duly authorized to do business in the State of Florida as set forth in the Insurance and Bonding attachment of the Construction ITB and awarded Agreement. The Bidder shall be required to provide the Certificate of
Insurance(s) with the limits set forth in the Construction ITB. If the Bidder cannot provide the document within the referenced timeframe, the County reserves the right to award to another Bidder. The Bidder shall procure and maintain property insurance upon the entire term of the awarded contract, if required, to the full insurable value of the scope of work.
B. The County and the Bidder waive against each other and the County’s separate Bidders, Contractors, Design Consultant, Subcontractors agents and employees of each and all of them, all damages covered by property insurance provided herein, except such rights as they may have to the proceeds of such insurance. The Bidder and County shall, where appropriate, require similar waivers of subrogation from the County’s separate Bidders, Design Consultants and Subcontractors and shall require each of them to include similar waivers in their contracts.
C. Collier County shall be responsible for purchasing and maintaining its own liability insurance.
6.1. Worker’s Compensation
Statutory Limits of Florida Statutes, Chapter 440 and all Federal Government Statutory Limits and
Requirements
Evidence of Workers’ Compensation coverage or a Certificate of Exemption issued by the State of Florida is required. Entities that are formed as Sole Proprietorships shall not be required to provide a proof of exemption.
An application for exemption can be obtained online at https://apps.fldfs.com/bocexempt/
6.2. Employer’s Liability
$1,000,000 single limit per occurrence
6.3. Commercial General Liability (Occurrence Form) patterned after the current ISO form
Bodily Injury and Property Damage
$1,000,000 single limit per occurrence, $2,000,000 aggregate for Bodily Injury Liability and Property Damage
Liability. This shall include Premises and Operations; Independent Contractors; Products and Completed
Operations and Contractual Liability.
6.4. Indemnification
To the maximum extent permitted by Florida law, the Contractor/Vendor shall defend, indemnify and hold harmless Collier County, its officers and employees from any and all liabilities, damages, losses and costs, including, but not limited to, reasonable attorneys’ fees and paralegals’ fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of the Contractor/ Vendor or anyone employed or utilized by the Contractor/Vendor in the performance of this Agreement.
6.5. Automobile Liability
$1,000,000 Each Occurrence; Bodily Injury & Property Damage, Owned/Non-owned/Hired; Automobile
Included
6.6. Additional Information
A. Vendor shall ensure that all subcontractors comply with the same insurance requirements that he is required to meet. The same Vendor shall provide County with certificates of insurance meeting the required insurance provisions.
B. Collier County must be named as "ADDITIONAL INSURED" on the Insurance Certificate for
Commercial General Liability where required. This insurance shall be primary and non-contributory with respect to any other insurance maintained by, or available for the benefit of, the Additional Insured and the Vendor’s policy shall be endorsed accordingly.
C. The Certificate Holder shall be named as Collier County Board of County Commissioners, OR, Board of
County Commissioners in Collier County, OR Collier County Government, OR Collier County. The https://apps.fldfs.com/bocexempt/
Certificates of Insurance must state the Contract Number, or Project Number, or specific Project description, or must read: For any and all work performed on behalf of Collier County.
D. On all certificates, the Certificate Holder must read: Collier County Board of Commissioners, 3295
Tamiami Trail East, Naples, FL 34112
E. Thirty (30) Days Cancellation Notice required.
F. Collier County shall procure and maintain Builders Risk Insurance on all construction projects where it is deemed necessary. Such coverage shall be endorsed to cover the interests of Collier County as well as the Contractor. Premiums shall be billed to the project and the Contractor shall not include Builders
Risk premiums in its project proposal or project billings. All questions regarding Builder’s Risk
Insurance will be addressed by the Collier County Risk Management Division.
G. Professional Services and/or Consulting Services may require professional liability insurance.
H. Environmental services, repairs, construction and/or hazardous materials projects may require pollution insurance.
7. PRICING PROPOSAL
LELY GOLF ESTATES MSTU DECORATIVE SIGNS REPLACEMENT BID SCHEDULE
Line Item Description Quantity Unit of
Measure Unit Cost Total
1 Custom Pedestrian Crossing with
Arrow Rider Street Sign per FDOT specifications (10 each)
1 LS
2 Custom 25 MPH Street Sign per
FDOT specifications (6 each)
1 LS
3 Street Stop Combo in Lely Golf
Estates per FDOT specifications (8 each)
1 LS
4 Custom Keep Right Bull Nose Street
Sign per FDOT specifications (2 each)
1 LS
5 Custom Neighborhood Watch Sign per
FDOT specifications
1 LS
6 Custom Speed Bump Signs with 25
MPH Rider Street Sign per FDOT specifications (10 each)
1 LS
7 Custom 25 MPH Street Sign per
FDOT specifications (2 each)
1 LS
Line Item Description Quantity Unit of
Measure Unit Cost Total
8 Street Stop Combo in Lely Golf
Estates per FDOT specifications (7 each)
1 LS
9 Custom No Trucks Street Sign per
FDOT specifications
1 LS
10 Pedestrian Crossing Sign with Ahead
Rider per FDOT specifications (3 each)
1 LS
11 No Soliciting Street Sign per FDOT specifications
1 LS
12 Keep Right Sign With 9 Dot Diamond
Rider per FDOT specifications
1 LS
13 Street Sign with One Street Name
Paddle and Keep Right with 9 Dot per
FDOT specifications
1 LS
14 Street Stop Combo in Lely Golf
Estates per FDOT specifications (8 each)
1 LS
TOTAL
8. VENDOR QUESTIONNAIRE
1. I certify that I have read, understood and agree to the terms in this Quick
Quote, and that I am authorized to submit this response on behalf of my company.*
☐ Please confirm
*Response required
2. Quick Quote Instructions have been acknowledged and accepted.*
☐ Please confirm
*Response required
3. Collier County Purchase Order Terms and Conditions. Collier County
Purchase Order Terms and Conditions have been acknowledged and accepted.*
Collier County Purchase Order Terms and Conditions have been acknowledged and accepted.
☐ Please confirm
4. Insurance Requirements -Vendor Acknowledges Insurance Requirements and is prepared to produce the required insurance certificate(s) if awarded this quote.*
☐ Please confirm
*Response required
5. Proof of Status from Division of Corporations - Florida Department of
State (SunBiz)* http://dos.myflorida.com/sunbiz/ should be attached with your submittal.
*Response required
6. E-Verify - Memorandum of Understanding*
Vendor MUST be enrolled in the E-Verify - https://www.e-verify.gov/ at the time of submission of the bid. E-
Verify Memorandum of Understanding or Company Profile page should be attached with your submittal.
*Response required
7. W-9 Form*
*Response required
8. Any required licenses. * http://dos.myflorida.com/sunbiz/ https://www.e-verify.gov/
| 1. QUICK QUOTE |
| 2. INTRODUCTION |
| 3. TERM |
| 4. AWARD CRITERIA |
| 5. SPECIFICATIONS/SCOPE OF WORK |
| 5.1. Lely Golf Estates MSTU Decorative Signs Replacement Project |
| 6. INSURANCE REQUIREMENTS |
| 6.1. Worker’s Compensation |
| 6.2. Employer’s Liability |
| 6.3. Commercial General Liability (Occurrence Form) patterned after the current ISO form |
| 6.4. Indemnification |
| 6.5. Automobile Liability |
| 6.6. Additional Information |
| 7. PRICING PROPOSAL |
| 8. VENDOR QUESTIONNAIRE |
| 1. I certify that I have read, understood and agree to the terms in this Quick Quote, and that I am authorized to submit this response on behalf of my company.* |
| 2. Quick Quote Instructions have been acknowledged and accepted.* |
| 3. Collier County Purchase Order Terms and Conditions. Collier County Purchase Order Terms and Conditions have been acknowledged and accepted.* |
| 4. Insurance Requirements -Vendor Acknowledges Insurance Requirements and is prepared to produce the required insurance certificate(s) if awarded this quote.* |
| 5. Proof of Status from Division of Corporations - Florida Department of State (SunBiz)* |
| 6. E-Verify - Memorandum of Understanding* |
| 7. W-9 Form* |
| 8. Any required licenses. * |
File details come from the government source that posted it. Updated .